Show Job Controls
Bid Cobra

BRAZORIA SH 288 (0598-02-118)

Items: 66

County: BRAZORIA
Length: N/A
Highway: SH 288
District: HOUSTON
Control Number: 0598-02-118
DBE Goal: N/A
Project: C 598-2-118
Guaranty: N/A
Time: 183 WORKING DAYS
Engineer's Estimate: $11,074,795.78
Date: 03/04/2021 (5 years ago)
Contract Number: N/A
Type: MILL, SEAL COAT AND 1.5 IN PFC OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$11,074,795.78
$9,211,640.25
Over/Under Est: -16.82% -$1,863,155.53
Over/Under Est: -10.22% -$1,131,791.46
Amt Left: 7.94% $731,364.07
Over/Under Est: -0.56% -$61,632.96
Amt Left: 19.56% $1,801,522.57
Delta: -10.76% -$1,070,158.50
$11,439,307.68
Over/Under Est: 3.29% $364,511.90
Amt Left: 24.18% $2,227,667.43
Delta: -3.87% -$426,144.86

Bid Items & Bid Tabulations

66 Total 0 of 66
BRAZORIA  |  SH 288  |  HOUSTON  |  0598-02-118  |  03/04/2021  |  $11,074,795.78  |  C 598-2-118  |  MILL, SEAL COAT AND 1.5 IN PFC OVERL...  |  183 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
ANGEL BROTHERS HOLDINGS CORP.
JAMES CONSTRUCTION GROUP, LLC
VULCAN CONSTRUCTION
REMOVING CONC (RIPRAP)
SY 276.000 $5.000 $15.000 $8.000 $8.500 $16.690
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 2,086.000 $10.330 $19.000 $6.000 $7.750 $3.480
BACKFILL (TY B)
STA 982.030 $165.000 $75.000 $50.000 $88.500 $164.170
ASPH (A-R TYPE II OR III)
GAL 254,301.000 $3.280 $2.880 $3.000 $5.070 $3.740
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 3,699.000 $128.660 $90.000 $110.000 $125.000 $155.100
D-GR HMA(SQ) TY-D PG76-22
TON 1,006.000 $105.000 $110.000 $152.000 $86.000 $135.670
TACK COAT
GAL 27,743.000 $3.750 $2.000 $2.100 $1.750 $3.140
PFC (ASPHALT) PG76-22
TON 2,219.000 $105.000 $108.000 $111.000 $114.000 $112.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 31,905.000 $110.000 $108.000 $111.000 $114.000 $112.000
TOM (ASPHALT) PG 76-22
TON 1,921.000 $129.000 $103.000 $110.000 $110.000 $120.410
TOM - F (AGGREGATE) SAC - A
TON 25,514.000 $119.240 $103.000 $110.000 $110.000 $120.410
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
SY 400.000 $22.000 $37.000 $40.000 $40.000 $51.810
PLANE ASPH CONC PAV (2 1/2")
SY 462,367.000 $1.300 $0.350 $1.050 $1.300 $1.460
PLANE ASPH CONC PAV (0"- 2 1/2")
SY 13,864.000 $5.000 $0.350 $4.900 $2.700 $3.480
PAV JT UNDERSEAL (24")
LF 1,008.000 $18.000 $20.000 $31.500 $30.000 $32.070
FULL - DEPTH REPAIR CRCP (10")
SY 200.000 $175.000 $400.000 $490.000 $465.000 $213.800
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 20.000 $225.000 $450.000 $735.000 $700.000 $32.070
CONC STR REPAIR (STANDARD)
SF 12.000 $360.000 $450.000 $630.000 $600.000 $641.390
RIPRAP (MOW STRIP)(4 IN)
CY 289.000 $500.000 $650.000 $1.000 $416.000 $523.800
CLEANING AND SEALING EXISTING JOINTS
LF 1,008.000 $22.000 $18.000 $19.000 $18.000 $19.240
MOBILIZATION
LS 1.000 $525,637.830 $100,000.000 $58,000.000 $390,000.000 $381,496.160
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,500.000 $5,000.000 $1,520.000 $4,800.000 $28,564.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,000.000 $21.550 $20.000 $53.000 $18.130 $20.850
MTL THRIE-BEAM GD FEN (TIM POST)
EA 24.000 $1,949.220 $2,200.000 $1,575.000 $1,611.220 $1,443.130
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 13.000 $770.000 $1,000.000 $525.000 $882.140 $769.670
REMOVE METAL BEAM GUARD FENCE
LF 4,975.000 $3.000 $1.500 $1.200 $1.010 $1.070
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $205.480 $100.000 $185.000 $75.530 $106.900
GUARDRAIL END TREATMENT (INSTALL)
EA 24.000 $2,665.000 $2,600.000 $2,625.000 $2,416.830 $2,351.770
