CAMERON PR 100 (0331-04-067)

Items: 99

County: CAMERON
Length: N/A
Highway: PR 100
District: PHARR
Control Number: 0331-04-067
DBE Goal: N/A
Project: STP 2017(193)TAPS
Guaranty: N/A
Time: 316 WORKING DAYS
Engineer's Estimate: $3,181,309.27
Date: 01/04/2017 (9 years ago)
Contract Number: N/A
Type: CONST. SIDEWALKS, RAMPS AND CURBS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$3,181,309.27
$3,452,509.19
Over/Under Est: 8.52% $271,199.92
Over/Under Est: 11.33% $360,392.93
Amt Left: 2.58% $89,193.01
$3,803,827.12
Over/Under Est: 19.57% $622,517.85
Amt Left: 10.18% $351,317.93
Delta: -7.40% -$262,124.92
Over/Under Est: 21.24% $675,630.09
Amt Left: 11.71% $404,430.17
Delta: -1.40% -$53,112.24
$3,951,761.06
Over/Under Est: 24.22% $770,451.79
Amt Left: 14.46% $499,251.87
Delta: -2.46% -$94,821.70
$4,360,541.12
Over/Under Est: 37.07% $1,179,231.85
Amt Left: 26.3% $908,031.93
Delta: -10.34% -$408,780.06
$4,468,404.55
Over/Under Est: 40.46% $1,287,095.28
Amt Left: 29.42% $1,015,895.36
Delta: -2.47% -$107,863.43
Over/Under Est: 52.35% $1,665,359.10
Amt Left: 40.38% $1,394,159.18
Delta: -8.47% -$378,263.82
$4,916,715.87
Over/Under Est: 54.55% $1,735,406.60
Amt Left: 42.41% $1,464,206.68
Delta: -1.45% -$70,047.50

Bid Items & Bid Tabulations

99 Total 0 of 99
CAMERON  |  PR 100  |  PHARR  |  0331-04-067  |  01/04/2017  |  $3,181,309.27  |  STP 2017(193)TAPS  |  CONST. SIDEWALKS, RAMPS AND CURBS  |  316 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REIM CONSTRUCTION, INC.
ARANDA BROTHERS CONSTRUCTION CO., INC.
FOREMOST PAVING, INC.
VALLEY INFRASTRUCTURE, INC.
TEXAS SAI, INC.
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
ANDERSON COLUMBIA CO., INC.
IOC COMPANY, LLC
PREPARING ROW
STA 244.500 $250.000 $446.000 $1,200.000 $1,000.000 $250.000 $866.710 $950.000 $300.000 $700.000 $2,350.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 1.000 $330.750 $901.000 $1,200.000 $1,500.000 $2,000.000 $1,000.000 $2,000.000 $2,000.000 $3,700.000 $2,500.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 6,302.000 $2.500 $5.000 $5.000 $6.000 $9.000 $10.390 $7.000 $10.000 $7.000 $13.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 12,684.000 $3.500 $10.250 $5.000 $8.000 $17.000 $9.670 $8.000 $15.000 $11.000 $18.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 940.000 $6.000 $14.500 $10.000 $15.000 $26.000 $17.060 $12.000 $20.000 $20.000 $22.000
EXCAVATION (ROADWAY)
CY 123.000 $15.750 $45.250 $10.000 $8.000 $14.000 $60.040 $28.000 $15.000 $44.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 2,170.000 $10.500 $35.500 $12.000 $25.000 $15.000 $19.200 $15.000 $20.000 $64.000 $38.000
FURNISHING AND PLACING TOPSOIL (4")
SY 205.000 $2.100 $6.200 $5.000 $60.000 $22.000 $45.000 $10.000 $10.000 $55.000 $7.000
BLOCK SODDING
SY 205.000 $5.250 $5.650 $5.000 $5.000 $10.000 $4.500 $5.500 $10.000 $5.000 $5.000
VEGETATIVE WATERING
