CALHOUN SH 185 (0432-01-064)

Items: 78

County: CALHOUN
Length: N/A
Highway: SH 185
District: YOAKUM
Control Number: 0432-01-064
DBE Goal: N/A
Project: BR 2020(436)
Guaranty: N/A
Time: 143 WORKING DAYS
Engineer's Estimate: $1,476,828.00
Date: 01/10/2020 (6 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,476,828.00
$1,937,924.59
Over/Under Est: 31.22% $461,096.59
Over/Under Est: 34.81% $514,124.63
Amt Left: 2.74% $53,028.04
$2,455,622.44
Over/Under Est: 66.28% $978,794.44
Amt Left: 26.71% $517,697.85
Delta: -23.34% -$464,669.81

Bid Items & Bid Tabulations

78 Total 0 of 78
CALHOUN  |  SH 185  |  YOAKUM  |  0432-01-064  |  01/10/2020  |  $1,476,828.00  |  BR 2020(436)  |  REPLACE BRIDGE AND APPROACHES  |  143 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SB CONTRACTORS LLC
HUNTER INDUSTRIES, LTD.
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 5.000 $5,000.000 $5,500.000 $865.800 $19,975.130
REMOV STAB BASE & ASPH PAV (8"-20")
SY 142.000 $20.000 $27.220 $15.600 $19.080
EXCAVATION (ROADWAY)
CY 1,394.000 $15.000 $18.560 $25.770 $12.560
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 619.000 $15.000 $14.910 $25.770 $34.070
BLADING
HR 20.000 $100.000 $89.100 $91.200 $477.020
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,891.000 $1.000 $2.320 $2.000 $0.140
BROADCAST SEED (TEMP) (WARM)
SY 473.000 $1.000 $3.480 $3.000 $0.140
BROADCAST SEED (TEMP) (COOL)
SY 473.000 $1.000 $3.480 $3.000 $0.140
VEGETATIVE WATERING
MG 31.000 $40.000 $52.190 $13.320 $20.480
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 842.000 $90.000 $114.130 $90.280 $77.950
LIME TRT (EXST MATL) (6")
SY 3,139.000 $5.000 $4.510 $6.840 $7.200
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 39.000 $200.000 $193.650 $210.000 $285.240
PRIME COAT (MC-30)
GAL 573.000 $5.000 $7.860 $8.760 $6.580
AGGR(TY-PE GR-3 SAC-B)
CY 34.000 $150.000 $207.570 $434.380 $122.300
AGGR(TY-PE GR-4 SAC-B)
CY 86.000 $150.000 $162.340 $372.090 $116.040
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 4,931.000 $4.000 $3.950 $7.710 $4.020
D-GR HMA TY-D SAC-B PG70-22
TON 1,540.000 $90.000 $125.230 $95.790 $140.550
D-GR HMA TY-B PG64-22(LEVEL-UP)
TON 1,047.000 $80.000 $124.080 $101.040 $128.810
TACK COAT
GAL 1,400.000 $4.000 $4.110 $3.490 $4.900
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 850.000 $55.000 $64.940 $57.160 $43.150
CEM STABIL BKFL
CY 81.000 $150.000 $164.660 $277.690 $84.490
TEMPORARY SPL SHORING
SF 76.000 $25.000 $19.030 $89.600 $53.280
TEMPORARY SPL SHORING (COFFERDAM)
SF 2,916.000 $25.000 $98.040 $75.000 $170.360
PRESTR CONC PIL (18 IN SQ)
LF 630.000 $130.000 $113.180 $190.000 $136.290
CL C CONC (ABUT)
CY 44.800 $1,200.000 $1,112.660 $1,500.000 $1,130.010
REINF CONC SLAB (BOX BEAM)
SF 4,060.000 $17.000 $21.310 $23.000 $24.530
APPROACH SLAB
CY 90.000 $500.000 $342.780 $850.000 $623.020
SHEAR KEY
CY 26.000 $250.000 $747.920 $500.000 $496.330
PRESTR CONC BOX BEAM (4B20)
LF 903.500 $220.000 $231.410 $150.000 $214.320
PRESTR CONC BOX BEAM (5B20)
LF 69.500 $230.000 $233.470 $160.000 $214.320
RIPRAP (CONC)(5 IN)
CY 25.000 $450.000 $488.450 $500.000 $489.130
RIPRAP (STONE PROTECTION)(12 IN)
CY 226.000 $170.000 $226.120 $230.000 $138.760
RAIL (TY SSTR)
LF 172.000 $80.000 $140.480 $111.020 $74.960
ARMOR JOINT (SEALED)
LF 114.000 $150.000 $85.160 $99.760 $178.160
RC PIPE (CL III)(18 IN)
LF 114.000 $70.000 $69.500 $175.540 $72.640
RC PIPE (CL III)(48 IN)
LF 28.000 $210.000 $245.120 $270.940 $226.600
HEADWALL (CH - FW - 0) (DIA= 48 IN)
EA 2.000 $10,000.000 $11,997.850 $12,393.230 $14,481.010