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $355.000 $175.000 $290.000 $151.050 $106.900
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $525.000 $500.000 $435.000 $395.000 $482.090
REMOVE SM RD SN SUP&AM
EA 5.000 $90.000 $100.000 $80.000 $50.000 $64.140
INSTL OM ASSM (OM-2Y)(WC)GND
EA 24.000 $60.000 $100.000 $52.500 $55.000 $69.480
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 72.000 $25.000 $30.000 $37.000 $25.000 $19.240
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 99,600.000 $0.290 $0.130 $0.260 $0.200 $0.140
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 11,520.000 $0.480 $0.130 $0.370 $0.240 $0.140
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 399,284.000 $0.250 $0.130 $0.210 $0.180 $0.140
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 59,812.000 $0.450 $0.180 $0.320 $0.400 $0.190
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 5,524.000 $0.960 $1.450 $0.600 $0.750 $1.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 428.000 $2.270 $2.900 $0.700 $2.000 $3.100
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 96.000 $52.660 $85.000 $37.000 $40.000 $90.860
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 96.000 $64.500 $85.000 $42.000 $40.000 $90.860
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 364,880.000 $0.250 $0.140 $0.210 $0.180 $0.150
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,880.000 $1.250 $0.550 $0.500 $1.000 $0.590
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 540.000 $1.300 $0.950 $0.650 $1.500 $1.020
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 14,953.000 $1.200 $0.750 $0.650 $0.750 $0.800
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,381.000 $3.150 $2.350 $2.100 $3.000 $2.510
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 107.000 $6.400 $4.750 $3.150 $8.000 $5.080
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 24,900.000 $0.700 $0.650 $0.500 $0.500 $0.690
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 24,900.000 $0.700 $0.520 $0.420 $0.500 $0.560
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 65,785.000 $0.500 $0.500 $0.370 $0.400 $0.530
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 60,215.000 $0.500 $0.520 $0.370 $0.400 $0.560
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 99,821.000 $0.750 $0.750 $0.780 $0.700 $0.800
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 91,220.000 $0.750 $0.750 $0.780 $0.700 $0.800
PREFAB PAV MRK TY C (W) (ARROW)
EA 24.000 $230.000 $175.000 $195.000 $175.000 $187.070
PREFAB PAV MRK TY C (W) (WORD)
EA 24.000 $270.000 $230.000 $235.000 $175.000 $245.870
REFL PAV MRKR TY II-C-R
EA 2,160.000 $4.450 $3.950 $2.950 $4.000 $4.220
PAV SURF PREP FOR MRK (6")
LF 243,721.000 $0.050 $0.020 $0.010 $0.040 $0.020
PAV SURF PREP FOR MRK (8")
LF 15,493.000 $0.100 $0.040 $0.010 $0.080 $0.040
PAV SURF PREP FOR MRK (12")
LF 481.000 $0.200 $0.200 $0.020 $0.150 $0.210
PAV SURF PREP FOR MRK (24")
LF 107.000 $1.000 $0.450 $0.050 $0.250 $0.480
PAV SURF PREP FOR MRK (ARROW)
EA 24.000 $10.000 $15.000 $3.150 $5.000 $16.030
PAV SURF PREP FOR MRK (WORD)
EA 24.000 $10.000 $15.000 $3.150 $5.000 $16.030
CONCRETE RAIL REPAIR (IN-KIND)
LF 20.000 $600.000 $700.000 $515.000 $1,400.000 $748.290
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 366.000 $65.000 $75.000 $160.000 $37.330 $43.740
TMA (STATIONARY)
DAY 168.000 $175.000 $75.000 $160.000 $227.500 $309.890
TMA (MOBILE OPERATION)
DAY 45.000 $250.000 $100.000 $450.000 $578.000 $80.170
Totals: $11,074,795.780 $9,211,640.250 $9,943,004.320 $11,013,162.825 $11,439,307.685