PREPARING ROW
|
STA
|
25.500
|
$2,000.000
|
$10,000.000
|
$21,000.000
|
$6,000.000
|
$25,000.000
|
$25,300.000
|
$55,931.210
|
$1,754.460
|
$35,000.000
|
$63,900.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
3,015.000
|
$8.750
|
$4.950
|
$5.750
|
$8.000
|
$1.000
|
$8.000
|
$5.110
|
$7.010
|
$9.000
|
$5.110
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
320.000
|
$6.000
|
$5.290
|
$6.000
|
$7.000
|
$1.000
|
$6.750
|
$7.770
|
$7.310
|
$7.000
|
$8.140
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
144.000
|
$18.500
|
$5.310
|
$6.000
|
$9.000
|
$5.000
|
$9.500
|
$9.370
|
$7.310
|
$7.000
|
$9.650
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
914.000
|
$3.710
|
$3.220
|
$7.310
|
$14.000
|
$1.000
|
$4.000
|
$4.450
|
$9.240
|
$9.000
|
$4.520
|
|
|
REMOVE STAB BS & ASPH PAV (5"-10")
|
SY
|
5,079.000
|
$6.500
|
$4.570
|
$4.000
|
$11.000
|
$1.000
|
$6.000
|
$5.000
|
$10.200
|
$10.000
|
$4.720
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,888.000
|
$6.700
|
$10.870
|
$2.360
|
$18.000
|
$12.000
|
$10.000
|
$8.000
|
$21.740
|
$10.000
|
$4.270
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
14.300
|
$2,000.000
|
$800.000
|
$969.730
|
$1,000.000
|
$2,450.000
|
$525.000
|
$346.940
|
$2,261.150
|
$1,500.000
|
$1,326.510
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
30,229.000
|
$12.250
|
$20.000
|
$10.000
|
$23.000
|
$15.000
|
$45.000
|
$20.000
|
$20.740
|
$20.000
|
$17.370
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
8,768.000
|
$40.000
|
$30.000
|
$40.000
|
$67.000
|
$45.000
|
$50.000
|
$50.000
|
$55.630
|
$60.000
|
$48.530
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
57,242.000
|
$1.400
|
$0.620
|
$0.830
|
$1.000
|
$0.620
|
$0.620
|
$0.620
|
$0.730
|
$0.620
|
$0.930
|
|
|
BLOCK SODDING
|
SY
|
11,538.000
|
$2.700
|
$2.750
|
$2.750
|
$3.000
|
$2.750
|
$4.200
|
$2.750
|
$3.240
|
$2.800
|
$2.750
|
|
|
STRAW OR HAY MULCH
|
SY
|
127,327.000
|
$0.240
|
$0.190
|
$0.190
|
$0.280
|
$0.190
|
$0.190
|
$0.190
|
$0.220
|
$0.200
|
$0.190
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
70,085.000
|
$0.170
|
$0.080
|
$0.080
|
$0.100
|
$0.080
|
$0.080
|
$0.080
|
$0.090
|
$0.100
|
$0.080
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
57,242.000
|
$0.200
|
$0.120
|
$0.120
|
$0.140
|
$0.120
|
$0.120
|
$0.120
|
$0.140
|
$0.120
|
$0.120
|
|
|
FERTILIZER
|
AC
|
28.710
|
$1,402.000
|
$626.730
|
$626.730
|
$700.000
|
$626.730
|
$626.730
|
$626.730
|
$738.000
|
$650.000
|
$626.730
|
|
|
VEGETATIVE WATERING
|
MG
|
3,446.000
|
$20.200
|
$23.610
|
$17.610
|
$10.000
|
$22.000
|
$1.000
|
$21.860
|
$23.250
|
$18.000
|
$21.220
|
|
|
LIME TRT (NEW BASE) (6")
|
SY
|
9,194.240
|
$2.500
|
$8.660
|
$3.100
|
$5.000
|
$5.000
|
$3.500
|
$3.860
|
$6.880
|
$5.000
|
$4.320
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
124.120
|
$210.000
|
$182.310
|
$280.510
|
$196.000
|
$200.000
|
$165.000
|
$184.810
|
$203.390
|
$185.000
|
$212.960
|
|
|
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(12")
|
SY
|
4,639.300
|
$22.400
|
$37.660
|
$20.000
|
$25.000
|
$35.000
|
$33.500
|
$32.810
|
$33.540
|
$35.000
|
$32.270
|
|
|
ASPHALT STAB BASE (GR 2)(PG 70)
|
TON
|
4,430.470
|
$90.000
|
$86.000
|
$90.990
|
