COLLIN FM 1827 (1746-01-027)

Items: 101

County: COLLIN
Length: N/A
Highway: FM 1827
District: DALLAS
Control Number: 1746-01-027
DBE Goal: N/A
Project: STP 1802(377)HESG
Guaranty: N/A
Time: 230 WORKING DAYS
Engineer's Estimate: $5,124,197.68
Date: 07/10/2018 (7 years ago)
Contract Number: N/A
Type: WDN, OV, BS REP
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$5,124,197.68
$5,440,851.66
Over/Under Est: 6.18% $316,653.98
Over/Under Est: 12.78% $654,802.31
Amt Left: 6.21% $338,148.33
Over/Under Est: 15.16% $776,691.74
Amt Left: 8.46% $460,037.76
Delta: -2.11% -$121,889.43
Over/Under Est: 16.36% $838,248.59
Amt Left: 9.59% $521,594.61
Delta: -1.04% -$61,556.85
Over/Under Est: 17.35% $888,880.39
Amt Left: 10.52% $572,226.41
Delta: -0.85% -$50,631.80
Over/Under Est: 19.2% $983,916.39
Amt Left: 12.26% $667,262.41
Delta: -1.58% -$95,036.00
Over/Under Est: 20.89% $1,070,283.12
Amt Left: 13.85% $753,629.14
Delta: -1.41% -$86,366.73
$6,380,919.27
Over/Under Est: 24.53% $1,256,721.59
Amt Left: 17.28% $940,067.61
Delta: -3.01% -$186,438.47

Bid Items & Bid Tabulations

101 Total 0 of 101
COLLIN  |  FM 1827  |  DALLAS  |  1746-01-027  |  07/10/2018  |  $5,124,197.68  |  STP 1802(377)HESG  |  WDN, OV, BS REP  |  230 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
ED BELL CONSTRUCTION COMPANY
OLDCASTLE MATERIALS TEXAS, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
D. L. LENNON INCORPORATED - CONTRACTOR
THE LANE CONSTRUCTION CORPORATION
ACCELERATED CRITICAL PATH, INC.
JAGOE-PUBLIC COMPANY
PREPARING ROW
STA 291.880 $750.000 $150.000 $400.000 $1,337.000 $1,200.000 $1,157.000 $335.000 $360.000 $505.000
REMOVING CONC (PAV)
SY 26.000 $10.000 $150.000 $20.000 $45.000 $110.000 $35.000 $110.000 $50.000 $60.000
REMOVING CONC (DRIVEWAYS)
SY 1,250.000 $12.850 $45.000 $10.000 $17.000 $25.000 $20.000 $28.500 $15.000 $51.500
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 5,730.000 $15.000 $10.000 $5.000 $5.000 $17.000 $12.000 $7.600 $50.000 $6.870
EXCAVATION (ROADWAY)
CY 9,700.000 $8.300 $10.000 $12.500 $12.000 $11.000 $15.000 $11.000 $12.000 $13.900
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,692.000 $15.000 $15.000 $1.000 $12.000 $18.000 $17.000 $42.000 $7.000 $15.500
BACKFILL (TY A OR B)
STA 291.880 $155.000 $530.000 $175.000 $182.000 $300.000 $230.000 $200.000 $220.000 $160.000
BLADING
STA 291.880 $82.000 $115.000 $405.000 $105.000 $300.000 $150.000 $125.000 $120.000 $143.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 64,858.000 $0.320 $0.300 $1.000 $0.270 $0.330 $0.260 $0.330 $1.000 $0.270
DRILL SEED (TEMP)(WARM OR COOL)
SY 64,858.000 $0.130 $0.150 $0.500 $0.120 $0.190 $0.080 $0.200 $0.100 $0.090
VEGETATIVE WATERING
MG 8,544.000 $6.300 $10.000 $20.000 $0.010 $0.100 $0.010 $23.000 $15.000 $31.610
FL BS (CMP IN PL)(TY D GR 4)(8")
SY 185.000 $11.000 $30.000 $45.000 $35.000 $55.000 $12.520 $28.000 $40.000 $49.000
FL BS (CMP IN PLACE)(TY D GR 4)(12")
SY 26,320.000 $17.000 $19.000 $27.250 $23.000 $35.000 $19.630 $38.000 $25.000 $26.000
CEMENT
TON 1.200 $142.000 $250.000 $150.000 $1,600.000 $200.000 $350.000 $350.000 $300.000 $171.000
CEMENT TREAT (NEW BASE)(DC)(8")
SY 185.000 $1.950 $30.000 $5.000 $25.000 $40.000 $25.000 $15.000 $9.000 $18.500
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 4,590.000 $5.000 $3.750 $8.000 $4.050 $6.000 $9.000 $4.100 $5.000 $3.600
ASPH (CRS-2P)
GAL 5,730.000 $3.500 $4.750 $4.300 $3.600 $4.250 $8.700 $4.500 $5.000 $4.470
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 4,816.000 $3.500 $5.250 $4.750 $4.330 $4.650 $7.750 $5.000 $5.000 $4.890
