PREPARING ROW
|
AC
|
26.850
|
$10,000.000
|
$661.860
|
$45,000.000
|
$35,000.000
|
$1,800.000
|
$9,178.000
|
$94,500.000
|
|
|
PREPARING ROW(OPT1)
|
STA
|
94.000
|
$500.000
|
$5,224.770
|
$5,000.000
|
$10,000.000
|
$6,315.890
|
$1,000.000
|
$22,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
42,921.000
|
$4.500
|
$4.860
|
$3.000
|
$5.840
|
$12.000
|
$9.500
|
$7.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,489.000
|
$11.000
|
$8.420
|
$3.000
|
$3.650
|
$3.700
|
$9.000
|
$5.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
710.000
|
$17.000
|
$8.300
|
$3.000
|
$6.830
|
$5.500
|
$11.000
|
$5.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,239.000
|
$25.000
|
$9.850
|
$3.000
|
$3.320
|
$3.150
|
$12.000
|
$3.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
3,492.000
|
$11.000
|
$0.770
|
$3.000
|
$2.750
|
$0.070
|
$3.000
|
$1.000
|
|
|
REMOVE CONCRETE (MSE PANELS)
|
SF
|
508.000
|
$10.000
|
$7.510
|
$4.000
|
$6.800
|
$33.000
|
$9.000
|
$5.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
1,070.000
|
$5.000
|
$7.970
|
$0.250
|
$6.460
|
$4.100
|
$4.500
|
$6.750
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-20")
|
SY
|
73,286.000
|
$5.000
|
$8.280
|
$0.250
|
$8.090
|
$4.500
|
$8.000
|
$4.650
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
9,321.000
|
$6.000
|
$7.980
|
$0.250
|
$8.770
|
$5.000
|
$4.500
|
$3.150
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
177,805.000
|
$8.000
|
$8.910
|
$5.500
|
$6.270
|
$7.150
|
$9.000
|
$8.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
45.000
|
$25.000
|
$13.870
|
$65.000
|
$35.380
|
$75.000
|
$15.000
|
$30.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
946.000
|
$13.500
|
$19.400
|
$25.000
|
$16.540
|
$45.000
|
$11.000
|
$15.750
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
7,552.000
|
$8.000
|
$9.140
|
$10.000
|
$17.530
|
$15.600
|
$5.000
|
$9.200
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
15,692.000
|
$8.000
|
$13.260
|
$18.000
|
$4.630
|
$15.000
|
$5.000
|
$3.600
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
221,020.000
|
$1.000
|
$0.910
|
$1.000
|
$0.950
|
$0.850
|
$2.200
|
$1.000
|
|
|
BLOCK SODDING
|
SY
|
829.000
|
$5.000
|
$2.200
|
$4.650
|
$4.960
|
$5.000
|
$5.000
|
$8.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
57,212.000
|
$0.170
|
$0.420
|
$0.180
|
$0.230
|
$0.240
|
$0.300
|
$0.170
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
28,606.000
|
$0.170
|
$0.080
|
$0.100
|
$0.090
|
$0.100
|
$0.190
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
28,606.000
|
$0.150
|
$0.080
|
$0.100
|
$0.090
|
$0.100
|
$0.190
|
$0.150
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
163,808.000
|
$0.300
|
$0.370
|
$0.260
|
$0.280
|
$0.290
|
$0.280
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
81,904.000
|
$0.300
|
$0.290
|
$0.270
|
$0.260
|
$0.270
|
$0.240
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
81,904.000
|
$0.300
|
$0.290
|
$0.270
|
$0.260
|
$0.270
|
$0.240
|
$0.350
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
57,212.000
|
$0.300
|
$0.100
|
$0.110
|
$0.130
|
$0.140
|
$0.170
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
5,584.470
|
$43.000
|
$7.280
|
$20.800
|
$20.620
|
$47.000
|
$15.000
|
$10.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
96,707.000
|
$3.000
|
$1.030
|
$4.000
|
$3.720
|
$5.000
|
$2.500
|
$2.150
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
2,399.000
|
$165.000
|
$182.200
|
$180.000
|
$182.980
|
$205.000
|
$180.000
|
$180.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
35,404.000
|
$3.500
|
$1.780
|
$5.000
|
$3.720
|
$5.000
|
$2.500
|
$2.800
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
64,272.000
|
$13.000
|
$2.440
|
$20.000
|
$17.240
|
$19.000
|
$20.000
|
$18.500
|
|
|
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(10")
|
SY
|
14,187.000
|
$23.000
|
$10.320
|
$30.000
|
$28.250
|
$31.000
|
$30.000
|
$30.000
|
|
|
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(12")
|
SY
|
19,982.000
|
$25.000
|
$10.320
|
$35.000
|
$33.360
|
$37.000
|
$35.000
|
$36.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
3,182.000
|
$60.000
|
$59.190
|
$95.000
|
$109.160
|
$98.000
|
$85.000
|
$84.800
|
|
|
ASPHALT STAB BASE (GR 1)(PG 64)
|
TON
|
23,371.000
|
$70.000
|
$59.190
|
$84.000
|
$93.900
|
$86.000
|
$95.000
|
$100.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
32,861.000
|
$4.000
|
$3.870
|
$2.900
|
$3.520
|
$4.400
|
$3.250
|
$2.800
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
12,552.000
|
$3.600
|
$2.570
|
$2.800
|
$3.520
|
$4.200
|
$4.000
|
$3.500
|
|
|
AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)
|
CY
|
271.000
|
$155.000
|
$78.420
|
$160.000
|
$234.750
|
$135.000
|
$90.000
|
$150.000
|
|
|
D-GR HMA(SQ) TY-C PG64-22
|
TON
|
3,563.000
|
$104.000
|
$145.010
|
$86.000
|
$103.290
|
$93.000
|
$85.000
|
$86.400
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
1,494.000
|
$80.000
|
$67.240
|
$90.000
|
$106.810
|
$94.000
|
$85.000
|
$88.400
|
|
|
SUPERPAVE MIXTURES SP-D PG70-22
|
TON
|
3,835.000
|
$110.000
|
$63.640
|
$94.000
|
$103.290
|
$97.000
|
$90.000
|
$90.250
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
330.000
|
$125.000
|
$93.530
|
$200.000
|
$228.880
|
$206.000
|
$130.000
|
$139.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
350.000
