Show Job Controls
Bid Cobra

CAMERON CS (0921-06-306)

Items: 77

County: CAMERON
Length: N/A
Highway: CS
District: PHARR
Control Number: 0921-06-306
DBE Goal: N/A
Project: BR 2023(387)
Guaranty: N/A
Time: 234 WORKING DAYS
Engineer's Estimate: $1,492,417.77
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
HECTOR SILLER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,492,417.77
$1,753,094.18
Over/Under Est: 17.47% $260,676.41
$1,881,581.89
Over/Under Est: 26.08% $389,164.12
Amt Left: 7.33% $128,487.71
Over/Under Est: 48.67% $726,305.09
Amt Left: 26.56% $465,628.68
Delta: -17.92% -$337,140.97
Subcontractor Percentage Amount
ANAHUAC INFRASTRUCTURE LLC 10.98% $255,467.78
GREGORY PILE DRIVING, INC. 5.87% $136,575.22
PATMO SERVICES, L.L.C. 2.79% $64,913.94
TEXAS HIGHWAY SYSTEMS, INC. 0.97% $22,568.65
PAVEMENT MARKINGS INC. 0.44% $10,237.32
PENHALL COMPANY 0.28% $6,514.66
SOIL TECH ADVANCE INC. 0.21% $4,886.00
Total: 21.54% $501,163.57