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 215.000 $125.000 $245.000 $250.000 $180.000 $260.000 $115.000 $275.000 $150.000 $273.690
SUPERPAVE MIXTURES SP-B PG64-22
TON 21.000 $66.000 $325.000 $140.000 $300.000 $250.000 $125.000 $225.000 $150.000 $168.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 14,822.000 $80.000 $80.000 $77.000 $89.000 $72.750 $72.500 $88.000 $89.000 $81.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 9,066.000 $56.000 $49.000 $50.000 $46.000 $65.000 $85.250 $75.000 $70.000 $69.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 66,717.000 $1.750 $1.250 $1.500 $1.450 $2.100 $3.500 $1.400 $1.500 $1.450
CONC PVMT (JOINTED - CPCD) (10")
SY 135.000 $75.000 $240.000 $180.000 $155.000 $135.000 $100.000 $150.000 $95.000 $126.000
TRENCH EXCAVATION PROTECTION
LF 14.000 $1.400 $15.000 $160.000 $13.000 $25.000 $20.000 $27.250 $25.000 $84.210
TEMPORARY SPL SHORING
SF 2,976.000 $20.000 $48.000 $35.000 $21.000 $42.000 $45.440 $27.250 $40.000 $32.040
RIPRAP (CONC)(4 IN)
CY 2.200 $360.000 $540.000 $950.000 $600.000 $1,600.000 $450.000 $700.000 $900.000 $525.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 126.000 $137.000 $130.000 $250.000 $110.000 $205.000 $185.000 $150.000 $150.000 $131.580
RIPRAP (MOW STRIP)(4 IN)
CY 34.900 $425.000 $600.000 $800.000 $600.000 $605.000 $450.000 $500.000 $600.000 $550.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 21.000 $460.000 $720.000 $1,100.000 $610.000 $475.000 $525.000 $520.000 $1,000.000 $1,005.270
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 12.000 $945.000 $750.000 $1,250.000 $635.000 $600.000 $575.000 $675.000 $1,500.000 $1,147.380
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 14.000 $710.000 $775.000 $1,600.000 $655.000 $625.000 $700.000 $685.000 $1,200.000 $1,210.540
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 46.000 $1,000.000 $890.000 $1,350.000 $755.000 $525.000 $750.000 $590.000 $1,100.000 $1,157.910
RC PIPE (CL III)(18 IN)
LF 1,899.000 $49.000 $55.000 $90.000 $44.000 $50.000 $45.000 $56.250 $60.000 $126.320
RC PIPE (CL III)(24 IN)
LF 426.000 $67.000 $105.000 $95.000 $90.000 $68.000 $55.000 $76.500 $95.000 $310.530
RC PIPE (CL III)(30 IN)
LF 207.000 $82.000 $140.000 $110.000 $125.000 $89.000 $70.000 $100.000 $150.000 $303.160
RC PIPE (CL III)(36 IN)
LF 138.000 $112.000 $175.000 $140.000 $155.000 $125.000 $100.000 $140.000 $170.000 $351.580
RC PIPE (CL III)(42 IN)
LF 12.000 $139.000 $220.000 $325.000 $197.000 $190.000 $130.000 $215.000 $340.000 $1,210.540
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $2,910.000 $4,150.000 $3,600.000 $3,600.000 $4,000.000 $3,800.000 $4,500.000 $4,500.000 $4,121.090
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 8.000 $5,825.000 $3,600.000 $8,500.000 $3,150.000 $2,800.000 $3,500.000 $3,150.000 $3,200.000 $5,052.680
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 4.000 $10,000.000 $5,400.000 $8,850.000 $4,700.000 $3,600.000 $4,000.000 $4,050.000 $6,500.000 $8,000.070
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $8,680.000 $7,200.000 $12,500.000 $6,222.000 $7,000.000 $6,000.000 $7,875.000 $8,500.000 $12,421.170
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 2.000 $9,975.000 $5,400.000 $12,250.000 $4,650.000 $3,800.000 $4,500.000 $4,275.000 $6,800.000 $8,789.550
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 2.000 $8,480.000 $6,600.000 $16,000.000 $6,000.000 $5,300.000 $6,500.000 $6,000.000 $12,000.000 $21,052.820
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $13,900.000 $11,400.000 $16,000.000 $8,300.000 $6,300.000 $16,000.000 $7,100.000 $13,000.000 $15,421.190
