PREPARING ROW
|
STA
|
907.400
|
$3,750.000
|
$6,370.000
|
$4,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
53.000
|
$50.000
|
$257.000
|
$33.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
73,493.000
|
$16.000
|
$8.500
|
$14.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
6,583.000
|
$1.000
|
$0.950
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
6,583.000
|
$3.250
|
$4.500
|
$5.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
6,333.000
|
$2.900
|
$0.350
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
1,940.000
|
$15.000
|
$57.650
|
$49.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
132.000
|
$120.000
|
$504.000
|
$239.000
|
|
|
FULL - DEPTH REPAIR CRCP (13")
|
SY
|
256.200
|
$260.000
|
$671.000
|
$300.000
|
|
|
FULL - DEPTH REPAIR CRCP (8"-14")
|
SY
|
178.000
|
$400.000
|
$984.000
|
$300.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,615.200
|
$23.000
|
$21.300
|
$47.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,735.000
|
$225.000
|
$584.100
|
$700.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
21.000
|
$275.000
|
$420.000
|
$480.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
87.000
|
$325.000
|
$861.300
|
$995.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
20.000
|
$350.000
|
$1,052.100
|
$1,300.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
18.000
|
$540.000
|
$622.800
|
$900.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
1,809.000
|
$800.000
|
$809.100
|
$1,200.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
8.000
|
$270.000
|
$268.200
|
$400.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
11.900
|
$1,000.000
|
$2,020.000
|
$1,500.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
110.300
|
$900.000
|
$1,188.000
|
$1,200.000
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
214.700
|
$1,000.000
|
$1,324.000
|
$1,200.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
390.700
|
$1,300.000
|
$1,840.000
|
$1,600.000
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
81.900
|
$450.000
|
$1,676.000
|
$1,800.000
|
|
|
CL C CONC (HPC)
|
CY
|
60.200
|
$1,000.000
|
$1,273.000
|
$900.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
631.500
|
$600.000
|
$538.000
|
$700.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
524.000
|
$600.000
|
$575.000
|
$1,000.000
|
|
|
RETROFIT RAIL (TY SSTR)(HPC)
|
LF
|
4,339.000
|
$300.000
|
$97.000
|
$229.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,750,000.000
|
$5,848,019.100
|
$6,875,382.290
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$30,000.000
|
$120,105.000
|
$135,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,320.000
|
$20.000
|
$28.500
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,320.000
|
$7.000
|
$11.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,612.000
|
$2.000
|
$2.850
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,612.000
|
$0.500
|
$0.750
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
5,327.000
|
$3.000
|
$4.500
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,327.000
|
$0.750
|
$0.850
|
$1.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
124,080.000
|
$35.000
|
$48.000
|
$69.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
58,350.000
|
$9.000
|
$4.000
|
$16.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
124,080.000
|
$9.000
|
$6.000
|
$15.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
9.000
|
$314.000
|
$473.000
|
$780.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (48 )
|
LF
|
66,244.500
|
$125.000
|
$95.900
|
$110.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (48 )
|
LF
|
1,648.000
|
$300.000
|
$300.000
|
$334.000
|
|
|
PERM CTB (F-SHAPE) (TY 3)
|
LF
|
9.000
|
$90.000
|
$401.000
|
$255.000
|
|
|
PERM CTB(SGL SLOPE)(TY 1)(48)(HPC)
|
LF
|
1,273.000
|
$200.000
|
$128.000
|
$145.000
|
|
|
PERM CTB (TRAN SSCB TO SSTR) (MOD)
|
LF
|
280.000
|
$90.000
|
$271.000
|
$415.000
|
|
|
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
|
LF
|
760.000
|
$525.000
|
$432.000
|
$720.000
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
