PREPARING ROW
|
STA
|
49.170
|
$700.000
|
$3,450.000
|
$700.000
|
$1,000.000
|
$233.220
|
|
|
REMOVING CONC (CURB)
|
LF
|
4,860.000
|
$3.500
|
$2.000
|
$3.500
|
$1.500
|
$2.840
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
612.000
|
$4.000
|
$2.000
|
$3.660
|
$4.400
|
$9.700
|
|
|
REMOVING STAB BASE & ASPH PAV (12"-14")
|
SY
|
1,285.000
|
$3.000
|
$3.000
|
$7.000
|
$2.400
|
$21.150
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,203.700
|
$3.000
|
$4.000
|
$6.000
|
$7.000
|
$10.280
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
47,395.900
|
$3.000
|
$4.000
|
$6.000
|
$7.000
|
$34.590
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
4,885.000
|
$5.300
|
$6.000
|
$10.000
|
$21.000
|
$15.390
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
100.000
|
$20.000
|
$26.000
|
$25.000
|
$32.000
|
$15.670
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
7,570.000
|
$0.270
|
$0.500
|
$0.480
|
$0.500
|
$0.480
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
7,570.000
|
$0.200
|
$0.500
|
$0.480
|
$0.440
|
$0.430
|
|
|
VEGETATIVE WATERING
|
MG
|
128.000
|
$22.000
|
$40.000
|
$25.000
|
$41.000
|
$15.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
174.860
|
$12.000
|
$1.000
|
$1.000
|
$4.300
|
$18.730
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
5,218.000
|
$40.000
|
$30.000
|
$46.000
|
$52.000
|
$55.040
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
13,837.000
|
$2.000
|
$4.000
|
$2.450
|
$5.000
|
$1.360
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
410.000
|
$150.000
|
$181.000
|
$140.000
|
$190.000
|
$211.910
|
|
|
CEMENT
|
TON
|
176.000
|
$159.000
|
$145.000
|
$140.000
|
$175.000
|
$190.430
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
12,944.000
|
$2.200
|
$2.250
|
$2.000
|
$8.000
|
$1.440
|
|
|
CEMENT TREAT (NEW BASE 14")
|
SY
|
2,323.000
|
$2.500
|
$2.500
|
$3.000
|
$15.000
|
$2.010
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,857.000
|
$3.500
|
$4.250
|
$3.410
|
$6.000
|
$3.780
|
|
|
ASPH (SPG 73-19)
|
GAL
|
671.000
|
$1.700
|
$19.000
|
$5.000
|
$6.000
|
$6.390
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
19.000
|
$35.000
|
$45.000
|
$100.000
|
$235.000
|
$215.740
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
1,922.000
|
$80.000
|
$74.000
|
$86.000
|
$95.000
|
$83.700
|
|
|
D-GR HMA TY B SAC-B PG (76-22)
|
TON
|
3,206.000
|
$75.000
|
$64.000
|
$78.000
|
$77.000
|
$80.290
|
|
|
D-GR HMA TY B SAC-B PG (64-22)
|
TON
|
1,781.000
|
$70.000
|
$60.000
|
$78.000
|
$70.000
|
$68.010
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
1,324.000
|
$76.000
|
$79.000
|
$86.000
|
$100.000
|
$83.360
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
16,288.000
|
$1.400
|
$1.250
|
$1.500
|
$1.600
|
$3.830
|
|
|
PLANE ASPH CONC PAV (3"- 5")
|
SY
|
6,426.000
|
$3.000
|
$2.500
|
$2.500
|
$4.000
|
$4.700
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
865.000
|
$35.000
|
$39.000
|
$45.000
|
$40.000
|
$47.330
|
|
|
SAND BACKFILL
|
CY
|
2,499.000
|
$15.000
|
$22.000
|
$10.000
|
$22.000
|
$26.320
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
4,215.000
|
$2.000
|
$4.500
|
$1.000
|
$4.200
|
$2.290
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
5.000
|
$10,000.000
|
$18,000.000
|
$5,500.000
|
$12,250.000
|
$16,000.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
330.000
|
$65.000
|
$85.000
|
$60.000
|
$88.000
|
$59.170
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
500.000
|
$130.000
|
$100.000
|
$100.000
|
$170.000
|
$82.930
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,072.000
|
$170.000
|
$160.000
|
$200.000
|
$175.000
|
$154.130
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
849.000
|
$210.000
|
$200.000
|
$300.000
|
$220.000
|
$203.340
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,186.000