$94.000
|
$85.000
|
$86.000
|
$86.400
|
$106.140
|
$92.000
|
$96.250
|
|
|
SALV, HAUL & STKPL RCL APH PV (0 TO 6")
|
SY
|
770.000
|
$3.000
|
$5.000
|
$5.000
|
$5.000
|
$1.000
|
$9.250
|
$2.650
|
$6.170
|
$5.000
|
$2.890
|
|
|
SLV, HAUL & STKPL RCL APH PV (6 TO 12")
|
SY
|
7,465.000
|
$5.600
|
$2.500
|
$5.000
|
$6.300
|
$1.000
|
$6.000
|
$3.260
|
$3.090
|
$3.000
|
$5.250
|
|
|
SALV,HAUL & STKPL RCL APH PV (0 TO 3")
|
SY
|
295.000
|
$7.000
|
$12.000
|
$5.000
|
$4.400
|
$1.000
|
$8.000
|
$4.880
|
$14.810
|
$12.000
|
$5.680
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-22
|
TON
|
1,254.120
|
$82.000
|
$105.000
|
$100.000
|
$116.000
|
$99.000
|
$105.000
|
$105.480
|
$129.590
|
$112.000
|
$129.940
|
|
|
D-GR HMA(SQ) TY-D PG70-22
|
TON
|
1,254.120
|
$84.150
|
$102.000
|
$100.000
|
$106.000
|
$96.000
|
$102.000
|
$102.470
|
$125.890
|
$110.000
|
$122.720
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
2,825.960
|
$6.000
|
$5.250
|
$2.000
|
$5.650
|
$5.000
|
$3.500
|
$2.000
|
$6.100
|
$2.800
|
$5.910
|
|
|
CEM STABIL BKFL
|
CY
|
26.860
|
$68.300
|
$160.000
|
$69.970
|
$50.000
|
$50.000
|
$45.000
|
$32.250
|
$146.830
|
$55.000
|
$50.530
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,838.000
|
$45.000
|
$25.000
|
$37.960
|
$30.000
|
$0.250
|
$21.500
|
$20.080
|
$5.650
|
$50.000
|
$75.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
5,040.000
|
$98.000
|
$30.000
|
$74.240
|
$30.000
|
$20.000
|
$165.000
|
$1.000
|
$56.790
|
$10.000
|
$75.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
128.000
|
$67.000
|
$95.280
|
$160.500
|
$124.000
|
$75.000
|
$75.000
|
$150.000
|
$145.100
|
$120.000
|
$69.500
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
625.000
|
$220.000
|
$184.760
|
$150.000
|
$157.000
|
$140.000
|
$150.000
|
$175.000
|
$189.280
|
$250.000
|
$139.510
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,243.000
|
$237.000
|
$331.670
|
$275.000
|
$247.000
|
$400.000
|
$280.000
|
$350.000
|
$298.280
|
$430.000
|
$264.530
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
1,554.000
|
$390.000
|
$529.950
|
$450.000
|
$427.000
|
$700.000
|
$475.000
|
$750.000
|
$510.570
|
$750.000
|
$498.680
|
|
|
DRILL SHAFT (66 IN)
|
LF
|
666.000
|
$470.000
|
$922.280
|
$550.000
|
$930.000
|
$1,150.000
|
$705.000
|
$900.000
|
$1,167.380
|
$1,100.000
|
$872.040
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
61.000
|
$242.000
|
$331.670
|
$230.000
|
$250.000
|
$230.000
|
$175.000
|
$325.000
|
$303.310
|
$240.000
|
$230.000
|
|
|
CL C CONC (ABUT)
|
CY
|
70.240
|
$895.000
|
$1,200.000
|
$695.740
|
$1,020.000
|
$1,100.000
|
$950.000
|
$1,300.000
|
$1,397.110
|
$1,000.000
|
$1,400.000
|
|
|
CL C CONC (CAP)
|
CY
|
284.000
|
$975.000
|
$1,200.000
|
$1,221.660
|
$920.000
|
$1,550.000
|
$1,200.000
|
$1,500.000
|
$1,585.620
|
$1,000.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
349.100
|
$1,000.000
|
$973.600
|
$1,094.130
|
$770.000
|
$1,200.000
|
$850.000
|
$1,400.000
|
$1,171.000
|
$1,000.000
|
$1,500.000
|
|
|
CL F CONC (CAP)
|
CY
|
96.800
|
$800.000
|
$1,154.090
|
$1,249.110
|
$860.000
|
$1,315.000
|
$1,200.000
|
$2,000.000
|
$970.010
|
$900.000
|
$1,500.000
|
|
|
CL F CONC (COLUMN)
|
CY
|
155.200
|
$800.000
