REMOVING CONCRETE(MOW STRIP)
|
LF
|
250.000
|
$10.000
|
$20.000
|
$8.000
|
$20.000
|
$10.960
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,551.000
|
$7.850
|
$11.500
|
$18.930
|
$11.570
|
$13.940
|
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$75.000
|
$60.000
|
$57.000
|
$144.000
|
$84.360
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
2,776.000
|
$23.000
|
$49.950
|
$41.390
|
$36.820
|
$45.850
|
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
107,244.000
|
$4.187
|
$0.000
|
$2.240
|
$0.000
|
$0.000
|
|
|
|
AGGR (TY-B GR-5)
|
CY
|
3,251.000
|
$75.000
|
$0.000
|
$24.180
|
$0.000
|
$0.000
|
|
|
|
D-GR HMA(SQ) TY-C PG64-22 (LEVEL-UP)
|
TON
|
271.000
|
$120.830
|
$62.000
|
$66.030
|
$197.090
|
$85.000
|
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
27,252.000
|
$45.045
|
$58.000
|
$53.940
|
$0.000
|
$0.000
|
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
1,531.000
|
$120.830
|
$0.000
|
$87.540
|
$0.000
|
$0.000
|
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
23,944.000
|
$120.830
|
$0.000
|
$87.540
|
$0.000
|
$0.000
|
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
3,830.000
|
$78.000
|
$59.000
|
$61.470
|
$64.450
|
$60.000
|
|
|
|
SUPERPAVE MIXTURES SP-C PG70-22
|
TON
|
958.000
|
$78.000
|
$61.000
|
$71.280
|
$70.970
|
$78.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
7,900.000
|
$45.000
|
$33.250
|
$34.840
|
$48.390
|
$36.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
4,813.000
|
$60.000
|
$41.250
|
$43.260
|
$53.490
|
$39.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
14,399.000
|
$30.000
|
$8.500
|
$8.650
|
$15.390
|
$13.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
4,000.000
|
$2.500
|
$2.250
|
$1.820
|
$5.000
|
$3.000
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
247,742.000
|
$1.280
|
$0.990
|
$1.070
|
$0.000
|
$0.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
6,054.000
|
$8.930
|
$5.000
|
$1.000
|
$5.000
|
$5.020
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
10.000
|
$300.000
|
$675.000
|
$500.000
|
$600.000
|
$650.000
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,200.000
|
$16.000
|
$26.000
|
$36.000
|
$29.000
|
$16.610
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$767,255.000
|
$290,000.000
|
$613,741.760
|
$350,000.000
|
$699,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$4,000.000
|
$5,000.000
|
$2,558.560
|
$7,000.000
|
$11,102.750
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
100.000
|
$50.000
|
$15.000
|
$13.790
|
$14.500
|
$19.050
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
100.000
|
$25.000
|
$1.000
|
$6.590
|
$6.500
|
$8.430
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,980.000
|
$30.000
|
$16.000
|
$10.000
|
$22.000
|
$30.200
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
260.000
|
$33.000
|
$16.000
|
$20.000
|
$30.000
|
$27.130
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$42.000
|
$16.000
|
$100.000
|
$30.000
|
$78.770
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,460.000
|
$11.000
|
$11.000
|
$10.000
|
$15.000
|
$7.480
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
260.000
|
$7.800
|
$11.000
|
$20.000
|
$15.000
|
$8.720
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$11.500
|
$11.000
|
$100.000
|
$15.000
|
$14.260
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,980.000
|
$10.000
|
$13.000
|
$10.000
|
$15.000
|
$7.570
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
260.000
|
$11.000
|
$13.000
|
$20.000
|
$15.000
|
$7.880
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
20.000
|
$8.000
|
$13.000
|
$100.000
|
$15.000
|
$17.060
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
90,394.000
|
$0.210
|
$0.250
|
$0.200
|
$0.130
|
$0.130
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,975.000
|
$17.000
|
$18.250
|
$17.100
|
$18.250
|
$17.100
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,500.000
|
$1,325.000
|
$1,758.790
|
$2,580.000
|
$1,258.790
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$850.000
|
$1,000.000
|
$963.720
|
$850.000
|
$963.720
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,975.000
|
$2.000
|
$1.050
|
$1.000
|
$2.000
|
$1.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$200.000
|
$160.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$220.000
|
$160.000
|
$150.000
|
$175.000
|
$150.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,300.000
|
$2,350.000
|
$2,287.000
|
$2,125.000
|
$2,287.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$250.000
|
$265.000
|
$250.000
|
$270.000
|
$250.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$7,500.000
|
$8,900.000
|
$8,500.000
|
$7,500.000
|
$8,500.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,400.000
|
$900.000
|
$850.000
|
$1,500.000
|
$850.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$700.000
|
$505.000
|
$500.000
|
$750.000
|
$500.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
