PREPARING ROW
|
AC
|
0.370
|
$7,000.000
|
$13,957.160
|
$13,957.160
|
$56,745.810
|
$47,000.000
|
|
|
PREPARING ROW
|
STA
|
389.000
|
$3,000.000
|
$31,527.000
|
$31,527.000
|
$19,724.370
|
$44,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
619,929.000
|
$6.000
|
$4.500
|
$4.500
|
$4.140
|
$3.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
9,881.000
|
$9.000
|
$5.420
|
$5.420
|
$7.070
|
$4.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,775.000
|
$12.000
|
$15.520
|
$15.520
|
$7.070
|
$4.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,559.000
|
$10.000
|
$7.790
|
$7.790
|
$7.070
|
$8.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,099.000
|
$12.000
|
$12.370
|
$12.370
|
$7.070
|
$14.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
2,479.000
|
$8.000
|
$12.920
|
$12.920
|
$10.100
|
$5.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
600.000
|
$30.000
|
$46.670
|
$46.670
|
$15.150
|
$30.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
553.000
|
$21.000
|
$31.540
|
$31.540
|
$10.100
|
$5.000
|
|
|
REMOVE CONC BARRIER W/CHAIN LINK FENCE
|
LF
|
6,085.000
|
$21.000
|
$12.770
|
$12.770
|
$11.110
|
$5.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
202.000
|
$14.000
|
$21.130
|
$21.130
|
$16.160
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-2")
|
SY
|
310,299.000
|
$3.500
|
$0.550
|
$0.550
|
$2.370
|
$1.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
43,065.000
|
$5.000
|
$2.120
|
$2.120
|
$3.030
|
$3.500
|
|
|
REMOV STAB BASE & ASPH PAV (8"-20")
|
SY
|
175,339.000
|
$6.000
|
$1.130
|
$1.130
|
$2.020
|
$4.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
663,326.000
|
$7.000
|
$8.000
|
$8.000
|
$7.340
|
$2.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
13,718.000
|
$15.000
|
$7.250
|
$7.250
|
$9.030
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
982,008.000
|
$7.500
|
$10.000
|
$10.000
|
$4.270
|
$11.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
13,062.000
|
$15.000
|
$12.870
|
$12.870
|
$20.860
|
$18.000
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR)
|
CY
|
2,908.000
|
$8.000
|
$120.990
|
$120.990
|
$20.200
|
$80.000
|
|
|
BLOCK SODDING
|
SY
|
227,607.000
|
$3.000
|
$2.650
|
$2.650
|
$2.650
|
$2.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
505,198.000
|
$0.150
|
$0.080
|
$0.080
|
$0.080
|
$0.080
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
366,403.000
|
$0.100
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
366,403.000
|
$0.100
|
$0.060
|
$0.060
|
$0.060
|
$0.050
|
|
|
FERTILIZER
|
AC
|
302.800
|
$600.000
|
$305.000
|
$305.000
|
$305.000
|
$200.000
|
|
|
VEGETATIVE WATERING
|
MG
|
12,310.700
|
$36.000
|
$20.000
|
$20.000
|
$23.000
|
$20.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
366,403.000
|
$1.000
|
$0.620
|
$0.620
|
$0.620
|
$0.790
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
3,556.000
|
$5.000
|
$4.790
|
$4.790
|
$10.810
|
$5.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
33,483.000
|
$165.000
|
$169.850
|
$169.850
|
$171.700
|
$180.000
|
|
|
LIME TRT (EXIST MATL)(18")
|
SY
|
686,949.000
|
$12.000
|
$4.200
|
$4.200
|
$5.250
|
$3.000
|
|
|
CEMENT
|
TON
|
4,238.000
|
$160.000
|
$160.000
|
$160.000
|
$191.900
|
$218.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
235,427.000
|
$4.000
|
$2.230
|
$2.230
|
$3.310
|
$2.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
304,349.000
|
$45.000
|
$37.940
|
$37.940
|
$42.620
|
$40.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
9,635.000
|
$50.000
|
$53.850
|
$53.850
|
$52.840
|
$50.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (14")
|
SY
|
543,472.000
|
$58.000
|
$58.620
|
$58.620
|
$60.870
|
$52.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(12")
|
SY
|
475.000
|
$90.000
|
$72.190
|
$72.190
|
$91.720
|
$110.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(15")
|
SY
|
25,002.000
|
$120.000
|
$75.440
|
$75.440
|
$95.820
|
$75.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(14")
|
SY
|
7,850.000
|
$100.000
|
$78.310
|
$78.310
|
$90.010
|
$70.000
|
|
|
CEM STABIL BKFL
|
CY
|
39,070.500
|
$80.000
|
$82.290
|
$82.290
|
$95.130
|
$75.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
348.000
|
$160.000
|
$150.000
|
$150.000
|
$200.000
|
$160.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
1,157.000
|
$85.000
|
$40.000
|
$40.000
|
$80.200
|
$75.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
2,330.000
|
$75.000
|
$80.000
|
$80.000
|
$63.690
|
$75.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
69.000
|
$75.000
|
$71.000
|
$71.000
|
$30.000
|
$140.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
1,236.000
|
$150.000
|
$96.310
|
$96.310
|
$159.530
|
$125.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
33,299.000
|
$5.000
|
$3.740
|
$3.740
|
$3.910
|
$0.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
130,830.000
|
$30.000
|
$13.040
|
$13.040
|
$24.230
|
$25.000
|
|
|
TEMPORARY SPL SHORING (SOIL NAIL)
|
SF
|
3,448.000
|
$60.000
|
$23.000
|
$23.000
|
$22.210
|
$25.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
53,520.000
|
$18.000
|
$12.570
|
$12.570
|
$12.920
|
$14.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
643.000
|
$100.000
|
$62.950
|
$62.950
|
$67.430
|
$100.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
8,018.000
|
$170.000
|
$148.520
|
$148.520
|
$151.280
|
$160.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
5,042.000
|
$220.000
|
$170.140
|
$170.140
|
$172.160
|
$180.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
40.000
|
$350.000
|
$200.000
|
$200.000
|
$520.000
|
$450.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
56.000
|
$120.000
|
$100.000
|
$100.000
|
$118.050
|
$118.050
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
12.000
|
$175.000
|
$176.500
|
$176.500
|
$180.000
|
$180.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
136.000
|
$300.000
|
$284.800
|
$284.800
|
$225.000
|
$225.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
153.000
|
$350.000
|
$351.300
|
$351.300
|
$355.000
|
$355.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
17.000
|
$450.000
|
$553.500
|
$553.500
|
$500.000
|
$500.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
236.000
|
$483.000
|
$556.750
|
$556.750
|
$466.000
|
$466.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
700.000
|
$560.000
|
$607.750
|
$607.750
|
$550.000
|
$550.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
270.000
|
$220.000
|
$227.300
|
$227.300
|
$185.000
|
$185.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
24.000
|
$252.000
|
$267.550
|
$267.550
|
$280.000
|
$280.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
56.000
|
$300.000
|
$411.360
|
$411.360
|
$390.000
|
$390.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
1,055.100
|
$1,300.000
|
$892.210
|
$892.210
|
$1,004.930
|
$750.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
818.400
|
$1,300.000
|
$847.950
|
$847.950
|
$957.550
|
$900.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
689.000
|
$1,000.000
|
$764.910
|
$764.910
|
$947.510
|
$900.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
54.000
|
$1,200.000
|
$499.530
|
$499.530
|
$789.230
|
$3,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
