Show Job Controls
Bid Cobra

COLORADO US 90 (0027-01-042)

Items: 90

County: COLORADO
Length: N/A
Highway: US 90
District: YOAKUM
Control Number: 0027-01-042
DBE Goal: 700.0%
Project: BR 2B24(201)
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $6,426,508.80
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
RYAN SIMPER
PAUL RODRIGUEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$6,426,508.80
1
Awarded
$7,530,900.00
Over/Under Est: 17.18% $1,104,391.20
Over/Under Est: 64.72% $4,159,409.74
Amt Left: 40.57% $3,055,018.54
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 1.65% $124,259.85
STRIPE LINES, INC. 0.82% $61,753.38
Total: 2.47% $186,013.23

Bid Items & Bid Tabulations

90 Total 0 of 90
COLORADO  |  US 90  |  YOAKUM  |  0027-01-042  |  06/05/2024  |  $6,426,508.80  |  BR 2B24(201)  |  BRIDGE MAINT  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CEKRA INC.
SOUTHERN ROAD & BRIDGE, LLC
BLADING
HR 10.000 $155.000 $190.000 $500.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 104.000 $1.000 $0.250 $8.000
BROADCAST SEED (TEMP) (WARM)
SY 26.000 $1.000 $0.250 $50.000
BROADCAST SEED (TEMP) (COOL)
SY 26.000 $1.000 $0.500 $50.000
VEGETATIVE WATERING
MG 0.870 $50.000 $20.000 $25,000.000
AGGR(TY-PE GR-4 SAC-B)
CY 7.000 $175.000 $1,000.000 $450.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 322.000 $6.000 $22.000 $250.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 100.000 $75.000 $175.000 $125.000
PLANE ASPH CONC PAV (6")
SY 949.000 $4.500 $23.000 $35.000
CL C CONC (RAIL FOUNDATION)
CY 52.100 $750.000 $500.000 $1,850.000
REINF CONC SLAB
SF 17,858.000 $24.000 $35.000 $5.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 200.000 $200.000 $500.000 $650.000
RIPRAP (CONC)(5 IN)
CY 24.000 $550.000 $580.000 $1,500.000
RIPRAP (MOW STRIP)(5 IN)
CY 3.300 $450.000 $500.000 $1,500.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 100.000 $6.000 $150.000 $95.000
STR STEEL (DIAPHRAGM & STIFFENER)
LB 8,415.000 $15.000 $8.000 $85.000
STR STEEL (SHEAR CONNECTOR)
LB 19,361.000 $12.000 $9.000 $38.000
STR STEEL (MISC NON-BRIDGE TYPE 1)
EA 1.000 $20,000.000 $350.000 $25,000.000
CLEAN AND PAINT EXIST STR (REF NO.1)
LS 1.000 $100,000.000 $200,000.000 $65,000.000
CLEAN AND PAINT EXIST STR (REF NO.2)
LS 1.000 $250,000.000 $607,086.600 $1,450,000.000
CLEAN AND PAINT EXIST STR (REF NO.3)
LS 1.000 $200,000.000 $490,000.000 $1,250,000.000
RAIL (TY T223)
LF 176.660 $140.000 $150.000 $350.000
RAIL (TY C1W)
LF 1,735.100 $250.000 $280.000 $395.000
ARMOR JOINT (SEALED)
LF 69.000 $300.000 $175.000 $777.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 92.000 $350.000 $100.000 $650.000
PIPE (PVC) (SCH 40) (4 IN)
LF 341.000 $69.000 $60.000 $95.000
REMOV STR (BRIDGE SLAB)
LF 765.500 $200.000 $750.000 $450.000
MOBILIZATION
LS 1.000 $590,000.000 $770,000.000 $850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,000.000 $18,000.000 $7,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $5.000 $5.000 $15.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $2.000 $2.000 $15.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 330.000 $50.000 $100.000 $95.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 120.000 $7.000 $85.000 $65.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 450.000 $15.000 $65.000 $65.000
DRIVEWAYS (ACP)
SY 30.000 $85.000 $125.000 $195.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $26.000 $28.000 $63.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,400.000 $2,700.000 $3,502.500
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $3.500 $5.000 $4.500
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $300.000 $375.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,200.000 $3,500.000 $5,434.500