450.000
|
$9.000
|
$11.250
|
$14.150
|
$18.000
|
$14.150
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
120.000
|
$9.000
|
$15.250
|
$16.040
|
$19.000
|
$16.040
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
5,375.000
|
$0.500
|
$0.290
|
$0.280
|
$0.160
|
$0.280
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
10,200.000
|
$0.500
|
$0.250
|
$0.240
|
$0.160
|
$0.240
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
10,200.000
|
$0.500
|
$0.250
|
$0.240
|
$0.160
|
$0.240
|
|
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
665.000
|
$0.600
|
$2.350
|
$2.310
|
$3.000
|
$2.310
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,055.000
|
$0.600
|
$2.350
|
$2.290
|
$3.000
|
$2.290
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
16.000
|
$175.000
|
$80.000
|
$78.000
|
$125.000
|
$78.000
|
|
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
16.000
|
$175.000
|
$152.000
|
$150.000
|
$125.000
|
$150.000
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
16.000
|
$236.000
|
$98.000
|
$97.000
|
$125.000
|
$97.000
|
|
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
8.000
|
$900.000
|
$750.000
|
$743.000
|
$450.000
|
$743.000
|
|
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
8.000
|
$1,150.000
|
$750.000
|
$743.000
|
$450.000
|
$743.000
|
|
|
|
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
|
LF
|
3,920.000
|
$0.520
|
$0.750
|
$0.740
|
$0.600
|
$0.740
|
|
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
1,230.000
|
$0.520
|
$1.250
|
$1.200
|
$0.700
|
$1.200
|
|
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
45,196.000
|
$0.450
|
$0.190
|
$0.180
|
$0.140
|
$0.180
|
|
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
33,015.000
|
$0.520
|
$0.280
|
$0.270
|
$0.160
|
$0.270
|
|
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
665.000
|
$0.600
|
$1.500
|
$1.400
|
$2.000
|
$1.400
|
|
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
2,055.000
|
$0.450
|
$1.150
|
$1.110
|
$2.000
|
$1.110
|
|
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
16.000
|
$175.600
|
$65.000
|
$63.000
|
$55.000
|
$63.000
|
|
|
|
REFL PAV MRK TY II (W) (NUMBER)
|
EA
|
16.000
|
$175.000
|
$41.000
|
$40.000
|
$55.000
|
$40.000
|
|
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
16.000
|
$200.000
|
$68.000
|
$67.000
|
$55.000
|
$67.000
|
|
|
|
REFL PAV MRK TY II (W) (ENTR GORE)
|
EA
|
8.000
|
$800.000
|
$460.000
|
$450.000
|
$150.000
|
$450.000
|
|
|
|
REFL PAV MRK TY II (W) (EXIT GORE)
|
EA
|
8.000
|
$800.000
|
$460.000
|
$450.000
|
$150.000
|
$450.000
|
|
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
45,196.000
|
$0.500
|
$0.190
|
$0.180
|
$0.160
|
$0.180
|
|
|
|
REFL PAV MRK TY II (BLACK) 4"(SHADOW)
|
LF
|
3,920.000
|
$0.520
|
$0.550
|
$0.500
|
$0.200
|
$0.500
|
|
|
|
REFL PAV MRK TY II (BLACK) 6"(SHADOW)
|
LF
|
1,230.000
|
$0.520
|
$0.550
|
$0.500
|
$0.250
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
45,196.000
|
$0.390
|
$0.370
|
$0.360
|
$0.320
|
$0.360
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
33,015.000
|
$0.390
|
$0.500
|
$0.480
|
$0.380
|
$0.480
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
45,196.000
|
$0.390
|
$0.370
|
$0.360
|
$0.320
|
$0.360
|
|
|
|
REFL PAV MRKR TY I-R
|
EA
|
112.000
|
$8.000
|
$8.750
|
$8.000
|
$15.000
|
$8.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,392.000
|
$8.000
|
$3.500
|
$3.300
|
$3.000
|
$3.300
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
46,500.000
|
$1.000
|
$0.650
|
$0.330
|
$2.500
|
$0.690
|
|
|
|
LITTER REMOVAL
|
CYC
|
7.000
|
$1,800.000
|
$250.000
|
$2,750.000
|
$1,400.000
|
$2,073.810
|
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
7.000
|
$1,800.000
|
$250.000
|
$4,000.000
|
$2,650.000
|
$1,790.550
|
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
7.000
|
$1,800.000
|
$250.000
|
$4,000.000
|
$2,650.000
|
$1,790.550
|
|
|
|
CAM (AGGREGATE)
|
TON
|
900.000
|
$90.000
|
$90.000
|
$104.880
|
$83.990
|
$93.500
|
|
|
|
CAM (ASPHALT)(PG 64-22)
|
TON
|
57.000
|
$90.000
|
$90.000
|
$104.880
|
$83.990
|
$93.500
|
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
8,327.400
|
$2.000
|
$1.200
|
$2.050
|
$1.840
|
$1.650
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
200.000
|
$75.000
|
$50.000
|
$156.450
|
$80.000
|
$95.000
|
|
1
|
|
HIR (SURFACE) (2")
|
SY
|
247,742.000
|
$5.400
|
$0.000
|
$0.000
|
$5.250
|
$5.250
|
|
1
|
|
HIR (RECYCLING AGENT)
|
GAL
|
123,871.000
|
$1.670
|
$0.000
|
$0.000
|
$2.750
|
$2.750
|
|
2
|
|
TBPFC (MEMBRANE)
|
GAL
|
107,244.000
|
$6.460
|
$1.500
|
$0.000
|
$1.950
|
$2.550
|
|
2
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
1,531.000
|
$120.830
|
$89.000
|
$0.000
|
$95.210
|
$98.000
|
|
2
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
23,944.000
|
$120.830
|
$89.000
|
$0.000
|
$95.210
|
$98.000
|
|
Totals: |
$13,796,277.458
|
$6,295,132.130
|
$6,750,845.500
|
$6,857,064.476
|
$7,048,748.070
|