124,867.000
|
$1.000
|
$0.650
|
$0.800
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
9,525.000
|
$30.000
|
$26.500
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,850.000
|
$2,200.000
|
$2,300.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
42.000
|
$1,000.000
|
$1,000.000
|
$1,585.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,400.000
|
$2.750
|
$2.500
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$225.000
|
$125.000
|
$220.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$300.000
|
$202.340
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
43.000
|
$3,000.000
|
$2,775.000
|
$2,900.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
15.000
|
$250.000
|
$200.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,100.000
|
$1,145.000
|
$1,400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
39.000
|
$700.000
|
$765.000
|
$610.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
39.000
|
$10,000.000
|
$6,935.000
|
$7,800.000
|
|
|
REMOVE RD IL ASM (BRIDGE MOUNT)
|
EA
|
24.000
|
$280.000
|
$528.300
|
$670.000
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
4.000
|
$500.000
|
$528.300
|
$670.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
134.000
|
$475.000
|
$528.300
|
$670.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
99.000
|
$450.000
|
$528.300
|
$670.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
126.000
|
$500.000
|
$528.300
|
$670.000
|
|
|
REPLACE LUMINAIRE W/LED (150W EQ)
|
EA
|
28.000
|
$575.000
|
$774.000
|
$980.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
6.000
|
$700.000
|
$828.000
|
$1,050.000
|
|
|
REPLACE LUMINAIRE W/LED (400W EQ)
|
EA
|
46.000
|
$600.000
|
$868.500
|
$1,100.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
72.000
|
$1,000.000
|
$1,804.500
|
$2,000.000
|
|
|
IN RD IL (TY SA) 40T-10 (250W EQ) LED
|
EA
|
1.000
|
$5,400.000
|
$4,284.000
|
$5,000.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
45.000
|
$45,000.000
|
$50,085.000
|
$60,000.000
|
|
|
HI MST IL POLE (175 FT)( 80 MPH)
|
EA
|
9.000
|
$63,000.000
|
$60,795.000
|
$75,000.000
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
46.000
|
$32,000.000
|
$26,518.500
|
$34,000.000
|
|
|
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
|
EA
|
6.000
|
$15,000.000
|
$18,477.000
|
$23,000.000
|
|
|
LED HI MST IL AM(6 FIXT)ASYM(TY A)SHLD
|
EA
|
8.000
|
$35,000.000
|
$26,892.000
|
$34,000.000
|
|
|
TEMP RD IL (RD IL ASM)
|
MO
|
15.000
|
$240,000.000
|
$900.000
|
$1,100.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
53,687.000
|
$16.000
|
$18.150
|
$21.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
32,158.000
|
$30.000
|
$36.650
|
$42.000
|
|
|
CONDT (PVC) (SCH 40) (2 1/2")
|
LF
|
2,400.000
|
$12.000
|
$23.650
|
$28.000
|
|
|
CONDT (PVC) (SCH 40) (2 1/2") (BORE)
|
LF
|
890.000
|
$25.000
|
$41.200
|
$49.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
26,556.000
|
$14.250
|
$22.050
|
$26.000
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
8,214.000
|
$25.250
|
$44.500
|
$54.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
404.000
|
$22.500
|
$49.050
|
$59.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
640.000
|
$25.000
|
$43.500
|
$54.000
|
|
|
CONDT (RM) (1 1/4")
|
LF
|
6,460.000
|
$15.000
|
$50.450
|
$60.000
|
|
|
CONDT (RM) (2")
|
LF
|
6,530.000
|
$30.000
|
$45.050
|
$55.000
|
|
|
CONDT (RM) (3")
|
LF
|
504.000
|
$43.000
|
$96.350
|
$115.000
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
3,810.000
|
$2.000
|
$2.100
|
$3.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
7,780.000
|
$2.000
|
$2.100
|
$3.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,290.000
|
$2.000
|
$2.300
|
$3.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
35,213.000
|
$1.750
|
$2.400
|
$3.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
33,068.000
|
$2.600
|
$2.650
|
$3.200
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
79,687.000
|
$2.250
|
$2.750
|
$3.200
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
20,780.000
|
$1.750
|
$3.050
|
$3.800