263,624.000
|
$22.000
|
$14.880
|
$14.880
|
$16.890
|
$11.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
1,805.400
|
$650.000
|
$508.970
|
$508.970
|
$469.910
|
$350.000
|
|
|
RETAINING WALL (MSE) (ASHLAR STONE FIN)
|
SF
|
169,599.000
|
$45.000
|
$55.310
|
$55.310
|
$54.340
|
$48.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
43,403.000
|
$20.000
|
$18.940
|
$18.940
|
$4.930
|
$15.000
|
|
|
RET WALL (SOIL NAIL)(ASHLAR FIN)
|
SF
|
31,683.000
|
$82.000
|
$45.370
|
$45.370
|
$57.280
|
$50.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
8,698.440
|
$140.000
|
$130.990
|
$130.990
|
$133.740
|
$130.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
5,600.000
|
$145.000
|
$159.170
|
$159.170
|
$125.180
|
$140.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
23,138.780
|
$170.000
|
$141.780
|
$141.780
|
$149.380
|
$150.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
4,508.000
|
$1.000
|
$0.240
|
$0.240
|
$2.000
|
$1.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
57.000
|
$400.000
|
$385.710
|
$385.710
|
$408.110
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2,596.000
|
$440.000
|
$383.800
|
$383.800
|
$350.000
|
$450.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
9.000
|
$480.000
|
$397.100
|
$397.100
|
$418.090
|
$700.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
20.000
|
$500.000
|
$382.130
|
$382.130
|
$407.970
|
$580.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
3,893.000
|
$120.000
|
$77.990
|
$77.990
|
$75.070
|
$95.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
78.000
|
$150.000
|
$87.790
|
$87.790
|
$86.070
|
$205.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
5,584.500
|
$105.000
|
$89.790
|
$89.790
|
$88.070
|
$95.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
188.000
|
$200.000
|
$96.840
|
$96.840
|
$94.280
|
$125.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,179.000
|
$435.000
|
$450.700
|
$450.700
|
$521.900
|
$480.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
262.000
|
$10.000
|
$21.850
|
$21.850
|
$27.440
|
$65.000
|
|
|
RAIL (TY SSTR)
|
LF
|
20,427.000
|
$45.000
|
$50.060
|
$50.060
|
$60.050
|
$36.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
3,875.100
|
$75.000
|
$55.820
|
$55.820
|
$65.850
|
$45.000
|
|
|
RAIL (TY T80SS)(HPC)
|
LF
|
1,298.500
|
$170.000
|
$84.970
|
$84.970
|
$96.700
|
$80.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
12,542.400
|
$50.000
|
$41.790
|
$41.790
|
$44.930
|
$45.000
|
|
|
RAIL (TY T80SS) W/DRAIN SLOTS
|
LF
|
781.800
|
$175.000
|
$86.000
|
$86.000
|
$90.980
|
$65.000
|
|
|
RAIL (TY PR22)
|
LF
|
1,835.000
|
$90.000
|
$98.410
|
$98.410
|
$102.780
|
$95.000
|
|
|
RAIL (TY PR22)(HPC)
|
LF
|
692.400
|
$170.000
|
$98.480
|
$98.480
|
$107.340
|
$95.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
|
LF
|
2,235.300
|
$80.000
|
$47.420
|
$47.420
|
$59.250
|
$55.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,969.000
|
$85.000
|
$114.750
|
$114.750
|
$130.430
|
$100.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
195.000
|
$180.000
|
$174.650
|
$174.650
|
$175.760
|
$330.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
660.000
|
$200.000
|
$175.970
|
$175.970
|
$195.360
|
$405.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
411.000
|
$205.000
|
$199.710
|
$199.710
|
$198.910
|
$605.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
404.000
|
$240.000
|
$214.200
|
$214.200
|
$216.550
|
$300.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
377.000
|
$250.000
|
$251.650
|
$251.650
|
$248.480
|
$830.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
894.000
|
$240.000
|
$276.070
|
$276.070
|
$256.410
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
4,235.000
|
$250.000
|
$239.900
|
$239.900
|
$260.020
|
$300.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
602.000
|
$275.000
|
$291.370
|
$291.370
|
$300.820
|
$450.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
310.000
|
$300.000
|
$344.640
|
$344.640
|
$325.220
|
$700.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
362.000
|
$330.000
|
$351.090
|
$351.090
|
$320.120
|
$350.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
62.000
|
$425.000
|
$401.700
|
$401.700
|
$399.680
|
$440.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
1,257.000
|
$350.000
|
$381.880
|
$381.880
|
$395.060
|
$450.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
374.000
|
$450.000
|
$497.670
|
$497.670
|
$495.090
|
$690.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
340.000
|
$650.000
|
$542.580
|
$542.580
|
$479.680
|
$500.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
2,445.000
|
$600.000
|
$563.010
|
$563.010
|
$565.400
|
$450.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)
|
LF
|
662.000
|
$750.000
|
$578.540
|
$578.540
|
$583.820
|
$535.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)
|
LF
|
4,224.000
|
$900.000
|
$712.820
|
$712.820
|
$703.560
|
$545.000
|
|
|
CONC BOX CULV(5'X 6.5')
|
LF
|
345.000
|
$650.000
|
$444.850
|
$444.850
|
$518.590
|
$650.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,289.000
|
$60.000
|
$51.380
|
$51.380
|
$76.840
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
25,406.000
|
$70.000
|
$62.310
|
$62.310
|
$77.260
|
$80.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,732.000
|
$80.000
|
$76.880
|
$76.880
|
$86.060
|
$105.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,411.000
|
$130.000
|
$104.650
|
$104.650
|
$109.040
|
$135.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
95.000
|
$115.000
|
$65.850
|
$65.850
|
$84.830
|
$80.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
451.000
|
$100.000
|
$118.410
|
$118.410
|
$127.010
|
$125.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
590.000
|
$150.000
|
$155.130
|
$155.130
|
$163.010
|
$170.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
8.000
|
$3,500.000
|
$4,354.560
|
$4,354.560
|
$4,812.940
|
$5,000.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$5,000.000
|
$4,693.760
|
$4,693.760
|
$5,158.700
|
$5,500.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
4.000
|
$6,500.000
|
$4,374.970
|
$4,374.970
|
$4,816.750
|
$6,400.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
2.000
|
$4,000.000
|
$3,437.470
|
$3,437.470
|
$3,312.940
|
$5,300.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
2.000
|
$4,850.000
|
$4,453.720
|
$4,453.720
|
$4,428.260
|
$8,950.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
1.000
|
$4,000.000
|
$4,400.860
|
$4,400.860
|
$5,796.310
|
$4,850.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
5.000
|
$4,600.000
|
$4,625.830
|
$4,625.830
|
$5,998.700
|
$5,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
4.000
|
$4,600.000
|
$4,704.570
|
$4,704.570
|
$6,078.570
|
$5,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
3.000
|
$5,000.000
|
$4,768.340
|
$4,768.340
|
$6,245.780
|
$5,400.000
|
|
|
INLET (COMPL)(PCO)(6FT)(NONE)
|
EA
|
11.000
|
$5,200.000
|
$6,013.330
|
$6,013.330
|
$8,099.570
|
$6,100.000
|
|
|
INLET (COMPL)(PCO)(6FT)(RIGHT)
|
EA
|
3.000
|
$6,000.000
|
$6,268.340
|
$6,268.340
|
$8,361.880
|
$6,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
1.000
|
$4,200.000
|
$4,592.110
|
$4,592.110