|
$50.000
|
$57.610
|
$50.000
|
$76.700
|
$90.000
|
$35.000
|
$64.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
19,366.000
|
$2.500
|
$1.640
|
$3.000
|
$1.530
|
$1.750
|
$1.500
|
$2.500
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
3,979.000
|
$2.500
|
$0.530
|
$3.000
|
$1.670
|
$1.500
|
$1.500
|
$2.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
22,877.000
|
$30.000
|
$66.180
|
$65.000
|
$62.430
|
$65.000
|
$61.000
|
$45.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
16,808.000
|
$55.000
|
$75.080
|
$70.000
|
$73.030
|
$68.000
|
$66.000
|
$53.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
18,001.000
|
$60.000
|
$83.990
|
$75.000
|
$85.230
|
$95.000
|
$75.000
|
$55.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,290.000
|
$90.000
|
$62.740
|
$55.000
|
$37.580
|
$45.500
|
$100.000
|
$61.600
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
1,610.000
|
$125.000
|
$92.510
|
$150.000
|
$89.440
|
$4.000
|
$55.000
|
$48.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
126.000
|
$170.000
|
$92.100
|
$146.200
|
$146.260
|
$118.000
|
$150.000
|
$125.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,137.000
|
$5.000
|
$1.750
|
$1.000
|
$1.060
|
$1.500
|
$1.750
|
$2.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
500.000
|
$15.000
|
$8.480
|
$25.000
|
$37.690
|
$3.800
|
$40.000
|
$60.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
772.000
|
$60.000
|
$187.680
|
$98.090
|
$105.600
|
$165.000
|
$110.000
|
$153.500
|
|
|
SOIL NAIL ANCHORS
|
LF
|
2,730.000
|
$18.250
|
$17.190
|
$19.000
|
$24.520
|
$34.000
|
$19.000
|
$24.150
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
212.000
|
$70.000
|
$81.900
|
$110.910
|
$44.430
|
$76.000
|
$75.000
|
$60.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
600.000
|
$125.000
|
$130.970
|
$99.190
|
$250.740
|
$89.000
|
$80.000
|
$307.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
10,428.000
|
$160.000
|
$144.380
|
$180.000
|
$143.630
|
$185.000
|
$150.000
|
$176.400
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
14.000
|
$120.000
|
$125.790
|
$80.000
|
$119.440
|
$54.500
|
$120.000
|
$250.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
70.000
|
$210.000
|
$189.110
|
$220.000
|
$112.360
|
$125.000
|
$113.000
|
$204.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
112.000
|
$145.000
|
$198.200
|
$171.000
|
$137.340
|
$237.000
|
$138.000
|
$270.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
90.000
|
$140.000
|
$199.360
|
$168.000
|
$121.220
|
$265.000
|
$122.000
|
$299.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
106.000
|
$235.000
|
$308.870
|
$275.000
|
$168.860
|
$320.000
|
$387.000
|
$362.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (42 IN)
|
LF
|
18.000
|
$485.000
|
$454.220
|
$350.000
|
$350.000
|
$340.000
|
$350.000
|
$385.000
|
|
|
CL C CONC (ABUT)
|
CY
|
147.000
|
$845.000
|
$715.020
|
$600.000
|
$788.540
|
$1,155.000
|
$950.000
|
$808.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
37.800
|
$1,380.000
|
$868.750
|
$850.000
|
$1,674.670
|
$1,650.000
|
$1,000.000
|
$1,631.000
|
|
|
CL C CONC (CAP)
|
CY
|
745.000
|
$1,000.000
|
$1,032.440
|
$1,000.000
|
$757.740
|
$1,140.000
|
$1,400.000
|
$890.000
|
|
|
CL C CONC (CAP)(EXTEND)
|
CY
|
20.800
|
$3,000.000
|
$1,290.550
|
$1,750.000
|
$2,318.880
|
$1,520.000
|
$1,400.000
|
$3,435.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
312.000
|
$850.000
|
$805.410
|
$1,800.000
|
$870.790
|
$1,460.000
|
$1,200.000
|
$1,000.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
40.000
|
$900.000
|
$779.940
|
$400.000
|
$727.500
|
$402.000
|
$1,000.000
|
$510.000
|
|
|
REINF CONC SLAB
|
SF
|
190,240.000
|
$15.000
|
$12.700
|
$14.000
|
$12.270
|
$22.500
|
$22.000
|
$14.800
|
|
|
APPROACH SLAB
|
CY
|
297.000
|
$430.000
|
$365.040
|
$400.000
|
$491.350
|
$530.000
|
$750.000
|
$495.000
|
|
|
APPROACH SLAB (EXTEND)
|
CY
|
32.000
|
$500.000
|
$444.220
|
$700.000
|
$1,018.010
|
$862.000
|
$1,100.000
|
$925.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(EXT SLAB)
|
SF
|
4,180.000
|
$30.000
|
$18.770
|
$16.000
|
$38.320
|
$37.500
|
$30.000
|
$36.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
1,673.000
|
$44.500
|
$38.290
|
$50.000
|
$53.960
|
$78.000
|
$80.000
|
$73.750
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
880.000
|
$145.000
|
$164.080
|
$230.000
|
$163.040
|
$180.000
|
$175.000
|
$183.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
9,262.250
|
$115.000
|
$147.840
|
$170.000
|
$135.180
|
$220.000
|
$200.000
|
$180.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
14,334.000
|
$120.000
|
$153.230
|
$175.000
|
$139.150
|
$220.000
|
$220.000
|
$176.500
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
778.000
|
$10.000
|
$93.840
|
$10.000
|
$3.790
|
$8.700
|
$7.750
|
$10.200
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
274.400
|
$375.000
|
$380.490
|
$361.020
|
$331.100
|
$310.000
|
$337.000
|
$362.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
284.000
|
$390.000
|
$373.360
|
$358.490
|
$336.840
|
$310.000
|
$343.000
|
$370.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
23.000
|
$650.000
|
$520.750
|
$444.230
|
$421.050
|
$695.000
|
$428.000
|
$630.000
|
|
|
RIPRAP (STONE TY R)(DRY)(6 IN)
|
CY
|
517.000
|
$100.000
|
$187.680
|
$146.550
|
$152.050
|
