CALHOUN SH 316 (0580-01-039)

Items: 67

County: CALHOUN
Length: 2.6560 MILES
Highway: SH 316
District: YOAKUM
Control Number: 0580-01-039
DBE Goal: 4.0%
Project: STP 2025(727)HRR
Guaranty: $64,000.00
Time: 105 WORKING DAYS
Engineer's Estimate: $3,189,957.90
Date: 05/02/2025 (1 year ago)
Contract Number: 5253211
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00193381
Contract Type: Federal
Project Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH - HSIP 2022
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CLAYTON HARRIS
JAMES JANAK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$3,189,957.90
$3,141,247.90
Over/Under Est: -1.53% -$48,710.00
Over/Under Est: 1.18% $37,774.93
Amt Left: 2.75% $86,484.93
Over/Under Est: 18.49% $589,669.07
Amt Left: 20.32% $638,379.07
Delta: -17.10% -$551,894.14
$3,981,901.65
Over/Under Est: 24.83% $791,943.75
Amt Left: 26.76% $840,653.75
Delta: -5.35% -$202,274.68
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 4.98% $156,434.15
Total: 4.98% $156,434.15

Bid Items & Bid Tabulations

67 Total 0 of 67
CALHOUN  |  SH 316  |  YOAKUM  |  0580-01-039  |  05/02/2025  |  $3,189,957.90  |  STP 2025(727)HRR  |  HAZARD ELIM & SAFETY  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LCR TOTAL TRANSPORT LLC
HUNTER INDUSTRIES, LTD.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
CK NEWBERRY, LLC
EXCAV (ROADWAY)
CY 8,639.000 $22.000 $15.000 $16.500 $20.000 $17.000
SUBGR WIDEN (OC)
STA 130.140 $555.000 $122.500 $976.810 $832.500 $250.000
EMBANK (FNL)(OC)(TY C)
CY 2,559.000 $26.000 $13.500 $14.300 $52.500 $25.000
BACKFILL (TY A)
STA 18.010 $260.000 $265.000 $120.930 $465.000 $650.000
BLADING
HR 20.000 $150.000 $130.000 $99.000 $110.000 $200.000
BROADCAST SEED (TEMP_WARM)
SY 25.000 $1.000 $5.250 $50.000 $10.000 $4.000
BROADCAST SEED (TEMP_COOL)
SY 25.000 $1.000 $5.250 $50.000 $10.000 $4.000
DRILL SEED (PERM_RURAL_CLAY)
SY 43,380.000 $0.250 $0.250 $0.520 $0.240 $0.500
DRILL SEED (TEMP_WARM)
SY 10,845.000 $0.250 $0.200 $0.490 $0.180 $0.500
DRILL SEED (TEMP_COOL)
SY 10,845.000 $0.250 $0.250 $0.490 $0.220 $0.500
VEGETATIVE WATERING
TGL 365.350 $50.000 $48.000 $23.100 $100.000 $35.000
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 10,085.000 $89.000 $114.000 $112.030 $152.000 $125.000
CEMENT
TON 701.000 $300.000 $205.000 $220.000 $200.000 $200.000
CEMENT TRT (EXIST MATL)(8")
SY 34,593.000 $3.500 $2.000 $2.200 $5.050 $2.500
ASPH (RC-250)
GAL 5,183.000 $5.000 $4.700 $4.950 $4.000 $6.000
AGGR (TY-E, GR-5)(SAC-B)
CY 185.000 $130.000 $183.000 $111.250 $135.000 $350.000
AGGR (TY-PE, GR-3)(SAC-B)
CY 339.000 $140.000 $189.000 $135.360 $175.000 $275.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 526.000 $150.000 $189.000 $135.920 $160.000 $175.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 34,765.000 $5.500 $4.200 $4.070 $3.600 $4.300
D-GR HMA TY-D SAC-B PG70-22
TON 3,621.000 $125.000 $160.000 $122.100 $145.000 $175.000
TACK COAT
GAL 3,181.000 $5.100 $4.000 $3.300 $3.500 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 500.000 $80.000 $92.000 $81.310 $70.500 $115.000
CUT & RESTORING PAV
SY 74.000 $230.000 $142.000 $250.000 $300.000 $125.000
CEM STABIL BKFL
CY 18.000 $210.000 $200.000 $135.000 $130.000 $400.000
TRENCH EXCAVATION PROTECTION
LF 50.000 $25.000 $29.000 $42.000 $125.000 $50.000
CONC BOX CULV (3 FT X 3 FT)
LF 252.000 $510.000 $313.000 $325.000 $680.000 $575.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $15,000.000 $26,900.000 $17,500.000 $26,100.000 $20,000.000
REMOV STR (SMALL)
EA 1.000 $3,500.000 $4,800.000 $22,000.000 $4,000.000 $15,000.000