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $17,200.000 $16,100.000 $20,500.000 $12,700.000 $8,750.000 $19,000.000 $9,800.000 $17,000.000 $18,000.160
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $23,000.000 $21,500.000 $24,000.000 $16,800.000 $12,250.000 $23,000.000 $13,775.000 $29,000.000 $26,789.710
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $22,800.000 $3,800.000 $38,000.000 $26,700.000 $24,450.000 $26,000.000 $27,500.000 $45,000.000 $41,053.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 135.000 $700.000 $835.000 $900.000 $660.000 $700.000 $550.000 $790.000 $700.000 $649.480
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,100.000 $950.000 $1,050.000 $855.000 $800.000 $650.000 $900.000 $1,200.000 $900.010
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 24.000 $971.000 $1,000.000 $1,050.000 $875.000 $800.000 $650.000 $900.000 $1,000.000 $815.800
SET (TY II) (30 IN) (RCP) (3: 1) (P)
EA 8.000 $1,800.000 $2,400.000 $1,750.000 $2,150.000 $1,350.000 $1,200.000 $1,525.000 $1,700.000 $1,773.700
SET (TY II) (36 IN) (RCP) (3: 1) (P)
EA 4.000 $3,010.000 $4,200.000 $2,350.000 $3,600.000 $1,550.000 $2,200.000 $1,750.000 $2,300.000 $2,673.710
CLEAN EXIST CULVERTS
EA 1.000 $1,550.000 $1,400.000 $850.000 $900.000 $3,500.000 $1,500.000 $1,800.000 $2,700.000 $8,672.230
REMOV STR (INLET)
EA 2.000 $870.000 $650.000 $550.000 $565.000 $700.000 $750.000 $790.000 $500.000 $1,331.590
REMOV STR (WINGWALL)
EA 8.000 $1,710.000 $900.000 $2,200.000 $775.000 $700.000 $750.000 $790.000 $3,000.000 $1,410.540
REMOV STR (HEADWALL)
EA 2.000 $965.000 $900.000 $1,100.000 $775.000 $700.000 $750.000 $790.000 $1,500.000 $1,473.700
REMOV STR (PIPE)
LF 2,307.000 $14.500 $30.000 $13.000 $16.000 $8.000 $15.000 $9.000 $9.000 $64.210
MOBILIZATION
LS 1.000 $480,000.000 $500,000.000 $409,282.810 $590,157.000 $590,000.000 $600,000.000 $300,000.000 $600,000.000 $630,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $8,000.000 $10,000.000 $14,500.000 $29,900.000 $7,000.000 $6,320.000 $26,000.000 $15,000.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 500.000 $27.500 $25.000 $25.730 $44.000 $24.510 $30.000 $24.500 $40.000 $31.580
ROCK FILTER DAMS (REMOVE)
LF 500.000 $8.650 $9.000 $8.400 $12.000 $5.960 $7.000 $6.000 $10.000 $7.370
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 155.600 $20.500 $27.000 $20.210 $27.000 $23.850 $24.000 $23.900 $40.000 $25.260
CONSTRUCTION EXITS (REMOVE)
SY 155.600 $7.250 $14.000 $8.400 $9.000 $8.920 $10.000 $9.000 $10.000 $10.530
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 780.000 $4.350 $7.000 $4.040 $5.500 $4.240 $5.000 $4.250 $6.000 $5.260
BIODEG EROSN CONT LOGS (REMOVE)
LF 780.000 $0.850 $3.000 $0.790 $0.500 $0.890 $1.000 $0.900 $1.000 $1.050
DRIVEWAYS (CONC)
SY 1,958.000 $69.000 $120.000 $105.000 $110.000 $86.910 $100.000 $80.000 $65.000 $73.000
DRIVEWAYS (ACP)
SY 7,477.000 $28.000 $33.000 $19.000 $28.000 $28.000 $25.500 $20.000 $23.000 $11.500
TURNOUTS (ACP)
SY 1,157.000 $50.000 $40.000 $54.000 $58.000 $40.000 $36.500 $44.000 $26.000 $40.250
RUMBLE STRIPS (SHOULDER)
LF 2,461.000 $0.180 $0.750 $0.320 $0.340 $0.270 $1.300 $0.300 $1.000 $0.350
RUMBLE STRIPS (CENTERLINE)
LF 8,235.000 $0.170 $0.750 $0.370 $0.340 $0.300 $1.350 $0.350 $1.000 $0.350
MTL W-BEAM GD FEN (TIM POST)
LF 1,287.500 $21.000 $18.500 $17.850 $20.000 $18.000 $17.000 $18.000 $20.000 $18.950
DRIVEWAY TERMINAL ANCHOR SECTION
EA 5.000 $644.000 $575.000 $551.250 $600.000 $800.000 $525.000 $800.000 $900.000 $842.110
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 300.000 $20.000 $19.000 $18.320 $20.000 $25.000 $17.450 $25.000 $25.000 $26.320
REMOVE METAL BEAM GUARD FENCE