$125.000
|
$175.000
|
$181.000
|
|
|
RIPRAP (STONE TY R)(DRY)(18 IN)
|
CY
|
238.000
|
$155.000
|
$173.600
|
$135.410
|
$173.170
|
$275.000
|
$200.000
|
$184.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
957.000
|
$115.000
|
$97.020
|
$109.720
|
$155.140
|
$250.000
|
$180.000
|
$184.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
86.600
|
$460.000
|
$413.350
|
$444.370
|
$421.050
|
$765.000
|
$428.000
|
$460.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
195.000
|
$13.000
|
$16.260
|
$4.060
|
$46.420
|
$54.000
|
$97.000
|
$5.500
|
|
|
RAIL (TY T223)
|
LF
|
400.000
|
$100.000
|
$87.210
|
$65.000
|
$62.820
|
$200.000
|
$85.000
|
$129.000
|
|
|
RAIL (TY SSTR)
|
LF
|
4,306.000
|
$40.000
|
$43.820
|
$50.000
|
$48.050
|
$72.000
|
$40.000
|
$52.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
960.000
|
$110.000
|
$87.610
|
$100.000
|
$60.600
|
$96.000
|
$95.000
|
$82.100
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
70.000
|
$180.000
|
$162.990
|
$200.000
|
$199.880
|
$245.000
|
$400.000
|
$181.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
536.000
|
$180.000
|
$149.200
|
$210.000
|
$190.890
|
$245.000
|
$400.000
|
$196.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
470.000
|
$200.000
|
$214.780
|
$220.000
|
$193.620
|
$245.000
|
$410.000
|
$191.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,457.000
|
$220.000
|
$225.920
|
$270.000
|
$257.490
|
$315.000
|
$450.000
|
$260.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
1,061.000
|
$305.000
|
$286.500
|
$350.000
|
$344.790
|
$430.000
|
$600.000
|
$344.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
161.000
|
$75.000
|
$43.870
|
$50.000
|
$78.760
|
$87.000
|
$75.000
|
$57.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,205.000
|
$70.000
|
$66.310
|
$100.000
|
$110.790
|
$74.000
|
$80.000
|
$63.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,031.000
|
$80.000
|
$83.580
|
$120.000
|
$136.070
|
$125.000
|
$90.000
|
$69.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
307.500
|
$105.000
|
$100.910
|
$150.000
|
$156.320
|
$185.000
|
$130.000
|
$90.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
17.000
|
$130.000
|
$156.610
|
$175.000
|
$395.150
|
$390.000
|
$250.000
|
$124.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 4)
|
LF
|
175.500
|
$180.000
|
$178.820
|
$200.000
|
$222.230
|
$245.000
|
$250.000
|
$263.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
4.000
|
$4,000.000
|
$3,924.980
|
$5,000.000
|
$2,447.360
|
$3,400.000
|
$4,500.000
|
$3,735.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
1.000
|
$4,700.000
|
$4,591.470
|
$5,000.000
|
$3,160.670
|
$5,000.000
|
$4,500.000
|
$4,675.000
|
|
|
INLET (COMPL)(PCU)(4FT)(NONE)
|
EA
|
2.000
|
$4,300.000
|
$5,292.440
|
$5,000.000
|
$2,791.730
|
$4,000.000
|
$3,500.000
|
$3,100.000
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
6.000
|
$4,800.000
|
$4,917.350
|
$5,000.000
|
$3,833.150
|
$5,400.000
|
$6,000.000
|
$5,330.000
|
|
|
INLET (COMPL)(PSL)(RH)(4FTX4FT)
|
EA
|
2.000
|
$4,500.000
|
$4,738.800
|
$4,000.000
|
$2,749.430
|
$3,100.000
|
$6,000.000
|
$3,630.000
|
|
|
INLET (COMPL)(PSL)(RH)(5FTX5FT)
|
EA
|
2.000
|
$5,200.000
|
$2,908.970
|
$4,000.000
|
$3,112.430
|
$2,900.000
|
$5,500.000
|
$4,240.000
|
|
|
INLET (COMPL)(PSL)(RH)(6FTX6FT)
|
EA
|
2.000
|
$5,335.000
|
$7,507.010
|
$4,600.000
|
$3,112.430
|
$2,900.000
|
$6,500.000
|
$4,650.000
|
|
|
INLET (COMPL)(PSL)(RH)(8FTX8FT)
|
EA
|
3.000
|
$10,000.000
|
$7,507.010
|
$9,000.000
|
$7,878.410
|
$8,900.000
|
$10,000.000
|
$9,370.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
9.000
|
$4,400.000
|
$4,807.870
|
$5,000.000
|
$4,652.430
|
$4,800.000
|
$6,000.000
|
$4,780.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
5.000
|
$5,700.000
|
$5,234.170
|
$5,000.000
|
$4,308.680
|
$4,800.000
|
$8,000.000
|
$4,135.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-4FTX4FT)
|
EA
|
3.000
|
$6,500.000
|
$6,869.030
|
$5,500.000
|
$3,589.450
|
$3,600.000
|
$6,000.000
|
$4,730.000
|
|
|
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
|
EA
|
1.000
|
$3,190.000
|
$5,444.740
|
$10,000.000
|
$2,420.280
|
$2,700.000
|
$6,000.000
|
$3,808.000
|
|
|
INLET (COMPL)(PAZD)(RC)(5FTX5FT)
|
EA
|
2.000
|
$3,900.000
|
$5,335.940
|
$10,000.000
|
$3,165.320
|
$3,000.000
|
$6,500.000
|
$2,550.000
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
20.000
|
$5,680.000
|
$5,799.680
|
$3,000.000
|
$7,351.560
|
$8,400.000
|
$6,500.000
|
$6,000.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
1.000
|
$3,580.000
|
$7,871.320
|
$8,000.000
|
$6,886.820
|
$14,000.000
|
$7,789.000
|
$7,300.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$5,800.000
|
$8,317.430
|
$8,000.000
|
$7,102.300
|
$20,000.000
|
$7,667.000
|
$5,840.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$10,435.000
|
$8,387.590
|
$8,000.000
|
$7,078.350
|
$17,000.000
|
$8,956.000
|
$5,850.000
|
|
|
WINGWALL (FW - S) (HW=4 FT)
|
EA
|
1.000
|
$9,105.000
|
$9,289.920
|
$8,000.000
|
$7,389.590
|
$18,000.000
|
$9,396.000
|
$7,300.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$9,105.000
|
$8,820.730
|
$6,500.000
|
$12,279.230
|
$15,800.000
|
$6,579.000
|
$3,780.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(P)
|
EA
|
3.000
|
$7,300.000
|
$8,820.730
|
$8,500.000
|
$11,896.160
|
$7,200.000
|
$8,257.000
