Items: 74

County: CARSON
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0275-04-069
DBE Goal: N/A
Project: STP 2B23(012)TAPS
Guaranty: N/A
Time: 96 WORKING DAYS
Engineer's Estimate: $5,701,285.85
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: TRANSPORTATION NON-ROADWAY
Mail/Deliver Bids To: N/A
ZACHARY MAYER
IVAN FUENTES
KENNETH PETR
LADENIA JEWITT
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,701,285.85
$6,318,689.75
Over/Under Est: 10.83% $617,403.90
Over/Under Est: 14.85% $846,801.60
Amt Left: 3.63% $229,397.70
$6,958,226.45
Over/Under Est: 22.05% $1,256,940.60
Amt Left: 10.12% $639,536.70
Delta: -6.26% -$410,139.00
$7,315,500.70
Over/Under Est: 28.31% $1,614,214.85
Amt Left: 15.78% $996,810.95
Delta: -5.13% -$357,274.25
Subcontractor Percentage Amount
APOLLO CONSTRUCTORS, INC. 7.30% $461,264.35
GREEN PLAINS DESIGN 3.10% $195,879.38
HJC FARMS, INC. 1.56% $98,571.56
TRP CONSTRUCTION GROUP, LLC 1.19% $75,192.41
PRIMATE CONSTRUCTION, LP 1.06% $66,978.11
H & F TRUCKING 0.30% $18,956.07
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.11% $6,950.56
BARRICADES UNLIMITED 0.09% $5,686.82
Total: 14.71% $929,479.26