MG 20.000 $27.300 $35.750 $50.000 $60.000 $55.000 $450.720 $60.000 $1.000 $55.000 $50.000
IRRIGATION SYSTEM
LS 1.000 $52,500.000 $163,000.000 $175,000.000 $162,000.000 $145,000.000 $133,583.000 $160,000.000 $250,000.000 $150,000.000 $140,000.000
PLANT MATERIAL (1-GAL)
EA 9,700.000 $8.650 $12.500 $20.000 $12.000 $10.000 $8.000 $12.000 $10.000 $11.000 $8.000
PLANT MATERIAL (3-GAL)
EA 4,700.000 $22.300 $24.500 $30.000 $22.000 $24.000 $21.000 $24.000 $30.000 $22.000 $21.000
MULCH
SY 3,035.000 $5.250 $10.250 $1.000 $10.000 $9.000 $7.500 $10.000 $5.000 $9.000 $7.500
PLANT BED PREPARATION
SY 3,035.000 $3.500 $17.000 $15.000 $16.000 $15.000 $14.000 $16.000 $5.000 $15.000 $14.000
PLANT MAINTENANCE
MO 12.000 $2,625.000 $2,250.000 $2,000.000 $2,500.000 $2,200.000 $2,000.000 $2,200.000 $1,000.000 $2,000.000 $2,000.000
IRRIGATION SYSTEM OPER AND MAINT
MO 12.000 $945.000 $2,500.000 $5,000.000 $5,000.000 $5,100.000 $4,800.000 $5,500.000 $1,000.000 $5,000.000 $400.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 21,754.000 $6.500 $11.250 $13.000 $15.000 $11.000 $12.190 $10.000 $15.000 $20.000 $26.000
RETAINING WALL (SPECIAL)
SF 320.000 $115.500 $57.000 $70.000 $165.000 $55.000 $162.320 $100.000 $100.000 $50.000 $26.000
RIPRAP (CONC) (CL B) (4")
CY 394.000 $400.000 $407.000 $290.000 $400.000 $425.000 $395.250 $500.000 $800.000 $400.000 $350.000
RAIL (HANDRAIL)(TY D)
LF 70.000 $89.250 $155.000 $120.000 $185.000 $150.000 $184.620 $115.000 $100.000 $120.000 $130.000
GRATE
EA 9.000 $840.000 $996.000 $505.000 $860.000 $1,750.000 $1,466.760 $775.000 $2,000.000 $2,100.000 $2,800.000
ADJUSTING MANHOLES
EA 13.000 $1,260.000 $536.000 $750.000 $475.000 $750.000 $465.000 $500.000 $1,500.000 $1,400.000 $800.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 83.000 $840.000 $257.000 $450.000 $450.000 $500.000 $436.000 $150.000 $200.000 $750.000 $500.000
ADJUSTING MANHOLES (WATER METER)
EA 30.000 $840.000 $333.000 $450.000 $465.000 $750.000 $462.000 $150.000 $200.000 $750.000 $520.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 14.000 $1,260.000 $571.000 $700.000 $465.000 $750.000 $462.000 $150.000 $500.000 $1,400.000 $550.000
MOBILIZATION
LS 1.000 $345,000.000 $200,000.000 $350,000.000 $300,000.000 $230,000.000 $629,395.470 $500,000.000 $450,000.000 $700,000.000 $425,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $4,000.000 $2,850.000 $1,850.000 $6,000.000 $3,500.000 $9,704.040 $1,500.000 $5,000.000 $25,000.000 $8,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,667.000 $3.150 $3.300 $4.000 $4.000 $4.000 $3.440 $4.000 $3.000 $3.500 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,667.000 $2.100 $2.000 $2.000 $1.000 $1.000 $1.290 $0.500 $1.000 $0.500 $1.250
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,225.000 $5.250 $3.850 $4.000 $5.000 $6.000 $6.660 $5.000 $5.000 $4.250 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,225.000 $1.050 $0.850 $1.000 $1.000 $1.000 $1.670 $0.500 $1.000 $0.500 $1.000
