Show Job Controls
Bid Cobra

CHAMBERS FM 563 (1023-01-035)

Items: 52

County: CHAMBERS
Length: N/A
Highway: FM 563
District: BEAUMONT
Control Number: 1023-01-035
DBE Goal: N/A
Project: F 2021(397)
Guaranty: N/A
Time: 137 WORKING DAYS
Engineer's Estimate: $5,069,726.17
Date: 03/04/2021 (5 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$5,069,726.17
$4,828,360.05
Over/Under Est: -4.76% -$241,366.12
Over/Under Est: -3.09% -$156,626.31
Amt Left: 1.76% $84,739.81
$5,362,180.20
Over/Under Est: 5.77% $292,454.03
Amt Left: 11.06% $533,820.15
Delta: -9.14% -$449,080.34

Bid Items & Bid Tabulations

52 Total 0 of 52
CHAMBERS  |  FM 563  |  BEAUMONT  |  1023-01-035  |  03/04/2021  |  $5,069,726.17  |  F 2021(397)  |  SURF/ROADWAY RESTOR  |  137 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
TEXAS MATERIALS GROUP, INC.
VULCAN CONSTRUCTION
SUBGRADE WIDENING (ORD COMP)
STA 167.000 $315.000 $800.000 $1,090.000 $462.100
BACKFILL (TY A OR B)
STA 167.000 $152.000 $160.000 $514.000 $161.100
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 25,934.000 $0.360 $0.280 $0.350 $0.400
VEGETATIVE WATERING
MG 36.000 $19.000 $35.000 $26.000 $307.200
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 7,321.000 $56.000 $90.000 $82.500 $65.700
LIME (HYD, COM, OR QK(SLURRY))
TON 474.000 $181.000 $172.000 $180.000 $195.100
LIME TRT (SUBGRADE)(6")
SY 29,283.000 $1.800 $3.500 $2.480 $6.700
EMULS ASPH (PRIME)(AE-P)
GAL 6,023.000 $4.500 $3.000 $2.910 $3.400
PLANE ASPH CONC PAV (1")
SY 40,730.000 $0.980 $1.050 $1.270 $1.450
RC PIPE (CL III)(24 IN)
LF 16.000 $87.000 $115.000 $113.000 $143.300
RC PIPE (CL III)(30 IN)
LF 4.000 $92.000 $210.000 $125.000 $171.900
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,010.000 $1,300.000 $1,003.000 $1,102.300
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $1,123.000 $1,800.000 $1,411.000 $2,755.600
REMOV STR (SET)
EA 5.000 $487.000 $450.000 $378.000 $826.700
MOBILIZATION
LS 1.000 $361,300.000 $65,000.000 $175,340.000 $310,990.350
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,500.000 $1,900.000 $1,100.000 $8,368.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 11,680.000 $5.000 $4.150 $3.780 $5.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 11,680.000 $1.300 $1.100 $0.760 $1.100
DRIVEWAYS (CONC)
SY 318.000 $71.000 $90.000 $123.000 $132.400
DRIVEWAYS (ACP)
SY 1,698.000 $41.000 $32.000 $22.000 $40.950
DRIVEWAYS (BASE)
SY 2,219.000 $21.000 $20.000 $28.000 $17.550
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 58,430.000 $0.230 $0.190 $0.110 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 29,215.000 $0.210 $0.190 $0.120 $0.250
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 45.000 $260.000 $205.000 $227.000 $275.800
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $300.000 $210.000 $227.000 $342.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 4.000 $600.000 $465.000 $526.000 $606.800
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 29.000 $440.000 $155.000 $398.000 $275.600
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 4.000 $65.000 $50.000 $55.000 $99.200
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 300.000 $0.110 $0.220 $0.260 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 63,298.000 $0.240 $0.220 $0.220 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 271.000 $0.580 $0.450 $0.460 $0.450
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 4.000 $2.250 $8.400 $12.050 $8.800
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 10,160.000 $0.200 $0.180 $0.260 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 52,978.000 $0.220 $0.180 $0.220 $0.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,864.000 $1.070 $0.500 $1.460 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 271.000 $0.730 $0.550 $1.010 $0.700
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 24.000 $6.340 $6.250 $12.100 $6.350
PAVEMENT SEALER 4"
LF 576.000 $0.200 $0.190 $0.260 $0.400
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 300.000 $0.280 $0.450 $0.360 $0.450
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 63,298.000 $0.330 $0.300 $0.340 $0.300
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 10,160.000 $0.300 $0.280 $0.340 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 52,978.000 $0.320 $0.280 $0.340 $0.300
PREFAB PAV MRK TY C (W) (ARROW)
EA 40.000 $201.000 $200.000 $192.000 $248.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 23.000 $40.000 $36.000 $45.500 $71.650
REFL PAV MRKR TY I-C
EA 16.000 $3.000 $3.500 $4.050 $3.450
REFL PAV MRKR TY II-A-A
EA 1,192.000 $3.500 $3.500 $3.260 $3.450
D-GR HMA TY-D PG70-22
TON 17,951.000 $82.000 $82.000 $83.600 $95.000
TACK COAT
GAL 2,911.000 $3.250 $2.500 $5.780 $5.450
SP MIXES SP-D SAC-A PG76-22
TON 19,353.000 $107.000 $95.000 $87.600 $95.000
TACK COAT
GAL 7,072.000 $2.750 $2.500 $4.130 $3.450
TMA (STATIONARY)
DAY 137.000 $265.000 $160.000 $330.000 $266.300
TMA (MOBILE OPERATION)
DAY 10.000 $205.000 $160.000 $51.000 $55.100
Totals: $5,069,726.170 $4,828,360.050 $4,913,099.860 $5,362,180.200