PREPARING ROW
|
STA
|
69.470
|
$6,000.000
|
$4,000.000
|
$9,010.000
|
$30,647.650
|
$8,192.200
|
$46,000.000
|
$33,840.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
47,427.000
|
$9.600
|
$13.000
|
$13.000
|
$5.500
|
$9.930
|
$10.000
|
$15.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
80.000
|
$10.000
|
$27.000
|
$7.000
|
$15.000
|
$13.200
|
$13.000
|
$15.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
0.250
|
$67.330
|
$446.000
|
$500.000
|
$2,000.000
|
$3,159.040
|
$2,000.000
|
$3,000.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,517.000
|
$13.300
|
$12.000
|
$5.500
|
$5.000
|
$9.230
|
$6.500
|
$15.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,593.000
|
$12.460
|
$19.000
|
$8.500
|
$5.000
|
$9.330
|
$7.500
|
$15.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
216.000
|
$9.140
|
$13.000
|
$12.000
|
$6.000
|
$12.920
|
$6.000
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
47,427.000
|
$7.500
|
$3.000
|
$2.000
|
$2.000
|
$2.180
|
$2.250
|
$5.000
|
|
|
REMOV STAB BASE & ASPH PAV (4"-14")
|
SY
|
6,518.000
|
$8.000
|
$6.000
|
$5.500
|
$5.500
|
$5.400
|
$6.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
33,138.000
|
$15.300
|
$13.000
|
$7.500
|
$12.000
|
$14.230
|
$7.000
|
$15.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
40,479.000
|
$13.500
|
$10.000
|
$17.000
|
$2.000
|
$17.840
|
$8.500
|
$8.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
52,874.000
|
$28.500
|
$10.000
|
$68.000
|
$61.000
|
$77.220
|
$11.000
|
$28.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
39,252.000
|
$1.300
|
$1.500
|
$2.300
|
$1.650
|
$1.000
|
$0.990
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
39,252.000
|
$4.200
|
$4.000
|
$3.600
|
$3.250
|
$3.720
|
$3.710
|
$3.540
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
14,785.000
|
$0.200
|
$0.200
|
$0.200
|
$0.280
|
$0.190
|
$0.190
|
$0.180
|
|
|
VEGETATIVE WATERING
|
MG
|
8,048.000
|
$11.000
|
$16.000
|
$10.000
|
$25.000
|
$0.100
|
$25.000
|
$0.100
|
|
|
PROOF ROLLING
|
HR
|
26.000
|
$120.000
|
$120.000
|
$210.000
|
$100.000
|
$199.490
|
$200.000
|
$175.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
5,765.000
|
$62.000
|
$80.000
|
$76.000
|
$75.000
|
$72.720
|
$60.000
|
$70.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
1,308.000
|
$180.000
|
$260.000
|
$240.000
|
$180.000
|
$251.600
|
$220.000
|
$240.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
78,687.000
|
$4.000
|
$4.000
|
$4.400
|
$3.500
|
$5.410
|
$8.250
|
$8.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
32,861.000
|
$91.500
|
$135.000
|
$110.000
|
$110.000
|
$124.030
|
$125.000
|
$120.000
|
|
|
CONC PVMT (JOINTED - CPCD) (10")
|
SY
|
39,523.000
|
$90.000
|
$95.000
|
$81.000
|
$95.000
|
$89.120
|
$110.000
|
$90.000
|
|
|
CURB (TYPE I)
|
LF
|
4,746.000
|
$33.000
|
$3.500
|
$10.000
|
$3.500
|
$16.730
|
$14.000
|
$2.000
|
|
|
CURB (TYPE II)
|
LF
|
12,848.000
|
$33.000
|
$8.000
|
$8.000
|
$5.000
|
$4.330
|
$12.000
|
$2.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
10,714.000
|
$3.000
|
$1.250
|
$9.000
|
$3.000
|
$7.290
|
$1.800
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
13,883.000
|
$40.000
|
$36.000
|
$33.000
|
$35.000
|
$34.410
|
$34.500
|
$30.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
4,455.000
|
$215.000
|
$175.000
|
$210.000
|
$200.000
|
$234.480
|
$205.000
|
$240.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
180.000
|
$300.000
|
$235.000
|
$250.000
|
$250.000
|
$231.660
|
$240.000
|
$250.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
521.000
|
$400.000
|
$325.000
|
$320.000
|
$325.000
|
$318.610
|
$320.000
|
$325.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
56.000
|
$230.000
|
$330.000
|
$300.000
|
$300.000
|
$277.800
|
$311.930
|
$298.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
16.000
|
$560.000
|
$600.000
|
$580.000
|
$571.000
|
$528.650
|
$597.690
|
$571.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
34.000
|
$570.000
|
$645.000
|
$630.000
|
$615.000
|
$574.360
|
$643.750
|
$615.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