LANDSCAPE PAVERS
SY 1,840.000 $70.000 $65.000 $66.000 $180.000 $80.000 $177.500 $75.000 $100.000 $200.000 $145.000
CONC CURB & GUTTER (TY I)
LF 2,480.000 $16.000 $19.000 $7.000 $28.000 $17.000 $20.000 $25.000 $35.000 $24.000 $22.000
DRIVEWAYS (CONC)
SY 4,556.000 $55.000 $61.500 $45.000 $50.000 $65.000 $46.100 $75.000 $80.000 $48.000 $100.000
CONC SIDEWALKS (4")
SY 9,490.000 $42.000 $41.000 $40.000 $30.000 $48.000 $26.230 $74.000 $45.000 $40.000 $42.000
CONC SIDEWALKS (6")
SY 7,284.000 $52.000 $50.000 $45.000 $38.000 $66.000 $37.100 $74.000 $55.000 $42.000 $52.000
CURB RAMPS (TY 2)
EA 4.000 $1,470.000 $1,190.000 $1,150.000 $1,300.000 $1,200.000 $1,250.000 $1,500.000 $2,000.000 $2,000.000 $1,500.000
CURB RAMPS (TY 7)
EA 30.000 $1,417.500 $1,230.000 $1,250.000 $1,400.000 $1,200.000 $1,350.000 $1,500.000 $2,000.000 $2,000.000 $1,500.000
CURB RAMPS (TY 10)
EA 8.000 $1,417.500 $1,280.000 $1,250.000 $1,500.000 $1,300.000 $1,450.000 $1,500.000 $2,000.000 $2,000.000 $1,250.000
CURB RAMPS (TY 11)
SY 266.000 $105.000 $156.000 $75.000 $40.000 $220.000 $36.150 $125.000 $100.000 $175.000 $80.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 153.000 $94.500 $69.500 $60.000 $45.000 $150.000 $43.620 $125.000 $100.000 $220.000 $110.000
CURB RAMPS (TY 7)(MOD)
EA 15.000 $1,522.500 $1,700.000 $1,300.000 $1,450.000 $1,500.000 $1,433.000 $1,500.000 $2,000.000 $2,200.000 $2,300.000
CURB RAMPS (TY 2)(MOD)
EA 1.000 $1,575.000 $1,370.000 $1,200.000 $1,450.000 $2,000.000 $1,433.000 $1,500.000 $2,000.000 $2,200.000 $3,800.000
CURB RAMPS (TY 10) (MOD)
EA 3.000 $1,522.500 $1,640.000 $1,400.000 $1,450.000 $1,500.000 $1,433.000 $1,500.000 $2,000.000 $2,200.000 $2,500.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 6,500.000 $18.000 $23.750 $10.000 $21.000 $21.000 $21.000 $21.000 $35.000 $21.000 $21.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 46.000 $551.250 $654.000 $400.000 $400.000 $525.000 $480.000 $150.000 $500.000 $492.000 $470.000
RELOCATE SM RD SN SUP&AM TY S80
EA 11.000 $504.000 $246.000 $250.000 $475.000 $560.000 $550.000 $150.000 $400.000 $370.000 $612.000
REMOVE SM RD SN SUP&AM
EA 18.000 $78.750 $69.500 $150.000 $61.000 $100.000 $75.000 $150.000 $100.000 $100.000 $115.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 182.000 $1.050 $0.500 $0.750 $0.480 $0.500 $0.450 $0.450 $4.000 $0.450 $0.450
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12,221.000 $1.580 $1.000 $1.250 $0.920 $1.000 $0.900 $0.900 $1.500 $0.900 $0.900
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 5,207.000 $3.150 $1.700 $2.500 $1.600 $2.000 $1.500 $1.500 $3.200 $1.500 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 823.000 $5.780 $3.400 $4.000 $3.200 $4.500 $3.000 $3.000 $9.200 $3.000 $3.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $131.250 $67.500 $80.000 $62.000 $160.000 $60.000 $60.000 $220.000 $60.000 $60.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $157.500 $113.000 $120.000 $120.000 $275.000 $100.000 $100.000 $400.000 $100.000 $100.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 140.000 $47.250 $17.000 $35.000 $15.000 $20.000 $15.000 $15.000 $25.000 $15.000 $15.000
