PREPARING ROW
|
STA
|
478.000
|
$4,602.760
|
$4,000.000
|
$14,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
95,560.000
|
$7.000
|
$4.500
|
$50.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
64.000
|
$115.000
|
$30.000
|
$100.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
150.000
|
$17.000
|
$25.000
|
$25.000
|
|
|
RMV TRT BASE & ASPH PAV (14")
|
CY
|
37,203.000
|
$12.700
|
$2.750
|
$8.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
52,443.000
|
$11.000
|
$18.000
|
$75.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
10,476.000
|
$22.000
|
$4.000
|
$75.000
|
|
|
BACKFILL (TY A)
|
STA
|
478.000
|
$246.000
|
$220.000
|
$300.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$33.000
|
$35.000
|
$18.280
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
325,064.000
|
$0.500
|
$0.480
|
$0.470
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
325,064.000
|
$0.400
|
$0.450
|
$0.440
|
|
|
VEGETATIVE WATERING
|
MG
|
5,471.000
|
$30.000
|
$30.000
|
$30.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,912.000
|
$10.000
|
$1.000
|
$1.000
|
|
|
PROOF ROLLING
|
HR
|
48.000
|
$70.000
|
$75.000
|
$75.000
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
53,556.000
|
$110.000
|
$85.000
|
$125.000
|
|
|
FL BS (RDWY DEL)(TY A GR 4)(FNL POS)
|
CY
|
67,518.000
|
$80.000
|
$82.000
|
$125.000
|
|
|
CEMENT
|
TON
|
1,807.000
|
$245.000
|
$185.000
|
$195.000
|
|
|
CEMENT TREAT (NEW BASE)(10")(DC)
|
SY
|
192,798.000
|
$3.300
|
$2.350
|
$5.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
191,226.000
|
$3.500
|
$0.010
|
$1.550
|
|
|
PRIME COAT (MC-30)
|
GAL
|
37,788.000
|
$5.500
|
$5.250
|
$5.000
|
|
|
ASPH (TIER II)
|
GAL
|
55,109.000
|
$5.500
|
$8.000
|
$5.000
|
|
|
AGGR (TY-B GR-4P SAC-B)
|
CY
|
1,470.000
|
$140.920
|
$75.000
|
$150.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
978.000
|
$2.000
|
$15.000
|
$5.500
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
5,984.000
|
$27.500
|
$36.000
|
$18.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
114.000
|
$550.000
|
$525.000
|
$650.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
272.000
|
$250.000
|
$350.000
|
$152.970
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
384.000
|
$75.000
|
$110.000
|
$137.080
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
64.000
|
$90.000
|
$125.000
|
$158.770
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
32.000
|
$141.000
|
$215.000
|
$241.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,200.000
|
$1,500.000
|
$1,839.980
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$1,900.000
|
$2,684.450
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,500.000
|
$3,000.000
|
$3,245.970
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$3,300.000
|
$1,000.000
|
$5,500.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$550.000
|
$700.000
|
$725.000
|
|
|
REMOV STR (PIPE)
|
LF
|
468.000
|
$20.000
|
$20.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,800,000.000
|
$2,100,000.000
|
$5,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
29.000
|
$9,500.000
|
$4,000.000
|
$3,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$60.000
|
$65.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$20.000
|
$30.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
1,560.000
|
$31.000
|
$20.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,560.000
|
$10.500
|
$10.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
92,983.000
|
$3.500
|
$4.250
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
92,983.000
|
$1.100
|
$1.250
|
$1.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
7,425.000
|
$4.500
|
$5.250
|
$5.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,425.000
|
$1.000
|
$1.250
|
$1.250
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
28.000
|
$7,000.000
|
$3,200.000
|
$3,211.650
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
3,060.000
|
$43.000
|
$32.000
|
$90.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
88,320.000
|
$6.000
|
$3.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
3,060.000
|
$12.000
|
$14.000
|
$15.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
183.000
|
$100.000
|
$95.000
|
$115.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,113.000
|
$55.000
|
$55.000
|
$60.000
|
|
|
TURNOUTS (ACP)
|
SY
|
914.000
|
$85.000
|
$165.000
|
$200.000
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
87,237.000
|
$0.180
|
$0.350
|
$0.940
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
775.000
|
$35.000
|
$30.000
|
$34.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,300.000
|
$2,950.000
|
$2,953.820
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,600.000
|
$1,750.000
|
$1,950.250
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
775.000
|
$3.200
|
$2.500
|
$10.350
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$280.000
|
$196.000
|
$775.960
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$3,300.000
|
$3,425.000
|
$3,988.430
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
11.000
|
$330.000
|
$197.000
|
$775.960
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
128.000
|
$1,200.000
|
$1,550.000
|
$1,034.610
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,000.000
|
$760.000
|
$517.310
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$27,700.000
|
$29,500.000
|
$39,992.960
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$9,400.000
|
$9,500.000
|
$9,575.340
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
3.000
|
$400.000
|
$305.000
|
$355.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
29.000
|
$32.000
|
$30.000
|
$85.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
18.000
|
$800.000
|
$750.000
|
$585.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
22.000
|
$950.000
|
$850.000
|
$855.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,100.000
|
$1,150.000
|
$965.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$111.000
|
$180.000
|
$50.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
2.000
|
$20.000
|
$10.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
23.000
|
$40.000
|
$20.000
|
$125.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
8.000
|
$96.000
|
$60.000
|
$125.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF(BI)
|
EA
|
24.000
|
$96.000
|
$480.000
|
$185.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,920.000
|
$5.100
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
329,600.000
|
$0.700
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
896.000
|
$10.000
|
$16.000
|
$16.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
8,000.000
|
$1.500
|
$0.600
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
60,800.000
|
$0.900
|
$0.600
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,800.000
|
$0.800
|
$1.000
|
$1.830
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
100.000
|
$1.120
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
44.000
|
$8.600
|
$16.000
|
$16.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
8,440.000
|
$0.650
|
$0.900
|
$0.880
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
46,353.000
|
$0.650
|
$0.900
|
$0.880
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
94,585.000
|
$0.820
|
$1.200
|
$1.200
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
1.000
|
$230.000
|
$510.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
1.000
|
$280.000
|
$510.000
|
$500.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
5.000
|
$3.880
|
$8.000
|
$7.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,796.000
|
$4.000
|
$8.000
|
$7.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
123,200.000
|
$0.540
|
$0.700
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
80.000
|
$1.500
|
$1.100
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
448.000
|
$4.000
|
$10.000
|
$10.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$70.000
|
$250.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
1.000
|
$70.000
|
$250.000
|
$250.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
3,000.000
|
$2.000
|
$11.250
|
$7.130
|
|
|
FILTER FABRIC (TY 2)
|
SY
|
405,104.000
|
$4.350
|
$1.150
|
$4.130
|
|
|
SP MIXES SP-B SAC-B PG76-22
|
TON
|
31,413.000
|
$140.000
|
$124.000
|
$150.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
15,707.000
|
$130.000
|
$128.000
|
$155.000
|
|
|
BONDING COURSE
|
GAL
|
12,859.000
|
$4.500
|
$3.400
|
$4.530
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
202,552.000
|
$1.520
|
$0.950
|
$1.830
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,373.000
|
$8,200.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
868.000
|
$216.000
|
$32.000
|
$1.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$243.000
|
$1.000
|
$150.000
|
|
|
DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM
|
MO
|
28.000
|
$7,856.270
|
$2,200.000
|
$2,883.680
|
|
Totals: |
$33,616,735.690
|
$27,558,982.080
|
$52,769,595.140
|