Bid Items & Bid Tabulations

74 Total 0 of 74
CARSON  |  IH 40  |  AMARILLO  |  0275-04-069  |  08/03/2023  |  $5,701,285.85  |  STP 2B23(012)TAPS  |  TRANSPORT NON-ROADWAY  |  96 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
L A FULLER & SONS CONSTRUCTION, LTD.
GILVIN-TERRILL, LTD.
DUININCK, INC.
EXCAVATION (ROADWAY)
CY 5,151.000 $18.000 $13.750 $16.000 $30.000 $29.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 7,722.000 $26.000 $21.000 $17.000 $30.000 $40.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 6.700 $800.000 $610.000 $1,990.000 $600.000 $1,400.000
DRILL SEEDING (TEMP) (COOL)
AC 6.700 $600.000 $500.000 $1,860.000 $500.000 $1,300.000
VEGETATIVE WATERING
MG 570.000 $26.000 $18.000 $85.000 $10.000 $36.500
MULCH
SY 993.000 $3.000 $42.000 $53.000 $15.000 $18.000
PLANT SOIL MIX
CY 166.000 $75.000 $430.000 $539.000 $100.000 $255.000
PLANT BED PREPARATION
SY 993.000 $3.000 $26.650 $33.500 $50.000 $2.900
PLANT MATERIAL (15 GAL) (TREE)
EA 10.000 $750.000 $970.000 $1,217.000 $1,500.000 $1,500.000
PLANT MATERIAL (30 GAL) (TREE)
EA 10.000 $1,200.000 $970.000 $1,217.000 $1,600.000 $1,500.000
PLANT MATERIAL (5 GAL) (SHRUB)
EA 12.000 $300.000 $66.000 $83.000 $1,200.000 $275.000
PLANT MAINTENANCE
MO 12.000 $3,000.000 $70.000 $89.000 $10,000.000 $9,400.000
PLANT MAINTENANCE
CYC 8.000 $1,000.000 $70.000 $2,880.000 $3,000.000 $5,200.000
VEGETATIVE WATERING
MG 54.000 $26.000 $860.000 $1,078.000 $10.000 $2,200.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 312.000 $295.000 $381.500 $385.000 $350.000 $425.000
LIME TRT (EXST MATL)(8")
SY 28,846.000 $6.500 $4.150 $4.900 $10.000 $8.300
PRIME COAT (MC-30)
GAL 7,212.000 $5.000 $5.350 $6.100 $4.500 $6.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 3,242.000 $5.000 $5.400 $6.800 $5.750 $5.700
CONC PVMT (CONT REINF - CRCP) (13")
SY 4,860.000 $117.000 $175.000 $179.000 $135.000 $155.000
CONC PVMT (JOINTED - CPCD) (10")
SY 22,141.000 $97.000 $110.000 $107.250 $115.000 $127.200
DRILL SHAFT (SIGN MTS) (24 IN)
LF 40.000 $150.000 $169.000 $265.000 $240.000 $245.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 256.000 $350.000 $345.000 $299.000 $250.000 $275.000
CL A CONC (COLLAR)
EA 2.000 $900.000 $1,890.000 $2,720.000 $2,150.000 $1,200.000
RIPRAP (CONC)(5 IN)
CY 58.000 $725.000 $765.000 $812.000 $850.000 $890.000
RC PIPE (CL III)(18 IN)
LF 12.000 $150.000 $265.000 $697.000 $150.000 $200.000
RC PIPE (CL III)(30 IN)
LF 30.000 $220.000 $250.000 $382.000 $195.000 $300.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 1.000 $2,200.000 $3,000.000 $3,755.000 $3,400.000 $1,250.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $3,500.000 $3,500.000 $3,755.000 $3,650.000 $4,000.000
REMOV STR (HEADWALL)
EA 2.000 $900.000 $1,450.000 $1,375.000 $4,000.000 $1,000.000
REMOV STR (PIPE)
LF 8.000 $50.000 $140.000 $344.000 $475.000 $30.000
MOBILIZATION
LS 1.000 $590,000.000 $630,000.000 $600,200.000 $695,000.000 $725,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $7,500.000 $30,000.000 $1,390.000 $50,000.000 $12,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 425.000 $5.000 $7.000 $15.000 $10.000 $8.950
BIODEG EROSN CONT LOGS (REMOVE)
LF 425.000 $1.250 $4.800 $5.000 $5.000 $3.600
CONC CURB (MONO) (TY II)
LF 3,694.000 $9.000 $7.000 $19.000 $17.500 $13.500
CHAIN LINK FENCE (INSTALL) (6')
LF 2,019.000 $40.000 $21.000 $29.250 $25.000 $26.500
IN RD IL (TY ST) 40T-8 (250W EQ) LED
EA 22.000 $5,000.000 $5,950.000 $6,380.000 $5,000.000 $5,800.000
IN RD IL (TY ST) 50T-12 (400W EQ) LED
EA 10.000 $6,300.000 $6,600.000 $7,440.000 $5,750.000 $6,800.000
CONDT (PVC) (SCH 40) (2")
LF 7,170.000 $18.000 $19.550 $20.000 $17.500 $18.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 230.000 $45.000 $26.400 $40.000 $30.000 $36.500
ELEC CONDR (NO.8) BARE
LF 7,510.000 $2.200 $1.750 $2.650 $2.000 $2.450
ELEC CONDR (NO.8) INSULATED
LF 15,020.000 $2.500 $1.900 $3.000 $2.500 $2.750
GROUND BOX TY C (162911)W/APRON
EA 4.000 $1,500.000 $1,530.000 $1,595.000 $1,500.000 $1,500.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $7,500.000 $8,450.000 $9,300.000 $7,250.000 $8,500.000
ALUMINUM SIGNS (TY G)
SF 246.000 $32.000 $45.000 $43.200 $40.000 $39.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $1,000.000 $1,045.000 $1,295.000 $1,000.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,300.000 $1,350.000 $1,695.000 $1,500.000 $1,500.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 9.000 $800.000 $620.000 $700.000 $550.000 $635.000
REMOVE SM RD SN SUP&AM
EA 1.000 $120.000 $310.000 $133.000 $100.000 $120.000
INSTALL LRSS (STRUCT STEEL)
LB 1,255.600 $8.000 $10.000 $11.000 $10.000 $10.000
REMOVE LRSA
EA 1.000 $1,000.000 $2,500.000 $1,995.000 $2,500.000 $1,800.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 6.000 $140.000 $190.000 $200.000 $150.000 $180.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 32.000 $140.000 $190.000 $200.000 $150.000 $180.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 6.000 $140.000 $190.000 $200.000 $150.000 $180.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 546.000 $1.000 $4.250 $4.600 $4.000 $4.850
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,376.000 $2.250 $3.200 $3.450 $3.000 $3.650
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 508.000 $4.000 $5.300 $5.750 $5.000 $6.050
PAVEMENT SEALER 8"
LF 1,376.000 $0.500 $1.100 $1.150 $1.000 $1.200
PAVEMENT SEALER 12"
LF 508.000 $1.200 $2.100 $2.300 $2.000 $2.450
PAVEMENT SEALER (YLD TRI)
EA 6.000 $20.000 $53.000 $57.500 $50.000 $60.500
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 6.000 $50.000 $106.000 $115.000 $100.000 $120.000
PLOWABLE REFL PAV MRKR TY II-C-R
EA 88.000 $85.000 $106.000 $115.000 $100.000 $120.000
ELIM EXT PAV MRK & MRKS (6")
LF 3,091.000 $1.000 $1.100 $1.150 $1.000 $1.200
PAV SURF PREP FOR MRK (BLAST CLN)(6")
LF 11,663.000 $0.150 $0.900 $1.000 $0.850 $1.050
PAV SURF PREP FOR MRK (BLAST CLN)(8")
LF 1,376.000 $0.200 $1.150 $1.250 $1.100 $1.350
PAV SURF PREP FOR MRK (BLAST CLN)(12")
LF 508.000 $0.200 $1.850 $2.000 $1.750 $2.100
PV SRF PRP FOR MK (BLT CLN)(18"YLD TRI)
LF 14.000 $0.500 $53.000 $57.500 $50.000 $60.500
D-GR HMA TY-B PG64-22
TON 4,684.000 $182.000 $143.000 $180.500 $175.000 $170.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $9,200.000 $17,265.000 $18,500.000 $12,000.000
HPPM W/RET REQ TY I(W)6"(SLD)(100MIL)
LF 9,752.000 $0.750 $2.550 $2.750 $2.400 $2.900
HPPM W/RET REQ TY I(Y)6"(SLD)(100MIL)
LF 1,365.000 $0.750 $2.550 $2.750 $2.400 $2.900
PAVEMENT SEALER 6"
LF 11,663.000 $0.400 $1.100 $1.150 $1.000 $1.200
TMA (STATIONARY)
DAY 30.000 $250.000 $450.000 $605.000 $750.000 $305.000
TMA (MOBILE OPERATION)
HR 24.000 $100.000 $90.000 $90.000 $95.000 $110.000
Totals: $5,701,285.850 $6,318,689.750 $6,548,087.450 $6,958,226.450 $7,315,500.700