126.000
|
$600.000
|
$700.000
|
$680.000
|
$671.000
|
$685.800
|
$702.370
|
$671.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
8.000
|
$230.000
|
$230.000
|
$220.000
|
$218.000
|
$222.810
|
$228.190
|
$218.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
26.000
|
$300.000
|
$440.000
|
$430.000
|
$422.000
|
$431.310
|
$441.730
|
$422.000
|
|
|
CL B CONC (FLUME)
|
CY
|
24.000
|
$585.000
|
$450.000
|
$660.000
|
$1,100.000
|
$983.970
|
$970.000
|
$625.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
206.900
|
$1,100.000
|
$800.000
|
$970.000
|
$1,200.000
|
$1,124.380
|
$1,300.000
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
491.200
|
$1,300.000
|
$1,100.000
|
$1,300.000
|
$1,500.000
|
$1,454.840
|
$1,300.000
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)(MASS)
|
CY
|
81.700
|
$1,500.000
|
$1,000.000
|
$1,500.000
|
$1,500.000
|
$1,589.250
|
$1,400.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
442.700
|
$1,200.000
|
$1,200.000
|
$1,100.000
|
$1,100.000
|
$1,178.850
|
$1,200.000
|
$2,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
809.300
|
$500.000
|
$410.000
|
$610.000
|
$610.000
|
$473.220
|
$500.000
|
$750.000
|
|
|
CL F CONC (PT CAP)(HPC)(MASS)
|
CY
|
273.300
|
$1,500.000
|
$1,300.000
|
$2,200.000
|
$2,700.000
|
$1,746.040
|
$2,400.000
|
$3,250.000
|
|
|
CL K CONC (MISC)
|
CY
|
17.600
|
$1,500.000
|
$600.000
|
$960.000
|
$1,500.000
|
$2,134.450
|
$1,800.000
|
$3,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
90,765.000
|
$20.000
|
$16.000
|
$21.000
|
$25.000
|
$22.500
|
$21.000
|
$24.000
|
|
|
BRIDGE MEDIAN (HPC)
|
SF
|
1,947.000
|
$16.000
|
$10.000
|
$18.000
|
$16.000
|
$16.520
|
$25.000
|
$23.000
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
10,606.000
|
$11.000
|
$10.000
|
$13.000
|
$13.000
|
$16.700
|
$25.000
|
$14.000
|
|
|
APPROACH SLAB
|
CY
|
235.000
|
$550.000
|
$700.000
|
$660.000
|
$800.000
|
$1,000.000
|
$800.000
|
$900.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
108,743.000
|
$45.000
|
$70.000
|
$48.000
|
$60.000
|
$55.920
|
$90.500
|
$100.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,505.370
|
$150.000
|
$210.000
|
$240.000
|
$203.000
|
$234.990
|
$205.000
|
$220.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
8,295.310
|
$200.000
|
$200.000
|
$220.000
|
$195.000
|
$202.160
|
$210.000
|
$220.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,653.490
|
$440.000
|
$400.000
|
$510.000
|
$450.000
|
$608.070
|
$700.000
|
$700.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
18.500
|
$500.000
|
$430.000
|
$460.000
|
$600.000
|
$596.770
|
$700.000
|
$700.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
1,359.000
|
$115.000
|
$120.000
|
$120.000
|
$110.000
|
$106.330
|
$120.000
|
$200.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
108.000
|
$210.000
|
$160.000
|
$220.000
|
$190.000
|
$208.910
|
$145.000
|
$325.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
235.900
|
$450.000
|
$440.000
|
$520.000
|
$750.000
|
$657.620
|
$800.000
|
$700.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
16,982.000
|
$15.400
|
$8.000
|
$6.000
|
$5.000
|
$8.000
|
$11.500
|
$6.500
|
|
|
RAIL (TY SSTR)
|
LF
|
11,570.000
|
$75.000
|
$80.000
|
$57.000
|
$65.000
|
$72.450
|
$115.000
|
$65.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
797.200
|
$73.000
|
$130.000
|
$99.000
|
$90.000
|
$236.790
|
$235.000
|
$65.000
|
|
|
RAIL (TY C221)
|
LF
|
1,581.000
|
$150.000
|
$130.000
|
$110.000
|
$110.000
|
$101.280
|
$200.000
|
$130.000
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
251.500
|
$110.000
|
$155.000
|
$150.000
|
$200.000
|
$264.890
|
$205.000
|
$130.000
|
|
|
RAIL (TY PR11)
|
LF
|
135.000
|
$135.000
|
$318.000
|
$140.000
|
$160.000
|
$152.890
|
$135.000
|
$190.000
|
|
|
ARMOR JOINT
|
LF
|
745.000
|
$240.000
|
$85.000
|
$235.000
|
$270.000
|
$283.000
|
$82.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
1,348.000
|
$130.000
|
$160.000
|
$165.000
|
$190.000
|
$220.730
|
$160.000
|
$215.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,029.000