MOBILIZATION
LS 1.000 $288,000.000 $175,000.000 $288,854.960 $151,000.000 $385,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,500.000 $2,112.000 $6,661.300 $1,200.000 $30,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $8,500.000 $7,609.260 $10,500.000 $10,000.000
TMA (STATIONARY)
DAY 20.000 $500.000 $225.000 $507.280 $50.000 $300.000
TMA (MOBILE OPERATION)
DAY 20.000 $500.000 $355.000 $1,014.570 $175.000 $700.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 50.000 $50.000 $52.650 $92.000 $50.000 $85.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $20.000 $10.500 $28.000 $10.000 $40.000
SANDBAGS FOR EROSION CONTROL
EA 100.000 $2.000 $14.750 $10.000 $14.000 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 470.000 $4.500 $3.800 $9.000 $3.600 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 470.000 $1.500 $1.250 $3.000 $1.200 $1.250
DRIVEWAYS (SURF TREAT)
SY 271.000 $47.000 $34.000 $30.800 $25.000 $55.000
TURNOUTS (SURF TREAT)
SY 124.000 $47.000 $36.000 $30.800 $32.000 $85.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $500.000 $790.000 $500.000 $500.000 $550.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $310.000 $395.000 $150.000 $150.000 $175.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $750.000 $1,000.000 $700.000 $700.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $775.000 $1,105.000 $800.000 $800.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $850.000 $1,240.000 $850.000 $850.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $950.000 $1,530.000 $975.000 $975.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,150.000 $1,895.000 $1,200.000 $1,200.000 $1,300.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 18.000 $500.000 $500.000 $500.000 $500.000 $550.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $550.000 $737.000 $625.000 $625.000 $700.000
REMOVE SM RD SN SUP&AM
EA 28.000 $100.000 $89.500 $100.000 $100.000 $125.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 6.000 $80.000 $142.000 $75.000 $75.000 $90.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 85,288.000 $0.600 $0.550 $0.520 $0.320 $0.550
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 300.000 $0.800 $1.050 $1.000 $0.490 $1.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,820.000 $0.600 $0.750 $0.720 $0.320 $0.750
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 12,812.000 $0.600 $0.700 $0.640 $0.320 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 16.000 $2.000 $2.050 $1.630 $1.000 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,686.000 $2.000 $2.150 $1.630 $1.000 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 150.000 $1.500 $5.250 $5.000 $1.880 $5.500
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 29,630.000 $1.250 $1.150 $1.100 $0.980 $1.250
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 6,406.000 $1.250 $1.850 $1.750 $0.980 $2.000
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 3,410.000 $1.250 $2.100 $2.000 $0.980 $2.500
PREFAB PM TY C (W)(24")(SLD)
LF 15.000 $17.000 $26.300 $25.000 $30.000 $30.000
PREFAB PM TY C (W)(ARROW)
EA 1.000 $300.000 $210.500 $200.000 $235.000 $225.000
PREFAB PM TY C (W)(WORD)
EA 1.000 $300.000 $316.000 $300.000 $245.000 $350.000
PREFAB PM TY C (Y)(24")(SLD)
LF 407.000 $17.000 $16.850 $16.000 $17.000 $20.000
REFL PAV MRKR TY I-C
EA 8.000 $5.500 $15.800 $15.000 $6.460 $20.000
REFL PAV MRKR TY II-A-A
EA 406.000 $5.500 $10.500 $10.000 $6.460 $15.000
Totals: $3,189,957.900 $3,141,247.900 $3,227,732.828 $3,779,626.970 $3,981,901.650
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
Total: $2,000.00