|
$6,305.060
|
$5,200.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
9.000
|
$5,000.000
|
$4,813.330
|
$4,813.330
|
$6,501.290
|
$5,420.000
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
5.000
|
$5,000.000
|
$5,218.330
|
$5,218.330
|
$6,909.290
|
$5,450.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
3.000
|
$5,200.000
|
$5,083.340
|
$5,083.340
|
$6,777.960
|
$5,950.000
|
|
|
INLET (COMPL)(PCU)(6FT)(RIGHT)
|
EA
|
1.000
|
$6,000.000
|
$6,054.610
|
$6,054.610
|
$8,168.290
|
$8,000.000
|
|
|
INLET (COMPL)(PCU)(6FT)(BOTH)
|
EA
|
6.000
|
$6,750.000
|
$6,324.580
|
$6,324.580
|
$8,413.110
|
$7,100.000
|
|
|
INLET (COMPL)(POD)(FG)(3FTX3FT)
|
EA
|
7.000
|
$6,000.000
|
$4,790.830
|
$4,790.830
|
$4,677.950
|
$5,560.000
|
|
|
INLET (COMPL)(PSL)(SL)(4FTX4FT)
|
EA
|
4.000
|
$5,000.000
|
$4,479.570
|
$4,479.570
|
$4,552.560
|
$5,250.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
18.000
|
$5,000.000
|
$4,127.070
|
$4,127.070
|
$4,278.870
|
$5,600.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
1.000
|
$6,000.000
|
$6,095.860
|
$6,095.860
|
$6,993.280
|
$6,600.000
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
11.000
|
$10,500.000
|
$11,383.330
|
$11,383.330
|
$14,404.490
|
$12,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
3.000
|
$5,000.000
|
$5,338.340
|
$5,338.340
|
$6,520.650
|
$6,100.000
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX3FT)
|
EA
|
1.000
|
$8,000.000
|
$13,333.360
|
$13,333.360
|
$14,535.300
|
$12,000.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
7.000
|
$6,000.000
|
$4,412.080
|
$4,412.080
|
$5,127.390
|
$6,000.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$5,000.000
|
$4,869.580
|
$4,869.580
|
$5,495.000
|
$6,300.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
6.000
|
$4,600.000
|
$4,974.580
|
$4,974.580
|
$5,590.030
|
$5,700.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
2.000
|
$5,000.000
|
$4,779.580
|
$4,779.580
|
$6,905.070
|
$5,500.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
7.000
|
$6,000.000
|
$4,858.330
|
$4,858.330
|
$6,962.440
|
$5,500.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
70.000
|
$6,000.000
|
$5,904.570
|
$5,904.570
|
$6,767.150
|
$5,300.000
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
47.000
|
$7,000.000
|
$7,788.800
|
$7,788.800
|
$6,845.870
|
$6,900.000
|
|
|
INLET (COMPL)(CURB)(TY 2)(15')
|
EA
|
1.000
|
$12,000.000
|
$10,723.360
|
$10,723.360
|
$12,837.040
|
$18,000.000
|
|
|
INLET (COMPL)(CURB)(TY 2)(20')
|
EA
|
3.000
|
$5,000.000
|
$13,393.340
|
$13,393.340
|
$15,486.880
|
$18,500.000
|
|
|
MANHOLE (COMPL)(SPECIAL)
|
EA
|
1.000
|
$5,000.000
|
$3,238.030
|
$3,238.030
|
$5,989.940
|
$10,000.000
|
|
|
JCTBOX(COMPL)(10 FT X 8 FT)
|
EA
|
1.000
|
$15,000.000
|
$14,368.030
|
$14,368.030
|
$14,500.880
|
$20,000.000
|
|
|
INLET (CURB)(SPL)
|
EA
|
4.000
|
$5,000.000
|
$4,472.070
|
$4,472.070
|
$6,563.150
|
$8,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$7,000.000
|
$2,333.310
|
$2,333.310
|
$4,810.710
|
$5,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$20,000.000
|
$24,401.000
|
$24,401.000
|
$24,961.390
|
$30,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
2.000
|
$27,000.000
|
$52,031.000
|
$52,031.000
|
$55,680.150
|
$45,000.000
|
|
|
WINGWALL (PW - 2) (HW=3 FT)
|
EA
|
2.000
|
$8,000.000
|
$9,105.500
|
$9,105.500
|
$8,754.890
|
$15,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$11,000.000
|
$9,524.500
|
$9,524.500
|
$9,077.730
|
$15,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
4.000
|
$10,000.000
|
$17,154.000
|
$17,154.000
|
$15,022.930
|
$18,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
5.000
|
$14,000.000
|
$23,135.200
|
$23,135.200
|
$21,925.950
|
$20,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
6.000
|
$17,000.000
|
$40,664.000
|
$40,664.000
|
$38,649.460
|
$40,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
6.000
|
$20,000.000
|
$38,685.830
|
$38,685.830
|
$37,734.090
|
$38,000.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$24,000.000
|
$63,350.000
|
$63,350.000
|
$60,961.890
|
$60,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$6,000.000
|
$2,763.000
|
$2,763.000
|
$5,601.720
|
$11,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (P)
|
EA
|
1.000
|
$6,500.000
|
$2,640.000
|
$2,640.000
|
$7,772.970
|
$13,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$7,000.000
|
$3,807.000
|
$3,807.000
|
$7,761.720
|
$13,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
$7,200.000
|
$6,232.000
|
$6,232.000
|
$10,994.220
|
$18,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$8,300.000
|
$6,191.500
|
$6,191.500
|
$11,612.980
|
$19,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$4,595.000
|
$4,595.000
|
$9,377.970
|
$19,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$870.000
|
$1,110.100
|
$1,110.100
|
$1,577.970
|
$2,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$800.000
|
$1,166.900
|
$1,166.900
|
$1,682.960
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
18.000
|
$1,100.000
|
$1,059.420
|
$1,059.420
|
$1,709.210
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
33.000
|
$1,100.000
|
$1,151.820
|
$1,151.820
|
$1,787.960
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$1,151.890
|
$1,151.890
|
$1,787.970
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,000.000
|
$1,411.990
|
$1,411.990
|
$1,964.230
|
$2,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
93.000
|
$1,350.000
|
$1,412.350
|
$1,412.350
|
$1,964.210
|
$2,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$2,247.560
|
$2,247.560
|
$2,399.220
|
$6,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,200.000
|
$2,246.590
|
$2,246.590
|
$2,920.460
|
$4,700.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,250.000
|
$1,190.460
|
$1,190.460
|
$1,825.460
|
$3,000.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$1,300.000
|
$2,062.290
|
$2,062.290
|
$2,099.210
|
$3,200.000
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
50.000
|
$600.000
|
$766.350
|
$766.350
|
$1,324.680
|
$450.000
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL V)
|
LF
|
184.000
|
$1,200.000
|
$772.650
|
$772.650
|
$1,141.370
|
$450.000
|
|
|
JACK BOR OR TUN PIPE(30 IN)(RC)(CL V)
|
LF
|
262.000
|
$1,250.000
|
$823.220
|
$823.220
|
$1,002.450
|
$550.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
1,372.000
|
$50.000
|
$53.310
|
$53.310
|
$23.270
|
$20.000
|
|
|
REMOV STR (INLET)
|
EA
|
39.000
|
$600.000
|
$581.820
|
$581.820
|
$596.760
|
$500.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
8.000
|
$600.000
|
$581.820
|
$581.820
|
$596.760
|
$500.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$350.000
|
$450.350
|
$450.350
|
$596.760
|
$450.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
28.000
|
$1,000.000
|
$1,477.300
|
$1,477.300
|
$1,514.920
|
$450.000
|
|
|
REMOV STR (PIPE)
|
LF
|
9,872.000
|
$15.000
|
$13.250
|
$13.250
|
$14.940
|
$10.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
7,964.000
|
$40.000
|
$65.260
|
$65.260
|
$30.930
|
$20.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
6.000
|
$76,000.000
|
$65,046.680
|
$65,046.680
|
$72,510.350
|
$45,000.000
|
|
|
REMOV STR (PICNIC AREA)
|
EA
|
10.000
|
$600.000
|