|
$7,775.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$5,355.000
|
$5,067.230
|
$8,500.000
|
$11,130.040
|
$24,000.000
|
$6,213.000
|
$3,605.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$7,300.000
|
$6,474.790
|
$8,500.000
|
$11,130.040
|
$12,500.000
|
$10,893.000
|
$5,715.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,200.000
|
$1,318.160
|
$2,000.000
|
$1,098.520
|
$1,200.000
|
$2,000.000
|
$1,295.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,355.000
|
$1,566.240
|
$2,077.010
|
$1,098.720
|
$1,210.000
|
$2,000.000
|
$1,330.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
44.000
|
$1,200.000
|
$1,102.440
|
$2,400.000
|
$1,177.820
|
$1,450.000
|
$2,200.000
|
$1,550.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,900.000
|
$1,185.990
|
$3,000.000
|
$1,310.810
|
$1,650.000
|
$2,300.000
|
$1,860.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,900.000
|
$1,467.410
|
$3,000.000
|
$1,363.700
|
$1,900.000
|
$2,300.000
|
$2,125.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
37.000
|
$1,750.000
|
$2,098.870
|
$3,000.000
|
$1,474.750
|
$2,400.000
|
$2,500.000
|
$2,360.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$3,500.000
|
$5,042.200
|
$4,500.000
|
$3,345.380
|
$4,500.000
|
$2,800.000
|
$4,225.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,800.000
|
$3,530.150
|
$5,000.000
|
$3,948.270
|
$4,100.000
|
$3,500.000
|
$4,100.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,700.000
|
$2,585.160
|
$3,000.000
|
$1,801.140
|
$100.000
|
$2,500.000
|
$2,060.000
|
|
|
SET (TY II) (DES 4) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,200.000
|
$2,675.680
|
$3,500.000
|
$3,186.720
|
$4,000.000
|
$3,500.000
|
$2,665.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
16.000
|
$2,860.000
|
$2,225.880
|
$3,000.000
|
$1,365.950
|
$1,460.000
|
$2,000.000
|
$3,440.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
209.000
|
$80.000
|
$40.280
|
$72.000
|
$68.150
|
$138.000
|
$40.000
|
$38.000
|
|
|
REMOV & RE - LAY PIPE (30 IN)
|
LF
|
64.000
|
$100.000
|
$50.670
|
$80.000
|
$74.190
|
$152.000
|
$40.000
|
$40.000
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
578.000
|
$120.000
|
$50.670
|
$100.000
|
$82.140
|
$48.000
|
$45.000
|
$45.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
16.000
|
$1,100.000
|
$1,320.030
|
$750.000
|
$500.000
|
$2,100.000
|
$2,000.000
|
$650.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
1,984.000
|
$15.000
|
$42.990
|
$63.000
|
$15.960
|
$41.000
|
$35.000
|
$28.750
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$900.000
|
$755.730
|
$500.000
|
$641.360
|
$695.000
|
$1,800.000
|
$325.000
|
|
|
REMOV STR (SET)
|
EA
|
67.000
|
$280.000
|
$473.650
|
$500.000
|
$538.470
|
$392.000
|
$1,900.000
|
$325.000
|
|
|
REMOV STR (PIPE)
|
LF
|
3,434.000
|
$18.000
|
$20.600
|
$10.000
|
$16.630
|
$12.000
|
$20.000
|
$10.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
2,641.000
|
$50.000
|
$28.650
|
$35.000
|
$33.690
|
$18.000
|
$55.000
|
$18.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$61,544.060
|
$95,000.000
|
$190,641.000
|
$125,000.000
|
$300,000.000
|
$143,750.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$10,000.000
|
$9,383.760
|
$10,000.000
|
$3,043.670
|
$3,200.000
|
$4,000.000
|
$850.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,900,000.000
|
$3,444,391.970
|
$4,000,000.000
|
$4,000,000.000
|
$4,300,000.000
|
$4,600,000.000
|
$4,820,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
37.000
|
$5,000.000
|
$16,559.580
|
$8,500.000
|
$14,696.220
|
$9,500.000
|
$13,000.000
|
$2,665.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
850.000
|
$30.000
|
$30.430
|
$42.000
|
$86.820
|
$110.000
|
$34.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
850.000
|
$9.000
|
$8.950
|
$8.700
|
$12.080
|
$15.500
|
$10.000
|
$11.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
612.000
|
$20.000
|
$22.890
|
$36.500
|
$31.460
|
$39.500
|
$25.000
|
$27.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
796.000
|
$10.000
|
$8.690
|
$9.250
|
$8.460
|
$10.600
|
$10.000
|
$16.000
|
|
|
SANDBAGS FOR EROSION CONTROL (12")
|
LF
|
1,493.000
|
$17.500
|
$8.910
|
$8.000
|
$7.760
|
$9.800
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,421.000
|
$2.800
|
$2.650
|
$3.000
|
$1.860
|
$2.400
|
$3.000
|
$3.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,421.000
|
$0.800
|
$0.630
|
$0.850
|
$0.290
|
$0.400
|
$1.000
|
$0.850
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,076.000
|
$7.000
|
$4.670
|
$5.500
|
$5.290
|
$6.650
|
$6.500
|
$6.300
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,076.000
|
$1.480
|
$1.480
|
$1.250
|
$0.300
|
$0.400
|
$1.500
|
$1.150
|
|
|
CONSTRUCTING DETOURS
|
SY
|
256.000
|
$56.000
|
$42.150
|
$100.000
|
$167.790
|
$115.000
|
$100.000
|
$61.000
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
31,263.000
|
$75.000
|
$40.180
|
$68.000
|
$91.560
|
$57.000
|
$110.000
|
$60.500
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
10,610.000
|
$44.000
|
$26.660
|
$10.000
|
$80.000
|
$37.000
|
$70.000
|
$11.450
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,040.000
|
$31.000
|
$38.430
|
$50.000
|
$46.250
|
$10.500
|
$62.000
|
$11.100
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$44.000
|
$40.800
|
$55.000
|
$45.030
|
$26.500
|