|
$300.000
|
$255.000
|
$375.000
|
$280.000
|
$261.140
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
422.000
|
$370.000
|
$375.000
|
$600.000
|
$420.000
|
$403.620
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
180.000
|
$695.000
|
$530.000
|
$850.000
|
$600.000
|
$651.930
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
80.000
|
$195.000
|
$240.000
|
$300.000
|
$225.000
|
$150.000
|
|
|
CL C CONC (ABUT)
|
CY
|
101.900
|
$650.000
|
$1,000.000
|
$1,100.000
|
$910.000
|
$919.610
|
|
|
CL C CONC (CAP)
|
CY
|
298.900
|
$845.000
|
$1,500.000
|
$1,200.000
|
$740.000
|
$739.660
|
|
|
CL C CONC (COLUMN)
|
CY
|
226.000
|
$870.000
|
$700.000
|
$1,200.000
|
$1,000.000
|
$1,340.120
|
|
|
CL C CONC (RAIL FOUNDATION)(HPC)
|
CY
|
60.000
|
$650.000
|
$380.000
|
$525.000
|
$450.000
|
$551.870
|
|
|
REINF CONC SLAB
|
SF
|
29,396.000
|
$14.000
|
$23.500
|
$16.000
|
$19.000
|
$25.240
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
12,739.000
|
$15.000
|
$18.500
|
$13.000
|
$16.000
|
$27.610
|
|
|
APPROACH SLAB
|
CY
|
106.300
|
$385.000
|
$500.000
|
$525.000
|
$550.000
|
$574.820
|
|
|
RETAINING WALL (MSE)
|
SF
|
40,899.000
|
$45.000
|
$47.000
|
$45.500
|
$60.000
|
$29.140
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
3,070.380
|
$125.000
|
$120.000
|
$122.500
|
$160.000
|
$150.260
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
964.360
|
$125.000
|
$135.000
|
$150.000
|
$140.000
|
$164.810
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
805.500
|
$135.000
|
$135.000
|
$150.000
|
$140.000
|
$171.740
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
940.450
|
$121.000
|
$148.000
|
$150.000
|
$140.000
|
$167.700
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
1,524.620
|
$143.000
|
$142.000
|
$150.000
|
$140.000
|
$162.580
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.800
|
$370.000
|
$400.000
|
$500.000
|
$410.000
|
$400.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
981.000
|
$420.000
|
$342.000
|
$325.000
|
$320.000
|
$316.100
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
8.000
|
$375.000
|
$400.000
|
$375.000
|
$360.000
|
$350.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
2,495.000
|
$7.500
|
$10.000
|
$9.500
|
$8.000
|
$17.570
|
|
|
RAIL (TY SSTR)
|
LF
|
6,088.000
|
$45.000
|
$55.000
|
$45.000
|
$45.000
|
$42.000
|
|
|
RAIL (TY C221)
|
LF
|
460.100
|
$79.000
|
$135.000
|
$90.000
|
$93.000
|
$91.000
|
|
|
RAIL (TY PR2)
|
LF
|
2,314.600
|
$86.000
|
$90.000
|
$58.000
|
$110.000
|
$100.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
142.000
|
$100.000
|
$110.000
|
$105.000
|
$86.000
|
$108.740
|
|
|
RC PIPE (CL IV) (24 IN) (SPL)
|
LF
|
238.000
|
$58.000
|
$49.000
|
$66.000
|
$50.000
|
$65.680
|
|
|
RC PIPE (CL IV) (42 IN) (SPL)
|
LF
|
3,471.000
|
$130.000
|
$116.000
|
$120.000
|
$120.000
|
$115.990
|
|
|
RC PIPE (CL IV) (18") (SPL)
|
LF
|
595.000
|
$55.000
|
$37.000
|
$45.000
|
$37.000
|
$57.620
|
|
|
INLET (COMPL)(POD)(FG)(4FTX4FT)
|
EA
|
9.000
|
$6,100.000
|
$330.000
|
$2,800.000
|
$500.000
|
$5,750.130
|
|
|
INLET (COMPL)(PSL)(SL)(5FTX5FT)
|
EA
|
10.000
|
$8,000.000
|
$3,800.000
|
$3,500.000
|
$3,800.000
|
$4,531.680
|
|
|
INLET (COMPL)(PSL)(SL)(8FTX8FT)
|
EA
|
1.000
|
$10,000.000
|
$9,000.000
|
$9,500.000
|
$9,100.000
|
$10,384.070
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
1.000
|
$4,000.000
|
$3,200.000
|
$3,000.000
|
$3,200.000
|
$4,438.770
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
10.000
|
$4,400.000
|
$3,800.000
|
$3,500.000
|
$3,800.000
|
$5,133.360
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
7.000
|
$4,375.000
|
$4,800.000
|
$4,500.000
|
$4,850.000
|
$5,133.360
|
|
|
INLET (COMPL)(TY MSE1)
|
EA
|
13.000
|
$6,000.000
|
$4,200.000
|
$2,800.000
|
$4,200.000
|
$3,866.500