$1,185.580
|
$1,185.580
|
$1,981.730
|
$5,000.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
3.000
|
$400.000
|
$581.820
|
$581.820
|
$1,448.470
|
$2,000.000
|
|
|
REMOV STR (CATTLE GUARD)
|
EA
|
1.000
|
$2,700.000
|
$1,000.000
|
$1,000.000
|
$1,437.470
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$13,868,000.000
|
$21,017,739.200
|
$21,017,739.200
|
$21,000,000.000
|
$20,050,758.190
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
55.000
|
$10,000.000
|
$36,785.200
|
$36,785.200
|
$36,159.300
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
14,885.000
|
$10.000
|
$16.750
|
$16.750
|
$16.840
|
$19.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,305.000
|
$30.000
|
$22.630
|
$22.630
|
$22.750
|
$23.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
18,190.000
|
$8.000
|
$5.410
|
$5.410
|
$5.440
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
4,500.000
|
$25.000
|
$21.420
|
$21.420
|
$21.530
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
4,500.000
|
$8.000
|
$8.880
|
$8.880
|
$8.930
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
37,874.000
|
$2.750
|
$2.200
|
$2.200
|
$2.210
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
38,814.000
|
$0.750
|
$0.390
|
$0.390
|
$0.390
|
$0.350
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
2,930.000
|
$4.000
|
$2.130
|
$2.130
|
$2.140
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
19,520.000
|
$5.000
|
$3.130
|
$3.130
|
$3.150
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
22,450.000
|
$1.000
|
$0.740
|
$0.740
|
$0.740
|
$0.400
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
940.000
|
$1.000
|
$2.950
|
$2.950
|
$2.970
|
$7.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
141,738.000
|
$45.000
|
$54.930
|
$54.930
|
$62.860
|
$60.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
77,940.000
|
$32.000
|
$12.000
|
$12.000
|
$30.800
|
$55.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
50,700.000
|
$33.000
|
$18.000
|
$18.000
|
$20.000
|
$60.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
2,420.000
|
$38.000
|
$50.000
|
$50.000
|
$24.000
|
$40.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
114,120.000
|
$5.000
|
$2.600
|
$2.600
|
$5.430
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
137,660.000
|
$6.000
|
$2.250
|
$2.250
|
$4.720
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
6,260.000
|
$8.000
|
$9.890
|
$9.890
|
$14.370
|
$6.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
77,940.000
|
$6.000
|
$5.580
|
$5.580
|
$11.600
|
$4.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
50,700.000
|
$9.000
|
$4.500
|
$4.500
|
$13.680
|
$4.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
2,420.000
|
$9.000
|
$6.600
|
$6.600
|
$13.530
|
$4.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
30,242.000
|
$55.000
|
$45.290
|
$45.290
|
$55.360
|
$45.000
|
|
|
PERM CONC TRF BARR (SGL SLP) (TY 1 SPL)
|
LF
|
6,880.000
|
$250.000
|
$225.240
|
$225.240
|
$183.440
|
$200.000
|
|
|
PERM CTB(SGL SLOPE)(TY 1)(42)(HPC)
|
LF
|
496.000
|
$132.000
|
$61.150
|
$61.150
|
$102.740
|
$45.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
721.000
|
$67.000
|
$151.620
|
$151.620
|
$109.790
|
$90.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
494.000
|
$5.000
|
$15.000
|
$15.000
|
$15.000
|
$2.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
35,013.000
|
$5.000
|
$1.090
|
$1.090
|
$4.560
|
$2.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
35.000
|
$23.000
|
$15.000
|
$15.000
|
$55.000
|
$45.000
|
|
|
CONC CURB (U-TURN)
|
LF
|
1,458.000
|
$24.000
|
$66.140
|
$66.140
|
$50.000
|
$45.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
80.000
|
$13.000
|
$15.000
|
$15.000
|
$15.000
|
$60.000
|
|
|
CONC CURB (TY F3)
|
LF
|
526.000
|
$145.000
|
$200.000
|
$200.000
|
$187.550
|
$145.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,893.000
|
$32.000
|
$64.550
|
$64.550
|
$60.790
|
$75.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,058.000
|
$89.000
|
$82.400
|
$82.400
|
$97.230
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,013.000
|
$26.000
|
$55.100
|
$55.100
|
$29.800
|
$50.000
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
1,520.000
|
$72.000
|
$133.880
|
$133.880
|
$127.850
|
$105.000
|
|
|
INTERSECTIONS (CONC) (FAST TRACK)
|
SY
|
1,186.000
|
$80.000
|
$155.340
|
$155.340
|
$157.620
|
$105.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
10,408.000
|
$50.000
|
$50.140
|
$50.140
|
$58.530
|
$45.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
10.000
|
$1,400.000
|
$1,521.250
|
$1,521.250
|
$1,200.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$1,500.000
|
$1,821.260
|
$1,821.260
|
$1,500.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$1,400.000
|
$1,521.260
|
$1,521.260
|
$1,200.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
13.000
|
$1,600.000
|
$1,821.250
|
$1,821.250
|
$1,500.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 20)
|
EA
|
2.000
|
$2,000.000
|
$1,821.260
|
$1,821.260
|
$1,500.000
|
$3,400.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
6.000
|
$2,500.000
|
$621.250
|
$621.250
|
$3,000.000
|
$3,500.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
8,600.000
|
$21.000
|
$18.000
|
$18.000
|
$18.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,818.000
|
$1,400.000
|
$1,400.000
|
$1,400.000
|
$1,720.000
|
|
|
SHORT RADIUS
|
LF
|
126.000
|
$40.000
|
$21.390
|
$21.390
|
$21.390
|
$27.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$900.000
|
$650.000
|
$650.000
|
$1,950.000
|
$800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
35.000
|
$1,134.000
|
$950.000
|
$950.000
|
$950.000
|
$1,165.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
225.000
|
$60.000
|
$47.680
|
$47.680
|
$47.680
|
$59.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
14.000
|
$870.000
|
$922.000
|
$922.000
|
$922.000
|
$1,131.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,841.000
|
$3.000
|
$2.750
|
$2.750
|
$2.750
|
$3.400
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
19.000
|
$217.000
|
$125.000
|
$125.000
|
$125.000
|
$154.000
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
1,448.000
|
$10.000
|
$10.320
|
$10.320
|
$10.320
|
$13.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
2.000
|
$5,000.000
|
$2,350.000
|
$2,350.000
|
$2,350.000
|
$2,882.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
30,372.000
|
$5.000
|
$2.800
|
$2.800
|
$2.800
|
$2.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
3.000
|
$865.000
|
$200.000
|
$200.000
|
$200.000
|
$505.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
43.000
|
$2,618.000
|
$2,455.000
|
$2,455.000
|
$2,455.000
|
$3,010.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$249.000
|
$200.000
|
$200.000
|
$200.000
|
$246.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
43.000
|
$1,500.000
|
$1,375.000
|
$1,375.000
|
$1,375.000
|
$1,690.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
13.000
|
$1,200.000
|
$775.000
|
$775.000
|
$775.000
|
$955.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
28.000
|
$12,000.000
|
$17,875.000
|
$17,875.000
|
$17,875.000
|
$22,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
|
EA
|
5.000
|
$22,000.000
|