$62.000
|
$20.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
14,335.000
|
$6.000
|
$4.920
|
$12.000
|
$5.660
|
$4.000
|
$12.000
|
$5.200
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
23,730.000
|
$15.000
|
$8.180
|
$8.000
|
$5.140
|
$5.900
|
$10.000
|
$5.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,040.000
|
$7.000
|
$8.260
|
$8.000
|
$6.360
|
$10.000
|
$10.000
|
$7.150
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$7.900
|
$10.850
|
$10.000
|
$8.170
|
$24.000
|
$10.000
|
$20.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
2,458.000
|
$56.000
|
$52.860
|
$50.000
|
$45.730
|
$65.500
|
$75.000
|
$68.000
|
|
|
COLORED TEXTURED CONC (6")
|
SY
|
5,238.000
|
$65.000
|
$56.340
|
$80.000
|
$60.000
|
$63.000
|
$80.000
|
$101.150
|
|
|
LANDSCAPE PAVERS
|
SY
|
3,972.000
|
$50.000
|
$63.980
|
$50.800
|
$44.210
|
$66.000
|
$70.000
|
$89.500
|
|
|
CONC CURB (TY II)
|
LF
|
1,306.000
|
$20.000
|
$18.070
|
$19.330
|
$2.810
|
$10.000
|
$12.000
|
$25.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
15,617.000
|
$10.000
|
$3.360
|
$2.500
|
$3.060
|
$3.750
|
$7.000
|
$3.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
392.000
|
$220.000
|
$226.160
|
$269.750
|
$129.200
|
$210.000
|
$220.000
|
$220.000
|
|
|
CONC CURB (LANDSCAPE)
|
LF
|
6,999.000
|
$10.000
|
$36.060
|
$9.060
|
$26.650
|
$22.000
|
$12.000
|
$35.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
2,645.000
|
$125.000
|
$63.410
|
$125.000
|
$54.740
|
$30.500
|
$85.000
|
$65.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
5,810.000
|
$70.000
|
$63.410
|
$50.840
|
$54.740
|
$44.000
|
$60.000
|
$65.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
75.000
|
$37.000
|
$3.000
|
$73.730
|
$274.480
|
$85.000
|
$45.000
|
$39.000
|
|
|
TURNOUTS (ACP)
|
SY
|
66.000
|
$50.000
|
$32.410
|
$80.010
|
$751.210
|
$142.000
|
$45.000
|
$49.500
|
|
|
DRIVEWAYS (BASE)
|
SY
|
785.000
|
$33.000
|
$30.040
|
$33.210
|
$22.990
|
$28.500
|
$20.000
|
$25.850
|
|
|
CONC SIDEWALKS (5")
|
SY
|
3,207.000
|
$54.000
|
$48.350
|
$51.420
|
$41.050
|
$43.700
|
$42.000
|
$56.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$1,500.000
|
$1,431.320
|
$1,440.000
|
$1,263.170
|
$1,450.000
|
$1,300.000
|
$1,380.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
5.000
|
$1,610.000
|
$1,438.990
|
$1,450.000
|
$1,263.160
|
$1,450.000
|
$1,300.000
|
$1,380.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$1,900.000
|
$2,594.040
|
$2,310.000
|
$1,578.960
|
$1,550.000
|
$1,610.000
|
$1,725.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
7.000
|
$1,850.000
|
$1,803.450
|
$1,523.000
|
$1,578.960
|
$1,390.000
|
$1,610.000
|
$1,725.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
4.000
|
$2,300.000
|
$2,607.930
|
$2,545.000
|
$2,210.540
|
$1,920.000
|
$2,250.000
|
$2,415.000
|
|
|
CURB RAMPS (TY 20)
|
SY
|
84.000
|
$105.000
|
$220.790
|
$40.000
|
$30.790
|
$77.000
|
$32.000
|
$34.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
22,075.000
|
$0.300
|
$0.110
|
$0.200
|
$0.300
|
$0.220
|
$0.300
|
$0.250
|
|
|
CONC MEDIAN
|
SY
|
100.000
|
$60.000
|
$54.150
|
$51.200
|
$53.680
|
$79.000
|
$55.000
|
$73.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
825.000
|
$20.000
|
$22.640
|
$21.000
|
$22.850
|
$23.100
|
$20.000
|
$31.650
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
9.000
|
$1,750.000
|
$2,098.800
|
$1,990.720
|
$1,573.420
|
$1,600.000
|
$1,385.000
|
$2,240.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$950.000
|
$1,239.060
|
$1,258.740
|
$919.130
|
$930.000
|
$1,175.000
|
$1,525.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,572.000
|
$4.500
|
$3.230
|
$3.740
|
$2.080
|
$2.100
|
$4.000
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$250.000
|
$230.270
|
$429.930
|
$181.750
|
$185.000
|
$350.000
|
$520.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,200.000
|
$2,944.620
|
$2,460.590
|
$275.220
|
$2,800.000
|
$2,350.000
|
$3,390.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
8.000
|
$12,775.000
|
$11,294.290
|
$21,952.000
|
$8,775.860
|
$9,800.000
|
$9,000.000
|
$11,560.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
19.000
|
$1,800.000
|
$1,299.780
|
$2,999.520
|
$1,246.280
|
$1,400.000
|
$2,000.000
|
$4,285.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$940.000
|
$2,580.130
|
$1,780.920
|
$955.480
|
$1,100.000
|
$1,000.000
|
$1,035.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
1.000
|
$15,000.000
|
$25,805.340
|
$9,900.000
|
$16,201.580
|
$18,000.000
|
$15,000.000
|
$18,860.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
6.000
|
$270.000
|
$305.690
|
$200.000
|
$223.090
|
$226.000
|
$350.000
|
$195.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$360.000
|
$446.940
|
$386.000
|
$446.190
|
$455.000
|
$450.000
|
$240.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$1,100.000
|
$733.810
|
$980.000
|
$1,090.310
|
$990.000
|
$1,100.000
|
$1,135.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
14.000
|
$2,900.000
|
$4,097.210
|
$3,464.000
|
$3,492.370
|
$3,250.000
|
$3,500.000
|
$3,690.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
5,790.000
|
$6.830
|
$9.160
|
$6.750
|
$4.970
|
$5.900
|
$5.000
|
$6.750
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
240.000
|
$14.820
|
$23.700
|
$17.000
|
$14.620
|
$8.800
|
$15.000