|
$233.000
|
$280.000
|
$280.000
|
$260.000
|
$320.510
|
$300.000
|
$275.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
314.000
|
$450.000
|
$550.000
|
$530.000
|
$600.000
|
$598.490
|
$650.000
|
$550.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
104.000
|
$550.000
|
$665.000
|
$640.000
|
$750.000
|
$1,260.060
|
$800.000
|
$900.000
|
|
|
CONC BOX CULV (5 FT X 4 FT) (MOD)
|
LF
|
8.000
|
$900.000
|
$1,170.000
|
$1,100.000
|
$1,600.000
|
$1,012.940
|
$1,150.000
|
$1,600.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
10,429.000
|
$72.000
|
$130.000
|
$99.000
|
$110.000
|
$126.150
|
$110.000
|
$130.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,471.000
|
$97.000
|
$142.000
|
$130.000
|
$130.000
|
$167.250
|
$135.000
|
$175.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
966.000
|
$115.000
|
$176.000
|
$170.000
|
$170.000
|
$251.590
|
$180.000
|
$200.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX5FT)
|
EA
|
2.000
|
$5,100.000
|
$8,100.000
|
$7,100.000
|
$8,000.000
|
$8,147.750
|
$7,500.000
|
$7,900.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
27.000
|
$6,000.000
|
$7,000.000
|
$5,700.000
|
$5,700.000
|
$6,953.610
|
$7,500.000
|
$9,900.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
17.000
|
$6,000.000
|
$8,100.000
|
$6,000.000
|
$6,100.000
|
$7,284.660
|
$7,500.000
|
$10,200.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
15.000
|
$6,000.000
|
$9,000.000
|
$6,200.000
|
$6,000.000
|
$7,544.770
|
$8,000.000
|
$10,800.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
9.000
|
$6,600.000
|
$7,000.000
|
$5,300.000
|
$6,300.000
|
$6,551.630
|
$6,500.000
|
$10,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
9.000
|
$6,600.000
|
$7,000.000
|
$5,300.000
|
$5,700.000
|
$6,610.740
|
$6,500.000
|
$10,200.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
21.000
|
$6,600.000
|
$9,300.000
|
$6,900.000
|
$7,500.000
|
$8,277.800
|
$8,500.000
|
$12,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
2.000
|
$6,000.000
|
$9,300.000
|
$7,700.000
|
$8,700.000
|
$5,290.690
|
$5,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(TY MSE1)
|
EA
|
17.000
|
$7,200.000
|
$4,900.000
|
$5,400.000
|
$9,900.000
|
$10,890.750
|
$7,500.000
|
$11,500.000
|
|
|
JUNCT BOX (COMPL)(JB)(5FT X 3FT)(FTW)
|
EA
|
1.000
|
$5,300.000
|
$10,500.000
|
$9,700.000
|
$5,500.000
|
$8,749.580
|
$8,000.000
|
$10,500.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
4.000
|
$7,200.000
|
$9,000.000
|
$6,000.000
|
$5,400.000
|
$6,165.130
|
$6,000.000
|
$7,000.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$12,000.000
|
$11,700.000
|
$9,100.000
|
$7,700.000
|
$15,839.880
|
$30,000.000
|
$13,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$17,000.000
|
$2,300.000
|
$20,300.000
|
$17,000.000
|
$15,872.450
|
$25,000.000
|
$24,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$23,000.000
|
$35,000.000
|
$26,600.000
|
$33,000.000
|
$32,916.200
|
$50,000.000
|
$30,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$29,000.000
|
$46,000.000
|
$36,700.000
|
$39,000.000
|
$35,498.630
|
$53,000.000
|
$40,000.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$1,500.000
|
$7,000.000
|
$1,600.000
|
$2,100.000
|
$3,370.590
|
$1,500.000
|
$14,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$2,000.000
|
$1,200.000
|
$8,800.000
|
$25,000.000
|
$6,577.820
|
$5,200.000
|
$165,000.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
84.000
|
$50.000
|
$64.000
|
$46.000
|
$130.000
|
$204.260
|
$400.000
|
$285.000
|
|
|
REMOV STR (INLET)
|
EA
|
86.000
|
$600.000
|
$720.000
|
$580.000
|
$800.000
|
$422.240
|
$600.000
|
$1,000.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
5.000
|
$770.000
|
$850.000
|
$570.000
|
$1,000.000
|
$438.340
|
$600.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$400.000
|
$720.000
|
$780.000
|
$650.000
|
$214.930
|
$300.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$2,000.000
|
$6,500.000
|
$1,700.000
|
$1,000.000
|
$1,248.950
|
$2,500.000
|
$4,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
9,739.000
|