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
64,520.000
|
$2.450
|
$3.350
|
$4.000
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
16,285.000
|
$3.000
|
$4.500
|
$5.400
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
43,746.000
|
$5.300
|
$5.050
|
$6.000
|
|
|
ELEC CONDR (NO.1) BARE
|
LF
|
7,950.000
|
$2.400
|
$4.800
|
$6.000
|
|
|
ELEC CONDR (NO.1) INSULATED
|
LF
|
21,200.000
|
$2.500
|
$5.050
|
$6.000
|
|
|
ELEC CONDR (NO.1/0) BARE
|
LF
|
4,880.000
|
$3.850
|
$6.300
|
$8.000
|
|
|
ELEC CONDR (NO.1/0) INSULATED
|
LF
|
23,285.000
|
$4.000
|
$6.350
|
$8.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
54.000
|
$700.000
|
$1,374.000
|
$1,650.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
122.000
|
$1,650.000
|
$2,181.000
|
$2,600.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
62.000
|
$1,350.000
|
$2,529.000
|
$3,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$4,000.000
|
$792.900
|
$950.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
16.000
|
$615.000
|
$528.300
|
$660.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)EX(O)
|
EA
|
1.000
|
$4,500.000
|
$9,706.500
|
$12,000.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
|
EA
|
7.000
|
$8,000.000
|
$6,683.400
|
$8,400.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
|
EA
|
2.000
|
$8,000.000
|
$5,598.000
|
$7,000.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(E)GC(U)
|
EA
|
1.000
|
$8,000.000
|
$6,760.000
|
$8,300.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)TP(O)
|
EA
|
1.000
|
$7,000.000
|
$8,497.000
|
$10,500.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)PS(U)
|
EA
|
10.000
|
$9,000.000
|
$11,268.000
|
$14,000.000
|
|
|
ELEC SRV TY D 120/240 125(NS)SS(N)PS(U)
|
EA
|
2.000
|
$5,000.000
|
$11,210.000
|
$14,000.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)EX(U)
|
EA
|
5.000
|
$8,000.000
|
$6,966.000
|
$8,500.000
|
|
|
ELC SRV TY D 120/240 150(NS)SS(N)EX(U)
|
EA
|
1.000
|
$6,000.000
|
$7,151.000
|
$8,600.000
|
|
|
ELEC SRV TY D 120/240 125(NS)SS(N)EX(O)
|
EA
|
1.000
|
$6,000.000
|
$6,890.000
|
$8,000.000
|
|
|
ELEC SRV TY D 120/240 150(NS)SS(N)PS(U)
|
EA
|
1.000
|
$6,000.000
|
$12,479.000
|
$16,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
105.000
|
$34.000
|
$21.700
|
$23.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
5,546.500
|
$32.000
|
$30.300
|
$34.000
|
|
|
REFURBISH ALUMINUM SIGNS (TY O)
|
EA
|
3.000
|
$5,000.000
|
$3,393.000
|
$3,500.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
143.750
|
$40.000
|
$60.000
|
$63.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
57.000
|
$5,000.000
|
$4,038.300
|
$4,300.000
|
|
|
REMOVE LRSA
|
EA
|
3.000
|
$700.000
|
$1,057.500
|
$1,100.000
|
|
|
INS OH SN SUP(20 FT CANT)
|
EA
|
1.000
|
$30,516.000
|
$25,319.000
|
$30,000.000
|
|
|
INS OH SN SUP(20 FT CANT)(SPAN ONLY)
|
EA
|
6.000
|
$12,500.000
|
$17,937.000
|
$22,500.000
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
2.000
|
$14,000.000
|
$37,134.000
|
$44,000.000
|
|
|
INS OH SN SUP(25 FT CANT)(SPAN ONLY)
|
EA
|
31.000
|
$25,000.000
|
$19,662.000
|
$24,000.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$16,000.000
|
$46,355.000
|
$55,000.000
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$18,000.000
|
$24,962.000
|
$30,000.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
1.000
|
$22,000.000
|
$55,841.000
|
$67,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
15.000
|
$8,000.000
|
$8,121.000
|
$8,000.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
2.000
|
$1,200.000
|
$1,233.000
|
$1,350.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
152.000
|
$50.000
|
$20.000
|
$27.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
600.000
|
$20.000
|
$21.200
|
$27.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
44.000
|
$20.000
|
$20.000
|
$27.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
1,000.000
|
$1.200
|
$2.000
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
41,980.000
|
$0.750
|
$1.350
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
1,769.000
|
$1.800
|