LF 1,775.000 $3.350 $3.250 $3.150 $3.300 $2.250 $3.000 $2.250 $3.000 $2.370
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $2,250.000 $2,500.000 $2,441.250 $2,500.000 $2,200.000 $2,325.000 $2,200.000 $2,500.000 $2,315.810
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 66.000 $295.000 $200.000 $225.750 $200.000 $250.000 $165.000 $250.000 $250.000 $194.740
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 9.000 $380.000 $225.000 $241.500 $215.000 $250.000 $199.000 $250.000 $250.000 $215.790
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 7.000 $690.000 $500.000 $624.750 $500.000 $475.000 $430.000 $475.000 $500.000 $473.690
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 194.000 $410.000 $425.000 $488.250 $400.000 $425.000 $500.000 $425.000 $400.000 $405.270
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $605.000 $500.000 $552.300 $465.000 $500.000 $400.000 $500.000 $500.000 $463.160
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $731.000 $600.000 $669.900 $585.000 $600.000 $800.000 $600.000 $600.000 $578.950
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $756.000 $700.000 $834.750 $655.000 $800.000 $1,050.000 $800.000 $800.000 $668.430
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 46.000 $57.600 $60.000 $157.500 $55.000 $45.000 $65.000 $45.000 $50.000 $54.740
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 46.000 $21.750 $30.000 $31.500 $31.000 $30.000 $30.000 $30.000 $30.000 $29.470
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 12,524.000 $0.350 $0.430 $0.410 $0.550 $0.650 $0.390 $0.400 $0.500 $0.410
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 5,614.000 $0.850 $0.460 $1.050 $1.050 $1.000 $2.000 $1.200 $1.500 $1.060
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 531.000 $1.720 $1.650 $1.580 $1.600 $1.550 $1.500 $1.500 $1.600 $1.580
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 437.000 $0.900 $2.200 $2.100 $2.000 $1.850 $2.000 $2.000 $2.200 $2.110
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 249.000 $3.100 $3.850 $3.680 $3.850 $3.600 $2.500 $3.500 $4.000 $3.680
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 24.000 $5.100 $11.000 $10.500 $7.000 $6.200 $10.000 $10.000 $10.000 $10.530
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $116.000 $170.500 $162.750 $138.000 $129.000 $155.000 $155.000 $160.000 $163.160
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $148.000 $269.500 $257.250 $168.000 $158.000 $245.000 $245.000 $275.000 $257.900
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 50,919.000 $0.330 $0.450 $0.430 $0.420 $0.400 $0.410 $0.410 $0.500 $0.430
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 6,640.000 $0.550 $0.630 $0.600 $0.610 $0.580 $0.570 $0.600 $0.600 $0.600
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 614.000 $0.350 $0.500 $0.470 $0.480 $0.450 $0.450 $0.450 $0.500 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 54,296.000 $0.350 $0.460 $0.430 $0.420 $0.400 $0.410 $0.400 $0.500 $0.430
REFL PAV MRKR TY I-C
EA 23.000 $3.750 $4.020 $3.830 $5.500 $5.000 $3.650 $3.650 $4.000 $3.840
REFL PAV MRKR TY II-A-A
EA 714.000 $2.850 $4.020 $3.830 $4.000 $3.600 $3.650 $3.650 $4.000 $3.840
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,250.000 $10,000.000 $13,500.000 $12,000.000 $7,500.000 $23,000.000 $10,000.000 $20,000.000 $12,100.000
TMA (STATIONARY)
EA 5.000 $9,000.000 $10,000.000 $200.000 $26,500.000 $12,000.000 $42,000.000 $15,000.000 $7,500.000 $13,250.000
Totals: $5,124,197.680 $5,440,851.660 $5,779,000.001 $5,900,889.420 $5,962,446.272 $6,013,078.070 $6,108,114.070 $6,194,480.800 $6,380,919.289