|
$832.750
|
$957.180
|
$718.000
|
$1,175.000
|
$850.000
|
$1,800.000
|
$1,226.680
|
$900.000
|
$1,500.000
|
|
|
CL C CONC (WEBWALL)
|
CY
|
61.300
|
$1,400.000
|
$2,098.920
|
$1,173.560
|
$1,700.000
|
$1,950.000
|
$1,000.000
|
$3,000.000
|
$7,956.240
|
$3,000.000
|
$3,500.000
|
|
|
REINF CONC SLAB
|
SF
|
78,493.000
|
$12.800
|
$17.790
|
$18.000
|
$14.000
|
$20.000
|
$14.500
|
$22.000
|
$24.290
|
$20.000
|
$24.500
|
|
|
APPROACH SLAB
|
CY
|
74.800
|
$411.630
|
$743.500
|
$861.840
|
$540.000
|
$650.000
|
$400.000
|
$510.390
|
$496.380
|
$480.000
|
$900.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
3,241.000
|
$13.000
|
$15.000
|
$19.040
|
$13.000
|
$15.000
|
$14.000
|
$10.320
|
$27.670
|
$16.000
|
$25.470
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
7,474.890
|
$132.250
|
$128.110
|
$197.070
|
$159.000
|
$175.000
|
$125.000
|
$125.050
|
$163.570
|
$150.000
|
$190.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
3,034.640
|
$179.250
|
$164.950
|
$222.430
|
$232.000
|
$175.000
|
$140.000
|
$141.140
|
$223.860
|
$170.000
|
$201.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
140.100
|
$425.500
|
$388.150
|
$491.090
|
$470.000
|
$575.000
|
$750.000
|
$450.000
|
$658.100
|
$500.000
|
$450.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
46.000
|
$425.000
|
$429.350
|
$545.660
|
$470.000
|
$575.000
|
$750.000
|
$750.000
|
$737.350
|
$500.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
27.800
|
$566.000
|
$517.320
|
$491.090
|
$700.000
|
$600.000
|
$530.000
|
$450.000
|
$879.600
|
$500.000
|
$450.000
|
|
|
RAIL (TY T223)
|
LF
|
3,450.000
|
$91.800
|
$105.000
|
$87.390
|
$90.000
|
$115.000
|
$81.000
|
$120.850
|
$103.950
|
$75.000
|
$72.930
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
276.000
|
$121.470
|
$85.000
|
$156.910
|
$94.000
|
$125.000
|
$102.000
|
$117.170
|
$225.040
|
$100.000
|
$114.070
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
28.000
|
$104.250
|
$90.000
|
$160.390
|
$110.000
|
$125.000
|
$80.000
|
$76.530
|
$169.400
|
$120.000
|
$102.160
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
23.000
|
$134.600
|
$100.000
|
$205.180
|
$125.000
|
$175.000
|
$90.000
|
$69.440
|
$212.630
|
$120.000
|
$141.050
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,270.000
|
$1,766.180
|
$2,990.670
|
$930.000
|
$1,300.000
|
$1,500.000
|
$2,661.710
|
$1,892.320
|
$2,700.000
|
$1,313.090
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,150.000
|
$3,750.000
|
$2,057.950
|
$1,015.000
|
$1,450.000
|
$1,900.000
|
$2,736.710
|
$2,086.660
|
$3,300.000
|
$1,403.980
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (P)
|
EA
|
4.000
|
$2,561.000
|
$3,750.000
|
$3,214.870
|
$2,030.000
|
$1,750.000
|
$2,700.000
|
$3,466.710
|
$2,055.980
|
$3,300.000
|
$2,402.460
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,032.000
|
$2,764.060
|
$3,579.380
|
$2,300.000
|
$2,500.000
|
$3,600.000
|
$3,696.710
|
$2,603.160
|
$4,700.000
|
$2,679.190
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$3,255.000
|
$2,697.400
|
$4,007.290
|
$2,600.000
|
$3,250.000
|
$3,500.000
|
$3,966.710
|
$3,375.340
|
$5,200.000
|
$3,184.600
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$3,805.000
|
