REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
392.000
|
$16.000
|
$28.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (5")
|
SY
|
33,846.000
|
$3.790
|
$4.500
|
|
|
BACKFILL (TY A OR B)
|
STA
|
336.000
|
$180.000
|
$175.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
5,078.000
|
$6.180
|
$4.750
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
3,511.000
|
$37.510
|
$65.000
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
715.000
|
$4.000
|
$7.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
460.000
|
$3.300
|
$12.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
133,862.000
|
$1.000
|
$1.150
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
17,461.000
|
$2.150
|
$2.000
|
|
|
PLANE ASPH CONC PAV (0" TO 5")
|
SY
|
1,013.000
|
$3.150
|
$10.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
3.000
|
$3,754.710
|
$1,650.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$185,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$13,500.000
|
$18,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$4.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$1.500
|
$3.750
|
|
|
CONSTRUCTING DETOURS
|
SY
|
8,400.000
|
$35.000
|
$48.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
640.000
|
$160.000
|
$95.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
196.000
|
$80.000
|
$115.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
98.000
|
$2,000.000
|
$1,900.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
65,703.000
|
$0.170
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
33,608.000
|
$0.200
|
$0.240
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
150.000
|
$42.000
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$3,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
444.000
|
$5.000
|
$6.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,340.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
51.000
|
$900.000
|
$1,450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$1,750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,050.000
|
$1,650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
55.000
|
$145.000
|
$200.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,839.000
|
$2.500
|
$2.250
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
1,206.000
|
$3.150
|
$1.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
2,487.000
|
$5.910
|
$8.500
|
|
REFL PAV MRK TY I (W)(RR XING)(090MIL)
|
EA
|
2.000
|
$451.560
|
$580.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
|
EA
|
40.000
|
$70.000
|
$44.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
1,023.000
|
$0.300
|
$0.400
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
1,829.000
|
$10.000
|
$3.600
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
2,500.000
|
$0.500
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
10,017.000
|
$3.000
|
$0.800
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
78,075.000
|
$0.500
|
$1.150
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
7,965.000
|
$0.790
|
$1.150
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
29,957.000
|
$1.000
|
$1.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
761.000
|
$4.500
|
$5.550
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
190.000
|
$0.500
|
$3.200
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,500.000
|
$0.750
|
$1.050
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
11.000
|
$5.000
|
$22.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,878.000
|
$0.380
|
$0.450
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,132.000
|
$2.000
|
$1.950
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
42,015.000
|
$6.500
|
$5.000
|
|
|
D-GR HMA TY-C SAC-A PG70-22
|
TON
|
24,971.000
|
$154.000
|
$225.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$12,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
67.000
|
$150.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
9.000
|
$350.000
|
$630.000
|
|
Totals: |
$6,143,841.410
|
$7,843,264.320
|