Show Job Controls
Bid Cobra

CALHOUN SH 172 (0420-03-018)

Items: 49

County: CALHOUN
Length: N/A
Highway: SH 172
District: YOAKUM
Control Number: 0420-03-018
DBE Goal: N/A
Project: STP 2023(715)HES
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $1,975,707.69
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
JAMES JANAK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,975,707.69
$2,118,839.16
Over/Under Est: 7.24% $143,131.47
Over/Under Est: 36.44% $719,882.12
Amt Left: 27.22% $576,750.65
$2,696,170.21
Over/Under Est: 36.47% $720,462.52
Amt Left: 27.25% $577,331.05
Delta: -0.02% -$580.40
Over/Under Est: 37.27% $736,331.97
Amt Left: 28% $593,200.50
Delta: -0.59% -$15,869.45

Bid Items & Bid Tabulations

49 Total 0 of 49
CALHOUN  |  SH 172  |  YOAKUM  |  0420-03-018  |  05/04/2023  |  $1,975,707.69  |  STP 2023(715)HES  |  HAZARD ELIM & SAFETY  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BRANNAN PAVING CO., LTD.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
CK NEWBERRY, LLC
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 10.500 $1,100.000 $1,080.000 $1,250.000 $2,500.000 $7,000.000
EXCAVATION (ROADWAY)
CY 1,198.000 $13.000 $12.590 $35.000 $50.000 $28.000
SUBGRADE WIDENING (ORD COMP)
STA 161.780 $500.000 $558.940 $800.000 $600.000 $910.200
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 2,649.000 $25.000 $24.340 $59.000 $30.000 $36.800
BLADING
HR 50.000 $150.000 $100.000 $75.000 $200.000 $144.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 53,427.000 $0.300 $0.340 $0.380 $0.400 $0.340
DRILL SEEDING (TEMP) (WARM)
SY 13,482.000 $0.200 $0.320 $0.340 $0.340 $0.320
DRILL SEEDING (TEMP) (COOL)
SY 13,482.000 $0.200 $0.320 $0.340 $0.340 $0.320
VEGETATIVE WATERING
MG 453.920 $22.000 $30.000 $10.000 $20.000 $24.500
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 9,879.000 $85.000 $108.000 $125.000 $115.000 $128.390
CEMENT
TON 160.000 $220.000 $225.000 $300.000 $220.000 $269.500
CEMENT TREAT (SUBGRADE)(6")
SY 17,499.000 $3.900 $2.280 $2.500 $3.000 $2.280
ASPH (RC-250)
GAL 4,855.000 $5.000 $7.510 $9.500 $5.500 $5.360
AGGR(TY-E GR-5 SAC-B)
CY 173.000 $150.000 $193.200 $220.000 $325.000 $129.090
AGGR(TY-PE GR-3 SAC-B)
CY 328.000 $130.000 $168.000 $210.000 $275.000 $169.490
AGGR(TY-PE GR-4 SAC-B)
CY 491.000 $130.000 $168.000 $140.800 $175.000 $169.570
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 32,848.000 $5.000 $4.610 $4.850 $5.250 $5.360
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 500.000 $100.000 $52.530 $105.000 $75.000 $90.200
CEM STABIL BKFL
CY 2.400 $120.000 $325.000 $500.000 $500.000 $350.000
CONC BOX CULV (4 FT X 3 FT)
LF 6.000 $350.000 $1,850.000 $2,000.000 $2,500.000 $1,200.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 1.000 $7,500.000 $11,296.000 $25,000.000 $25,000.000 $15,000.000
MOBILIZATION
LS 1.000 $178,000.000 $102,863.000 $150,000.000 $250,000.000 $265,179.770
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $2,345.410 $4,000.000 $15,000.000 $3,222.570
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 210.000 $40.000 $55.330 $42.000 $40.000 $55.330
ROCK FILTER DAMS (REMOVE)
LF 210.000 $12.000 $10.700 $15.000 $5.000 $10.700
TEMP SEDMT CONT FENCE (INSTALL)
LF 350.000 $5.000 $4.650 $6.000 $5.000 $4.650
TEMP SEDMT CONT FENCE (REMOVE)
LF 350.000 $1.000 $1.000 $2.000 $3.000 $1.000
INTERSECTIONS (SURF TREAT)
SY 49.000 $50.000 $30.780 $90.000 $100.000 $55.200
DRIVEWAYS (SURF TREAT)
SY 2,052.000 $45.000 $34.430 $75.900 $50.000 $41.400
TURNOUTS (SURF TREAT)
SY 294.000 $45.000 $37.680 $90.200 $45.000 $41.400
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 6.000 $450.000 $550.000 $525.000 $800.000 $525.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 15.000 $250.000 $225.000 $265.000 $400.000 $265.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $750.000 $650.000 $715.000 $800.000 $715.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $925.000 $875.000 $785.000 $1,200.000 $785.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,000.000 $950.000 $950.000 $1,300.000 $950.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 27.000 $425.000 $430.000 $425.000 $600.000 $425.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 4.000 $485.000 $485.000 $500.000 $700.000 $500.000
REMOVE SM RD SN SUP&AM
EA 39.000 $100.000 $75.000 $85.000 $200.000 $85.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 64,712.000 $0.350 $0.320 $0.440 $0.600 $0.440
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 3,887.000 $0.350 $0.360 $0.420 $0.600 $0.420
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 3,696.000 $0.350 $0.360 $0.420 $0.600 $0.420
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,352.000 $2.000 $1.750 $1.000 $1.000 $1.630
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 32,356.000 $0.800 $0.980 $0.900 $1.250 $0.900
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 3,887.000 $0.800 $1.100 $0.950 $1.250 $0.950
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 3,696.000 $0.800 $1.100 $0.950 $1.250 $0.950
REFL PAV MRKR TY II-A-A
EA 241.000 $4.000 $4.800 $5.000 $6.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $9,500.000 $18,000.000 $12,000.000 $8,768.250
TMA (STATIONARY)
DAY 20.000 $250.000 $200.000 $150.000 $250.000 $324.750
TMA (MOBILE OPERATION)
DAY 20.000 $250.000 $275.000 $150.000 $300.000 $324.750
Totals: $1,975,707.690 $2,118,839.163 $2,695,589.810 $2,696,170.210 $2,712,039.666