Show Job Controls
Bid Cobra

COMAL IH 35 (0016-05-109)

Items: 89

County: COMAL
Length: N/A
Highway: IH 35
District: SAN ANTONIO
Control Number: 0016-05-109
DBE Goal: N/A
Project: NH 2017(152)
Guaranty: N/A
Time: 159 WORKING DAYS
Engineer's Estimate: $8,480,601.48
Date: 12/01/2016 (9 years ago)
Contract Number: N/A
Type: SEAL COAT, PFC OVERLAY, PAVEMENT MARKINGS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$8,480,601.48
$6,295,132.13
Over/Under Est: -25.77% -$2,185,469.35
Over/Under Est: -20.4% -$1,729,755.98
Amt Left: 7.24% $455,713.37
Over/Under Est: -19.14% -$1,623,537.01
Amt Left: 8.93% $561,932.34
Delta: -1.57% -$106,218.97
$7,048,748.07
Over/Under Est: -16.88% -$1,431,853.41
Amt Left: 11.97% $753,615.94
Delta: -2.80% -$191,683.60

Bid Items & Bid Tabulations

89 Total 0 of 89
COMAL  |  IH 35  |  SAN ANTONIO  |  0016-05-109  |  12/01/2016  |  $8,480,601.48  |  NH 2017(152)  |  SEAL COAT, PFC OVERLAY, PAVMT MRK  |  159 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
HUNTER INDUSTRIES, LTD.
CLARK CONSTRUCTION OF TEXAS, INC.
AUSTIN MATERIALS, LLC
REMOVING CONCRETE(MOW STRIP)
LF 250.000 $10.000 $20.000 $8.000 $20.000 $10.960
EXCAVATION (ROADWAY)
CY 5,551.000 $7.850 $11.500 $18.930 $11.570 $13.940
PROOF ROLLING
HR 40.000 $75.000 $60.000 $57.000 $144.000 $84.360
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 2,776.000 $23.000 $49.950 $41.390 $36.820 $45.850
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 107,244.000 $4.187 $0.000 $2.240 $0.000 $0.000
AGGR (TY-B GR-5)
CY 3,251.000 $75.000 $0.000 $24.180 $0.000 $0.000
D-GR HMA(SQ) TY-C PG64-22 (LEVEL-UP)
TON 271.000 $120.830 $62.000 $66.030 $197.090 $85.000
D-GR HMA TY-D PG64-22
TON 27,252.000 $45.045 $58.000 $53.940 $0.000 $0.000
PFC (ASPHALT) PG76-22
TON 1,531.000 $120.830 $0.000 $87.540 $0.000 $0.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 23,944.000 $120.830 $0.000 $87.540 $0.000 $0.000
SUPERPAVE MIXTURES SP-B PG64-22
TON 3,830.000 $78.000 $59.000 $61.470 $64.450 $60.000
SUPERPAVE MIXTURES SP-C PG70-22
TON 958.000 $78.000 $61.000 $71.280 $70.970 $78.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 7,900.000 $45.000 $33.250 $34.840 $48.390 $36.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 4,813.000 $60.000 $41.250 $43.260 $53.490 $39.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 14,399.000 $30.000 $8.500 $8.650 $15.390 $13.000
PLANE ASPH CONC PAV(0" TO 2")
SY 4,000.000 $2.500 $2.250 $1.820 $5.000 $3.000
PLANE ASPH CONC PAV (2")
SY 247,742.000 $1.280 $0.990 $1.070 $0.000 $0.000
TEMPORARY SPL SHORING
SF 6,054.000 $8.930 $5.000 $1.000 $5.000 $5.020
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $300.000 $675.000 $500.000 $600.000 $650.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,200.000 $16.000 $26.000 $36.000 $29.000 $16.610
MOBILIZATION
LS 1.000 $767,255.000 $290,000.000 $613,741.760 $350,000.000 $699,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $4,000.000 $5,000.000 $2,558.560 $7,000.000 $11,102.750
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 100.000 $50.000 $15.000 $13.790 $14.500 $19.050
CONSTRUCTION EXITS (REMOVE)
SY 100.000 $25.000 $1.000 $6.590 $6.500 $8.430
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,980.000 $30.000 $16.000 $10.000 $22.000 $30.200
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 260.000 $33.000 $16.000 $20.000 $30.000 $27.130
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 20.000 $42.000 $16.000 $100.000 $30.000 $78.770
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,460.000 $11.000 $11.000 $10.000 $15.000 $7.480
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 260.000 $7.800 $11.000 $20.000 $15.000 $8.720
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 20.000 $11.500 $11.000 $100.000 $15.000 $14.260
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,980.000 $10.000 $13.000 $10.000 $15.000 $7.570
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 260.000 $11.000 $13.000 $20.000 $15.000 $7.880
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 20.000 $8.000 $13.000 $100.000 $15.000 $17.060
RUMBLE STRIPS (SHOULDER)
LF 90,394.000 $0.210 $0.250 $0.200 $0.130 $0.130
MTL W-BEAM GD FEN (TIM POST)
LF 2,975.000 $17.000 $18.250 $17.100 $18.250 $17.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,500.000 $1,325.000 $1,758.790 $2,580.000 $1,258.790
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $850.000 $1,000.000 $963.720 $850.000 $963.720
REMOVE METAL BEAM GUARD FENCE