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
315.000
|
$8.300
|
$12.450
|
$8.000
|
$10.380
|
$14.000
|
$11.000
|
$15.500
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
560.000
|
$28.080
|
$18.080
|
$20.000
|
$11.740
|
$16.500
|
$12.000
|
$18.500
|
|
|
CONDT (RM) (1")
|
LF
|
305.000
|
$24.000
|
$13.360
|
$19.500
|
$12.250
|
$18.500
|
$13.000
|
$20.500
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
1,420.000
|
$1.060
|
$1.300
|
$0.960
|
$0.830
|
$1.150
|
$0.900
|
$1.300
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
5,810.000
|
$1.150
|
$1.340
|
$1.090
|
$0.800
|
$1.300
|
$0.900
|
$1.450
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
8,839.000
|
$1.500
|
$2.000
|
$1.100
|
$0.890
|
$1.350
|
$0.900
|
$1.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
100.000
|
$1.320
|
$1.450
|
$1.220
|
$1.640
|
$1.450
|
$1.700
|
$1.650
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
200.000
|
$1.290
|
$2.320
|
$1.280
|
$1.680
|
$1.600
|
$1.700
|
$1.800
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
12.000
|
$750.000
|
$893.620
|
$754.000
|
$756.020
|
$685.000
|
$800.000
|
$780.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
9.000
|
$700.000
|
$929.900
|
$700.000
|
$572.100
|
$740.000
|
$600.000
|
$845.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
7.000
|
$700.000
|
$1,019.080
|
$700.000
|
$861.320
|
$770.000
|
$870.000
|
$880.000
|
|
|
ELC SRV TY A 120/240 060(NS)AL(E)SP(O)
|
EA
|
2.000
|
$5,500.000
|
$5,143.710
|
$5,280.000
|
$4,446.830
|
$4,950.000
|
$4,500.000
|
$5,635.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
5.000
|
$5,500.000
|
$5,143.710
|
$6,700.000
|
$4,956.370
|
$4,800.000
|
$5,000.000
|
$5,480.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
162.000
|
$30.000
|
$32.660
|
$29.000
|
$26.000
|
$14.600
|
$26.000
|
$18.500
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
754.000
|
$32.000
|
$31.600
|
$54.000
|
$26.210
|
$25.500
|
$27.000
|
$23.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
54.000
|
$420.000
|
$498.140
|
$407.000
|
$482.500
|
$470.000
|
$785.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
37.000
|
$600.000
|
$547.100
|
$603.000
|
$607.020
|
$590.000
|
$876.000
|
$690.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$700.000
|
$667.640
|
$540.000
|
$866.440
|
$840.000
|
$980.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$700.000
|
$714.370
|
$773.000
|
$798.990
|
$775.000
|
$1,140.000
|
$955.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$770.000
|
$851.140
|
$670.000
|
$856.060
|
$830.000
|
$1,175.000
|
$1,070.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$910.000
|
$724.290
|
$640.000
|
$959.820
|
$930.000
|
$1,300.000
|
$1,090.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
3.000
|
$900.000
|
$605.980
|
$1,100.000
|
$856.060
|
$830.000
|
$1,600.000
|
$1,425.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
5.000
|
$1,400.000
|
$2,054.570
|
$2,179.000
|
$1,639.480
|
$3,600.000
|
$2,500.000
|
$2,825.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
98.000
|
$105.000
|
$76.670
|
$76.000
|
$88.200
|
$86.000
|
$102.000
|
$95.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
5.000
|
$80.000
|
$92.140
|
$51.470
|
$51.880
|
$51.000
|
$40.000
|
$52.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
42.000
|
$30.000
|
$27.990
|
$26.060
|
$35.280
|
$34.500
|
$25.000
|
$40.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
68,285.000
|
$0.500
|
$0.660
|
$0.260
|
$1.250
|
$1.250
|
$1.100
|
$1.150
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
46,541.000
|
$0.550
|
$0.660
|
$0.260
|
$1.250
|
$1.250
|
$1.100
|
$1.150
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
45,199.000
|
$0.600
|
$0.600
|
$0.470
|
$0.750
|
$1.100
|
$0.900
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
14.000
|
$136.000
|
$172.200
|
$194.670
|
$125.000
|
$219.000
|
$180.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
8.000
|
$165.000
|
$217.740
|
$213.330
|
$125.000
|
$250.000
|
$201.000
|
$230.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
51,881.000
|
$0.600
|
$0.600
|
$0.500
|
$0.750
|
$1.100
|
$0.900
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
395.000
|
$1.500
|
$1.290
|
$3.180
|
$1.000
|
$2.100
|
$2.000
|
$2.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
10,378.000
|
$0.800
|
$0.590
|
$0.660
|
$1.100
|
$0.770
|
$0.800
|
$0.850
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
1,527.000
|
$2.800
|
$1.670
|
$3.420
|
$3.500
|
$2.600
|
$3.000
|
$2.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
187.000
|
$6.000
|
$4.480
|
$4.920
|
$7.000
|
$6.100
|
$6.000
|
$7.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
40.000
|
$100.000
|
$91.000
|
$80.670
|
$165.000
|
$127.000
|
$125.000
|
$145.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
|
EA
|
4.000
|
$180.000
|
$168.130
|
$167.520
|
$200.000
|
$252.000
|
$250.000
|
$290.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
2.000
|
$120.000
|
$127.540
|
$111.460
|
$165.000
|
$155.000
|
$155.000
|
$170.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
851.000
|
$5.600
|
$2.820
|
$4.500
|
$7.000
|
$5.100
|
$6.000
|
$5.750
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(090MIL)
|
EA
|
2.000
|
$285.000
|
$117.300
|
$300.000
|
$125.000
|
$102.000
|
$101.000
|
$115.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
