Items: 168

County: COMAL
Length: 0.5330 MILES
Highway: IH 35
District: SAN ANTONIO
Control Number: 0016-05-128
DBE Goal: 0.0%
Project: STP 2026(781)HES
Guaranty: $100,000.00
Time: 343 WORKING DAYS
Engineer's Estimate: $1,944,478.15
Date: 1:00 PM JULY 01, 2026 (in 21 days) Changed
Contract Number: 7263203
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00193362
Contract Type: Federal
Project Description: CONSTRUCT ROUNDABOUTS AT IH 35 SBFR INTERSECTIONS WITH BI 35H AND LONE STAR AVE.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
COMAL IH 35 (0016-05-128)
Project Name: N/A
Project: STP 2026(781)HES
Length: 0.5330 MILES
Project Type: JOINT BID UTILITY
Limits From: SBFR IH 35 AT LOMA VISTA
Limits To: SBFR IH 35 AT PEACH AVE
Project Description: CONSTRUCT ROUNDABOUTS AT IH 35 SBFR INTERSECTIONS WITH BI 35H AND LONE STAR AVE.
(0016-05-130)
Project Name: N/A
Project: N/A
Length: 0.0000 MILES
Project Type: RIGHT OF WAY
Limits From: SBFR IH 35 AT LOMA VISTA
Limits To: SBFR IH 35 AT PEACH AVE
Project Description: CONSTRUCT ROUNDABOUTS AT IH 35 SBFR INTERSECTIONS WITH BI 35H AND LONE STAR AVE.
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

168 Total 0 of 168
5 Added
1 Removed
7 Changed
COMAL  |  IH 35  |  SAN ANTONIO  |  0016-05-128  |  1:00 PM JULY 01, 2026  |  $1,944,478.15  |  STP 2026(781)HES  |  HAZARD ELIM & SAFETY  |  343 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 45.000
EXCAV (ROADWAY)
CY 30,577.000
EMBANK (FNL)(OC)(TY C)
CY 4,699.000
EMBANK (FNL)(DC)(TY C)
CY 17.000
FURN & PLACE TOPSOIL (6")
SY 13,563.000
ROLL SODDING
SY 2,339.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 13,563.000
FERTILIZER
AC 3.000
VEGETATIVE WATERING
TGL 2,203.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 96.000
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
SY 225.000
PROOF ROLLING
HR 14.000
FL BS (CMP IN PLC)(TY A GR 1-2)
TON 578.000
FL BS (CMP IN PLC)(TY D GR 1-2)
TON 14,633.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 157.000
LIME TRT (EXIST MATL)(6")
SY 35,876.000
CEMENT TRT (EXIST MATL)(8")
SY 1,880.000
Added
CM TRT(PT MX)(CL L)(TYA)(GR1-2)(IN VEH)
CY 840.000
TACK COAT
GAL 8,239.000
PRIME COAT(MC-30 OR AE-P)
GAL 6,592.000
D-GR HMA TY-B PG64-22
TON 15,391.000
SP MIXES SP-C SAC-B PG76-22
TON 3,256.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 2,213.000
PLANE ASPH CONC PAV(0" TO 2")
SY 958.000
CONC PAV (JOINT REINF) (10")
SY 2,069.000
FULL - DEPTH REPAIR CRCP (6")
CY 830.000
CUT & RESTORING PAV
SY 249.000
FLOWABLE BACKFILL
CY 528.000
TRENCH EXCAVATION PROTECTION
LF 6,151.000
DRILL SHAFT (42 IN)
LF 80.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 352.000
SLAB SPAN
CY 4.000
RETAINING WALL (SPREAD FOOTING)
SF 280.000
RIPRAP (CONC)(4 IN)
CY 1.000
RAIL (HANDRAIL)(TY C)
LF 100.000
RAIL (HANDRAIL)(TY F)
LF 51.000
RC PIPE (CL III)(24 IN)
LF 2,055.000
RC PIPE (CL III)(30 IN)
LF 1,486.000
RC PIPE (CL III)(36 IN)
LF 338.000
MANH (COMPL)(PRM)(48IN)
EA 1.000
MANH (COMPL)(PRM)(60IN)
EA 5.000
MANH (COMPL)(PRM)(72IN)
EA 3.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 4.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 3.000
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 15.000
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 12.000
INLET (COMPL)(PCO)(6FT)(LEFT)
EA 3.000
INLET (COMPL)(PCU)(6FT)(BOTH)
EA 1.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 4.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
EA 3.000
JUNCT BOX (COMPL)(JB)(7FT X 5FT)(FTW)
EA 3.000
ADJUSTING MANHOLES
EA 3.000
REMOV STR (INLET)
EA 22.000
REMOV STR (MANHOLE)
EA 3.000
REMOV STR (PIPE)
LF 543.000
MOBILIZATION
LS 1.000
Added
MOBILIZATION (CALLOUT)
EA 2.000
Qty Changed
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,440.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,523.000
CONSTRUCTION EXITS (REMOVE)
SY 1,523.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,104.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,104.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 570.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 570.000
CONSTRUCTING DETOURS
SY 5,812.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 3,300.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 520.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 7,180.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 840.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 2,980.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 400.000