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 123.000 $131.250 $95.500 $100.000 $90.000 $100.000 $85.000 $85.000 $80.000 $85.000 $85.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 123.000 $131.250 $225.000 $250.000 $200.000 $215.000 $200.000 $200.000 $200.000 $200.000 $200.000
REFL PAV MRK TY I (Y)4"(DOT)(100MIL)
LF 360.000 $1.580 $0.500 $0.750 $0.450 $0.500 $0.450 $0.450 $3.000 $0.450 $0.450
PAVEMENT SEALER 4"
LF 40,566.000 $0.160 $0.160 $0.400 $0.180 $0.160 $0.150 $0.150 $0.300 $0.150 $0.150
PAVEMENT SEALER 8"
LF 12,221.000 $0.530 $0.330 $0.500 $0.320 $0.350 $0.300 $0.300 $0.600 $0.300 $0.300
PAVEMENT SEALER 12"
LF 5,207.000 $1.050 $0.670 $0.900 $0.650 $0.500 $0.600 $0.600 $1.000 $0.600 $0.600
PAVEMENT SEALER 24"
LF 823.000 $2.100 $1.300 $1.500 $1.300 $1.500 $1.200 $1.200 $1.600 $1.200 $1.200
PAVEMENT SEALER (ARROW)
EA 1.000 $26.250 $5.650 $6.000 $7.000 $55.000 $5.000 $5.000 $50.000 $5.000 $5.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $63.000 $11.200 $15.000 $11.000 $80.000 $10.000 $10.000 $70.000 $10.000 $10.000
PAVEMENT SEALER (YLD TRI)
EA 140.000 $21.000 $2.800 $4.000 $3.000 $6.000 $2.500 $2.500 $6.000 $2.500 $2.500
PAVEMENT SEALER (BIKE ARROW)
EA 123.000 $10.500 $5.650 $6.000 $7.000 $48.000 $5.000 $5.000 $6.000 $5.000 $5.000
PAVEMENT SEALER (BIKE SYMBOL)
EA 123.000 $10.500 $11.200 $15.000 $12.000 $80.000 $10.000 $10.000 $6.000 $10.000 $10.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 39,924.000 $1.050 $0.500 $0.650 $0.500 $0.500 $0.450 $0.450 $0.450 $0.450 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 100.000 $1.050 $0.500 $0.650 $0.500 $0.600 $0.450 $0.450 $1.600 $0.450 $0.450
ELIM EXT PAV MRK & MRKS (4")
LF 350.000 $0.580 $0.400 $0.500 $0.500 $1.750 $0.400 $0.400 $1.750 $0.400 $0.400
ELIM EXT PAV MRK & MRKS (12")
LF 3,577.000 $1.470 $0.850 $1.000 $1.000 $2.000 $0.800 $0.800 $2.000 $0.800 $0.800
ELIM EXT PAV MRK & MRKS (24")
LF 634.000 $3.150 $1.750 $2.000 $1.750 $5.000 $1.600 $1.600 $7.000 $1.600 $1.600
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $31.500 $13.450 $15.000 $15.000 $85.000 $12.000 $12.000 $150.000 $12.000 $12.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 1.000 $36.750 $28.250 $35.000 $30.000 $135.000 $25.000 $25.000 $250.000 $25.000 $25.000
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
EA 237.000 $36.750 $13.450 $15.000 $16.000 $55.000 $12.000 $12.000 $35.000 $12.000 $12.000
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
EA 237.000 $42.000 $28.250 $26.000 $32.000 $55.000 $25.000 $25.000 $35.000 $25.000 $25.000
PAV SURF PREP FOR MRK (4")
