Show Job Controls
Bid Cobra

BROWN US0377 (6395-84-001)

Items: 56

County: BROWN
Length: N/A
Highway: US0377
District: BROWNWOOD
Control Number: 6395-84-001
DBE Goal: N/A
Project: RMC - 639584001
Guaranty: N/A
Time: 150 W
Engineer's Estimate: $1,319,056.26
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
BLAKE STEMBRIDGE
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,319,056.26
$1,177,145.00
Over/Under Est: -10.76% -$141,911.26
Over/Under Est: -10.1% -$133,172.26
Amt Left: 0.74% $8,739.00
$1,429,684.05
Over/Under Est: 8.39% $110,627.79
Amt Left: 21.45% $252,539.05
Delta: -20.56% -$243,800.05
Subcontractor Percentage Amount
ELITE CASTLE RESOURCES LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

56 Total 0 of 56
BROWN  |  US0377  |  BROWNWOOD  |  6395-84-001  |  01/06/2023  |  $1,319,056.26  |  RMC - 639584001  |  METAL BEAM GUARD FENCE REPAIR  |  150 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
T&L CLEANING SERVICES LLC
HJC FARMS, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $505.060 $300.000 $200.000 $300.000
MOBILIZATION (CALLOUT)
EA 10.000 $3,000.000 $100.000 $100.000 $1.000
CONC CURB (TY II)(PRECAST)(RT)
EA 5.000 $60.000 $100.000 $200.000 $25.000
CONC CURB (TY II)(PRECAST)(LT)
EA 5.000 $60.000 $100.000 $200.000 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,500.000 $30.000 $25.000 $24.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,500.000 $29.960 $26.000 $30.000 $31.000
TERMINAL ANCHOR SECTION
EA 5.000 $62.110 $100.000 $1.000 $0.010
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,811.870 $1,000.000 $1,500.000 $500.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $698.670 $500.000 $1.000 $1.000
SHORT RADIUS
LF 100.000 $136.140 $20.000 $20.000 $40.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,272.160 $1,000.000 $1,200.000 $850.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 25.000 $63.610 $30.000 $20.000 $1.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 5.000 $845.350 $500.000 $1,000.000 $750.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 50.000 $244.760 $300.000 $100.000 $750.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $3.380 $1.000 $1.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $259.790 $100.000 $100.000 $500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $101.850 $100.000 $100.000 $200.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 5.000 $3,129.210 $1,000.000 $1,500.000 $1.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 5.000 $4,295.750 $3,000.000 $1,500.000 $1,500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $18.450 $25.000 $24.000 $27.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $40.210 $5.000 $20.000 $1.000
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $27.280 $35.000 $25.000 $25.000
REM / REPL TIMBER POST W / O CONC FND
EA 400.000 $72.580 $25.000 $20.000 $35.000
REM / REPL STEEL POST W / O CONC FND
EA 300.000 $110.200 $60.000 $30.000 $75.000
REM / REPL TIMBER POST W / CONC FND
EA 20.000 $193.200 $50.000 $20.000 $30.000
REM / REPL STEEL POST W / CONC FND
EA 5.000 $115.420 $45.000 $100.000 $250.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $131.700 $100.000 $200.000 $275.000
REALIGN POSTS
EA 150.000 $35.210 $10.000 $10.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $16.760 $88.000 $10.000 $15.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 750.000 $39.360 $30.000 $30.000 $30.000
REPLACE HINGED TOP SGT STEEL POST
EA 5.000 $171.130 $60.000 $40.000 $100.000
RESET HINGED TOP SGT STL POST
EA 5.000 $70.450 $25.000 $10.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 150.000 $3,290.070 $3,100.000 $3,500.000 $3,300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $927.180 $750.000 $600.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $127.400 $100.000 $10.000 $500.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $65.280 $75.000 $1.000 $50.000
REPLACE SGT CABLE ANCHOR
EA 20.000 $66.530 $75.000 $1.000 $50.000
REPLACE SGT STRUT
EA 20.000 $63.930 $70.000 $1.000 $50.000
REPLACE SGT OBJECT MARKER
EA 5.000 $27.180 $56.000 $30.000 $50.000
REMOVE AND REPLACE DAT
EA 5.000 $1,136.090 $1,200.000 $1,200.000 $1,000.000
REPLACE SINGLE GDRAIL TERM POST(WOOD)
EA 50.000 $36.000 $30.000 $30.000 $60.000
REPLACE SINGLE GDRAIL TERM POST(STEEL)
EA 50.000 $72.000 $60.000 $50.000 $250.000
REPLACE POSTS (TL-3)
EA 1,500.000 $113.020 $130.000 $120.000 $200.000
REPLACE POSTS (TL-4)
EA 200.000 $174.100 $190.000 $160.000 $275.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $40.210 $100.000 $1.000 $1.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $177.510 $100.000 $1.000 $1.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 20.000 $1,374.360 $1,350.000 $1,000.000 $1,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $1,534.980 $1,000.000 $1,500.000 $1,000.000
REPLACE CABLE (TL-3)
LF 10.000 $2.440 $6.000 $1.000 $1.000
REPLACE POST HARDWARE (TL-4)
EA 150.000 $18.470 $20.000 $25.000 $40.000
REP POST HARDWARE(TL-3)(TY SPECIFIED)
EA 750.000 $18.000 $20.000 $20.000 $40.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 5.000 $74.650 $100.000 $200.000 $100.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 5.000 $46.670 $100.000 $200.000 $100.000
REPAIR (TY T1 - 101R)
LF 50.000 $15.490 $20.000 $20.000 $40.000
REPAIR (STEEL RAIL)
LF 25.000 $103.120 $20.000 $20.000 $40.000
TMA (STATIONARY)
DAY 130.000 $191.540 $1.000 $100.000 $275.000
Totals: $1,319,056.260 $1,177,145.000 $1,185,884.000 $1,429,684.050