Bid Items & Bid Tabulations

77 Total 0 of 77
CAMERON  |  CS  |  PHARR  |  0921-06-306  |  01/05/2023  |  $1,492,417.77  |  BR 2023(387)  |  BRIDGE REPL  |  234 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LUCANIA CONSTRUCTION LLC
FOREMOST PAVING, INC.
TEXAS CORDIA CONSTRUCTION, LLC
PREPARING ROW
STA 7.270 $2,500.000 $4,000.000 $4,200.000 $2,000.000
REMOVING CONC (PAV)
SY 600.000 $20.000 $40.000 $20.000 $12.000
REMOVING CONC (RIPRAP)
SY 75.000 $11.000 $15.000 $20.000 $50.000
REMOVING CONC (CURB AND GUTTER)
LF 700.000 $6.000 $10.000 $7.000 $12.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 1,247.000 $5.000 $40.000 $11.000 $20.000
EXCAVATION (ROADWAY)
CY 1,401.230 $11.040 $11.000 $15.000 $22.000
EXCAVATION (CHANNEL)
CY 90.000 $30.000 $80.000 $50.000 $45.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 394.000 $20.000 $20.000 $45.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 560.610 $12.000 $20.000 $50.000 $40.000
BACKFILL (TY A)
STA 3.770 $160.000 $4,500.000 $2,000.000 $1,740.000
BLADING
STA 7.270 $500.000 $400.000 $600.000 $790.000
FURNISHING AND PLACING TOPSOIL (4")
SY 294.000 $0.750 $6.000 $12.000 $16.000
FURNISHING AND PLACING TOPSOIL
CY 150.000 $60.000 $50.000 $95.000 $73.000
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 294.000 $0.450 $3.000 $2.500 $3.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 294.000 $0.400 $3.000 $2.500 $3.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 1,790.000 $0.500 $0.600 $0.500 $1.000
DRILL SEEDING (TEMP) (WARM)
SY 1,790.000 $0.200 $0.600 $0.500 $1.000
VEGETATIVE WATERING
MG 147.430 $35.000 $40.000 $3.000 $20.000
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 1,790.000 $2.000 $3.200 $2.650 $3.000
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
CY 506.000 $85.000 $100.000 $56.000 $65.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 356.000 $85.000 $170.000 $110.000 $180.000
CEMENT
TON 29.000 $200.000 $250.000 $215.000 $300.000
CEMENT TREAT (NEW BASE)(11")
SY 2,812.000 $5.000 $12.000 $15.500 $3.000
PRIME COAT (MC-30)
GAL 550.000 $6.000 $12.000 $9.000 $8.000
CEM STABIL BKFL
CY 185.000 $105.000 $150.000 $150.000 $100.000
PRESTR CONC PIL (16 IN SQ)
LF 518.000 $160.000 $180.000 $225.000 $200.000
DRILL SHAFT (24 IN)
LF 336.000 $250.000 $300.000 $350.000 $300.000
CL C CONC (ABUT)
CY 56.600 $950.000 $1,300.000 $2,500.000 $1,500.000
REINF CONC SLAB (SLAB BEAM)
SF 3,248.000 $27.000 $30.000 $30.000 $60.000
PRESTR CONC SLAB BEAM (4SB12)
LF 37.000 $200.000 $330.000 $207.000 $535.000
PRESTR CONC SLAB BEAM (5SB12)
LF 296.000 $250.000 $290.000 $207.000 $375.000
PRESTR CONC SLAB BEAM (4SB15)
LF 405.000 $220.000 $290.000 $207.000 $375.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 33.000 $450.000 $550.000 $600.000 $857.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 110.000 $155.000 $250.000 $230.000 $293.000
RAIL (TY T223)
LF 114.000 $135.000 $230.000 $150.000 $449.000
RAIL (TY C402)
LF 98.000 $150.000 $300.000 $230.000 $167.000
TYPE A JOINT
LF 160.000 $80.000 $60.000 $18.000 $413.000
RC PIPE (CL III)(18 IN)
LF 152.000 $90.000 $90.000 $160.000 $105.000
RC PIPE (CL III)(30 IN)
LF 96.000 $150.000 $180.000 $210.000 $176.000
RC PIPE (CL III)(36 IN)
LF 112.000 $200.000 $200.000 $220.000 $260.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 1.000 $6,000.000 $3,250.000 $5,000.000 $5,615.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,200.000 $1,500.000 $1,300.000 $1,836.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $3,000.000 $2,500.000 $2,100.000 $2,897.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $5,000.000 $3,400.000 $8,000.000 $4,138.000
REMOV STR (BOX CULVERT)
EA 1.000 $5,500.000 $5,000.000 $2,000.000 $55,250.000
REMOV STR (WINGWALL)
EA 4.000 $1,500.000 $800.000 $5,000.000 $3,749.000
REMOV STR (PIPE)
LF 56.000 $30.000 $25.000 $15.000 $23.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $50,000.000 $28,000.000 $65,000.000 $63,500.000
MOBILIZATION
LS 1.000 $154,000.000 $100,000.000 $180,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $4,000.000 $1,500.000 $4,500.000 $5,100.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $30.000 $20.000 $53.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $10.000 $10.000 $26.000 $19.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 60.000 $100.000 $100.000 $140.000 $274.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,341.000 $6.000 $5.000 $4.150 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,341.000 $2.000 $1.500 $1.250 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 581.000 $6.000 $6.750 $5.500 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 581.000 $1.000 $1.500 $1.250 $1.000
CONC CURB & GUTTER (TY II)
LF 700.000 $23.500 $30.000 $13.500 $59.000
DRIVEWAYS (ACP)
SY 261.100 $40.000 $100.000 $70.000 $57.000
DRIVEWAYS (BASE)
SY 178.100 $70.000 $70.000 $35.000 $13.000
MTL W-BEAM GD FEN (TIM POST)
LF 150.000 $35.000 $55.000 $43.000 $41.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,300.000 $2,900.000 $2,000.000 $1,968.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $3,200.000 $700.000 $1,500.000 $1,431.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,400.000 $3,200.000 $3,500.000 $3,133.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 6.000 $25,000.000 $32,000.000 $23,000.000 $25,480.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 11.000 $750.000 $800.000 $820.000 $1,136.000
REMOVE SM RD SN SUP&AM
EA 8.000 $125.000 $200.000 $75.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $32.680 $20.000 $13.500 $38.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 4.000 $90.000 $30.000 $37.000 $80.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,443.000 $3.000 $2.500 $2.500 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,443.000 $3.000 $2.500 $2.500 $2.000
PREFAB PAV MRK TY B (W)(BIKE ARROW)
EA 4.000 $250.000 $265.000 $300.000 $240.000
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
EA 4.000 $255.000 $265.000 $250.000 $240.000
REFL PAV MRKR TY II-A-A
EA 19.000 $8.000 $11.000 $5.000 $10.000
PAV SURF PREP FOR MRK (4")
LF 1,035.000 $1.000 $0.300 $0.500 $0.300
D-GR HMA TY-D SAC-A PG76-22
TON 458.100 $145.000 $220.000 $220.000 $212.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 1,164.000 $1.750 $3.000 $5.000 $3.000
Totals: $1,492,417.769 $1,753,094.180 $1,881,581.890 $2,218,722.860