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $350.000 $250.000 $375.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $1,400.000 $2,775.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $25,000.000 $9,500.000 $39,525.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 2.000 $35,000.000 $40,000.000 $45,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $9,000.000 $9,500.000 $12,500.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 14.000 $30.000 $40.000 $150.860
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 6.000 $600.000 $750.000 $552.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $650.000 $900.000 $502.500
REMOVE SM RD SN SUP&AM
EA 12.000 $100.000 $150.000 $105.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 16.000 $35.000 $34.000 $31.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $70.000 $300.000 $42.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 544.000 $1.500 $2.000 $3.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 3,880.000 $1.500 $2.500 $2.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 490.000 $2.000 $3.500 $3.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 5,410.000 $1.500 $3.500 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 272.000 $2.000 $2.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 490.000 $0.950 $5.000 $2.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 544.000 $1.100 $6.000 $3.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 3,880.000 $1.100 $6.000 $2.250
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 5,410.000 $1.100 $6.000 $2.250
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 110.000 $17.000 $35.000 $25.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 3.000 $260.000 $350.000 $375.000
PREFAB PAV MRK TY C (W) (WORD)
EA 3.000 $850.000 $350.000 $547.500
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 443.000 $17.000 $40.000 $25.000
REFL PAV MRKR TY I-C
EA 80.000 $6.000 $9.000 $9.000
REFL PAV MRKR TY II-A-A
EA 272.000 $6.000 $9.000 $8.250
ELIM EXT PAV MRK & MRKS (4")
LF 9,413.000 $1.000 $1.000 $1.500
ELIM EXT PAV MRK & MRKS (8")
LF 635.000 $1.500 $1.500 $3.000
ELIM EXT PAV MRK & MRKS (12")
LF 200.000 $2.000 $2.000 $4.500
ELIM EXT PAV MRK & MRKS (24")
LF 70.000 $4.000 $4.000 $15.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 3.000 $65.000 $20.000 $450.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 3.000 $70.000 $25.000 $450.000
CONCRETE POST REPLACEMENT
EA 90.000 $900.000 $400.000 $950.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 520.000 $840.000 $100.000 $850.000
REP STL BRIDGE MEMBER (TRUSS VERTICAL)
EA 2.000 $11,500.000 $4,100.000 $78,500.000
REP STL BRIDGE MEMBER (TRUSS DIAGONAL)
EA 3.000 $11,500.000 $4,500.000 $9,500.000
REP STL BRIDGE MEMBER(TRUSS SWAY BRACE)
EA 7.000 $11,500.000 $15,000.000 $38,500.000
REP STL BRIDGE MEMBER (BOTTOM CHORD)
EA 10.000 $8,000.000 $12,000.000 $18,500.000
REP STL BRIDGE MEMBER (TOP CHORD)
EA 1.000 $8,000.000 $12,000.000 $9,500.000
REP STL BRIDGE MEMBER (ENDPOST)
EA 12.000 $8,000.000 $6,500.000 $12,500.000
REP STL BRDG MEMB (TRUSS PORTAL BRACE)
EA 3.000 $8,000.000 $11,000.000 $12,500.000
REP STL BRIDGE MEMBER (FLOORBEAM)
EA 9.000 $20,000.000 $35,000.000 $7,500.000
REP STL BRIDGE MEMBER (STRINGER)
EA 3.000 $12,500.000 $8,750.000 $28,500.000
REP STL BRIDGE MEMBER (GUSSET CON)
EA 18.000 $10,000.000 $6,000.000 $8,500.000
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
EA 16.000 $25,000.000 $2,000.000 $25,000.000
REP STL BRIDGE MEMBER(REPL RIVET/BOLT)
EA 13,500.000 $125.000 $125.000 $80.000
D-GR HMA TY-B PG64-22
TON 209.000 $165.000 $225.000 $350.000
D-GR HMA TY-D SAC-B PG70-22
TON 130.000 $165.000 $250.000 $350.000
TMA (STATIONARY)
DAY 6.000 $250.000 $650.000 $350.000
TMA (MOBILE OPERATION)
DAY 6.000 $320.000 $1,000.000 $1,250.000
Totals: $6,426,508.800 $7,530,900.000 $10,585,918.540