Show Job Controls
Bid Cobra

CARSON US 60 (0169-05-041)

Items: 97

County: CARSON
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0169-05-041
DBE Goal: N/A
Project: NH 2013(613)
Guaranty: N/A
Time: 198 WORKING DAYS
Engineer's Estimate: $15,490,402.35
Date: 02/06/2019 (7 years ago)
Contract Number: N/A
Type: REHAB EXISITNG ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$15,490,402.35
1
$16,325,738.31
Over/Under Est: 5.39% $835,335.96
Over/Under Est: 11.83% $1,832,357.64
Amt Left: 6.11% $997,021.68
$17,376,512.66
Over/Under Est: 12.18% $1,886,110.31
Amt Left: 6.44% $1,050,774.35
Delta: -0.31% -$53,752.67

Bid Items & Bid Tabulations

97 Total 0 of 97
CARSON  |  US 60  |  AMARILLO  |  0169-05-041  |  02/06/2019  |  $15,490,402.35  |  NH 2013(613)  |  REHAB EXISITNG ROADWAY  |  198 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
J. LEE MILLIGAN, INC.
PREPARING ROW
AC 14.830 $350.000 $186.360 $1,900.000 $170.000
PREPARING ROW
STA 20.000 $5,500.000 $1,296.000 $7,900.000 $1,350.000
REMOVING CONC (PAV)
SY 3,634.000 $30.000 $16.320 $15.000 $12.150
REMOVING CONC (MEDIANS)
SY 646.000 $25.000 $24.240 $13.000 $13.200
REMOVING CONC (CURB AND GUTTER)
LF 3,198.000 $6.000 $9.670 $7.000 $5.300
REMOVE CONC (GUTTER)
LF 940.000 $9.500 $9.120 $7.000 $5.750
EXCAVATION (ROADWAY)
CY 4,042.000 $20.000 $14.770 $7.500 $25.600
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 495.000 $25.000 $11.350 $10.000 $35.350
BACKFILL (TY A)
STA 645.960 $210.000 $163.720 $62.000 $210.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 15.950 $440.000 $238.680 $230.000 $235.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 6,667.000 $0.850 $1.300 $1.500 $1.300
FL BS (CMP IN PLC)(TY A OR B GR 4)(9")
SY 3,634.000 $25.000 $13.070 $21.000 $18.700
FL BS (CMP IN PLC)(TY A OR B GR4)(10")
SY 1,748.000 $25.000 $38.720 $22.000 $41.550
REWORK BS MTL (TY B)(15")(DEN CONT)
SY 822.000 $5.000 $47.330 $6.000 $57.800
CEMENT
TON 243.000 $195.000 $183.020 $156.000 $156.000
CEMENT TREAT (EXIST MATL)(DC)(8")
SY 19,321.000 $4.000 $3.480 $2.500 $3.100
PRIME COAT (AE-P)
GAL 41,133.000 $3.600 $4.010 $4.000 $4.100
EMULS ASPH (EROSN CONT)(MS-2)
GAL 4,761.000 $3.800 $3.390 $4.000 $4.100
ASPH (MULTI OPTION)
GAL 53,826.000 $4.000 $3.000 $4.000 $2.750
AGGR(TY-B GR-4 SAC-B)
CY 1,287.000 $95.000 $108.670 $90.000 $81.550
D-GR HMA TY-B PG64-28
TON 29,858.000 $85.000 $96.710 $85.000 $97.750
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
TON 58,774.000 $87.000 $97.420 $105.000 $103.400
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 16,600.000 $22.000 $19.930 $24.000 $23.450
PLANE ASPH CONC PAV(0" TO 2")
SY 17,648.000 $3.000 $1.620 $1.900 $2.850
PLANE ASPH CONC PAV (7")
SY 5,315.000 $6.000 $3.780 $3.900 $8.350
PLANE ASPH CONC PAV (3")
SY 139,897.000 $3.000 $1.350 $1.700 $3.000
PLANE ASPH CONC PAV (6")
SY 16,338.000 $6.000 $3.780 $3.800 $6.400
CONC PVMT (CONT REINF - CRCP) (11")
SY 17,211.000 $73.000 $92.500 $85.000 $102.350
FLOWABLE BACKFILL
CY 3.000 $195.000 $240.740 $62.000 $315.000
RIPRAP (CONC)(4 IN)
CY 13.000 $525.000 $493.970 $900.000 $575.000
RIPRAP (CONC)(FLUME)
CY 3.000 $600.000 $578.010 $900.000 $845.000
MOBILIZATION
LS 1.000 $1,300,000.000 $1,080,000.000 $1,565,902.040 $1,545,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $17,000.000 $25,355.420 $11,000.000 $18,350.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 600.000 $8.000 $3.350 $4.000 $8.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $1.500 $1.080 $1.000 $1.950
CONC CURB (MONO) (TY II)
LF 2,450.000 $5.000 $3.020 $9.000 $11.000
CONC CURB & GUTTER (TY II)
LF 458.000 $20.000 $35.990 $20.000 $31.600
CONC CURB & GUTTER (VALLEY GUTTER)
LF 798.000 $40.000 $78.510 $44.000 $55.850
CONCRETE GUTTER (MODIFIED)
LF 2,960.000 $50.000 $34.050 $45.000 $51.100
RUMBLE STRIPS (SHOULDER)
LF 104,591.000 $0.160 $0.190 $0.140 $0.120
RUMBLE STRIPS (CENTERLINE)
LF 36,770.000 $0.200 $0.190 $0.140 $0.320
MTL W-BEAM GD FEN (STEEL POST)
LF 250.000 $28.000 $33.170 $30.000 $31.600
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,125.000 $1,382.190 $4,000.000 $1,315.000
REMOVE METAL BEAM GUARD FENCE
LF 700.000 $3.700 $4.420 $13.000 $4.200