$4,393.610
|
$6,025.620
|
$3,300.000
|
$4,250.000
|
$4,475.000
|
$4,576.710
|
$4,474.800
|
$8,100.000
|
$3,918.540
|
|
|
REMOV STR (PIPE)
|
LF
|
23.000
|
$33.600
|
$18.600
|
$30.740
|
$21.000
|
$50.000
|
$25.000
|
$35.940
|
$33.610
|
$30.000
|
$53.150
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$350,000.000
|
$780,000.000
|
$877,040.000
|
$850,000.000
|
$750,000.000
|
$500,000.000
|
$549,853.030
|
$839,917.950
|
$1,150,000.000
|
$785,236.690
|
|
|
REMOV STR (DOLPHIN AND FENDER SYS)
|
EA
|
1.000
|
$250,000.000
|
$40,000.000
|
$25,000.000
|
$250,000.000
|
$125,000.000
|
$125,000.000
|
$99,422.500
|
$120,932.260
|
$600,000.000
|
$69,555.870
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,034,060.000
|
$1,200,000.000
|
$1,271,047.470
|
$1,300,000.000
|
$1,250,000.000
|
$1,400,000.000
|
$1,377,965.000
|
$1,377,733.350
|
$1,600,000.000
|
$1,631,300.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$6,500.000
|
$1,245.000
|
$1,347.690
|
$1,500.000
|
$9,000.000
|
$31,000.000
|
$3,604.750
|
$7,539.360
|
$2,000.000
|
$7,243.460
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
290.000
|
$34.400
|
$32.860
|
$32.860
|
$37.000
|
$32.860
|
$30.000
|
$20.000
|
$102.840
|
$45.000
|
$32.860
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
290.000
|
$11.400
|
$8.560
|
$8.650
|
$10.000
|
$8.560
|
$8.000
|
$8.000
|
$20.270
|
$9.000
|
$8.560
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
800.000
|
$32.900
|
$29.960
|
$29.960
|
$33.000
|
$29.960
|
$20.000
|
$20.000
|
$57.860
|
$40.000
|
$29.960
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
800.000
|
$11.400
|
$8.940
|
$8.940
|
$10.000
|
$8.940
|
$8.000
|
$8.000
|
$12.800
|
$10.000
|
$8.940
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
550.000
|
$7.000
|
$6.000
|
$1.290
|
$1.000
|
$8.360
|
$6.000
|
$1.400
|
$19.480
|
$15.000
|
$4.480
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,425.000
|
$2.320
|
$4.520
|
$4.520
|
$5.000
|
$4.520
|
$3.000
|
$1.200
|
$9.320
|
$6.000
|
$4.520
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,425.000
|
$1.750
|
$0.620
|
$0.620
|
$1.000
|
$0.620
|
$1.000
|
$0.600
|
$2.660
|
$0.700
|
$0.620
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
265.000
|
$7.650
|
$4.890
|
$4.890
|
$7.000
|
$4.890
|
$4.000
|
$4.000
|
$17.720
|
$6.500
|
$4.890
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
265.000
|
$1.950
|
$0.620
|
$0.620
|
$1.000
|
$0.620
|
$1.000
|
$1.250
|
$2.200
|
$0.600
|
$0.620
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,440.000
|
$15.650
|
$5.530
|
$27.050
|
$20.000
|
$13.000
|
$12.000
|
$8.240
|
$25.380
|
$20.000
|
$8.920
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,620.000
|
$11.450
|
$3.370
|
$4.190
|
$10.000
|
$6.500
|
$7.500
|
$5.240
|
$11.110
|
$8.000
|
$9.190
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,440.000
|
$11.150
|
$7.000
|
$14.420
|
$22.000
|
$10.000
|
$12.000
|
$14.050
|
$18.610
|
$6.000
|
$8.920
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,096.000
|
$54.000
|
$37.380
|
$16.930
|
$20.000
|
$45.000
|
$50.000
|
$16.070
|
$66.200
|
$17.000
|
$69.160
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
311.000
|
$26.650
|
$21.060
|
$21.060
|
$21.000
|
