Show Job Controls
Bid Cobra

CALHOUN FM 3084 (3171-01-012)

Items: 89

County: CALHOUN
Length: 3.7600 MILES
Highway: FM 3084
District: YOAKUM
Control Number: 3171-01-012
DBE Goal: 4.0%
Project: STP 2025(848)HES
Guaranty: $100,000.00
Time: 150 WORKING DAYS
Engineer's Estimate: $5,019,825.65
Date: 07/01/2025 (11 months ago) Changed
Contract Number: 7253210
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00193383
Contract Type: Federal
Project Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH - HSIP 2022
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMES JANAK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$5,019,825.65
$4,398,168.09
Over/Under Est: -12.38% -$621,657.56
Over/Under Est: -9.95% -$499,518.87
Amt Left: 2.78% $122,138.69
$4,594,619.05
Over/Under Est: -8.47% -$425,206.60
Amt Left: 4.47% $196,450.96
Delta: -1.64% -$74,312.27
Over/Under Est: -6.42% -$322,266.65
Amt Left: 6.81% $299,390.91
Delta: -2.24% -$102,939.95
Over/Under Est: 1.46% $73,106.83
Amt Left: 15.8% $694,764.39
Delta: -8.42% -$395,373.48
Over/Under Est: 8.98% $450,973.14
Amt Left: 24.39% $1,072,630.70
Delta: -7.42% -$377,866.31
Over/Under Est: 46.11% $2,314,772.59
Amt Left: 66.76% $2,936,430.15
Delta: -34.07% -$1,863,799.45
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 11.75% $516,784.75
INTERSTATE BARRICADES & MARKINGS, INC. 2.40% $105,556.03
LONE STAR EROSION CONTROL 1.30% $57,176.19
THIRD COAST SERVICES LLC 1.10% $48,379.85
HOGAN MURRAY, INC. 0.55% $24,189.92
HIGHWAY BARRICADES AND SERVICES, LLC 0.54% $23,750.11
DEPENDABLE FENCE 0.31% $13,634.32
Total: 17.95% $789,471.17