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
2.000
|
$8,000.000
|
$9,300.000
|
$13,500.000
|
$9,450.000
|
$1,605.880
|
|
|
REMOV STR (INLET)
|
EA
|
10.000
|
$400.000
|
$400.000
|
$500.000
|
$410.000
|
$488.410
|
|
|
REMOV STR (MANHOLE)
|
EA
|
2.000
|
$400.000
|
$400.000
|
$500.000
|
$410.000
|
$488.420
|
|
|
REMOV STR (PIPE)
|
LF
|
3,839.000
|
$6.000
|
$9.000
|
$8.000
|
$9.000
|
$12.300
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$720,000.000
|
$865,000.000
|
$1,000,000.000
|
$660,000.000
|
$1,035,627.080
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$4,300.000
|
$2,500.000
|
$2,000.000
|
$3,200.000
|
$9,726.880
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
312.000
|
$14.000
|
$30.000
|
$12.000
|
$23.000
|
$24.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$8.000
|
$17.000
|
$7.000
|
$8.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,680.000
|
$4.000
|
$4.000
|
$4.500
|
$3.300
|
$2.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,680.000
|
$1.000
|
$1.000
|
$2.000
|
$0.500
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,368.000
|
$4.000
|
$5.000
|
$3.000
|
$5.000
|
$4.150
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,368.000
|
$1.000
|
$1.000
|
$0.740
|
$0.500
|
$1.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
365.000
|
$18.000
|
$65.000
|
$10.840
|
$72.000
|
$23.370
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
2,380.000
|
$7.000
|
$7.000
|
$15.000
|
$45.000
|
$30.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$7.000
|
$10.000
|
$15.000
|
$45.000
|
$63.510
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,060.000
|
$5.000
|
$5.000
|
$10.000
|
$1.000
|
$5.210
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$5.000
|
$5.000
|
$10.000
|
$1.000
|
$38.020
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,380.000
|
$6.000
|
$7.000
|
$15.000
|
$15.000
|
$4.800
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$6.000
|
$7.000
|
$15.000
|
$16.000
|
$38.020
|
|
|
CONC CURB & GUTTER (TY A)
|
LF
|
667.000
|
$11.500
|
$11.500
|
$13.500
|
$12.000
|
$12.000
|
|
|
CONC CURB TY A (BARRIER)(MOD)
|
LF
|
4,049.000
|
$9.000
|
$10.000
|
$12.000
|
$10.000
|
$10.000
|
|
|
CONC CURB TY C (BARRIER)
|
LF
|
2,046.000
|
$8.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
130.000
|
$45.000
|
$40.000
|
$30.000
|
$36.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
50.000
|
$21.000
|
$25.000
|
$25.000
|
$21.000
|
$27.500
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
2.000
|
$1,400.000
|
$2,000.000
|
$700.000
|
$1,530.000
|
$1,670.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,200.000
|
$2,700.000
|
$1,432.710
|
$2,550.000
|
$2,485.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
2.000
|
$13,500.000
|
$14,500.000
|
$15,000.000
|
$19,650.000
|
$14,800.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
$770.000
|
$345.000
|
$300.000
|
$350.000
|
$600.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
4.000
|
$260.000
|
$175.000
|
$420.000
|
$180.000
|
$300.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
13.000
|
$1,200.000
|
$1,250.000
|
$2,300.000
|
$1,280.000
|
$1,325.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
1.000
|
$1,100.000
|
$1,350.000
|
$1,000.000
|
$1,380.000
|
$1,290.000
|
|
|
IN RD IL (TY ST) 50T-8 (400W EQ) LED
|
EA
|
4.000
|
$4,100.000
|
$3,500.000
|
$3,100.000
|
$3,600.000
|
$5,800.000
|
|
|
IN RD IL (TY ST) 50T-12 (400W EQ) LED
|
EA
|
4.000
|
$4,500.000
|
$3,800.000
|
$3,500.000
|
$3,900.000
|
$6,150.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,890.000
|
$9.000
|
$6.500
|
$12.000
|
$7.000
|
$11.150
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
385.000
|
$38.750
|
$28.000
|
$40.000
|
$29.000
|
$20.350
|
|
|
CONDT (RM) (1")
|
LF
|
675.000
|
$28.000
|
$25.000
|
$30.000
|
$26.000
|
$10.550