$22,050.000
|
$22,050.000
|
$22,050.000
|
$26,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
13.000
|
$7,500.000
|
$7,150.000
|
$7,150.000
|
$7,150.000
|
$8,800.000
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
2.000
|
$1,000.000
|
$2.000
|
$2.000
|
$3,500.000
|
$2,000.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
210.000
|
$15.000
|
$14.000
|
$14.000
|
$14.000
|
$18.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
5,617.000
|
$20.000
|
$15.000
|
$15.000
|
$15.000
|
$18.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
20.000
|
$250.000
|
$225.000
|
$225.000
|
$230.000
|
$221.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$270.000
|
$235.000
|
$235.000
|
$240.000
|
$240.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
31.000
|
$480.000
|
$315.000
|
$315.000
|
$610.000
|
$610.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
13.000
|
$482.000
|
$525.000
|
$525.000
|
$550.000
|
$550.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
4.000
|
$210.000
|
$157.500
|
$157.500
|
$213.000
|
$213.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
24.000
|
$980.000
|
$951.720
|
$951.720
|
$1,300.000
|
$1,300.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
3.000
|
$3,800.000
|
$2,999.000
|
$2,999.000
|
$3,000.000
|
$3,000.000
|
|
|
IN RD IL (TY SA) 50T-12 (400W EQ) LED
|
EA
|
24.000
|
$4,000.000
|
$3,347.450
|
$3,347.450
|
$3,600.000
|
$3,600.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
22.000
|
$32,000.000
|
$28,008.350
|
$28,008.350
|
$31,500.000
|
$31,500.000
|
|
|
CONDT (HDPE) (4")
|
LF
|
3,255.000
|
$10.000
|
$14.450
|
$14.450
|
$16.000
|
$16.000
|
|
|
CONDT (HDPE) (4") BORE
|
LF
|
3,085.000
|
$20.000
|
$27.930
|
$27.930
|
$50.000
|
$50.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
280.000
|
$9.000
|
$10.280
|
$10.280
|
$8.000
|
$8.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
500.000
|
$12.000
|
$13.450
|
$13.450
|
$9.500
|
$13.450
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
72,670.000
|
$11.000
|
$11.950
|
$11.950
|
$12.000
|
$12.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
22,715.000
|
$8.000
|
$11.280
|
$11.280
|
$9.000
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
10,085.000
|
$21.000
|
$21.200
|
$21.200
|
$22.000
|
$22.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
14,420.000
|
$29.000
|
$26.900
|
$26.900
|
$23.000
|
$23.000
|
|
|
CONDT (RM) (1")
|
LF
|
1,550.000
|
$18.000
|
$18.130
|
$18.130
|
$25.000
|
$25.000
|
|
|
CONDT (RM) (3")
|
LF
|
1,630.000
|
$41.000
|
$62.630
|
$62.630
|
$50.000
|
$50.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
50,940.000
|
$1.000
|
$0.670
|
$0.670
|
$0.900
|
$0.900
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
2,540.000
|
$1.100
|
$0.800
|
$0.800
|
$1.000
|
$1.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
7,500.000
|
$1.200
|
$0.830
|
$0.830
|
$1.150
|
$1.150
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
6,560.000
|
$1.200
|
$1.080
|
$1.080
|
$1.300
|
$1.300
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
12,670.000
|
$1.500
|
$1.210
|
$1.210
|
$1.400
|
$1.400
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,880.000
|
$1.500
|
$1.320
|
$1.320
|
$1.750
|
$1.750
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
4,625.000
|
$2.000
|
$1.450
|
$1.450
|
$1.850
|
$1.850
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
13,265.000
|
$1.800
|
$1.630
|
$1.630
|
$1.800
|
$1.800
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
39,320.000
|
$2.000
|
$1.770
|
$1.770
|
$2.100
|
$2.100
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
8,730.000
|
$2.200
|
$2.050
|
$2.050
|
$2.000
|
$2.000
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
27,720.000
|
$2.600
|
$2.160
|
$2.160
|
$2.250
|
$2.250
|
|
|
ELEC CONDR (NO.1) BARE
|
LF
|
1,895.000
|
$2.400
|
$2.440
|
$2.440
|
$3.000
|
$3.000
|
|
|
ELEC CONDR (NO.1) INSULATED
|
LF
|
3,790.000
|
$2.500
|
$2.670
|
$2.670
|
$3.100
|
$3.100
|
|
|
GROUND BOX TY A (122311)
|
EA
|
33.000
|
$650.000
|
$732.000
|
$732.000
|
$570.000
|
$570.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
79.000
|
$920.000
|
$894.500
|
$894.500
|
$1,150.000
|
$1,150.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
12.000
|
$885.000
|
$829.750
|
$829.750
|
$980.000
|
$980.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,030.000
|
$1,039.750
|
$1,039.750
|
$1,300.000
|
$1,300.000
|
|
|
REMOVE GROUND BOX
|
EA
|
11.000
|
$215.000
|
$210.000
|
$210.000
|
$260.000
|
$260.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
3.000
|
$505.000
|
$472.500
|
$472.500
|
$415.000
|
$415.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)PS(U)
|
EA
|
7.000
|
$6,000.000
|
$4,711.800
|
$4,711.800
|
$6,500.000
|
$6,500.000
|
|
|
ELC SRV TY A 120/240 100(NS)SS(E)PS(U)
|
EA
|
2.000
|
$6,000.000
|
$4,192.940
|
$4,192.940
|
$7,500.000
|
$7,500.000
|
|
|
ELC SRV TY A 120/240 200(NS)SS(E)GC(U)
|
EA
|
1.000
|
$6,000.000
|
$7,054.750
|
$7,054.750
|
$6,500.000
|
$6,500.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
1.000
|
$6,000.000
|
$4,478.750
|
$4,478.750
|
$7,000.000
|
$7,000.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
|
EA
|
2.000
|
$6,000.000
|
$4,196.320
|
$4,196.320
|
$7,300.000
|
$7,300.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)PS(U)
|
EA
|
4.000
|
$6,000.000
|
$4,163.860
|
$4,163.860
|
$8,200.000
|
$8,200.000
|
|
|
ELC SRV TY D 120/240 200(NS)SS(N)PS(U)
|
EA
|
1.000
|
$6,000.000
|
$4,136.800
|
$4,136.800
|
$3,500.000
|
$3,500.000
|
|
|
ELC SRV TY A 120/240 200(NS)SS(E)PS(U)
|
EA
|
1.000
|
$6,000.000
|
$4,132.740
|
$4,132.740
|
$10,000.000
|
$10,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
467.000
|
$25.000
|
$24.000
|
$24.000
|
$26.000
|
$26.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
453.000
|
$28.000
|
$24.000
|
$24.000
|
$25.000
|
$25.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,273.000
|
$30.000
|
$25.620
|
$25.620
|
$27.000
|
$27.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
138.000
|
$520.000
|
$465.000
|
$465.000
|
$500.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
8.000
|
$620.000
|
$610.000
|
$610.000
|
$745.000
|
$745.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
139.000
|
$600.000
|
$620.000
|
$620.000
|
$650.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$760.000
|
$685.000
|
$685.000
|
$687.000
|
$687.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
9.000
|
$700.000
|
$650.000
|
$650.000
|
$1,000.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
13.000
|
$635.000
|
$775.000
|
$775.000
|
$650.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
8.000
|
$748.000
|
$895.000
|
$895.000
|
$825.000
|
$825.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$1,000.000
|
$980.000
|
$980.000
|
$850.000
|
$850.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
8.000
|
$1,900.000
|
$1,800.000
|
$1,800.000
|
$2,300.000
|
$2,000.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,000.000
|
$1,900.000
|
$1,900.000
|
$2,000.000
|
$2,000.000
|
|
|
RELOCATE SM RD SN SUP&AM(HIST MRKR)
|
EA
|
1.000
|
$400.000
|
$500.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
269.000
|
$85.000
|
$65.000
|
$65.000
|
$75.000
|
$75.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,630.000