|
LF
|
8,812.000
|
$0.700
|
$0.340
|
$0.830
|
$0.500
|
$0.770
|
$0.800
|
$0.900
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
4,670.000
|
$0.200
|
$0.110
|
$0.140
|
$0.180
|
$0.360
|
$0.400
|
$0.400
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
19,861.000
|
$0.150
|
$0.090
|
$0.110
|
$0.160
|
$0.310
|
$0.300
|
$0.350
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
187.000
|
$2.800
|
$2.660
|
$2.670
|
$2.500
|
$1.550
|
$1.600
|
$1.750
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
40.000
|
$57.000
|
$72.780
|
$60.480
|
$78.000
|
$46.000
|
$45.000
|
$52.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
2.000
|
$65.000
|
$75.730
|
$65.470
|
$78.000
|
$51.000
|
$50.000
|
$58.000
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
4,410.000
|
$0.350
|
$0.110
|
$0.120
|
$0.180
|
$0.360
|
$0.350
|
$0.400
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
20,056.000
|
$0.150
|
$0.100
|
$0.110
|
$0.160
|
$0.310
|
$0.300
|
$0.350
|
|
REFL PAV MRK TY II (Y) 8" (SLD)
|
LF
|
282.000
|
$0.380
|
$0.280
|
$0.380
|
$0.400
|
$0.620
|
$0.600
|
$0.700
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
245.000
|
$3.400
|
$3.210
|
$2.810
|
$3.500
|
$1.550
|
$1.500
|
$1.750
|
|
REFL PAV MRK TY II (Y) (MED NOSE)
|
EA
|
2.000
|
$132.000
|
$98.530
|
$90.620
|
$85.000
|
$76.000
|
$75.000
|
$90.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
7,460.000
|
$0.250
|
$0.070
|
$0.040
|
$0.120
|
$0.070
|
$0.070
|
$0.070
|
|
|
PAVEMENT SEALER 8"
|
LF
|
7,832.000
|
$0.420
|
$0.260
|
$0.090
|
$0.200
|
$0.090
|
$0.090
|
$0.090
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,434.000
|
$0.950
|
$0.780
|
$0.220
|
$0.400
|
$0.130
|
$0.120
|
$0.140
|
|
|
PAVEMENT SEALER 24"
|
LF
|
727.000
|
$1.500
|
$1.570
|
$0.480
|
$0.800
|
$0.250
|
$0.250
|
$0.300
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
12.000
|
$33.500
|
$26.140
|
$13.610
|
$29.000
|
$5.200
|
$5.000
|
$5.750
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
15.000
|
$42.000
|
$36.770
|
$12.410
|
$29.000
|
$7.200
|
$7.000
|
$8.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
4.000
|
$55.000
|
$15.620
|
$10.000
|
$85.000
|
$10.500
|
$10.000
|
$12.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
4.000
|
$65.000
|
$4.690
|
$10.900
|
$85.000
|
$10.500
|
$10.000
|
$12.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
27.000
|
$12.100
|
$12.530
|
$1.000
|
$9.000
|
$3.100
|
$3.000
|
$3.500
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
4,290.000
|
$0.750
|
$0.860
|
$0.740
|
$1.500
|
$1.050
|
$1.000
|
$1.150
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
4,290.000
|
$0.750
|
$0.750
|
$0.700
|
$1.500
|
$1.050
|
$1.000
|
$1.150
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
7,959.000
|
$0.500
|
$0.240
|
$0.270
|
$0.450
|
$0.360
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
30,979.000
|
$0.300
|
$0.250
|
$0.340
|
$0.450
|
$0.360
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
8,812.000
|
$0.350
|
$0.560
|
$0.270
|
$0.680
|
$0.410
|
$0.400
|
$0.450
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
13,887.000
|
$0.300
|
$0.490
|
$0.530
|
$0.600
|
$0.410
|
$0.400
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
4,410.000
|
$0.400
|
$0.230
|
$0.290
|
$0.480
|
$0.360
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
29,474.000
|
$0.200
|
$0.250
|
$0.340
|
$0.480
|
$0.360
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
15,586.000
|
$0.300
|
$0.220
|
$0.270
|
$0.680
|
$0.410
|
$0.400
|
$0.450
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
403.000
|
$12.500
|
$11.880
|
$11.680
|
$12.000
|
$12.500
|
$12.000
|
$14.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$120.000
|
$195.470
|
$220.820
|
$185.000
|
$210.000
|
$200.000
|
$230.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
6.000
|
$210.000
|
$347.100
|
$210.000
|
$210.000
|
$410.000
|
$400.000
|
$460.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
26.000
|
$275.000
|
$259.510
|
$185.000
|
$185.000
|
$280.000
|
$275.000
|
$315.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
27.000
|
$58.000
|
$33.680
|
$15.000
|
$15.000
|
$41.000
|
$40.000
|
$45.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
247.000
|
$5.000
|
$2.830
|
$4.250
|
$4.250
|
$4.600
|
$4.500
|
$5.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
562.000
|
$3.500
|
$2.490
|
$4.350
|
$4.250
|
$4.600
|
$4.500
|
$5.200
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,165.000
|
$4.000
|
$2.850
|
$4.250
|
$4.250
|
$4.600
|
$4.500
|
$5.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
27,118.000
|
$0.400
|
$0.380
|
$0.250
|
$0.250
|
$0.370
|
$0.350
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$72.000
|
$67.080
|
$25.000
|
$25.000
|
$36.000
|
$35.000
|
$40.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$74.000
|
$64.390
|
$25.000
|
$25.000
|
$36.000
|
$35.000
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,460.000
|
$0.150
|
$0.080
|
$0.010
|
$0.010
|
$0.020
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
7,832.000
|
$0.200
|
$0.210
|
$0.020
|
$0.020
|
$0.030
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,434.000
|
$0.500
|
$0.280
|
$0.040
|
$0.040
|
$0.040
|
$0.030
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
727.000
|
$0.700
|
$0.690
|
$0.100
|
$0.100
|
$0.070