$20.000
|
$24.000
|
$29.480
|
$23.330
|
$30.000
|
$21.060
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,026.000
|
$1,650.000
|
$1,650.000
|
$2,400.000
|
$1,650.000
|
$1,515.000
|
$1,539.000
|
$1,924.720
|
$1,600.000
|
$1,650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
856.000
|
$3.600
|
$2.280
|
$2.280
|
$1.000
|
$3.000
|
$1.250
|
$1.500
|
$3.500
|
$2.000
|
$2.280
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,010.000
|
$2,690.000
|
$2,690.000
|
$2,900.000
|
$2,100.000
|
$2,670.000
|
$2,625.000
|
$2,449.640
|
$2,700.000
|
$2,690.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$3,000.000
|
$1,515.000
|
$2,354.500
|
$1,600.000
|
$2,600.000
|
$1,601.930
|
$1,515.000
|
$4,479.370
|
$2,500.000
|
$2,600.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,033.000
|
$814.000
|
$1,074.570
|
$1,100.000
|
$1,200.000
|
$1,178.880
|
$814.000
|
$1,399.790
|
$1,100.000
|
$1,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$25,000.000
|
$22,545.000
|
$22,838.960
|
$18,000.000
|
$23,000.000
|
$26,733.300
|
$22,545.000
|
$27,988.200
|
$32,000.000
|
$23,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
4.000
|
$237.000
|
$260.000
|
$260.000
|
$280.000
|
$200.000
|
$250.000
|
$280.000
|
$235.510
|
$500.000
|
$260.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$450.000
|
$420.000
|
$420.000
|
$445.000
|
$350.000
|
$425.000
|
$505.000
|
$412.130
|
$150.000
|
$420.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,229.000
|
$8.650
|
$7.000
|
$9.000
|
$9.700
|
$9.000
|
$9.250
|
$10.000
|
$10.460
|
$10.000
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (2") (CONC ENCSE)
|
LF
|
3,080.000
|
$10.000
|
$7.500
|
$8.250
|
$9.400
|
$8.250
|
$8.000
|
$10.000
|
$9.590
|
$9.000
|
$8.250
|
|
|
CONDT (RM) (3/4")
|
LF
|
360.000
|
$16.300
|
$18.000
|
$20.000
|
$21.500
|
$20.000
|
$10.000
|
$10.000
|
$23.240
|
$22.000
|
$20.000
|
|
|
CONDT (RM) (2")
|
LF
|
40.000
|
$57.300
|
$35.000
|
$25.000
|
$27.000
|
$25.000
|
$31.000
|
$10.000
|
$29.060
|
$28.000
|
$25.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,064.000
|
$0.940
|
$1.350
|
$1.500
|
$1.650
|
$1.500
|
$1.250
|
$1.300
|
$1.740
|
$2.000
|
$1.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,696.000
|
$1.350
|
$1.450
|
$2.100
|
$2.250
|
$2.100
|
$1.300
|
$1.500
|
$2.440
|
$2.200
|
$2.100
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
165.000
|
$2.350
|
$1.790
|
$1.900
|
$2.000
|
$1.900
|
$1.500
|
$1.700
|
$2.210
|
$2.000
|
$1.900
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
330.000
|
$2.800
|
$1.950
|
$2.000
|
$2.150
|
$2.000
|
$1.600
|
$1.900
|
$2.320
|
$5.500
|
$2.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
740.000
|
$2.250
|
$2.080
|
$2.200
|
$2.350
|
$2.200
|
$2.050
|
$2.000
|
$2.560
|
$2.300
|
$2.200
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,068.000
|
$800.000
|
$950.000
|
$1,020.000
|
$950.000
|
$1,010.000
|
$750.000
|
$1,104.120
|
$1,000.000
|
$950.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$281.000
|
$300.000
|
$120.000
|
$130.000
|
$120.000
|
$200.000
|
$200.000
|
$139.470
|
$125.000
|
$120.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$353.000
|
$500.000
|
$500.000
|
$540.000
|
$500.000
|