Bid Items & Bid Tabulations

89 Total 0 of 89
CALHOUN  |  FM 3084  |  YOAKUM  |  3171-01-012  |  07/01/2025  |  $5,019,825.65  |  STP 2025(848)HES  |  HAZARD ELIM & SAFETY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CLARK CONSTRUCTION OF TEXAS, INC.
HUNTER INDUSTRIES, LTD.
CK NEWBERRY, LLC
LCR TOTAL TRANSPORT LLC
J. CARROLL WEAVER, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
MATAGORDA CONSTRUCTION & MATERIALS
EXCAV (ROADWAY)
CY 9,716.000 $17.000 $15.400 $18.900 $17.000 $27.250 $18.610 $26.000 $50.000
EMBANK (FNL)(OC)(TY C)
CY 4,135.000 $18.000 $14.480 $18.900 $25.000 $16.250 $12.300 $31.850 $75.000
BLADING
HR 25.000 $150.000 $100.000 $108.000 $150.000 $152.000 $37.960 $200.000 $250.000
BROADCAST SEED (TEMP_WARM)
SY 165.000 $1.100 $3.000 $3.230 $8.000 $3.200 $3.330 $0.980 $20.000
BROADCAST SEED (TEMP_COOL)
SY 165.000 $1.100 $3.000 $3.230 $8.000 $3.200 $3.330 $0.980 $20.000
DRILL SEED (PERM_RURAL_CLAY)
SY 44,067.000 $0.500 $0.250 $0.270 $0.350 $0.250 $0.280 $0.420 $1.000
DRILL SEED (TEMP_WARM)
SY 11,017.000 $0.500 $0.160 $0.170 $0.300 $0.200 $0.180 $0.420 $1.000
DRILL SEED (TEMP_COOL)
SY 11,017.000 $0.500 $0.200 $0.220 $0.300 $0.200 $0.220 $0.420 $1.000
VEGETATIVE WATERING
TGL 372.320 $50.000 $30.000 $21.000 $20.000 $64.850 $31.450 $20.000 $30.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 12,045.000 $115.000 $113.150 $101.010 $100.000 $124.800 $134.990 $166.000 $175.000
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
CY 5,096.000 $110.000 $107.040 $101.010 $100.000 $110.800 $124.430 $136.600 $130.000
CEMENT
TON 712.000 $250.000 $205.000 $209.000 $200.000 $196.000 $213.400 $200.000 $300.000
CEMENT TRT (EXIST MATL & NEW BASE)(8")
SY 58,609.000 $4.000 $2.070 $4.440 $1.500 $1.700 $2.290 $3.500 $4.000
ASPH (RC-250)
GAL 9,959.000 $6.000 $7.830 $5.360 $5.000 $4.250 $5.380 $5.900 $8.000
AGGR (TY-E, GR-5)(SAC-B)
CY 356.000 $135.000 $210.000 $111.750 $175.000 $149.000 $158.610 $143.300 $500.000
AGGR (TY-PE, GR-3)(SAC-B)
CY 617.000 $135.000 $141.900 $132.890 $165.000 $170.000 $193.800 $133.700 $300.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 611.000 $135.000 $141.210 $110.800 $135.000 $170.000 $158.330 $139.000 $800.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 48,005.000 $6.500 $4.590 $4.130 $3.750 $4.000 $3.920 $4.050 $12.000
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
TON 250.000 $250.000 $244.560 $125.600 $175.000 $172.500 $199.790 $173.000 $130.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $100.000 $70.150 $62.480 $72.000 $80.000 $112.880 $75.200 $80.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,500.000 $100.000 $99.800 $90.090 $105.000 $113.000 $143.530 $98.300 $80.000
CUT AND RESTORE PAV (FLEX BASE)
SY 99.000 $75.000 $99.550 $86.400 $75.000 $35.500 $88.800 $80.000 $100.000
CEM STABIL BKFL
CY 34.000 $250.000 $250.000 $270.000 $325.000 $181.500 $349.400 $250.000 $300.000
RIPRAP (CONC)(5 IN)
CY 14.000 $700.000 $750.000 $809.990 $900.000 $807.000 $832.500 $750.000 $1,000.000
RIPRAP (MOW STRIP)(5 IN)
CY 17.200 $475.000 $750.000 $809.990 $800.000 $783.000 $832.500 $750.000 $1,500.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 11.000 $350.000 $180.000 $260.020 $800.000 $325.000 $199.800 $180.000 $300.000
CMP (GAL STL 18 IN)
LF 84.000 $110.000 $60.000 $64.800 $125.000 $64.000 $66.600 $60.000 $200.000
CONC BOX CULV (5 FT X 2 FT)
LF 101.000 $750.000 $700.000 $755.990 $1,150.000 $744.000 $777.000 $700.000 $1,500.000
RC PIPE (CL III)(15 IN)
LF 412.000 $110.000 $55.000 $59.400 $130.000 $87.500 $61.050 $55.000 $80.000
RC PIPE (CL III)(18 IN)
LF 132.000 $120.000 $60.000 $64.800 $240.000 $107.000 $66.600 $60.000 $90.000
RC PIPE (CL III)(24 IN)
LF 80.000 $160.000 $140.000 $151.200 $125.000 $122.000 $155.400 $140.000 $120.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C)
EA 16.000 $7,200.000 $12,500.000 $13,499.800 $6,000.000 $10,500.000 $13,875.000 $12,500.000 $3,500.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 30.000 $1,400.000 $900.000 $971.990 $2,500.000 $1,100.000 $999.000 $900.000 $4,000.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 19.000 $1,750.000 $1,000.000 $1,079.980 $2,400.000 $1,200.000 $1,110.000 $1,000.000 $4,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000 $1,900.000 $950.000 $1,025.980 $2,500.000 $1,120.000 $1,054.500 $950.000 $4,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $2,000.000 $1,000.000 $1,079.980 $3,000.000 $1,425.000 $1,110.000 $1,000.000 $4,000.000
SET (TY II) (18 IN) (TP) (6: 1) (P)
EA 2.000 $2,100.000 $1,000.000 $1,079.980 $3,250.000 $1,418.000 $1,110.000 $1,000.000 $4,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $2,500.000 $2,500.000 $2,699.960 $3,000.000 $1,660.000 $2,775.000 $2,500.000 $6,000.000
THERMOPLASTIC PIPE (HDPE) (18")
LF 8.000 $105.000 $60.000 $64.800 $300.000 $59.250 $67.000 $60.000 $50.000
REMOV STR (SMALL)
EA 13.000 $1,500.000 $1,200.000 $1,200.000 $1,500.000 $784.000 $1,332.000 $1,200.000 $1,000.000
MOBILIZATION
LS 1.000 $500,000.000 $269,000.000 $449,563.340 $425,000.000 $363,000.000 $439,092.610 $300,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $8,500.000 $3,200.000 $6,750.000 $20,000.000 $2,326.000 $6,105.000 $6,000.000 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $12,500.000 $8,174.940 $7,500.000 $11,500.000 $7,300.390 $18,000.000 $3,000.000
TMA (STATIONARY)
DAY 20.000 $300.000 $200.000 $510.930 $300.000 $283.000 $555.000 $125.000 $400.000