$1.650
|
$1.800
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
44,618.000
|
$1.200
|
$1.350
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
2,158.000
|
$1.600
|
$2.500
|
$2.700
|
|
|
WK ZN PAV MRK REMOV (W)12"(LNDP)
|
LF
|
356.000
|
$4.000
|
$7.000
|
$7.800
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
2,544.000
|
$4.750
|
$6.000
|
$6.700
|
|
|
WK ZN PAV MRK REMOV (W)(TPL ARROW)
|
EA
|
6.000
|
$350.000
|
$500.000
|
$557.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
98,745.000
|
$0.750
|
$1.350
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
75,180.000
|
$0.750
|
$1.350
|
$1.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
22,790.000
|
$4.000
|
$5.250
|
$5.800
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
148,286.000
|
$0.300
|
$0.550
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
565,592.000
|
$0.500
|
$0.650
|
$0.700
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
52,988.000
|
$0.500
|
$1.000
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
20,144.000
|
$2.000
|
$1.500
|
$1.600
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
8.000
|
$50.000
|
$45.000
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
312.000
|
$75.000
|
$75.000
|
$80.000
|
|
|
ELIM EXT PAV MRK & MRKS (SYMBOL)
|
EA
|
147.000
|
$50.000
|
$97.000
|
$105.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
548,914.000
|
$0.080
|
$0.150
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
53,056.000
|
$0.150
|
$0.250
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
37,651.000
|
$0.750
|
$0.650
|
$0.700
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
15.000
|
$20.000
|
$35.000
|
$39.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
180.000
|
$18.000
|
$40.000
|
$44.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
22,790.000
|
$0.750
|
$1.100
|
$1.200
|
|
|
FULL - WIDTH MOWING
|
CYC
|
8.000
|
$8,500.000
|
$3,501.000
|
$13,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
8.000
|
$6,000.000
|
$2,670.000
|
$10,500.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
8.000
|
$900.000
|
$1,872.000
|
$10,500.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
8.000
|
$900.000
|
$2,000.000
|
$10,500.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
8.000
|
$2,600.000
|
$2,355.000
|
$12,000.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
8.000
|
$2,600.000
|
$1,720.000
|
$12,000.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
8.000
|
$2,600.000
|
$2,400.000
|
$12,000.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
434.000
|
$575.000
|
$1,390.000
|
$160.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
6,503.000
|
$26.000
|
$15.250
|
$6.000
|
|
|
REMOVE ABOVE-GROUND CONDUIT
|
LF
|
5,290.000
|
$7.000
|
$9.000
|
$11.000
|
|
|
REMOVE UNDERGROUND CONDUIT
|
LF
|
2,570.000
|
$6.000
|
$45.000
|
$57.000
|
|
|
REMOVE CONDUCTOR
|
LF
|
33,000.000
|
$3.000
|
$1.350
|
$1.600
|
|
|
INSTALL CIRCUIT BREAKER
|
EA
|
5.000
|
$165.000
|
$506.700
|
$640.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,640.230
|
$28,048.000
|
$24,000.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
|
LF
|
55,119.000
|
$4.000
|
$6.800
|
$8.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
570.000
|
$3.000
|
$14.100
|
$17.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(24 FIBER)
|
LF
|
12,745.000
|
$5.000
|
$6.950
|
$8.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(36 FIBER)
|
LF
|
15,856.000
|
$3.300
|
$3.500
|
$4.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER)
|
LF
|
14,816.000
|
$5.750
|
$3.500
|
$4.400
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER)
|
LF
|
78,934.000
|
$5.000
|
$4.150
|
$5.000
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
1.000
|
$2,431.000
|
$2,588.000
|
$3,000.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
72.000
|
$65.000
|
$83.000
|
$100.000
|
|
|
FIBER OPTIC PATCH PANEL (6 POSITION)
|
EA
|
44.000
|
$3,120.000
|
$1,224.000
|
$1,500.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
5.000
|
$2,800.000
|
$1,526.000
|
$1,900.000
|
|
|