$18.000
|
$34.000
|
$17.000
|
$22.000
|
$11.260
|
$12.500
|
$40.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
429.000
|
$50.000
|
$95.000
|
$53.000
|
$45.000
|
$55.380
|
$27.000
|
$130.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$65,000.000
|
$60,000.000
|
$500,000.000
|
$65,000.000
|
$47,191.890
|
$210,000.000
|
$300,000.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
1.000
|
$740.000
|
$1,300.000
|
$1,900.000
|
$2,000.000
|
$972.720
|
$1,700.000
|
$2,500.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
1.000
|
$375.790
|
$1,200.000
|
$970.000
|
$500.000
|
$868.860
|
$475.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,665,555.270
|
$2,845,408.000
|
$4,573,900.000
|
$4,600,000.000
|
$4,893,987.000
|
$5,600,000.000
|
$5,900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$13,000.000
|
$11,000.000
|
$26,100.000
|
$13,900.000
|
$10,541.900
|
$20,000.000
|
$30,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
290.000
|
$30.000
|
$35.000
|
$33.000
|
$28.500
|
$34.130
|
$34.020
|
$32.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
290.000
|
$9.000
|
$13.000
|
$10.000
|
$14.000
|
$10.710
|
$10.680
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
819.000
|
$20.000
|
$19.000
|
$33.000
|
$28.000
|
$33.340
|
$33.230
|
$32.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
819.000
|
$6.000
|
$13.000
|
$8.000
|
$12.000
|
$8.380
|
$8.350
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,347.000
|
$2.000
|
$2.000
|
$3.100
|
$2.850
|
$3.170
|
$3.160
|
$3.020
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,347.000
|
$0.500
|
$0.500
|
$0.500
|
$0.850
|
$0.490
|
$0.490
|
$0.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,918.000
|
$4.000
|
$3.500
|
$4.600
|
$3.950
|
$4.670
|
$4.660
|
$4.450
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
53.000
|
$4.250
|
$5.000
|
$8.000
|
$5.500
|
$8.090
|
$8.060
|
$7.700
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,971.000
|
$1.000
|
$1.150
|
$0.500
|
$1.010
|
$0.490
|
$0.490
|
$0.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
412.000
|
$92.500
|
$187.000
|
$120.000
|
$110.000
|
$118.150
|
$135.000
|
$170.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
9,540.000
|
$25.000
|
$38.000
|
$26.000
|
$32.000
|
$28.830
|
$50.000
|
$25.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,057.000
|
$25.000
|
$35.000
|
$33.000
|
$12.000
|
$36.980
|
$62.000
|
$20.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$30.000
|
$45.000
|
$45.000
|
$24.000
|
$38.590
|
$60.000
|
$20.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
7,440.000
|
$8.000
|
$8.000
|
$7.000
|
$4.000
|
$3.750
|
$11.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
9,540.000
|
$8.000
|
$16.000
|
$9.000
|
$3.050
|
$6.140
|
$8.000
|
$4.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,057.000
|
$10.000
|
$12.000
|
$13.000
|
$6.100
|
$6.180
|
$12.000
|
$4.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$10.000
|
$13.000
|
$19.000
|
$6.300
|
$3.330
|
$12.000
|
$4.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (48 )
|
LF
|
3,504.000
|
$195.000
|
$135.000
|
$81.000
|
$85.000
|
$99.090
|
$145.000
|
$100.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (48 )
|
LF
|
456.500
|
$300.000
|
$370.000
|
$210.000
|
$300.000
|
$423.290
|
$270.000
|
$500.000
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
370.000
|
$70.000
|
$140.000
|
$110.000
|
$80.000
|
$145.020
|
$105.000
|
$150.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,032.000
|
$74.310
|
$80.000
|
$70.000
|
$75.000
|
$85.010
|
$90.000
|
$80.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
6,310.000
|
$50.000
|
$58.000
|
$52.000
|
$65.000
|
$70.230
|
$66.000
|
$65.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
18.000
|
$2,000.000
|
$2,100.000
|
$1,900.000
|
$2,300.000
|
$2,456.190
|
$3,000.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$2,300.000
|
$2,700.000
|
$2,400.000
|
$2,600.000
|
$2,634.290
|
$3,500.000
|
$3,000.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
800.000
|
$22.000
|
$25.000
|
$24.000
