CAMERON SH 4 (0039-10-080)

Items: 104

County: CAMERON
Length: N/A
Highway: SH 4
District: PHARR
Control Number: 0039-10-080
DBE Goal: 400.0%
Project: F 2B24(071)
Guaranty: N/A
Time: 440 WORKING DAYS
Engineer's Estimate: $33,616,735.69
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
ANDRES ESPINOZA
GABRIEL VILLARREAL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$33,616,735.69
$27,558,982.08
Over/Under Est: -18.02% -$6,057,753.61
$52,769,595.14
Over/Under Est: 56.97% $19,152,859.45
Amt Left: 91.48% $25,210,613.06
Subcontractor Percentage Amount
SOIL TECH ADVANCE INC. 1.84% $864,875.55
HIGHWAY BARRICADES AND SERVICES, LLC 1.11% $521,745.57
LAREDO STRIPING, INC. 1.06% $498,243.52
Total: 4.01% $1,884,864.64

Bid Items & Bid Tabulations

104 Total 0 of 104
CAMERON  |  SH 4  |  PHARR  |  0039-10-080  |  05/03/2024  |  $33,616,735.69  |  F 2B24(071)  |  REHAB EXIST ROADWAY  |  440 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOREMOST PAVING, INC.
IOC COMPANY, LLC
PREPARING ROW
STA 478.000 $4,602.760 $4,000.000 $14,000.000
REMOVING CONC (PAV)
SY 95,560.000 $7.000 $4.500 $50.000
REMOVING CONC (RIPRAP)
CY 64.000 $115.000 $30.000 $100.000
REMOVING CONC (DRIVEWAYS)
SY 150.000 $17.000 $25.000 $25.000
RMV TRT BASE & ASPH PAV (14")
CY 37,203.000 $12.700 $2.750 $8.500
EXCAVATION (ROADWAY)
CY 52,443.000 $11.000 $18.000 $75.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 10,476.000 $22.000 $4.000 $75.000
BACKFILL (TY A)
STA 478.000 $246.000 $220.000 $300.000
FURNISHING AND PLACING TOPSOIL
CY 50.000 $33.000 $35.000 $18.280
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 325,064.000 $0.500 $0.480 $0.470
CELL FBR MLCH SEED(TEMP)(WARM)
SY 325,064.000 $0.400 $0.450 $0.440
VEGETATIVE WATERING
MG 5,471.000 $30.000 $30.000 $30.000
SPRINKLING (DUST CONTROL)
MG 1,912.000 $10.000 $1.000 $1.000
PROOF ROLLING
HR 48.000 $70.000 $75.000 $75.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 53,556.000 $110.000 $85.000 $125.000
FL BS (RDWY DEL)(TY A GR 4)(FNL POS)
CY 67,518.000 $80.000 $82.000 $125.000
CEMENT
TON 1,807.000 $245.000 $185.000 $195.000
CEMENT TREAT (NEW BASE)(10")(DC)
SY 192,798.000 $3.300 $2.350 $5.000
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 191,226.000 $3.500 $0.010 $1.550
PRIME COAT (MC-30)
GAL 37,788.000 $5.500 $5.250 $5.000
ASPH (TIER II)
GAL 55,109.000 $5.500 $8.000 $5.000
AGGR (TY-B GR-4P SAC-B)
CY 1,470.000 $140.920 $75.000 $150.000
PLANE ASPH CONC PAV (1.5")
SY 978.000 $2.000 $15.000 $5.500
REINF CONC SLAB (HPC)
SF 5,984.000 $27.500 $36.000 $18.000
RIPRAP (MOW STRIP)(4 IN)
CY 114.000 $550.000 $525.000 $650.000
RETROFIT RAIL (TY SSTR)
LF 272.000 $250.000 $350.000 $152.970
RC PIPE (CL III)(18 IN)
LF 384.000 $75.000 $110.000 $137.080
RC PIPE (CL III)(24 IN)
LF 64.000 $90.000 $125.000 $158.770
RC PIPE (CL III)(30 IN)
LF 32.000 $141.000 $215.000 $241.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 18.000 $1,200.000 $1,500.000 $1,839.980
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $2,000.000 $1,900.000 $2,684.450
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $3,500.000 $3,000.000 $3,245.970
CLEAN EXIST CULVERTS
EA 2.000 $3,300.000 $1,000.000 $5,500.000
REMOV STR (SET)
EA 10.000 $550.000 $700.000 $725.000
REMOV STR (PIPE)
LF 468.000 $20.000 $20.000 $15.000
MOBILIZATION
LS 1.000 $2,800,000.000 $2,100,000.000 $5,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $9,500.000 $4,000.000 $3,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $60.000 $65.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $20.000 $30.000 $30.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 1,560.000 $31.000 $20.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 1,560.000 $10.500 $10.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 92,983.000 $3.500 $4.250 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 92,983.000 $1.100 $1.250 $1.250
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 7,425.000 $4.500 $5.250 $5.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 7,425.000 $1.000 $1.250 $1.250
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 28.000 $7,000.000 $3,200.000 $3,211.650