$480.000
|
$200.000
|
$581.110
|
$600.000
|
$500.000
|
|
|
ELC SRV TY A 240/480 100(SS)SS(E)GC(U)
|
EA
|
1.000
|
$5,815.000
|
$5,425.000
|
$5,565.000
|
$6,000.000
|
$5,565.000
|
$6,000.000
|
$5,200.000
|
$6,467.800
|
$7,500.000
|
$5,565.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$3,568.000
|
$4,250.000
|
$3,800.000
|
$4,200.000
|
$3,800.000
|
$3,600.000
|
$4,000.000
|
$4,416.460
|
$5,000.000
|
$3,800.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
36.000
|
$49.150
|
$23.450
|
$23.450
|
$15.000
|
$40.000
|
$21.000
|
$17.000
|
$28.650
|
$22.000
|
$23.450
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$485.090
|
$1,060.000
|
$1,060.000
|
$475.000
|
$515.000
|
$395.000
|
$800.000
|
$942.030
|
$500.000
|
$1,060.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$760.000
|
$485.000
|
$485.000
|
$580.000
|
$540.000
|
$530.000
|
$570.000
|
$671.200
|
$500.000
|
$485.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$700.000
|
$710.000
|
$710.000
|
$635.000
|
$715.000
|
$595.000
|
$810.000
|
$953.800
|
$700.000
|
$710.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$131.550
|
$75.000
|
$75.000
|
$84.000
|
$60.000
|
$125.000
|
$75.000
|
$88.320
|
$50.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
42.000
|
$47.900
|
$25.000
|
$25.000
|
$25.000
|
$25.000
|
$20.000
|
$21.000
|
$24.730
|
$16.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$39.600
|
$25.000
|
$25.000
|
$31.000
|
$25.000
|
$35.000
|
$32.000
|
$37.680
|
$30.000
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,575.000
|
$1.100
|
$0.640
|
$0.640
|
$1.100
|
$0.600
|
$1.100
|
$0.600
|
$0.700
|
$0.700
|
$0.640
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,380.000
|
$1.100
|
$0.640
|
$0.640
|
$1.100
|
$0.600
|
$1.100
|
$0.600
|
$0.700
|
$0.700
|
$0.640
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
100.000
|
$6.350
|
$5.000
|
$5.000
|
$6.400
|
$5.260
|
$4.500
|
$5.260
|
$6.110
|
$5.300
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,335.000
|
$1.140
|
$0.450
|
$0.450
|
$0.400
|
$0.350
|
$0.580
|
$0.350
|
$0.410
|
$0.400
|
$0.450
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
7,885.000
|
$0.750
|
$0.490
|
$0.490
|
$0.500
|
$0.500
|
$0.730
|
$0.500
|
$0.580
|
$0.550
|
$0.490
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
80.000
|
$0.400
|
$0.570
|
$0.570
|
$0.400
|
$0.400
|
$6.250
|
$0.400
|
$0.460
|
$0.450
|
$0.570
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,370.000
|
$1.100
|
$0.570
|
$0.570
|
$0.400
|
$0.350
|
$0.600
|
$0.350
|
$0.410
|
$0.380
|
$0.570
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
370.000
|
$0.450
|
$0.600
|
$0.600
|
$0.500
|
$0.500
|
$1.350
|
$0.500
|
$0.580
|
$0.550
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
6,675.000
|
$0.450
|
$0.550
|
$0.550
|
$0.500
|
$0.500
|
$0.730
|
$0.500
|
$0.580
|
$0.550
|
$0.550
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
107.000
|
$4.870
|
$3.500
|
$3.500
|
$4.250
|
$4.000
|
$7.100
|
$4.000
|
$4.650
|
$4.000
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
17,395.000
|
$0.550
|
$0.300
|
$0.300
|
$0.380
|
$0.300
|
$0.380
|
$0.300
|
$0.350
|
$0.320
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
22,740.000
|