|
$20.000
|
$23.410
|
$28.110
|
$23.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
475.000
|
$35.000
|
$30.000
|
$30.000
|
$20.000
|
$29.190
|
$35.850
|
$30.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$1,550.000
|
$1,400.000
|
$1,400.000
|
$500.000
|
$1,404.380
|
$1,606.750
|
$1,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,500.000
|
$1,400.000
|
$1,400.000
|
$500.000
|
$1,384.240
|
$1,606.750
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,250.000
|
$3.450
|
$2.200
|
$2.100
|
$5.000
|
$2.010
|
$3.660
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$3,000.000
|
$3,000.000
|
$3,100.000
|
$1,800.000
|
$3,005.060
|
$3,177.920
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
15.000
|
$300.000
|
$230.000
|
$230.000
|
$275.000
|
$226.510
|
$261.690
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
$2,057.630
|
$1,006.720
|
$950.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$700.000
|
$550.000
|
$840.000
|
$1,010.920
|
$503.360
|
$950.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
6.000
|
$20,000.000
|
$26,000.000
|
$25,800.000
|
$22,684.860
|
$23,230.070
|
$25,000.000
|
$23,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
5.000
|
$8,500.000
|
$8,000.000
|
$8,200.000
|
$7,766.380
|
$7,802.080
|
$10,500.000
|
$10,000.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$2,500.000
|
$2,000.000
|
$2,000.000
|
$1,980.000
|
$2,023.660
|
$2,072.560
|
$1,980.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
6.000
|
$400.000
|
$400.000
|
$400.000
|
$390.000
|
$398.600
|
$408.230
|
$390.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$490.000
|
$400.000
|
$400.000
|
$390.000
|
$398.600
|
$408.230
|
$390.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
2.000
|
$550.000
|
$1,200.000
|
$1,100.000
|
$1,125.000
|
$1,149.810
|
$1,177.590
|
$1,125.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
12.000
|
$1,400.000
|
$1,600.000
|
$1,600.000
|
$1,545.000
|
$1,579.070
|
$1,617.220
|
$1,545.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
1.000
|
$45,000.000
|
$47,000.000
|
$47,200.000
|
$46,330.000
|
$47,351.620
|
$48,495.680
|
$46,330.000
|
|
|
HI MST IL POLE (175 FT)( 80 MPH)
|
EA
|
1.000
|
$34,800.000
|
$60,000.000
|
$59,600.000
|
$58,510.000
|
$59,800.210
|
$61,245.030
|
$58,510.000
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
2.000
|
$27,500.000
|
$40,000.000
|
$39,600.000
|
$38,860.000
|
$39,716.910
|
$40,676.500
|
$38,860.000
|
|
|
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
|
EA
|
2.000
|
$7,500.000
|
$20,000.000
|
$19,100.000
|
$18,770.000
|
$19,183.900
|
$19,647.400
|
$18,770.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,135.000
|
$10.000
|
$18.000
|
$18.000
|
$17.550
|
$17.940
|
$18.370
|
$17.550
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
650.000
|
$22.000
|
$34.000
|
$31.000
|
$30.450
|
$31.120
|
$31.870
|
$30.450
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
9,743.000
|
$17.000
|
$26.000
|
$27.000
|
$26.070
|
$26.640
|
$27.290
|
$26.070
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
2,700.000
|
$30.000
|
$30.000
|
$30.000
|
$29.700
|
$30.350
|
$31.090
|
$29.700
|
|
|
CONDT (RM) (1")
|
LF
|
1,015.000
|
$30.000
|
$42.000
|
$41.000
|
$40.450
|
$41.340
|
$42.340
|
$40.450
|
|
|
CONDT (RM) (2")
|
LF
|
129.000
|
$40.000
|
$52.000
|
$50.000
|
$49.500
|
$50.590
|
$51.810
|
$49.500
|
|
|
CONDT (RM) (3")
|
LF
|
702.000
|
$55.000
|
$92.000
|
$90.000
|
$88.400
|
$90.350
|
$92.530
|
$88.400
|
|
|
CONDT (RM) (4")
|
LF
|
442.000
|
$75.000
|
$120.000
|
$120.000
|
$116.000
|
$118.560
|
$121.420
|
$116.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
3,045.000
|
$1.000
|
$1.910
|
$1.700
|
$1.700
|
$1.740
|
$1.780
|
$1.700
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
3,360.000
|
$1.200
|
$2.250
|
$2.000
|
$2.000
|
$2.040
|
$2.090
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
13,075.000
|
$1.400
|
$2.300
|
$2.100
|
$2.070
|
$2.120
|
$2.170
|
$2.070
|
|
|
GROUND BOX TY A (122311)
|
EA
|
2.000
|
$725.000
|
$1,200.000
|
$1,100.000
|
$1,070.000
|
$1,093.600