COLORED TEXTURED CONC (5")
SY 8,043.000
CONC CURB (TY I)
LF 14,304.000
CONC CURB (TY II)
LF 1,010.000
CONC CURB (TY F3)
LF 100.000
Qty Changed
DRIVEWAYS (CONC)
SY 300.000
DRIVEWAYS (CONC) (HES)
SY 942.000
CONC SIDEWALKS (4")
SY 5,697.000
CURB RAMPS (TY 1)
EA 5.000
CURB RAMPS (TY 2)
EA 15.000
CURB RAMPS (TY 20)
EA 7.000
REMOVE RD IL ASM (TRANS-BASE)
EA 13.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 43.000
IN RD IL (TY SA) 50T-8-8 (400W EQ) LED
EA 1.000
TEMP RD IL SETUP AND REMOVE
EA 20.000
TEMP RD IL MAINTAIN SYSTEM
MO 18.000
CONDT (PVC) (SCH 40) (2")
LF 8,805.000
CONDT (PVC) (SCH 40) (3")
LF 2,749.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,219.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,958.000
ELEC CONDR (NO.8) BARE
LF 10,282.000
ELEC CONDR (NO.8) INSULATED
LF 21,444.000
ELEC CONDR (NO.6) BARE
LF 521.000
ELEC CONDR (NO.6) INSULATED
LF 1,042.000
GROUND BOX TY A (122311)W/APRON
EA 41.000
REMOVE GROUND BOX
EA 10.000
REMOVE ELECTRICAL SERVICES
EA 2.000
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
EA 3.000
ALUMINUM SIGNS (TY O)
SF 821.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 56.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 47.000
INS OH SN SUP(70 FT BRDG)
EA 2.000
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 1,653.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 30,782.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 161.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 31,842.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 726.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 509.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 131.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 416.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,011.000
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 565.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,164.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 605.000
RE PM TY I (W)6"(BRK)(090MIL)(CALLOUT)
LF 720.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 11,844.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 7,724.000
PREFAB PM TY C (W)(ARROW)
EA 21.000
PREFAB PM TY C (W)(DBL ARROW)
EA 23.000
PREFAB PM TY C (W)(WORD)
EA 4.000
PREFAB PM TY C (W)(SYMBOL)
EA 22.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 84.000
ELIM EXT PM & MRKS (6")
LF 3,043.000
ELIM EXT PM & MRKS (24") (CALLOUT)
LF 93.000
STRIP MOWING
AC 3.000
Qty Changed
LITTER REMOVAL
CYC 22.000
Qty Changed
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 22.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 2.000
Qty Changed
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 22.000
Qty Changed
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 22.000
Qty Changed
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 22.000
BONDING COURSE
GAL 3,955.000
COMM CABLE (UNDRGRND)(19 AWG)(6 PAIR)
LF 254.000
SDR26 PVC C900 WWL ABAND INC GROUT 8"
LF 345.000
SDR26 PVC C900 WWL ABAND INC GROUT 12"
LF 163.000
SDR26 PVC C900 REMOV EXC & BKFL 6"
LF 166.000
SDR26 PVC C900 WWL OPEN CUT 8"
LF 85.000
SDR26 PVC C900 8" IN 18" STL CAS O CUT
LF 50.000
SDR26 PVC C900 WWL 8" IN 18" STL CAS JB
LF 225.000
SDR26 PVC C900 WWL OPEN CUT 12"
LF 362.000
MANHOLE ABANDONMENT
EA 3.000
SS MANHOLE 6' DEPTH 4' DIA
EA 6.000
EXTRA DEPTH SS MANHOLE>6'DEPTH 4' DIA
EA 50.000
SS DROP MANHOLE 6' DEPTH 4' DIA
EA 2.000
MANHOLE REMOVAL
EA 2.000
Added
SEWER BYPASS PUMPING
LS 1.000
PVC WL INSTL OPEN CUT 8 IN
LF 509.000
PVE WL INSTL OPEN CUT 16 IN
LF 549.000
STL CAS INSTL OPEN CUT 30 IN MIN
LF 70.000
DI WL REMOV INC EXC & BKFL 6 IN
LF 403.000
DI WL ABAND INC GROUT 6 IN
LF 200.000
PVC WL REMOV INC EXC & BKFL 8 IN
LF 265.000
GATE VALVE ASSEMBLY 6 IN
EA 2.000
GATE VALVE ASSEMBLY 8 IN
EA 5.000
GATE VALVE ASSEMBLY 16 IN
EA 3.000
PVC WL ABAND INC GROUT 8 IN
LF 358.000
PVC WL 8" WITHIN 18" STL CAS OPEN CUT
LF 114.000
PVC WL 8" WITHIN 18" STL CAS JACK BORE
LF 107.000
FIRE HYDRANT ASSEMBLY
EA 2.000
REMOVE FIRE HYDRANT ASSEMBLY
EA 1.000
TIE INTO EXISTING WL
EA 6.000
AIR RELEASE VALVE 2 IN
EA 2.000
TEMPORARY WATER SERVICE
EA 1.000
Added
WL FITTINGS AND ACCESSORIES
TON 3.120
Added
HYDROSTATIC TESTING
EA 4.000
Removed CEMENT TON 1,680.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,800.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $62,800.00