Show Job Controls
Bid Cobra

COLLIN FM 2933 (2977-01-011)

Items: 119

County: COLLIN
Length: 5.6440 MILES
Highway: FM 2933
District: DALLAS
Control Number: 2977-01-011
DBE Goal: 0.0%
Project: F 2026(860)
Guaranty: $100,000.00
Time: 257 WORKING DAYS
Engineer's Estimate: $12,347,605.91
Date: 1:00 PM JULY 02, 2026 (in 22 days)
Contract Number: 7263239
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00188996
Contract Type: Federal
Project Description: RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JENNIFER VORSTER
DEREJE TESEMMA
COLLIN FM 2933 (2977-01-011)
Project Name: N/A
Project: F 2026(860)
Length: 5.6440 MILES
Project Type: CONSTRUCTION
Limits From: CR 335
Limits To: FM 545
Project Description: RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

119 Total 0 of 119
COLLIN  |  FM 2933  |  DALLAS  |  2977-01-011  |  1:00 PM JULY 02, 2026  |  $12,347,605.91  |  F 2026(860)  |  REHAB EXIST ROADWAY  |  257 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 297.810
REMOV CONC (DRIVEWAYS)
SY 925.000
REMOV CONC (FLUME)
SY 18.000
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 6,348.000
EXCAV (ROADWAY)
CY 13,236.000
EXCAV (CHANNEL)
CY 32.000
EMBANK (FNL)(DC)(TY C)
CY 11,563.000
BLADING
STA 297.140
DRILL SEED (PERM_RURAL_CLAY)
SY 233,514.000
DRILL SEED (TEMP_WARM_COOL)
SY 233,514.000
VEGETATIVE WATERING
TGL 69,480.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 9,335.000
FL BS (CMP IN PLC)(TY D GR-1-2)(9")
SY 101,204.000
REWORK BS MTL (TY C)(6")(ORD COMP)
SY 9,918.000
REWORK BS MTL (TY C)(9")(ORD COMP)
SY 57,145.000
CEMENT
TON 531.000
CEMENT TRT (EXIST MATL)(6")
SY 5,804.000
CEMENT TRT (EXIST MATL & NEW BASE)(6")
SY 98,706.000
PRIME COAT(MC-30 OR AE-P)
GAL 30,363.000
ASPH (CRS-2P)
GAL 16,876.000
ASPH (RC-250)
GAL 13,499.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 13,499.000
AGGR (TY-B OR L, GR-3)(SAC-B)
CY 647.000
AGGR (TY-B OR L, GR-5)
CY 277.000
SP MIXES SP-C SAC-B PG64-22
TON 17,512.000
TACK COAT
GAL 16.000
PLANE & TEXT ASPH CONC PAV(6" TO 8")
SY 16,234.000
PLANE & TEXT ASPH CONC PAV(3")
SY 60,063.000
CUT & RESTORING PAV
SY 348.000
CEM STABIL BKFL
CY 186.000
FLOWABLE BACKFILL
CY 30.000
TRENCH EXCAVATION PROTECTION
LF 307.000
TEMPORARY SPL SHORING
SF 1,951.000
RIPRAP (MOW STRIP)(4 IN)
CY 101.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 741.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 604.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 172.000
RETROFIT RAIL (TY T631)
LF 160.000
CONC BOX CULV (5 FT X 5 FT)
LF 214.000
CONC BOX CULV (9 FT X 6 FT)(EXTEND)
LF 6.000
RC PIPE (CL III)(18 IN)
LF 2,614.000
RC PIPE (CL III)(24 IN)
LF 614.000
RC PIPE (CL III)(30 IN)
LF 175.000
RC PIPE (CL III)(36 IN)
LF 178.000
RC PIPE (CL III)(42 IN)
LF 62.000
RC PIPE (CL III)(48 IN)
LF 12.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 6.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 7.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 3.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 2.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 5.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 4.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000
WINGWALL (PW - 1) (HW=12 FT)
EA 2.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 158.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 9.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 22.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000
CLEAN EXIST CULVERTS
EA 12.000
REMOV STR (INLET)
EA 3.000
REMOV STR (SET)
EA 76.000
REMOV STR (WINGWALL)
EA 2.000
REMOV STR (PIPE)
LF 3,753.000
REMOV STR (RET WALL)
LF 112.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 350.000
TMA (MOBILE OPERATION)
HR 200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 670.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 150.000
ROCK FILTER DAMS (REMOVE)
LF 820.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 164.000
CONSTRUCTION EXITS (REMOVE)
SY 164.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,476.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,476.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,113.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,113.000
DRIVEWAYS (CONC) (HES)
SY 904.000
DRIVEWAYS (ACP)
SY 12,024.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 44,491.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 19,753.000
MTL W-BEAM GD FEN (TIM POST)
LF 900.000
REMOVE METAL BEAM GUARD FENCE
LF 587.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 54.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 6.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 7.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 94.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 14.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 14.000
INSTL OM ASSM (OM-2Z)(WFLX)GNDLL
EA 71.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 57,540.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 635.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 22.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 6.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 6.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 61,514.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,012.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 250.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 635.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 309.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 4.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 57,769.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 3,551.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 44,834.000
REFL PAV MRKR TY I-C
EA 84.000
REFL PAV MRKR TY II-A-A
EA 935.000
DRIFTWOOD REMOVAL
CY 10.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $320,663.19
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $213,775.46
Total: $534,438.65