|
$1,120.020
|
$1,070.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
6.000
|
$1,200.000
|
$1,900.000
|
$1,800.000
|
$1,815.000
|
$1,855.020
|
$1,899.840
|
$1,815.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
2.000
|
$1,200.000
|
$2,100.000
|
$2,100.000
|
$2,105.000
|
$2,151.420
|
$2,203.400
|
$2,105.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
2.000
|
$1,200.000
|
$1,300.000
|
$1,200.000
|
$1,210.000
|
$1,236.680
|
$1,266.560
|
$1,210.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,780.970
|
$2,100.000
|
$2,100.000
|
$2,010.000
|
$2,054.320
|
$2,103.960
|
$2,010.000
|
|
|
REMOVE GROUND BOX
|
EA
|
8.000
|
$275.000
|
$613.000
|
$600.000
|
$585.000
|
$597.900
|
$612.350
|
$585.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$550.000
|
$613.000
|
$600.000
|
$585.000
|
$597.900
|
$612.340
|
$585.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
1.000
|
$6,500.000
|
$9,200.000
|
$9,000.000
|
$8,840.000
|
$9,034.930
|
$9,253.230
|
$8,840.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
54.000
|
$35.000
|
$32.000
|
$31.000
|
$31.650
|
$30.200
|
$33.130
|
$30.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,148.250
|
$25.500
|
$26.000
|
$26.000
|
$34.400
|
$25.170
|
$36.010
|
$25.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
257.000
|
$40.000
|
$27.000
|
$27.000
|
$56.850
|
$26.170
|
$59.510
|
$26.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$600.000
|
$400.000
|
$400.000
|
$937.000
|
$387.590
|
$403.000
|
$385.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
13.000
|
$700.000
|
$1,000.000
|
$980.000
|
$1,177.000
|
$956.380
|
$994.410
|
$950.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$847.000
|
$1,020.000
|
$1,000.000
|
$1,380.000
|
$1,001.690
|
$1,041.520
|
$995.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
9.000
|
$660.000
|
$740.000
|
$720.000
|
$912.000
|
$709.740
|
$737.950
|
$705.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
13.000
|
$700.000
|
$930.000
|
$930.000
|
$1,101.000
|
$911.080
|
$947.300
|
$905.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$750.000
|
$1,300.000
|
$1,200.000
|
$1,447.000
|
$1,203.030
|
$1,250.860
|
$1,195.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
2.000
|
$700.000
|
$1,400.000
|
$1,300.000
|
$1,530.000
|
$1,303.710
|
$1,355.540
|
$1,295.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$1,600.000
|
$3,200.000
|
$3,000.000
|
$3,860.000
|
$2,969.830
|
$3,087.900
|
$2,950.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
5.000
|
$2,000.000
|
$2,600.000
|
$2,400.000
|
$3,565.000
|
$2,365.790
|
$2,459.850
|
$2,350.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$2,200.000
|
$2,600.000
|
$2,600.000
|
$3,565.000
|
$2,516.800
|
$2,616.860
|
$2,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$100.000
|
$310.000
|
$310.000
|
$260.000
|
$302.020
|
$314.020
|
$300.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$24,000.000
|
$31,000.000
|
$30,800.000
|
$31,530.000
|
$30,201.610
|
$33,003.860
|
$30,000.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
2.000
|
$40,000.000
|
$36,000.000
|
$35,900.000
|
$40,680.000
|
$35,235.210
|
$42,581.580
|
$35,000.000
|
|
|
INS OH SN SUP(95 FT BRDG)
|
EA
|
1.000
|
$60,000.000
|
$57,000.000
|
$56,500.000
|
$64,580.000
|
$55,369.620
|
$67,598.780
|
$55,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
4.000
|
$4,500.000
|
$10,500.000
|
$10,300.000
|
$5,670.000
|
$10,067.200
|
$5,935.040
|
$10,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
12.000
|
$21.150
|
$26.000
|
$26.000
|
$30.000
|
$20.130
|
$31.400
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
20,258.000
|
$0.200
|
$0.580
|
$0.400
|
$0.400
|
$0.400
|
$0.420
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
41,733.000
|
$1.000
|
$1.150
|
$1.300
|
$1.250
|
$1.260
|
$1.310
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,385.000
|
$0.750
|
$1.150
|
$1.300
|
$1.250
|
$1.260
|
$1.310
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
855.000
|
$1.450
|
$1.730
|
$3.700
|
$3.600
|
$3.620
|
$3.770