LF 2,975.000 $2.000 $1.050 $1.000 $2.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $200.000 $160.000 $150.000 $150.000 $150.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $220.000 $160.000 $150.000 $175.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,300.000 $2,350.000 $2,287.000 $2,125.000 $2,287.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $250.000 $265.000 $250.000 $270.000 $250.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $7,500.000 $8,900.000 $8,500.000 $7,500.000 $8,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,400.000 $900.000 $850.000 $1,500.000 $850.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $700.000 $505.000 $500.000 $750.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 450.000 $9.000 $11.250 $14.150 $18.000 $14.150
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 120.000 $9.000 $15.250 $16.040 $19.000 $16.040
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 5,375.000 $0.500 $0.290 $0.280 $0.160 $0.280
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 10,200.000 $0.500 $0.250 $0.240 $0.160 $0.240
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 10,200.000 $0.500 $0.250 $0.240 $0.160 $0.240
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 665.000 $0.600 $2.350 $2.310 $3.000 $2.310
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,055.000 $0.600 $2.350 $2.290 $3.000 $2.290
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 16.000 $175.000 $80.000 $78.000 $125.000 $78.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 16.000 $175.000 $152.000 $150.000 $125.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $236.000 $98.000 $97.000 $125.000 $97.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 8.000 $900.000 $750.000 $743.000 $450.000 $743.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 8.000 $1,150.000 $750.000 $743.000 $450.000 $743.000
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 3,920.000 $0.520 $0.750 $0.740 $0.600 $0.740
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 1,230.000 $0.520 $1.250 $1.200 $0.700 $1.200
REFL PAV MRK TY II (W) 4" (SLD)
LF 45,196.000 $0.450 $0.190 $0.180 $0.140 $0.180
REFL PAV MRK TY II (W) 6" (BRK)
LF 33,015.000 $0.520 $0.280 $0.270 $0.160 $0.270
REFL PAV MRK TY II (W) 12" (LNDP)
LF 665.000 $0.600 $1.500 $1.400 $2.000 $1.400
REFL PAV MRK TY II (W) 12" (SLD)
LF 2,055.000 $0.450 $1.150 $1.110 $2.000 $1.110
REFL PAV MRK TY II (W) (ARROW)
EA 16.000 $175.600 $65.000 $63.000 $55.000 $63.000
REFL PAV MRK TY II (W) (NUMBER)
EA 16.000 $175.000 $41.000 $40.000 $55.000 $40.000
REFL PAV MRK TY II (W) (WORD)
EA 16.000 $200.000 $68.000 $67.000 $55.000 $67.000
REFL PAV MRK TY II (W) (ENTR GORE)
EA 8.000 $800.000 $460.000 $450.000 $150.000 $450.000
REFL PAV MRK TY II (W) (EXIT GORE)
EA 8.000 $800.000 $460.000 $450.000 $150.000 $450.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 45,196.000 $0.500 $0.190 $0.180 $0.160 $0.180
REFL PAV MRK TY II (BLACK) 4"(SHADOW)
LF 3,920.000 $0.520 $0.550 $0.500 $0.200 $0.500
REFL PAV MRK TY II (BLACK) 6"(SHADOW)
LF 1,230.000 $0.520 $0.550 $0.500 $0.250 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 45,196.000 $0.390 $0.370 $0.360 $0.320 $0.360
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 33,015.000 $0.390 $0.500 $0.480 $0.380 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 45,196.000 $0.390 $0.370 $0.360 $0.320 $0.360
REFL PAV MRKR TY I-R
EA 112.000 $8.000 $8.750 $8.000 $15.000 $8.000
REFL PAV MRKR TY II-C-R
EA 2,392.000 $8.000 $3.500 $3.300 $3.000 $3.300
ELIM EXT PAV MRK & MRKS (4")
LF 46,500.000 $1.000 $0.650 $0.330 $2.500 $0.690
LITTER REMOVAL
CYC 7.000 $1,800.000 $250.000 $2,750.000 $1,400.000 $2,073.810
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 7.000 $1,800.000 $250.000 $4,000.000 $2,650.000 $1,790.550
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 7.000 $1,800.000 $250.000 $4,000.000 $2,650.000 $1,790.550
CAM (AGGREGATE)
TON 900.000 $90.000 $90.000 $104.880 $83.990 $93.500
CAM (ASPHALT)(PG 64-22)
TON 57.000 $90.000 $90.000 $104.880 $83.990 $93.500
GEOGRID BASE REINFORCEMENT (TY II)
SY 8,327.400 $2.000 $1.200 $2.050 $1.840 $1.650
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $75.000 $50.000 $156.450 $80.000 $95.000
1
HIR (SURFACE) (2")
SY 247,742.000 $5.400 $0.000 $0.000 $5.250 $5.250
1
HIR (RECYCLING AGENT)
GAL 123,871.000 $1.670 $0.000 $0.000 $2.750 $2.750
2
TBPFC (MEMBRANE)
GAL 107,244.000 $6.460 $1.500 $0.000 $1.950 $2.550
2
TBPFC (ASPHALT)(PG 76-22)
TON 1,531.000 $120.830 $89.000 $0.000 $95.210 $98.000
2
TBPFC (AGGREGATE) (SAC-A)
TON 23,944.000 $120.830 $89.000 $0.000 $95.210 $98.000
Totals: $13,796,277.458 $6,295,132.130 $6,750,845.500 $6,857,064.476 $7,048,748.070