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $375.000 $442.300 $775.000 $420.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,150.000 $3,427.830 $4,000.000 $3,265.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $370.000 $442.300 $700.000 $420.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $700.000 $884.600 $900.000 $840.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 10.000 $800.000 $1,022.820 $1,100.000 $975.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 24.000 $900.000 $1,271.610 $1,250.000 $1,210.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $1,000.000 $1,078.110 $1,100.000 $1,025.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $1,271.610 $1,350.000 $1,580.000
REMOVE SM RD SN SUP&AM
EA 54.000 $105.000 $110.580 $105.000 $105.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 10.000 $90.000 $149.280 $140.000 $142.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 45.000 $140.000 $149.280 $140.000 $142.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 199.000 $140.000 $149.280 $140.000 $142.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 13.000 $140.000 $149.280 $140.000 $142.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 103.000 $120.000 $149.280 $140.000 $142.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 236.000 $12.000 $16.590 $20.000 $15.800
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 6.000 $30.000 $44.230 $25.000 $42.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,903.000 $0.500 $0.140 $0.130 $0.140
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 71,602.000 $0.250 $0.140 $0.130 $0.140
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 282.000 $3.250 $2.700 $2.600 $2.650
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,686.000 $0.250 $0.140 $0.130 $0.140
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 86,756.000 $0.250 $0.140 $0.130 $0.140
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,870.000 $0.850 $0.970 $0.920 $0.950
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 282.000 $17.000 $10.800 $11.000 $10.550
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 1,870.000 $0.800 $0.970 $1.000 $0.950
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 9,353.000 $0.900 $0.910 $0.500 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,814.000 $0.800 $0.910 $0.500 $1.200
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 12,384.000 $0.800 $0.760 $0.710 $0.740
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 554.000 $5.000 $3.780 $3.560 $3.700
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 276.000 $10.000 $7.560 $7.200 $7.400
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 22.000 $150.000 $113.400 $110.000 $111.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 22.000 $225.000 $226.800 $214.000 $220.000
REFL PAV MRK TY I (W)(RR XING)(090MIL)
EA 7.000 $510.000 $486.000 $459.000 $474.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 90.000 $22.000 $27.000 $26.000 $26.350
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 27,878.000 $0.340 $0.360 $0.400 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 90,519.000 $0.340 $0.360 $0.400 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 5,393.000 $0.340 $0.360 $0.400 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 146,791.000 $0.340 $0.360 $0.400 $0.350
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
LF 935.000 $6.000 $23.760 $23.000 $23.200
PLOWABLE REFL PAV MRKR TY I-C
EA 48.000 $35.000 $48.600 $46.000 $47.450
PLOWABLE REFL PAV MRKR TY II-A-A
EA 96.000 $35.000 $48.600 $46.000 $47.450
REFL PAV MRKR TY I-C
EA 740.000 $3.000 $3.240 $3.100 $3.150
REFL PAV MRKR TY II-A-A
EA 1,028.000 $3.000 $3.240 $3.100 $3.150
REFL PAV MRKR TY II-C-R
EA 1,427.000 $3.500 $3.240 $3.100 $3.150
ELIM EXT PAV MRK & MRKS (4")
LF 58,990.000 $1.000 $0.810 $1.000 $0.800
ELIM EXT PAV MRK & MRKS (8")
LF 2,400.000 $0.800 $1.620 $1.900 $1.600
ELIM EXT PAV MRK & MRKS (24")
LF 12.000 $3.000 $4.320 $4.200 $4.250
EMULSION
GAL 460,260.000 $2.900 $3.500 $4.000 $2.600
CEMENT
TON 587.000 $195.000 $183.020 $156.000 $156.000
EMUL TRTMNT(MX EXST MTRL & NEW BASE) 8"
SY 139,897.000 $3.000 $2.470 $3.400 $2.700
UNDERSEAL COURSE
GAL 52,725.000 $3.500 $4.770 $4.000 $3.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $17,000.000 $4,804.210 $18,000.000 $24,300.000
TMA (STATIONARY)
DAY 198.000 $350.000 $384.220 $1,000.000 $665.000
TMA (MOBILE OPERATION)
HR 780.000 $70.000 $65.960 $100.000 $66.500
Totals: $15,490,402.350 $16,325,738.326 $17,322,759.990 $17,376,512.660