LF 40,566.000 $0.150 $0.130 $0.250 $0.150 $0.350 $0.120 $0.120 $0.050 $0.120 $0.120
PAV SURF PREP FOR MRK (8")
LF 12,164.000 $0.480 $0.270 $0.350 $0.260 $0.650 $0.250 $0.250 $0.100 $0.250 $0.250
PAV SURF PREP FOR MRK (12")
LF 5,253.000 $0.790 $0.400 $0.550 $0.450 $1.000 $0.400 $0.400 $0.150 $0.400 $0.400
PAV SURF PREP FOR MRK (24")
LF 823.000 $1.580 $0.850 $1.200 $0.900 $2.250 $0.800 $0.800 $0.300 $0.800 $0.800
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $13.650 $1.700 $2.000 $2.000 $21.000 $1.500 $1.500 $6.000 $1.500 $1.500
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $21.000 $1.700 $2.000 $2.000 $40.000 $1.500 $1.500 $12.000 $1.500 $1.500
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 140.000 $7.350 $1.900 $2.000 $2.000 $6.000 $1.500 $1.500 $3.000 $1.500 $1.500
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 123.000 $7.350 $1.700 $2.000 $2.000 $25.000 $1.500 $1.500 $3.000 $1.500 $1.500
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 123.000 $6.830 $1.700 $2.000 $2.000 $50.000 $1.500 $1.500 $3.000 $1.500 $1.500
PED SIG SEC (LED)(COUNTDOWN)
EA 28.000 $500.000 $546.000 $700.000 $500.000 $525.000 $485.000 $485.000 $500.000 $485.000 $485.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 3,600.000 $2.100 $2.050 $7.000 $2.000 $1.950 $1.800 $1.800 $5.000 $1.800 $1.800
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 3,750.000 $1.580 $1.750 $2.000 $2.000 $1.700 $1.600 $1.600 $5.000 $1.600 $1.600
PED POLE ASSEMBLY
EA 10.000 $1,800.000 $2,080.000 $1,050.000 $2,000.000 $2,000.000 $1,850.000 $2,500.000 $2,000.000 $1,850.000 $1,850.000
PED DETECT PUSH BUTTON (APS)
EA 28.000 $800.000 $866.000 $850.000 $800.000 $825.000 $770.000 $770.000 $500.000 $770.000 $770.000
PED DETECT PUSH BUTTON (STANDARD)
EA 10.000 $577.500 $152.000 $850.000 $150.000 $150.000 $135.000 $150.000 $400.000 $135.000 $135.000
PED DETECTOR CONTROLLER UNIT
EA 4.000 $3,465.000 $4,280.000 $2,650.000 $4,000.000 $4,100.000 $3,800.000 $4,000.000 $5,000.000 $3,800.000 $3,800.000
VEH LP DETECT (SAWCUT)
LF 270.000 $8.400 $22.000 $7.000 $23.000 $22.000 $20.000 $20.000 $20.000 $20.000 $20.000
GRINDING
SY 1.000 $210.000 $25.000 $10.000 $100.000 $500.000 $15,000.000 $250.000 $100.000 $20.000 $400.000
RETROFIT DET WARN SURF(SURF APPLIED)
SF 16.000 $26.250 $27.250 $10.000 $20.000 $300.000 $213.580 $250.000 $60.000 $200.000 $300.000
WHEEL STOPS
EA 162.000 $200.000 $81.000 $100.000 $310.000 $175.000 $268.120 $150.000 $100.000 $100.000 $80.000
TREATED TIMBER BIKE RACK (INSTALL)
EA 10.000 $262.500 $875.000 $750.000 $1,000.000 $1,000.000 $362.530 $1,000.000 $5,000.000 $2,800.000 $1,300.000
REMOV AND RESET PRECAST CONC WHEEL STOP
EA 25.000 $105.000 $74.000 $80.000 $150.000 $75.000 $136.320 $100.000 $100.000 $100.000 $350.000
Totals: $3,181,309.270 $3,452,509.190 $3,541,702.200 $3,803,827.120 $3,856,939.360 $3,951,761.065 $4,360,541.120 $4,468,404.550 $4,846,668.370 $4,916,715.870