FIBER OPTIC PATCH PANEL (72 POSITION)
|
EA
|
9.000
|
$3,000.000
|
$4,347.000
|
$5,500.000
|
|
|
FIBER OPTIC PATCH PANEL (96 POSITION)
|
EA
|
1.000
|
$11,515.000
|
$5,004.000
|
$6,300.000
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 2)
|
EA
|
6.000
|
$21,697.000
|
$21,920.000
|
$27,000.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
26.000
|
$9,174.000
|
$9,846.000
|
$12,000.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
26.000
|
$1,106.000
|
$1,303.000
|
$1,600.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
7,555.000
|
$17.000
|
$31.550
|
$39.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
3,735.000
|
$22.000
|
$22.950
|
$29.000
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
252.000
|
$89.000
|
$147.600
|
$180.000
|
|
|
MLTPLY PV MK W/WTY (W) (6") (SLD)
|
LF
|
169,318.000
|
$0.890
|
$0.950
|
$1.000
|
|
|
MLTPLY PV MK W/WTY (W) (6") (BRK)
|
LF
|
210,137.000
|
$0.920
|
$1.250
|
$1.300
|
|
|
MLTPLY PV MK W/WTY (W) (6") (DOT)
|
LF
|
3,101.000
|
$3.000
|
$2.000
|
$2.200
|
|
|
MLTPLY PV MK W/WTY (W) (8") (SLD)
|
LF
|
53,056.000
|
$2.090
|
$1.450
|
$1.600
|
|
|
MLTPLY PV MK W/WTY (W) (12") (SLD)
|
LF
|
23,546.000
|
$4.450
|
$5.000
|
$5.500
|
|
|
MLTPLY PV MK W/WTY (W) (12") (LNDP)
|
LF
|
14,105.000
|
$5.460
|
$4.000
|
$4.400
|
|
|
MLTPLY PV MK W/WTY (Y) (6") (SLD)
|
LF
|
169,329.000
|
$0.890
|
$0.950
|
$1.000
|
|
|
MLTPLY PV MK (W) (ARROW)
|
EA
|
17.000
|
$500.000
|
$275.000
|
$300.000
|
|
|
MLTPLY PV MK (W) (WORD)
|
EA
|
180.000
|
$260.000
|
$340.000
|
$350.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
62,040.000
|
$1.000
|
$4.100
|
$5.000
|
|
|
JUNCTION BOX (INSTALL)
|
EA
|
21.000
|
$1,500.000
|
$1,331.000
|
$1,650.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
126.000
|
$443.000
|
$1,212.000
|
$1,530.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$100,000.000
|
$40,005.000
|
$50,000.000
|
|
|
LONG CHANNEL MOUNT CURB SYS (REMOVE)
|
LF
|
73,850.000
|
$6.000
|
$5.150
|
$3.500
|
|
|
SHIFT OVERHEAD SIGN PANELS
|
EA
|
1.000
|
$4,300.000
|
$3,803.000
|
$4,500.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
5.000
|
$10,000.000
|
$9,855.000
|
$12,000.000
|
|
|
ITS POLE (30 FT)(90 MPH)
|
EA
|
12.000
|
$10,000.000
|
$10,364.000
|
$13,000.000
|
|
|
ITS POLE (55 FT)(90 MPH)
|
EA
|
1.000
|
$26,000.000
|
$18,473.000
|
$24,000.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
13.000
|
$8,000.000
|
$6,548.000
|
$8,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,200.000
|
$200.000
|
$425.000
|
$277.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
300.000
|
$175.000
|
$778.000
|
$332.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
|
EA
|
20.000
|
$3,500.000
|
$4,815.000
|
$6,100.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
|
EA
|
26.000
|
$5,343.000
|
$5,189.000
|
$6,500.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
|
EA
|
13.000
|
$7,870.000
|
$7,281.000
|
$9,000.000
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
1.000
|
$900.000
|
$818.000
|
$1,000.000
|
|
|
INST LRG GRND MNT AND OVRHD SIGN(STATE)
|
SF
|
114.000
|
$37.000
|
$43.000
|
$50.000
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
5.000
|
$60,000.000
|
$18,639.000
|
$23,000.000
|
|
|
GROUND BOX (173030)
|
EA
|
12.000
|
$2,500.000
|
$3,686.000
|
$4,600.000
|
|
|
GROUND BOX (111824)
|
EA
|
6.000
|
$2,500.000
|
$3,924.000
|
$4,800.000
|
|
|
LIGHTING PROTECTION SYSTEM
|
EA
|
5.000
|
$12,000.000
|
$12,834.000
|
$16,000.000
|
|
|
VARIABLE MESSAGE SYS(VMS) W/FND MTD CAB
|
EA
|
15.000
|
$97,000.000
|
$96,053.000
|
$120,000.000
|
|
|
VARIABLE MESSAGE SYS(VMS) W/OUT CABINET
|
EA
|
1.000
|
$95,000.000
|
$77,157.000
|
$97,000.000
|
|
|
HARDENED ETHERNET SWITCH
|
EA
|
10.000
|
$5,500.000
|
$9,855.000
|
$12,000.000
|
|
|
AMBER SLDMS 7X50 W/FTD MTD CAB
|
EA
|
4.000
|
$65,000.000
|
$28,395.000
|
$35,000.000
|
|
|
AMBER SLDMS 7X35 W/FTD MTD CAB
|
EA
|
1.000
|
$62,500.000
|
$28,485.000
|
$35,500.000
|
|
|
AMBER SLDMS 7X35 W/OUT CABINET
|
EA
|
1.000
|
$15,000.000
|
$17,168.000
|
$21,000.000
|
|
Totals: |
$54,383,908.910
|
$58,488,663.000
|
$68,792,859.440
|