TMA (MOBILE OPERATION)
DAY 20.000 $400.000 $300.000 $766.400 $300.000 $422.500 $555.000 $125.000 $600.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 530.000 $40.000 $55.000 $59.170 $50.000 $58.000 $61.050 $61.000 $20.000
ROCK FILTER DAMS (REMOVE)
LF 530.000 $10.000 $12.000 $12.910 $20.000 $12.600 $13.320 $24.000 $10.000
SANDBAGS FOR EROSION CONTROL
EA 100.000 $22.000 $14.000 $15.060 $20.000 $14.750 $15.540 $26.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 310.000 $4.500 $4.750 $5.110 $7.000 $5.000 $5.550 $8.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 310.000 $1.500 $1.000 $1.080 $3.000 $1.100 $3.330 $1.100 $1.000
DRIVEWAYS (CONC)
SY 54.000 $115.000 $250.000 $274.710 $200.000 $120.000 $277.500 $250.000 $120.000
DRIVEWAYS (SURF TREAT)
SY 1,699.000 $45.000 $39.380 $43.600 $35.000 $36.000 $16.650 $57.500 $40.000
TURNOUTS (SURF TREAT)
SY 180.000 $47.000 $91.220 $43.600 $35.000 $40.000 $14.430 $126.100 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $50.000 $35.640 $28.600 $36.000 $28.000 $29.420 $26.500 $40.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,500.000 $1,641.000 $1,473.360 $1,800.000 $1,437.000 $1,515.150 $1,365.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 125.000 $5.000 $5.000 $3.240 $5.000 $3.250 $3.330 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,703.000 $3,292.130 $3,800.000 $2,160.000 $3,385.500 $3,050.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $300.000 $361.600 $300.000 $353.000 $371.850 $335.000 $500.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 14.000 $225.000 $150.000 $150.000 $150.000 $158.000 $199.800 $150.000 $500.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 5.000 $300.000 $175.000 $175.000 $175.000 $185.000 $255.300 $175.000 $500.000
CONDT (PVC) (SCH 40) (2")
LF 1,205.000 $15.000 $16.080 $17.440 $21.000 $21.750 $23.310 $16.100 $16.000
ELEC CONDR (NO.8) BARE
LF 1,205.000 $1.500 $2.250 $2.440 $3.000 $3.000 $3.070 $2.250 $18.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,400.000 $1,198.020 $1,299.510 $2,000.000 $1,895.000 $1,998.000 $1,198.000 $2,500.000
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
EA 1.000 $6,000.000 $5,599.510 $6,073.890 $2,000.000 $2,050.000 $2,164.500 $5,600.000 $20,000.000
ALUMINUM SIGNS (TY A)
SF 32.000 $50.000 $40.260 $25.000 $25.000 $105.250 $37.960 $40.300 $500.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $1,250.000 $825.000 $825.000 $825.000 $1,100.000 $1,093.350 $1,025.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $1,250.000 $875.000 $875.000 $875.000 $1,160.000 $1,182.150 $1,100.000 $3,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,250.000 $975.000 $975.000 $975.000 $1,265.000 $1,620.600 $1,200.000 $1,200.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 16.000 $650.000 $525.000 $525.000 $525.000 $500.000 $577.200 $475.000 $100.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 6.000 $650.000 $550.000 $550.000 $550.000 $579.000 $749.250 $550.000 $500.000
REMOVE SM RD SN SUP&AM
EA 27.000 $100.000 $100.000 $100.000 $100.000 $89.500 $105.450 $85.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $55.000 $35.000 $35.000 $35.000 $47.500 $33.300 $45.000 $35.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 16.000 $90.000 $75.000 $75.000 $75.000 $100.000 $81.590 $95.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 119,050.000 $0.500 $0.300 $0.450 $0.500 $0.450 $0.280 $0.450 $0.520
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 11,704.000 $0.350 $0.300 $0.680 $0.700 $0.750 $0.610 $0.680 $0.520
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 2,585.000 $0.800 $0.300 $0.780 $0.800 $0.800 $0.610 $0.780 $0.520
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,643.000 $2.000 $2.000 $1.630 $0.600 $2.000 $1.120 $1.000 $0.520
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 39,730.000 $1.250 $1.350 $0.780 $0.800 $0.800 $1.330 $0.780 $1.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 1,310.000 $1.250 $1.350 $1.100 $1.100 $1.200 $2.160 $1.100 $1.000
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 4,879.000 $1.250 $1.350 $1.100 $1.100 $1.200 $2.160 $1.100 $1.000
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
LF 80.000 $50.000 $25.000 $35.000 $35.000 $37.000 $42.180 $35.000 $25.000
PREFAB PM TY C (W)(24")(SLD)
LF 24.000 $20.000 $20.000 $50.000 $50.000 $53.000 $33.300 $50.000 $25.000
REFL PAV MRKR TY II-A-A
EA 260.000 $7.500 $5.000 $15.000 $15.000 $16.000 $7.770 $15.000 $8.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $375.000 $179.310 $194.500 $350.000 $350.000 $370.740 $180.000 $2,500.000
VEH SIG SEC (12")LED(RED)
EA 2.000 $375.000 $179.310 $194.500 $350.000 $350.000 $370.740 $180.000 $2,500.000
TRF SIG CBL (TY A)(10 AWG)(3 CONDR)
LF 1,205.000 $3.000 $5.310 $5.760 $3.250 $3.400 $3.550 $5.400 $9.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 2.000 $5,500.000 $5,343.500 $5,796.190 $8,000.000 $8,421.000 $8,880.000 $5,500.000 $15,000.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $625.000 $263.930 $286.290 $850.000 $895.000 $943.500 $265.000 $10,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $12,000.000 $10,000.000 $10,218.670 $5,000.000 $7,370.000 $13,320.000 $10,000.000 $10,000.000
Totals: $5,019,825.650 $4,398,168.090 $4,520,306.778 $4,594,619.050 $4,697,559.002 $5,092,932.484 $5,470,798.790 $7,334,598.240
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,500.00
Total: $2,500.00