|
$6.000
|
$5.540
|
$5.540
|
$4.000
|
$4.000
|
|
|
REMOVE LRSA
|
EA
|
23.000
|
$908.000
|
$1,050.000
|
$1,050.000
|
$1,100.000
|
$1,100.000
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
1.000
|
$30,000.000
|
$14,926.500
|
$14,926.500
|
$20,000.000
|
$20,000.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
2.000
|
$30,000.000
|
$26,786.750
|
$26,786.750
|
$28,500.000
|
$28,500.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$35,000.000
|
$15,944.250
|
$15,944.250
|
$22,000.000
|
$22,000.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
3.000
|
$22,000.000
|
$21,767.000
|
$21,767.000
|
$23,000.000
|
$23,000.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
10.000
|
$24,200.000
|
$22,823.000
|
$22,823.000
|
$25,000.000
|
$25,000.000
|
|
|
INS OH SN SUP(155 FT BRDG)
|
EA
|
2.000
|
$88,000.000
|
$89,194.250
|
$89,194.250
|
$108,000.000
|
$108,000.000
|
|
|
INS OH SN SUP(165 FT BRDG)
|
EA
|
1.000
|
$95,000.000
|
$114,634.000
|
$114,634.000
|
$120,000.000
|
$120,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
3.000
|
$6,386.000
|
$4,925.000
|
$4,925.000
|
$4,025.000
|
$4,025.000
|
|
|
SIGN WALKWAY (36 IN) WITH HNDRL
|
LF
|
61.000
|
$208.000
|
$279.060
|
$279.060
|
$279.060
|
$279.060
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
|
EA
|
204.000
|
$52.000
|
$55.000
|
$55.000
|
$55.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
418.000
|
$25.000
|
$13.000
|
$13.000
|
$22.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
59.000
|
$18.000
|
$13.000
|
$13.000
|
$22.000
|
$24.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
480.000
|
$16.000
|
$14.000
|
$14.000
|
$22.000
|
$39.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
94.000
|
$28.000
|
$25.000
|
$25.000
|
$33.750
|
$34.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
39.000
|
$24.000
|
$25.000
|
$25.000
|
$33.750
|
$33.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
19,210.000
|
$0.250
|
$0.120
|
$0.120
|
$0.120
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
143,972.000
|
$0.250
|
$0.120
|
$0.120
|
$0.120
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
254.000
|
$0.500
|
$0.240
|
$0.240
|
$0.240
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
300.000
|
$1.200
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
139,797.000
|
$0.250
|
$0.120
|
$0.120
|
$0.120
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
46,720.000
|
$0.800
|
$0.800
|
$0.800
|
$0.800
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
331,729.000
|
$0.800
|
$0.550
|
$0.550
|
$0.550
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,380.000
|
$1.400
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(LNDP)
|
LF
|
1,407.000
|
$4.000
|
$6.750
|
$6.750
|
$6.750
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
4,046.000
|
$3.000
|
$6.750
|
$6.750
|
$6.750
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
788.000
|
$5.000
|
$13.210
|
$13.210
|
$13.210
|
$9.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
12.000
|
$200.000
|
$400.000
|
$400.000
|
$400.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
3.000
|
$250.000
|
$500.000
|
$500.000
|
$500.000
|
$300.000
|
|
|
WK ZN PAV MRK REMOV (W)(ENTR GORE)
|
EA
|
35.000
|
$500.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$750.000
|
|
|
WK ZN PAV MRK REMOV (W)(EXIT GORE)
|
EA
|
31.000
|
$500.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$850.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
11.000
|
$220.000
|
$550.000
|
$550.000
|
$550.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
325,125.000
|
$0.800
|
$0.550
|
$0.550
|
$0.550
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,221.000
|
$1.000
|
$2.000
|
$2.000
|
$1.110
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
473.000
|
$1.000
|
$2.000
|
$2.000
|
$4.000
|
$3.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
830.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
29,515.000
|
$0.800
|
$0.800
|
$0.800
|
$0.800
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
245.000
|
$2.100
|
$1.500
|
$1.500
|
$1.500
|
$3.300
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
9,550.000
|
$3.000
|
$2.750
|
$2.750
|
$2.750
|
$3.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,850.000
|
$6.800
|
$5.500
|
$5.500
|
$5.500
|
$5.600
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
8.000
|
$155.000
|
$400.000
|
$400.000
|
$400.000
|
$200.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
6,785.000
|
$1.000
|
$0.800
|
$0.800
|
$0.800
|
$1.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
3,880.000
|
$2.500
|
$3.000
|
$3.000
|
$3.000
|
$3.100
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
39,365.000
|
$0.800
|
$0.500
|
$0.500
|
$0.500
|
$1.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
201,125.000
|
$0.200
|
$0.110
|
$0.110
|
$0.110
|
$0.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
328,345.000
|
$0.300
|
$0.160
|
$0.160
|
$0.160
|
$0.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
36,300.000
|
$0.500
|
$0.220
|
$0.220
|
$0.220
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
13,330.000
|
$0.700
|
$0.330
|
$0.330
|
$0.330
|
$2.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,850.000
|
$2.000
|
$0.660
|
$0.660
|
$0.660
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
16.000
|
$34.000
|
$25.000
|
$25.000
|
$25.000
|
$40.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
20.000
|
$37.000
|
$30.000
|
$30.000
|
$30.000
|
$60.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
11.000
|
$50.000
|
$35.000
|
$35.000
|
$35.000
|
$50.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
5.000
|
$50.000
|
$35.000
|
$35.000
|
$35.000
|
$75.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
4.000
|
$100.000
|
$50.000
|
$50.000
|
$50.000
|
$75.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
129.000
|
$15.000
|
$5.000
|
$5.000
|
$5.000
|
$10.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
8.000
|
$90.000
|
$25.000
|
$25.000
|
$25.000
|
$75.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
19,455.000
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.480
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
90,615.000
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.460
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
39,365.000
|
$0.500
|
$0.600
|
$0.600
|
$0.600
|
$0.700
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
86,600.000
|
$0.500
|
$0.600
|
$0.600
|
$0.600
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
90,225.000
|
$0.300
|
$0.400
|
$0.400
|
$0.400
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
84,285.000
|
$0.500
|
$0.400
|
$0.400
|
$0.400
|
$0.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
16.000
|
$235.000
|
$280.000
|
$280.000
|
$280.000
|
$185.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
11.000
|
$350.000
|
$500.000
|
$500.000
|
$500.000
|
$270.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
5.000
|
$350.000
|
$550.000
|
$550.000
|
$550.000
|
$265.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$400.000
|
$750.000
|
$750.000
|
$750.000
|
$325.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
20.000
|
$280.000
|
$350.000
|
$350.000
|
$350.000
|