|
$0.060
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
12.000
|
$19.000
|
$12.620
|
$5.000
|
$5.000
|
$3.100
|
$3.000
|
$3.500
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
4.000
|
$18.000
|
$24.850
|
$10.000
|
$10.000
|
$6.200
|
$6.000
|
$7.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
4.000
|
$17.000
|
$44.740
|
$8.000
|
$8.000
|
$7.400
|
$7.000
|
$8.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
15.000
|
$26.000
|
$15.300
|
$5.000
|
$5.000
|
$5.100
|
$5.000
|
$5.750
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
27.000
|
$9.000
|
$11.620
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
$1.150
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$4,500.000
|
$21,547.570
|
$49,633.130
|
$49,633.130
|
$42,000.000
|
$49,700.000
|
$47,600.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,000.000
|
$2,414.110
|
$7,805.520
|
$7,805.520
|
$3,600.000
|
$7,806.000
|
$4,025.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$60,000.000
|
$44,446.080
|
$31,508.150
|
$31,508.150
|
$33,000.000
|
$31,509.000
|
$37,400.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
21.000
|
$190.000
|
$214.300
|
$245.050
|
$245.050
|
$200.000
|
$246.000
|
$230.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
3.000
|
$220.000
|
$203.100
|
$215.930
|
$215.930
|
$200.000
|
$216.000
|
$230.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
22.000
|
$385.000
|
$512.260
|
$643.930
|
$643.930
|
$485.000
|
$644.000
|
$550.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
22.000
|
$86.000
|
$55.610
|
$150.790
|
$150.790
|
$31.000
|
$151.000
|
$35.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
21.000
|
$85.000
|
$66.470
|
$132.650
|
$132.650
|
$77.000
|
$133.000
|
$86.000
|
|
|
BACK PLATE (12")(5 SEC)
|
EA
|
3.000
|
$135.000
|
$84.110
|
$159.170
|
$159.170
|
$102.000
|
$160.000
|
$115.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
5,536.000
|
$1.160
|
$1.810
|
$0.920
|
$0.920
|
$1.600
|
$0.920
|
$1.800
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
8,277.000
|
$1.300
|
$2.440
|
$1.510
|
$1.510
|
$1.700
|
$1.510
|
$1.900
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
1,565.500
|
$1.560
|
$1.970
|
$1.990
|
$1.990
|
$2.050
|
$1.990
|
$2.400
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM&ILSN
|
EA
|
2.000
|
$5,800.000
|
$7,459.350
|
$12,070.840
|
$12,070.840
|
$11,000.000
|
$12,071.000
|
$12,400.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
|
EA
|
1.000
|
$6,000.000
|
$8,843.570
|
$12,746.510
|
$12,746.510
|
$11,500.000
|
$12,747.000
|
$13,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
|
EA
|
4.000
|
$8,000.000
|
$10,741.470
|
$14,169.670
|
$14,169.670
|
$11,500.000
|
$14,170.000
|
$13,100.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-24')ILSN
|
EA
|
1.000
|
$10,725.000
|
$11,729.700
|
$19,531.840
|
$19,531.840
|
$14,000.000
|
$19,532.000
|
$15,650.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
15.000
|
$1,600.000
|
$2,248.790
|
$770.040
|
$770.040
|
$1,200.000
|
$771.000
|
$1,350.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
22.000
|
$2,400.000
|
$713.300
|
$1,405.920
|
$1,405.920
|
$980.000
|
$1,406.000
|
$1,120.000
|
|
|
CNC CRACK REPAIR (FLOOD)(GRAVITY)
|
SF
|
4,433.000
|
$10.000
|
$23.460
|
$12.350
|
$11.910
|
$8.000
|
$7.250
|
$23.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
1,392.000
|
$50.000
|
$92.730
|
$42.480
|
$74.720
|
$61.500
|
$55.500
|
$75.000
|
|
|
LANDSCAPE AMENITY (TY 1)
|
EA
|
4.000
|
$2,000.000
|
$23,459.400
|
$5,000.000
|
$2,315.140
|
$4,000.000
|
$3,000.000
|
$8,625.000
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
9,709.000
|
$60.000
|
$60.700
|
$1.000
|
$10.000
|
$5.000
|
$56.000
|
$433.000
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
|
CY
|
883.000
|
$65.000
|
$54.480
|
$1.000
|
$10.000
|
$5.000
|
$57.000
|
$1,087.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$10,150.000
|
$9,639.830
|
$20,000.000
|
$10,576.980
|
$15,500.000
|
$15,200.000
|
$17,250.000
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
2.000
|
$5,200.000
|
$6,968.020
|
$8,319.470
|
$8,319.470
|
$6,600.000
|
$8,320.000
|
$7,500.000
|
|
|
VIVDS CAMERA ASSEMBLY
|
EA
|
9.000
|
$1,700.000
|
$1,827.400
|
$1,886.560
|
$1,886.560
|
$1,900.000
|
$1,887.000
|
$2,130.000
|
|
|
VIVDS SET-UP SYSTEM
|
EA
|
2.000
|
$800.000
|
$515.450
|
$195.440
|
$195.440
|
$715.000
|
$196.000
|
$815.000
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
2,624.000
|
$2.090
|
$4.890
|
$2.130
|
$2.130
|
$2.250
|
$2.150
|
$2.600
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
2,140.000
|
$4.010
|
$2.670
|
$4.900
|
$4.900
|
$4.250
|
$4.900
|
$4.800
|
|
|
PAVEMENT SEALER 6"
|
LF
|
46,865.000
|
$0.600
|
$0.940
|
$0.160
|
$0.160
|
$0.230
|
$0.070
|
$0.200
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
2.000
|
$6,050.000
|
$6,990.000
|
$6,845.550
|
$6,845.550
|
$7,200.000
|
$6,846.000
|
$8,200.000
|
|
|
ILSN (LED) (6 D)
|
EA
|
6.000
|
$3,500.000
|
$2,486.700
|
$3,130.410
|
$3,130.410
|
$3,200.000
|
$3,131.000
|
$3,600.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$13,000.000
|
$110,397.180
|
$20,000.000
|
$26,442.460
|
$89,000.000
|
$150,000.000
|
$86,250.000
|
|
Totals: |
$34,921,671.100
|
$35,023,918.949
|
$39,822,103.621
|
$40,446,041.236
|
$43,890,406.305
|
$46,789,819.155
|
$48,296,194.000
|