PREPARING ROW
|
STA
|
5.000
|
$5,000.000
|
$5,500.000
|
$865.800
|
$19,975.130
|
|
|
REMOV STAB BASE & ASPH PAV (8"-20")
|
SY
|
142.000
|
$20.000
|
$27.220
|
$15.600
|
$19.080
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,394.000
|
$15.000
|
$18.560
|
$25.770
|
$12.560
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
619.000
|
$15.000
|
$14.910
|
$25.770
|
$34.070
|
|
|
BLADING
|
HR
|
20.000
|
$100.000
|
$89.100
|
$91.200
|
$477.020
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
1,891.000
|
$1.000
|
$2.320
|
$2.000
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
473.000
|
$1.000
|
$3.480
|
$3.000
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
473.000
|
$1.000
|
$3.480
|
$3.000
|
$0.140
|
|
|
VEGETATIVE WATERING
|
MG
|
31.000
|
$40.000
|
$52.190
|
$13.320
|
$20.480
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
842.000
|
$90.000
|
$114.130
|
$90.280
|
$77.950
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
3,139.000
|
$5.000
|
$4.510
|
$6.840
|
$7.200
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
39.000
|
$200.000
|
$193.650
|
$210.000
|
$285.240
|
|
|
PRIME COAT (MC-30)
|
GAL
|
573.000
|
$5.000
|
$7.860
|
$8.760
|
$6.580
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
34.000
|
$150.000
|
$207.570
|
$434.380
|
$122.300
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
86.000
|
$150.000
|
$162.340
|
$372.090
|
$116.040
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
4,931.000
|
$4.000
|
$3.950
|
$7.710
|
$4.020
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,540.000
|
$90.000
|
$125.230
|
$95.790
|
$140.550
|
|
|
D-GR HMA TY-B PG64-22(LEVEL-UP)
|
TON
|
1,047.000
|
$80.000
|
$124.080
|
$101.040
|
$128.810
|
|
|
TACK COAT
|
GAL
|
1,400.000
|
$4.000
|
$4.110
|
$3.490
|
$4.900
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
850.000
|
$55.000
|
$64.940
|
$57.160
|
$43.150
|
|
|
CEM STABIL BKFL
|
CY
|
81.000
|
$150.000
|
$164.660
|
$277.690
|
$84.490
|
|
|
TEMPORARY SPL SHORING
|
SF
|
76.000
|
$25.000
|
$19.030
|
$89.600
|
$53.280
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
2,916.000
|
$25.000
|
$98.040
|
$75.000
|
$170.360
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
630.000
|
$130.000
|
$113.180
|
$190.000
|
$136.290
|
|
|
CL C CONC (ABUT)
|
CY
|
44.800
|
$1,200.000
|
$1,112.660
|
$1,500.000
|
$1,130.010
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
4,060.000
|
$17.000
|
$21.310
|
$23.000
|
$24.530
|
|
|
APPROACH SLAB
|
CY
|
90.000
|
$500.000
|
$342.780
|
$850.000
|
$623.020
|
|
|
SHEAR KEY
|
CY
|
26.000
|
$250.000
|
$747.920
|
$500.000
|
$496.330
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
903.500
|
$220.000
|
$231.410
|
$150.000
|
$214.320
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
69.500
|
$230.000
|
$233.470
|
$160.000
|
$214.320
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
25.000
|
$450.000
|
$488.450
|
$500.000
|
$489.130
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
226.000
|
$170.000
|
$226.120
|
$230.000
|
$138.760
|
|
|
RAIL (TY SSTR)
|
LF
|
172.000
|
$80.000
|
$140.480
|
$111.020
|
$74.960
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
114.000
|
$150.000
|
$85.160
|
$99.760
|
$178.160
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
114.000
|
$70.000
|
$69.500
|
$175.540
|
$72.640
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
28.000
|
$210.000
|
$245.120
|
$270.940
|
$226.600
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$10,000.000
|
$11,997.850
|
$12,393.230
|
$14,481.010
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,192.000
|
$1,620.850
|
$2,255.390
|
$637.160
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$15,000.000
|
$18,878.200
|
$41,696.290
|
$68,145.910
|
|
|
REMOV STR (SMALL)
|
EA
|
3.000
|
$1,357.000
|
$566.500
|
$1,746.840
|
$6,814.590
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$120,000.000
|
$180,000.000
|
$190,000.000
|
$170,364.770
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$2,500.000
|
$2,500.000
|
$8,000.000
|
$13,629.180
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
275.000
|
$3.000
|
$5.800
|
$5.000
|
$2.640
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
275.000
|
$1.000
|
$3.480
|
$3.000
|
$0.830
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
480.000
|
$35.000
|
$19.200
|
$67.240
|
$44.300
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$5.000
|
$7.740
|
$15.140
|
$6.800
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
480.000
|
$10.000
|
$29.480
|
$29.870
|
$15.270
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
527.000
|
$40.000
|
$23.200
|
$39.420
|
$21.990
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$25.000
|
$25.510
|
$22.380
|
$24.390
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,850.000
|
$1,988.700
|
$1,670.000
|
$2,131.150
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
672.000
|
$2.000
|
$2.090
|
$2.000
|
$3.240
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$150.000
|
$260.900
|
$150.000
|
$271.170
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,800.000
|
$2,898.950
|
$2,821.000
|
$3,149.290
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$260.900
|
$150.000
|
$336.130
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,300.000
|
$2,145.200
|
$1,500.000
|
$1,661.420
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$750.000
|
$115.950
|
$1,000.000
|
$1,059.090
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$11,943.650
|
$7,850.000
|
$10,289.070
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
3.000
|
$400.000
|
$347.900
|
$620.680
|
$1,371.780
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$29.000
|
$18.250
|
$88.450
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
27.000
|
$25.000
|
$17.390
|
$21.750
|
$104.940
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,235.000
|
$1.000
|
$0.750
|
$0.900
|
$2.730
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
50.000
|
$4.000
|
$16.230
|
$5.500
|
$29.030
|
|
|
WK ZN PAV MRK REMOV (W)(RR XING)
|
EA
|
2.000
|
$500.000
|
$666.750
|
$500.000
|
$1,722.120
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,246.000
|
$1.000
|
$0.750
|
$0.800
|
$2.960
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
270.000
|
$2.000
|
$1.160
|
$1.780
|
$3.610
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
450.000
|
$2.000
|
$1.160
|
$1.780
|
$2.860
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
60.000
|
$1.000
|
$3.480
|
$0.900
|
$2.790
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
440.000
|
$0.560
|
$0.350
|
$1.260
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,964.000
|
$0.540
|
$0.500
|
$1.160
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
200.000
|
$0.560
|
$0.400
|
$1.190
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,400.000
|
$0.540
|
$0.550
|
$1.160
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
82.000
|
$15.000
|
$17.390
|
$15.000
|
$45.730
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$600.000
|
$666.750
|
$600.000
|
$1,809.990
|
|
REFL PAV MRKR TY I-C
|
EA
|
25.000
|
$4.000
|
$11.600
|
$4.000
|
$11.070
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
46.000
|
$4.000
|
$11.590
|
$4.500
|
$10.190
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$8,000.000
|
$7,875.880
|
$9,775.710
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$361.550
|
$315.040
|
$681.460
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$400.000
|
$405.850
|
$300.000
|
$681.460
|
|
Totals: |
$1,476,828.000
|
$1,937,924.608
|
$1,990,952.630
|
$2,455,622.448
|