$235.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
129.000
|
$20.000
|
$20.000
|
$20.000
|
$20.000
|
$45.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
352.000
|
$3.000
|
$3.100
|
$3.100
|
$3.100
|
$4.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
203.000
|
$3.500
|
$3.100
|
$3.100
|
$3.100
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
412.000
|
$3.000
|
$3.100
|
$3.100
|
$3.100
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
8,381.000
|
$3.500
|
$3.100
|
$3.100
|
$3.100
|
$3.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
360,645.000
|
$0.500
|
$0.650
|
$0.650
|
$0.650
|
$0.520
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
8,881.000
|
$0.700
|
$1.000
|
$1.000
|
$1.000
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
2,766.000
|
$1.500
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
1.000
|
$75.000
|
$200.000
|
$200.000
|
$200.000
|
$500.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
201,125.000
|
$0.100
|
$0.150
|
$0.150
|
$0.150
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
328,345.000
|
$0.100
|
$0.230
|
$0.230
|
$0.230
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
36,300.000
|
$0.200
|
$0.310
|
$0.310
|
$0.310
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
13,330.000
|
$0.500
|
$1.000
|
$1.000
|
$1.000
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,850.000
|
$1.200
|
$2.000
|
$2.000
|
$2.000
|
$0.900
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
16.000
|
$18.000
|
$20.000
|
$20.000
|
$20.000
|
$35.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
11.000
|
$40.000
|
$30.000
|
$30.000
|
$30.000
|
$45.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
5.000
|
$34.000
|
$30.000
|
$30.000
|
$30.000
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
8.000
|
$35.000
|
$25.000
|
$25.000
|
$25.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
20.000
|
$22.000
|
$30.000
|
$30.000
|
$30.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
129.000
|
$10.000
|
$5.000
|
$5.000
|
$5.000
|
$15.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$30,000.000
|
$32,874.740
|
$32,874.740
|
$30,000.000
|
$30,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,000.000
|
$2,100.000
|
$2,100.000
|
$3,800.000
|
$3,800.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$40,000.000
|
$101,218.490
|
$101,218.490
|
$60,000.000
|
$60,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
12.000
|
$225.000
|
$211.000
|
$211.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
2.000
|
$230.000
|
$211.000
|
$211.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
12.000
|
$225.000
|
$211.000
|
$211.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
2.000
|
$220.000
|
$211.000
|
$211.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
12.000
|
$220.000
|
$211.000
|
$211.000
|
$250.000
|
$250.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
2.000
|
$230.000
|
$211.000
|
$211.000
|
$250.000
|
$250.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
16.000
|
$530.000
|
$569.000
|
$569.000
|
$500.000
|
$500.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
14.000
|
$85.000
|
$148.700
|
$148.700
|
$103.000
|
$103.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
845.000
|
$2.000
|
$1.550
|
$1.550
|
$1.500
|
$1.500
|
|
|
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
|
LF
|
185.000
|
$3.600
|
$2.790
|
$2.790
|
$4.000
|
$4.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(20 CONDR)
|
LF
|
1,610.000
|
$5.500
|
$4.330
|
$4.330
|
$5.200
|
$5.200
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')ILSN
|
EA
|
1.000
|
$7,000.000
|
$7,099.900
|
$7,099.900
|
$8,000.000
|
$8,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
|
EA
|
1.000
|
$8,090.000
|
$7,492.400
|
$7,492.400
|
$9,300.000
|
$9,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')ILSN
|
EA
|
1.000
|
$8,090.000
|
$7,204.900
|
$7,204.900
|
$10,000.000
|
$10,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
|
EA
|
2.000
|
$8,090.000
|
$7,597.400
|
$7,597.400
|
$9,500.000
|
$9,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
|
EA
|
1.000
|
$9,400.000
|
$7,702.400
|
$7,702.400
|
$11,300.000
|
$11,300.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
11.000
|
$200.000
|
$1,613.500
|
$1,613.500
|
$1,700.000
|
$1,700.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
16.000
|
$800.000
|
$905.300
|
$905.300
|
$650.000
|
$650.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,570.000
|
$4,015.600
|
$4,015.600
|
$3,100.000
|
$3,100.000
|
|
|
STRIP MOWING
|
CYC
|
18.000
|
$1,800.000
|
$3,600.000
|
$3,600.000
|
$2,890.000
|
$1,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
54.000
|
$2,250.000
|
$100.000
|
$100.000
|
$3,250.000
|
$3,000.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
18.000
|
$1,600.000
|
$500.000
|
$500.000
|
$1,590.000
|
$3,500.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
18.000
|
$1,200.000
|
$500.000
|
$500.000
|
$1,805.000
|
$3,800.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
18.000
|
$1,500.000
|
$500.000
|
$500.000
|
$1,445.000
|
$3,800.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
54.000
|
$2,250.000
|
$500.000
|
$500.000
|
$1,805.000
|
$3,000.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
54.000
|
$1,570.000
|
$500.000
|
$500.000
|
$1,590.000
|
$3,000.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
54.000
|
$2,000.000
|
$500.000
|
$500.000
|
$1,805.000
|
$3,000.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
54.000
|
$1,500.000
|
$500.000
|
$500.000
|
$1,805.000
|
$3,000.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
235,543.000
|
$75.000
|
$65.780
|
$65.780
|
$63.180
|
$60.000
|
|
|
D-GR HMA TY-C SAC-B PG76-22
|
TON
|
2,276.000
|
$100.000
|
$88.470
|
$88.470
|
$73.790
|
$77.000
|
|
|
TACK COAT
|
GAL
|
2,096.000
|
$4.500
|
$3.000
|
$3.000
|
$4.040
|
$4.000
|
|
|
CATTLE GUARD (16')
|
EA
|
1.000
|
$5,000.000
|
$15,000.000
|
$15,000.000
|
$15,000.000
|
$4,500.000
|
|
|
ASBESTOS ABATEMENT (COATINGS)
|
SF
|
5,940.000
|
$52.000
|
$9.970
|
$9.970
|
$9.970
|
$10.200
|
|
|
ASBESTOS ABATEMENT (OTHER)
|
LF
|
2,500.000
|
$50.000
|
$15.000
|
$15.000
|
$40.000
|
$8.200
|
|
|
STEEL FENCE (REMOVE)
|
LF
|
151.000
|
$30.000
|
$25.000
|
$25.000
|
$25.000
|
$3.000
|
|
|
STEEL FENCE (INSTALL)
|
LF
|
151.000
|
$125.000
|
$75.000
|
$75.000
|
$75.000
|
$25.000
|
|
|
LEAD PAINT REMOVAL (SF)
|
SF
|
2,000.000
|
$50.000
|
$10.000
|
$10.000
|
$84.020
|
$85.750
|
|
|
LEAD PAINT REMOVAL (LF)
|
LF
|
4,048.000
|
$80.000
|
$10.000
|
$10.000
|
$40.000
|
$8.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$16,000.000
|
$16,000.000
|
$14,800.000
|
$18,500.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
22,520.000
|
$3.650
|
$2.540
|
$2.540
|
$1.550
|
$1.550
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
53,755.000
|
$4.000
|
$4.450
|
$4.450
|
$2.350
|
$2.350
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
17.000
|
$1,460.000
|
$1,447.450
|
$1,447.450
|
$900.000
|
$900.000
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
8.000
|
$4,705.000
|
$6,923.750
|
$6,923.750
|
$4,500.000
|
$4,500.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
3.000
|
$2,100.000
|
$1,691.250
|
$1,691.250
|
$2,150.000