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,192.000 $1,620.850 $2,255.390 $637.160
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $15,000.000 $18,878.200 $41,696.290 $68,145.910
REMOV STR (SMALL)
EA 3.000 $1,357.000 $566.500 $1,746.840 $6,814.590
MOBILIZATION
LS 1.000 $120,000.000 $180,000.000 $190,000.000 $170,364.770
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $2,500.000 $2,500.000 $8,000.000 $13,629.180
TEMP SEDMT CONT FENCE (INSTALL)
LF 275.000 $3.000 $5.800 $5.000 $2.640
TEMP SEDMT CONT FENCE (REMOVE)
LF 275.000 $1.000 $3.480 $3.000 $0.830
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 480.000 $35.000 $19.200 $67.240 $44.300
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 360.000 $5.000 $7.740 $15.140 $6.800
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 480.000 $10.000 $29.480 $29.870 $15.270
DRIVEWAYS (SURF TREAT)
SY 527.000 $40.000 $23.200 $39.420 $21.990
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $25.000 $25.510 $22.380 $24.390
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,850.000 $1,988.700 $1,670.000 $2,131.150
REMOVE METAL BEAM GUARD FENCE
LF 672.000 $2.000 $2.090 $2.000 $3.240
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $150.000 $260.900 $150.000 $271.170
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,800.000 $2,898.950 $2,821.000 $3,149.290
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $300.000 $260.900 $150.000 $336.130
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,300.000 $2,145.200 $1,500.000 $1,661.420
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $750.000 $115.950 $1,000.000 $1,059.090
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $11,943.650 $7,850.000 $10,289.070
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $400.000 $347.900 $620.680 $1,371.780
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $25.000 $29.000 $18.250 $88.450
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 27.000 $25.000 $17.390 $21.750 $104.940
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 8,235.000 $1.000 $0.750 $0.900 $2.730
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 50.000 $4.000 $16.230 $5.500 $29.030
WK ZN PAV MRK REMOV (W)(RR XING)
EA 2.000 $500.000 $666.750 $500.000 $1,722.120
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,246.000 $1.000 $0.750 $0.800 $2.960
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 270.000 $2.000 $1.160 $1.780 $3.610
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 450.000 $2.000 $1.160 $1.780 $2.860
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 60.000 $1.000 $3.480 $0.900 $2.790
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 440.000 $0.560 $0.350 $1.260
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 4,964.000 $0.540 $0.500 $1.160
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 200.000 $0.560 $0.400 $1.190
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,400.000 $0.540 $0.550 $1.160
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 82.000 $15.000 $17.390 $15.000 $45.730
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $600.000 $666.750 $600.000 $1,809.990
REFL PAV MRKR TY I-C
EA 25.000 $4.000 $11.600 $4.000 $11.070
REFL PAV MRKR TY II-A-A
EA 46.000 $4.000 $11.590 $4.500 $10.190
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $8,000.000 $7,875.880 $9,775.710
TMA (STATIONARY)
DAY 20.000 $300.000 $361.550 $315.040 $681.460
TMA (MOBILE OPERATION)
DAY 20.000 $400.000 $405.850 $300.000 $681.460
Totals: $1,476,828.000 $1,937,924.608 $1,990,952.630 $2,455,622.448