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,060.000 $43.000 $32.000 $90.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 88,320.000 $6.000 $3.000 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,060.000 $12.000 $14.000 $15.000
DRIVEWAYS (CONC)
SY 183.000 $100.000 $95.000 $115.000
DRIVEWAYS (ACP)
SY 2,113.000 $55.000 $55.000 $60.000
TURNOUTS (ACP)
SY 914.000 $85.000 $165.000 $200.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 87,237.000 $0.180 $0.350 $0.940
MTL W-BEAM GD FEN (STEEL POST)
LF 775.000 $35.000 $30.000 $34.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,300.000 $2,950.000 $2,953.820
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,600.000 $1,750.000 $1,950.250
REMOVE METAL BEAM GUARD FENCE
LF 775.000 $3.200 $2.500 $10.350
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $280.000 $196.000 $775.960
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $3,300.000 $3,425.000 $3,988.430
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $330.000 $197.000 $775.960
CRASH CUSH ATTEN (MOVE & RESET)
EA 128.000 $1,200.000 $1,550.000 $1,034.610
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,000.000 $760.000 $517.310
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $27,700.000 $29,500.000 $39,992.960
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $9,400.000 $9,500.000 $9,575.340
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 3.000 $400.000 $305.000 $355.000
ALUMINUM SIGNS (TY A)
SF 29.000 $32.000 $30.000 $85.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 18.000 $800.000 $750.000 $585.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 22.000 $950.000 $850.000 $855.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,100.000 $1,150.000 $965.000
REMOVE SM RD SN SUP&AM
EA 35.000 $111.000 $180.000 $50.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 2.000 $20.000 $10.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 23.000 $40.000 $20.000 $125.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 8.000 $96.000 $60.000 $125.000
INSTL OM ASSM (OM-3R)(WFLX)SRF(BI)
EA 24.000 $96.000 $480.000 $185.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,920.000 $5.100 $5.000 $5.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 329,600.000 $0.700 $0.550 $0.550
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 896.000 $10.000 $16.000 $16.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 8,000.000 $1.500 $0.600 $0.550
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 60,800.000 $0.900 $0.600 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,800.000 $0.800 $1.000 $1.830
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 100.000 $1.120 $2.000 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 44.000 $8.600 $16.000 $16.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 8,440.000 $0.650 $0.900 $0.880
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 46,353.000 $0.650 $0.900 $0.880
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 94,585.000 $0.820 $1.200 $1.200
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $230.000 $510.000 $500.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $280.000 $510.000 $500.000
REFL PAV MRKR TY I-C
EA 5.000 $3.880 $8.000 $7.500
REFL PAV MRKR TY II-A-A
EA 1,796.000 $4.000 $8.000 $7.500
ELIM EXT PAV MRK & MRKS (6")
LF 123,200.000 $0.540 $0.700 $0.650
ELIM EXT PAV MRK & MRKS (8")
LF 80.000 $1.500 $1.100 $1.100
ELIM EXT PAV MRK & MRKS (24")
LF 448.000 $4.000 $10.000 $10.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $70.000 $250.000 $250.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $70.000 $250.000 $250.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 3,000.000 $2.000 $11.250 $7.130
FILTER FABRIC (TY 2)
SY 405,104.000 $4.350 $1.150 $4.130
SP MIXES SP-B SAC-B PG76-22
TON 31,413.000 $140.000 $124.000 $150.000
SP MIXES SP-D SAC-A PG76-22
TON 15,707.000 $130.000 $128.000 $155.000
BONDING COURSE
GAL 12,859.000 $4.500 $3.400 $4.530
GEOGRID BASE REINFORCEMENT (TY II)
SY 202,552.000 $1.520 $0.950 $1.830
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,373.000 $8,200.000 $25,000.000
TMA (STATIONARY)
DAY 868.000 $216.000 $32.000 $1.000
TMA (MOBILE OPERATION)
DAY 40.000 $243.000 $1.000 $150.000
DRIVEWAY ASSISTANCE DEVICE(DAD) SYSTEM
MO 28.000 $7,856.270 $2,200.000 $2,883.680
Totals: $33,616,735.690 $27,558,982.080 $52,769,595.140