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
3,175.000
|
$1.300
|
$1.800
|
$1.600
|
$2.000
|
$1.350
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
8,390.000
|
$1.500
|
$1.900
|
$1.600
|
$2.000
|
$1.400
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
18.000
|
$839.000
|
$975.000
|
$1,000.000
|
$1,000.000
|
$725.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
|
EA
|
2.000
|
$3,940.000
|
$5,200.000
|
$6,000.000
|
$5,300.000
|
$7,780.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
28.000
|
$30.000
|
$50.000
|
$15.000
|
$50.000
|
$19.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$500.000
|
$430.000
|
$600.000
|
$600.000
|
$585.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
2.000
|
$930.000
|
$920.000
|
$950.000
|
$1,000.000
|
$970.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$1,260.000
|
$2,400.000
|
$1,000.000
|
$2,300.000
|
$1,620.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
2.000
|
$420.000
|
$1,500.000
|
$350.000
|
$630.000
|
$615.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$60.000
|
$50.000
|
$80.000
|
$66.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
2.000
|
$55.000
|
$33.000
|
$100.000
|
$50.000
|
$48.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$10.000
|
$50.000
|
$15.000
|
$15.000
|
$14.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
6.000
|
$15.000
|
$23.000
|
$35.000
|
$38.000
|
$37.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
60.000
|
$1.000
|
$0.950
|
$1.000
|
$1.000
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
9,172.000
|
$0.600
|
$0.950
|
$1.000
|
$1.000
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
10,469.000
|
$0.600
|
$0.950
|
$1.000
|
$1.000
|
$0.950
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,864.000
|
$0.800
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
600.000
|
$2.750
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
72.000
|
$6.000
|
$4.000
|
$4.000
|
$4.100
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,040.000
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.380
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
13,795.000
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
12,567.000
|
$0.400
|
$0.400
|
$0.400
|
$0.400
|
$0.380
|
|
PREFAB PAV MRK TY B (W)(UTURN ARROW)
|
EA
|
4.000
|
$730.000
|
$625.000
|
$700.000
|
$640.000
|
$625.000
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
4.000
|
$740.000
|
$625.000
|
$700.000
|
$640.000
|
$625.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
351.000
|
$3.000
|
$4.000
|
$4.000
|
$4.100
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,988.000
|
$0.400
|
$0.250
|
$0.200
|
$0.200
|
$0.200
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
439.000
|
$1.000
|
$0.450
|
$0.400
|
$0.400
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
210.000
|
$4.000
|
$1.250
|
$1.200
|
$1.200
|
$1.200
|
|
|
FULL - WIDTH MOWING
|
CYC
|
12.000
|
$4,000.000
|
$1,000.000
|
$1,500.000
|
$2,650.000
|
$4,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
12.000
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
$2,275.000
|
$2,000.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
12.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
$2,104.790
|
|
|
TRANSPLANT PLANT MATERIAL (TYPE I)
|
EA
|
20.000
|
$800.000
|
$950.000
|
$1,000.000
|
$970.000
|
$950.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
7.000
|
$16,550.000
|
$5,500.000
|
$7,500.000
|
$7,450.000
|
$10,200.000
|
|
|
GEOGRID REINFORCE EMBANKMENTS (TY B)
|
SY
|
14,645.000
|
$1.250
|
$1.850
|
$1.550
|
$2.800
|
$3.100
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
16,245.000
|
$1.300
|
$2.000
|
$1.350
|
$1.500
|
$2.470
|
|
Totals: |
$9,905,938.630
|
$10,510,081.900
|
$10,789,846.290
|
$11,370,337.598
|
$12,193,306.946
|