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
10,303.000
|
$0.750
|
$1.150
|
$1.300
|
$1.300
|
$1.310
|
$1.360
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,358.000
|
$0.870
|
$1.150
|
$1.100
|
$1.080
|
$1.090
|
$1.130
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,852.000
|
$3.300
|
$4.610
|
$3.600
|
$3.500
|
$3.520
|
$3.660
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
933.000
|
$6.000
|
$6.920
|
$7.500
|
$7.500
|
$7.550
|
$7.850
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
20.000
|
$130.000
|
$140.000
|
$130.000
|
$125.000
|
$125.840
|
$130.840
|
$135.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
4.000
|
$220.000
|
$200.000
|
$210.000
|
$200.000
|
$201.350
|
$209.350
|
$190.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
4.000
|
$200.000
|
$230.000
|
$230.000
|
$225.000
|
$226.510
|
$235.520
|
$225.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$400.000
|
$250.000
|
$310.000
|
$300.000
|
$302.020
|
$314.030
|
$325.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
16.000
|
$150.000
|
$166.000
|
$180.000
|
$175.000
|
$176.180
|
$183.180
|
$155.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
54,162.000
|
$0.150
|
$0.230
|
$0.200
|
$0.200
|
$0.200
|
$0.210
|
$0.200
|
|
|
PAVEMENT SEALER 6"
|
LF
|
7,720.000
|
$0.200
|
$0.400
|
$0.300
|
$0.290
|
$0.290
|
$0.300
|
$0.350
|
|
|
PAVEMENT SEALER 8"
|
LF
|
9,358.000
|
$0.300
|
$0.580
|
$0.400
|
$0.390
|
$0.390
|
$0.410
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
11,140.000
|
$0.700
|
$2.300
|
$0.600
|
$0.580
|
$0.580
|
$0.610
|
$2.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
933.000
|
$2.000
|
$4.000
|
$2.100
|
$2.000
|
$2.010
|
$2.090
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
20.000
|
$30.000
|
$80.000
|
$26.000
|
$25.000
|
$25.170
|
$26.170
|
$75.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
16.000
|
$40.000
|
$110.000
|
$56.000
|
$55.000
|
$55.370
|
$57.570
|
$100.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
4.000
|
$40.000
|
$86.460
|
$56.000
|
$55.000
|
$55.370
|
$57.570
|
$75.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
4.000
|
$56.000
|
$86.460
|
$56.000
|
$55.000
|
$55.370
|
$57.570
|
$75.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
2.000
|
$80.000
|
$115.270
|
$77.000
|
$75.000
|
$75.510
|
$78.510
|
$100.000
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
9,288.000
|
$3.500
|
$4.610
|
$2.600
|
$2.500
|
$2.520
|
$2.620
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
12.000
|
$4.000
|
$5.760
|
$5.000
|
$5.000
|
$5.030
|
$5.230
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,490.000
|
$3.670
|
$4.150
|
$3.600
|
$3.500
|
$3.520
|
$3.660
|
$3.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,970.000
|
$0.400
|
$0.690
|
$0.850
|
$0.850
|
$0.860
|
$0.890
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
8,500.000
|
$0.500
|
$0.810
|
$0.850
|
$0.850
|
$0.860
|
$0.890
|
$0.700
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
32,200.000
|
$0.050
|
$0.120
|
$0.150
|
$0.140
|
$0.140
|
$0.150
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,130.000
|
$0.070
|
$0.230
|
$0.200
|
$0.210
|
$0.210
|
$0.220
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
5,281.000
|
$0.120
|
$0.400
|
$0.300
|
$0.280
|
$0.280
|
$0.290
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,970.000
|
$0.400
|
$1.150
|
$1.500
|
$1.500
|
$1.510
|
$1.570
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
933.000
|
$1.000
|
$1.150
|
$3.100
|
$3.000
|
$3.020
|
$3.140
|
$1.000
|
|
|
REMOVAL OF CABLES
|
LF
|
2,070.000
|
$1.000
|
$1.130
|
$1.000
|
$1.000
|
$1.020
|
$1.050
|
$1.000
|
|
|
INSTALL OF CABLES
|
LF
|
565.000
|
$4.000
|
$5.630
|
$5.000
|
$5.000
|
$5.110
|
$5.230
|
$5.000
|
|
|
INSTALL OF FND FOR GROUND MNT CABINETS
|
EA
|
1.000
|
$2,000.000
|
$5,200.000
|
$5,100.000
|
$5,015.000
|
$5,125.590
|
$5,249.420
|
$5,015.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
9.000
|
$60.000
|
$220.000
|
$630.000
|
$100.000
|
$100.670
|
$1,000.000
|
$500.000
|
|
|
LITTER REMOVAL
|
AC
|
57.250
|
$100.000
|
$75.000
|
$520.000