|
$2,150.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
2.000
|
$2,500.000
|
$1,691.250
|
$1,691.250
|
$1,500.000
|
$1,500.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
528.000
|
$50.000
|
$37.130
|
$37.130
|
$21.000
|
$21.000
|
|
|
ITS GRND MNT CAB (TY 6) (CONF 2)
|
EA
|
4.000
|
$14,000.000
|
$10,897.500
|
$10,897.500
|
$11,250.000
|
$1,125.000
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
6.000
|
$9,500.000
|
$6,289.850
|
$6,289.850
|
$5,100.000
|
$5,100.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
72,670.000
|
$15.000
|
$15.770
|
$15.770
|
$13.250
|
$13.250
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
12,520.000
|
$31.000
|
$29.520
|
$29.520
|
$29.000
|
$29.000
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
1,870.000
|
$77.000
|
$89.950
|
$89.950
|
$75.000
|
$75.000
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
77.000
|
$195.000
|
$146.400
|
$146.400
|
$135.000
|
$135.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
2.000
|
$14,000.000
|
$8,140.000
|
$8,140.000
|
$11,200.000
|
$11,200.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$7,065.000
|
$6,807.500
|
$6,807.500
|
$6,200.000
|
$6,200.000
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
2.000
|
$7,600.000
|
$6,206.600
|
$6,206.600
|
$7,700.000
|
$7,700.000
|
|
|
ITS POLE (50 FT)(90 MPH)
|
EA
|
4.000
|
$10,800.000
|
$8,386.450
|
$8,386.450
|
$9,900.000
|
$9,900.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
6.000
|
$6,800.000
|
$4,992.500
|
$4,992.500
|
$5,300.000
|
$5,300.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
300.000
|
$20.000
|
$28.710
|
$28.710
|
$20.000
|
$18.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
12.000
|
$1,000.000
|
$420.000
|
$420.000
|
$1,100.000
|
$1,100.000
|
|
|
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
|
EA
|
6.000
|
$1,000.000
|
$420.000
|
$420.000
|
$350.000
|
$350.000
|
|
|
TERMINAL SERVER (INSTALL ONLY)
|
EA
|
5.000
|
$600.000
|
$630.000
|
$630.000
|
$450.000
|
$450.000
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
17.000
|
$27,700.000
|
$24,043.470
|
$24,043.470
|
$22,700.000
|
$22,700.000
|
|
|
LED HI MST IL ASM (6 FIXT) (ASYM)(TY B)
|
EA
|
5.000
|
$27,600.000
|
$23,820.300
|
$23,820.300
|
$23,000.000
|
$23,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
400.000
|
$200.000
|
$228.370
|
$228.370
|
$269.580
|
$167.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
378.000
|
$200.000
|
$505.120
|
$505.120
|
$742.110
|
$800.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)
|
EA
|
5.000
|
$3,050.000
|
$3,188.750
|
$3,188.750
|
$3,100.000
|
$3,100.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
116.000
|
$3,050.000
|
$3,408.750
|
$3,408.750
|
$3,000.000
|
$3,000.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
3.000
|
$6,300.000
|
$4,682.500
|
$4,682.500
|
$4,600.000
|
$4,600.000
|
|
|
DECORATIVE MEDALLION W/ LED BACKLIGHT
|
EA
|
4.000
|
$62,500.000
|
$47,224.060
|
$47,224.060
|
$5,000.000
|
$3,250.000
|
|
|
TEMP Q-DETECT (TY2) (2 SYS)
|
DAY
|
1,770.000
|
$250.000
|
$62.380
|
$62.380
|
$65.000
|
$65.000
|
|
|
ITS RVSD (DATA COLLECT ONLY) SYS
|
EA
|
5.000
|
$8,700.000
|
$9,226.500
|
$9,226.500
|
$9,300.000
|
$9,300.000
|
|
|
VIVDS PROSR SYS
|
EA
|
1.000
|
$7,000.000
|
$7,705.500
|
$7,705.500
|
$11,000.000
|
$11,000.000
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
6.000
|
$2,500.000
|
$1,483.750
|
$1,483.750
|
$1,850.000
|
$1,850.000
|
|
|
VIVDS TEMPORARY
|
EA
|
1.000
|
$4,000.000
|
$21,682.750
|
$21,682.750
|
$45,000.000
|
$45,000.000
|
|
|
VIVDS CABLING
|
LF
|
1,825.000
|
$3.000
|
$2.750
|
$2.750
|
$2.750
|
$3.000
|
|
|
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
|
EA
|
1.000
|
$5,000.000
|
$7,705.500
|
$7,705.500
|
$8,500.000
|
$8,500.000
|
|
|
ILSN (LED) (6 S)
|
EA
|
4.000
|
$6,000.000
|
$2,855.000
|
$2,855.000
|
$2,133.500
|
$2,134.000
|
|
|
ILSN (LED) (8 S)
|
EA
|
2.000
|
$8,000.000
|
$3,200.000
|
$3,200.000
|
$2,375.000
|
$2,375.000
|
|
|
C-900 DR-18 PVC WL (6") (OPEN CUT)
|
LF
|
1,225.000
|
$77.000
|
$150.000
|
$150.000
|
$150.000
|
$70.000
|
|
|
C-900 DR-18 PVC WL (6") (CARRIER PIPE)
|
LF
|
312.000
|
$66.000
|
$175.000
|
$175.000
|
$175.000
|
$380.000
|
|
|
C-900 DR-18 PVC WL (12") (OPEN CUT)
|
LF
|
618.000
|
$95.000
|
$110.000
|
$110.000
|
$110.000
|
$80.000
|
|
|
C-900 DR-18 PVC WL (12") (CARRIER PIPE)
|
LF
|
734.000
|
$90.000
|
$155.000
|
$155.000
|
$155.000
|
$445.000
|
|
|
RESILIENT SEATED GATE VALVE (6")
|
EA
|
6.000
|
$1,430.000
|
$1,300.000
|
$1,300.000
|
$1,300.000
|
$1,400.000
|
|
|
RESILIENT SEATED GATE VALVE (12")
|
EA
|
6.000
|
$2,200.000
|
$2,700.000
|
$2,700.000
|
$2,700.000
|
$3,200.000
|
|
|
WATER SERVICE CONNECTION
|
EA
|
5.000
|
$2,500.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$2,500.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
4.100
|
$10,000.000
|
$4,300.000
|
$4,300.000
|
$4,300.000
|
$15,000.000
|
|
|
CONNECT EXISTING WATER LINE
|
EA
|
9.000
|
$2,750.000
|
$5,500.000
|
$5,500.000
|
$5,500.000
|
$2,500.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
2.000
|
$4,400.000
|
$5,400.000
|
$5,400.000
|
$5,400.000
|
$5,500.000
|
|
|
REMOVE UTILITY (WATERLINE)
|
LF
|
1,168.000
|
$20.000
|
$30.000
|
$30.000
|
$30.000
|
$15.000
|
|
|
REMOVE UTILITY (SEWER)
|
LF
|
124.000
|
$50.000
|
$30.000
|
$30.000
|
$30.000
|
$1,200.000
|
|
|
REMOVE UTILITY (VALVE)
|
EA
|
6.000
|
$330.000
|
$450.000
|
$450.000
|
$450.000
|
$1,500.000
|
|
|
REMOVE UTILITY (FIRE HYDRANT)
|
EA
|
2.000
|
$550.000
|
$500.000
|
$500.000
|
$500.000
|
$1,100.000
|
|
|
REMOVE UTILITY (MANHOLE)
|
EA
|
1.000
|
$2,000.000
|
$800.000
|
$800.000
|
$800.000
|
$3,000.000
|
|
|
SDR-26 PVC SEWER (12") (OPEN CUT)
|
LF
|
60.000
|
$150.000
|
$275.000
|
$275.000
|
$275.000
|
$100.000
|
|
|
SDR-26 PVC SEWER (12") (CARRIER PIPE)
|
LF
|
422.000
|
$121.000
|
$230.000
|
$230.000
|
$230.000
|
$500.000
|
|
|
SDR-26 PVC SEWER (15") (OPEN CUT)
|
LF
|
150.000
|
$160.000
|
$250.000
|
$250.000
|
$250.000
|
$75.000
|
|
|
SDR-26 PVC SEWER (15") (CARRIER PIPE)
|
LF
|
413.000
|
$132.000
|
$218.000
|
$218.000
|
$218.000
|
$500.000
|
|
|
STEEL CASING (16") (BORE)
|
LF
|
312.000
|
$440.000
|
$340.000
|
$340.000
|
$340.000
|
$550.000
|
|
|
STEEL CASING (20") (BORE)
|
LF
|
817.000
|
$550.000
|
$390.000
|
$390.000
|
$390.000
|
$570.000
|
|
|
STEEL CASING (20") (OPEN CUT)
|
LF
|
339.000
|
$330.000
|
$180.000
|
$180.000
|
$180.000
|
$160.000
|
|
|
STEEL CASING (24") (BORE)
|
LF
|
348.000
|
$605.000
|
$410.000
|
$410.000
|
$410.000
|
$600.000
|
|
|
STEEL CASING (24") (OPEN CUT)
|
LF
|
65.000
|
$400.000
|
$185.000
|
$185.000
|
$185.000
|
$200.000
|
|
|
CONCRETE PIPE ENCASEMENT
|
LF
|
55.000
|
$83.000
|
$85.000
|
$85.000
|
$85.000
|
$210.000
|
|
|
MANHOLE (4FT DIA)
|
EA
|
5.000
|
$5,390.000
|
$6,600.000
|
$6,600.000
|
$6,600.000
|
$5,000.000
|
|
|
MANHOLE (EXT DEPTH)(4FT DIA)
|
VF
|
4.000
|
$330.000
|
$200.000
|
$200.000
|
$200.000
|
$1,000.000
|
|
|
CONNECT EXISTING SEWER LINE
|
EA
|
5.000
|
$2,310.000
|
$500.000
|
$500.000
|
$500.000
|
$6,500.000
|
|
|
MH REHAB (EPOXY LINING)
|
VF
|
21.000
|
$200.000
|
$365.000
|
$365.000
|
$365.000
|
$428.840
|
|
Totals: |
$212,800,313.850
|
$209,999,113.313
|
$209,999,113.313
|
$211,966,485.651
|
$212,278,836.000
|