$0.120
|
$0.100
|
$0.100
|
$0.010
|
$0.040
|
$0.070
|
$0.040
|
$0.050
|
$0.050
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
14,930.000
|
$0.100
|
$0.200
|
$0.200
|
$0.020
|
$0.060
|
$0.100
|
$0.060
|
$0.070
|
$0.070
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
100.000
|
$0.500
|
$1.000
|
$1.000
|
$0.110
|
$0.240
|
$5.000
|
$0.240
|
$0.280
|
$0.250
|
$1.000
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
2.000
|
$9,400.000
|
$4,650.000
|
$4,950.000
|
$5,300.000
|
$4,950.000
|
$26,500.000
|
$7,000.000
|
$5,753.030
|
$6,500.000
|
$4,950.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$3,375.000
|
$1,900.000
|
$1,450.000
|
$1,600.000
|
$1,450.000
|
$2,990.000
|
$2,500.000
|
$1,685.230
|
$2,000.000
|
$1,450.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$50,000.000
|
$21,000.000
|
$4,850.000
|
$5,100.000
|
$4,850.000
|
$28,000.000
|
$5,000.000
|
$5,636.800
|
$10,000.000
|
$4,850.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$185.570
|
$200.000
|
$220.000
|
$235.000
|
$220.000
|
$200.000
|
$150.000
|
$255.690
|
$225.000
|
$220.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$188.000
|
$200.000
|
$220.000
|
$235.000
|
$220.000
|
$200.000
|
$150.000
|
$255.690
|
$225.000
|
$220.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
16.000
|
$68.000
|
$75.000
|
$25.000
|
$27.000
|
$25.000
|
$75.000
|
$60.000
|
$29.060
|
$26.000
|
$25.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
810.000
|
$2.550
|
$2.150
|
$2.100
|
$2.300
|
$2.100
|
$2.000
|
$2.000
|
$2.440
|
$2.200
|
$2.100
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
4.000
|
$4,482.850
|
$6,750.000
|
$5,700.000
|
$6,000.000
|
$5,700.000
|
$5,750.000
|
$6,000.000
|
$6,624.700
|
$5,800.000
|
$5,700.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$2,070.000
|
$1,989.420
|
$1,905.790
|
$2,500.000
|
$2,750.000
|
$500.000
|
$2,500.000
|
$4,395.860
|
$2,500.000
|
$1,347.430
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$1,270.000
|
$1,673.910
|
$1,111.340
|
$2,400.000
|
$1,750.000
|
$500.000
|
$1,500.000
|
$8,867.690
|
$1,500.000
|
$1,397.200
|
|
|
DOLPHIN AND FENDER SYSTEM
|
LS
|
1.000
|
$900,000.000
|
$250,986.700
|
$164,029.890
|
$1,050,000.000
|
$300,000.000
|
$600,000.000
|
$644,259.540
|
$607,983.830
|
$1,000,000.000
|
$428,070.140
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
32.000
|
$27.000
|
$120.000
|
$24.380
|
$85.000
|
$400.000
|
$250.000
|
$1,200.000
|
$102.980
|
$125.000
|
$120.320
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$109.000
|
$250.000
|
$253.870
|
$150.000
|
$475.000
|
$250.000
|
$1,200.000
|
$247.690
|
$200.000
|
$592.890
|
|
|
INSTALL LED NAVIGATIONAL LIGHTS SYS
|
EA
|
1.000
|
$35,000.000
|
$37,950.000
|
$39,600.000
|
$43,000.000
|
$39,600.000
|
$3,500.000
|
$40,000.000
|
$46,024.200
|
$60,000.000
|
$39,600.000
|
|
|
REMOVE LED NAVIGATIONAL LIGHT SYS
|
EA
|
1.000
|
$5,000.000
|
$3,800.000
|
$2,500.000
|
$2,700.000
|
$2,500.000
|
$1,000.000
|
$2,000.000
|
$2,905.560
|
$2,800.000
|
$2,500.000
|
|
Totals: |
$11,460,495.882
|
$12,141,991.657
|
$12,684,974.745
|
$13,281,190.294
|
$13,838,081.728
|
$13,989,653.938
|
$14,859,389.335
|
$15,254,418.312
|
$16,185,965.248
|
$16,243,054.920
|