|
$173.930
|
$140.940
|
$300.000
|
$381.100
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
3.000
|
$200.000
|
$2,100.000
|
$3,000.000
|
$470.000
|
$755.040
|
$2,000.000
|
$2,181.810
|
|
|
ANTI - GRAFFITI COATING(PERMNENT-TY II)
|
SF
|
116,157.000
|
$0.350
|
$0.510
|
$0.640
|
$0.650
|
$0.450
|
$0.470
|
$0.450
|
|
|
NO. OF WORKING DAYS
|
$/D
|
5,000.000
|
$609.000
|
$470.000
|
$555.000
|
$495.000
|
$485.000
|
$609.000
|
$519.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
18,819.000
|
$92.000
|
$112.000
|
$110.000
|
$107.000
|
$106.460
|
$110.000
|
$105.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
372.000
|
$250.000
|
$150.000
|
$130.000
|
$126.000
|
$127.580
|
$132.000
|
$130.000
|
|
|
TACK COAT
|
GAL
|
406.000
|
$3.000
|
$9.000
|
$5.500
|
$5.350
|
$5.570
|
$5.750
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,500.000
|
$35,000.000
|
$33,400.000
|
$15,000.000
|
$10,046.920
|
$14,000.000
|
$9,500.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
90.000
|
$4.910
|
$18.000
|
$17.000
|
$16.600
|
$16.970
|
$17.380
|
$16.600
|
|
|
CCTV MOUNT (POST)
|
EA
|
1.000
|
$8,600.000
|
$900.000
|
$840.000
|
$820.000
|
$838.080
|
$858.330
|
$820.000
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$1,825.830
|
$5,700.000
|
$5,600.000
|
$5,470.000
|
$5,590.620
|
$5,725.690
|
$5,470.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
4,850.000
|
$27.000
|
$36.000
|
$35.000
|
$34.450
|
$35.210
|
$36.060
|
$34.450
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
1,350.000
|
$33.500
|
$41.000
|
$40.000
|
$39.600
|
$40.470
|
$41.450
|
$39.600
|
|
|
CONDUIT (PREPARE)
|
LF
|
1,630.000
|
$2.500
|
$3.830
|
$3.500
|
$3.400
|
$3.470
|
$3.560
|
$3.400
|
|
|
GROUND BOX (PREPARE)
|
EA
|
5.000
|
$350.000
|
$800.000
|
$800.000
|
$790.000
|
$807.420
|
$826.930
|
$790.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
1.000
|
$10,829.200
|
$37,000.000
|
$35,200.000
|
$34,515.000
|
$35,276.090
|
$36,128.390
|
$34,515.000
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)
|
LF
|
3,120.000
|
$0.350
|
$0.630
|
$0.550
|
$0.540
|
$0.540
|
$0.570
|
$0.550
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)
|
LF
|
24,931.000
|
$0.350
|
$0.630
|
$0.550
|
$0.540
|
$0.540
|
$0.570
|
$0.550
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)
|
LF
|
7,720.000
|
$0.150
|
$0.860
|
$0.850
|
$0.810
|
$0.820
|
$0.850
|
$0.750
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)
|
LF
|
28,785.000
|
$0.350
|
$0.630
|
$0.550
|
$0.520
|
$0.520
|
$0.540
|
$0.550
|
|
|
RELOCATE ITS RADIO
|
EA
|
2.000
|
$1,848.900
|
$4,350.460
|
$3,900.000
|
$3,865.000
|
$3,950.230
|
$4,045.670
|
$3,865.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
1.000
|
$16,500.000
|
$31,742.060
|
$28,700.000
|
$28,200.000
|
$28,821.840
|
$29,518.200
|
$28,200.000
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 1)
|
EA
|
1.000
|
$5,700.000
|
$7,395.230
|
$6,700.000
|
$6,570.000
|
$6,714.870
|
$6,877.110
|
$6,570.000
|
|
|
REMOVE EXIST FIB OPT DMS SYS(TY-2)
|
EA
|
1.000
|
$1,642.500
|
$12,629.290
|
$11,400.000
|
$11,220.000
|
$11,467.410
|
$11,744.480
|
$11,220.000
|
|
|
TMA (STATIONARY)
|
DAY
|
130.000
|
$100.000
|
$265.000
|
$160.000
|
$800.000
|
$124.360
|
$300.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$60.000
|
$135.000
|
$53.000
|
$100.000
|
$59.160
|
$150.000
|
$250.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
|
EA
|
11.000
|
$5,700.000
|
$4,800.000
|
$4,700.000
|
$4,650.000
|
$4,752.540
|
$4,867.360
|
$4,650.000
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
2.000
|
$1,000.000
|
$640.000
|
$620.000
|
$611.000
|
$624.480
|
$639.570
|
$611.000
|
|
|
ITS RVSD (DC & WWA) (RELOCATE)
|
EA
|
1.000
|
$1,147.500
|
$7,500.000
|
$7,200.000
|
$7,025.000
|
$1,469.070
|
$7,353.380
|
$7,025.000
|
|
|
RELOCATE HIGH MAST LIGHTING ASSEMBLY
|
EA
|
2.000
|
$15,000.000
|
$21,000.000
|
$19,600.000
|
$19,255.000
|
$19,679.600
|
$20,155.070
|
$19,255.000
|
|
Totals: |
$43,400,072.438
|
$45,928,573.640
|
$48,514,214.580
|
$50,324,576.858
|
$51,364,875.991
|
$57,522,601.092
|
$59,843,753.935
|