Show Job Controls
Bid Cobra

BRAZOS FM 974 (0540-03-039)

Items: 77

County: BRAZOS
Length: 0.0000 MILES
Highway: FM 974
District: BRYAN
Control Number: 0540-03-039
DBE Goal: 0.0%
Project: SSW 540-3-39
Guaranty: $86,000.00
Time: 217 WORKING DAYS
Engineer's Estimate: $4,315,845.66
Date: 1:00 PM JULY 01, 2026 (in 21 days)
Contract Number: 7263013
Type: WIDEN ROAD - ADD SHOULDERS
Project ID: A00206416
Project Description: REHABILITATE ROADWAY AND WIDEN SHOULDERS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMES ROBBINS
JOHN SHEPHERD
BRAZOS FM 974 (0540-03-039)
Project Name: N/A
Project: SSW 540-3-39
Length: 0.0000 MILES
Project Type: CONSTRUCTION
Limits From: 3 MI S OF FM 2776
Limits To: FM 2776
Project Description: REHABILITATE ROADWAY AND WIDEN SHOULDERS
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

77 Total 0 of 77
BRAZOS  |  FM 974  |  BRYAN  |  0540-03-039  |  1:00 PM JULY 01, 2026  |  $4,315,845.66  |  SSW 540-3-39  |  WIDEN ROAD - ADD SHOULDERS  |  217 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 159.000
REMOV CONC (MOWSTRIP)
SY 18.000
REMOV CONC (DRIVEWAYS)
SY 87.000
RMV (2"-8") TRT/UNTRT BASE & ASPH PAV
SY 144.000
EXCAV (ROADWAY)
CY 11,856.400
EMBANK (FNL)(DC)(TY C)
CY 2,424.900
BACKFILL (TY A OR B)
STA 159.000
FURN & PLACE TOPSOIL (4")
SY 42,397.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 42,397.000
BROADCAST SEED (TEMP_WARM)
SY 21,195.000
BROADCAST SEED (TEMP_COOL)
SY 21,195.000
VEGETATIVE WATERING
TGL 426.000
FL BS (CMP IN PLC)(TY A GR 1-2) (10")
SY 52,999.000
REWORK BS MTL (TY B)(8")(ORD COMP)
SY 42,405.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 211.000
LIME TRT (EXIST MATL)(10")
SY 15,015.000
CEMENT
TON 853.000
CEMENT TRT (EXIST MATL)(10")
SY 60,066.000
ASPH (AC-20-5TR)
GAL 41,335.000
ASPH (RC-250)
GAL 15,018.000
AGGR (TY-PB OR PL, GR-4)(SAC-A)
CY 853.000
AGGR (TY-B OR L, GR-5)
CY 406.000
CUT & RESTORING PAV
SY 17.000
CEM STABIL BKFL
CY 41.000
TRENCH EXCAVATION PROTECTION
LF 43.000
RIPRAP (MOW STRIP)(4 IN)
CY 103.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 4.000
RC PIPE (CL III)(18 IN)
LF 761.000
RC PIPE (CL III)(24 IN)
LF 143.000
RC PIPE (CL III)(36 IN)
LF 48.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 52.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 4.000
CLEAN EXIST CULVERTS
EA 2.000
REMOV STR (SET)
EA 62.000
REMOV STR (PIPE)
LF 54.000
REMOV STR (PIPE)
EA 32.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 218.000
TMA (MOBILE OPERATION)
DAY 15.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,180.000
ROCK FILTER DAMS (REMOVE)
LF 1,180.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,660.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,660.000
DRIVEWAYS (CONC)
SY 87.000
DRIVEWAYS (ACP)
SY 490.000
DRIVEWAYS (SURF TREAT)
SY 2,279.000
TURNOUTS (SURF TREAT)
SY 502.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,350.000
REMOVE METAL BEAM GUARD FENCE
LF 248.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 29.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 71.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000
REMOVE SM RD SN SUP&AM
EA 73.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 12.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 12.000
INSTL OM SM RD SIGN (1-OM-PW)R
EA 4.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 31,796.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 31,796.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,769.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 52.000
RE PM TY II (W) 6" (SLD)
LF 31,436.000
RE PM TY II (W) 24" (SLD)
LF 52.000
RE PM TY II (Y) 6" (BRK)
LF 1,679.000
RE PM TY II (Y) 6" (SLD)
LF 19,841.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 31,436.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 1,679.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 19,841.000
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 15,898.000
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
LF 31,436.000
REFL PAV MRKR TY II-A-A
EA 363.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $12,529.42
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $98,905.42
Total: $111,434.84