PREPARING ROW
|
STA
|
297.000
|
$1,500.000
|
$1,000.000
|
$450.000
|
$350.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
14.000
|
$45.000
|
$70.000
|
$97.000
|
$50.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
345.000
|
$30.000
|
$16.000
|
$27.000
|
$22.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
3,781.000
|
$13.500
|
$15.000
|
$17.500
|
$12.500
|
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
65.620
|
$2,000.000
|
$1,500.000
|
$3,515.000
|
$330.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
31,236.000
|
$13.500
|
$15.000
|
$15.000
|
$11.500
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
120.000
|
$27.000
|
$23.000
|
$20.000
|
$42.000
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
22,217.000
|
$16.000
|
$15.000
|
$14.000
|
$22.500
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
242,719.000
|
$1.650
|
$0.500
|
$0.150
|
$0.800
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
242,719.000
|
$0.200
|
$0.200
|
$0.280
|
$0.150
|
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
242,719.000
|
$0.200
|
$0.150
|
$0.260
|
$0.120
|
|
|
|
VEGETATIVE WATERING
|
MG
|
3,813.000
|
$25.000
|
$10.000
|
$1.000
|
$0.010
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
242,719.000
|
$1.500
|
$0.820
|
$1.110
|
$0.800
|
|
|
|
PROOF ROLLING
|
HR
|
24.000
|
$125.000
|
$150.000
|
$95.000
|
$120.000
|
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
34,423.000
|
$56.000
|
$70.000
|
$56.300
|
$63.700
|
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
45,797.000
|
$2.750
|
$3.500
|
$3.000
|
$5.670
|
|
|
|
CEMENT
|
TON
|
1,863.000
|
$265.000
|
$300.000
|
$270.000
|
$290.000
|
|
|
|
CEM TRT (MX EXT MTL/NW BASE)(DC)(10")
|
SY
|
149,225.000
|
$4.500
|
$3.500
|
$2.150
|
$2.500
|
|
|
|
PRIME COAT (MS-2)
|
GAL
|
30,188.000
|
$8.000
|
$4.000
|
$4.190
|
$5.900
|
|
|
|
ASPH (CRS-2)
|
GAL
|
66,953.000
|
$5.500
|
$3.500
|
$4.200
|
$4.100
|
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
1,063.000
|
$245.000
|
$135.000
|
$185.000
|
$160.000
|
|
|
|
PLANE ASPH CONC PAV(MICRO)(0"-3")
|
SY
|
1,310.000
|
$5.500
|
$5.250
|
$4.150
|
$9.200
|
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
26.420
|
$75.000
|
$50.000
|
$180.000
|
$45.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
673.000
|
$175.000
|
$200.000
|
$275.000
|
$310.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
110.000
|
$212.500
|
$100.000
|
$50.000
|
$150.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
172.000
|
$125.000
|
$150.000
|
$50.000
|
$125.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
751.000
|
$30.000
|
$5.000
|
$11.800
|
$10.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,227.000
|
$35.000
|
$35.000
|
$27.100
|
$60.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
120.000
|
$230.000
|
$330.000
|
$350.000
|
$295.000
|
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
3.000
|
$690.000
|
$1,000.000
|
$707.000
|
$600.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
36.000
|
$560.000
|
$650.000
|
$562.000
|
$750.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
53.000
|
$225.000
|
$150.000
|
$260.350
|
$350.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
120.000
|
$265.000
|
$170.000
|
$241.500
|
$300.000
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
120.000
|
$220.000
|
$200.000
|
$241.500
|
$300.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
77.000
|
$450.000
|
$650.000
|
$571.350
|
$800.000
|
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
26.420
|
$51.000
|
$92.000
|
$76.600
|
$65.000
|
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
105.670
|
$50.000
|
$75.000
|
$53.000
|
$45.000
|
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
270.000
|
$180.000
|
$350.000
|
$418.500
|
$200.000
|
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
276.000
|
$690.000
|
$450.000
|
$620.000
|
$575.000
|
|
|
|
CONC BOX CULV (9 FT X 5 FT)
|
LF
|
65.000
|
$850.000
|
$900.000
|
$1,368.000
|
$1,050.000
|
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
26.000
|
$565.000
|
$935.000
|
$750.000
|
$1,540.000
|
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
112.000
|
$610.000
|
$450.000
|
$564.300
|
$480.000
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
298.000
|
$85.000
|
$142.000
|
$110.750
|
$63.000
|
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
396.000
|
$110.000
|
$168.000
|
$143.750
|
$95.000
|
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
232.000
|
$145.000
|
$230.000
|
$221.500
|
$180.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$5,165.000
|
$4,700.000
|
$7,920.000
|
$12,000.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$6,905.000
|
$6,200.000
|
$8,158.000
|
$15,000.000
|
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
1.000
|
$7,850.000
|
$10,300.000
|
$9,990.000
|
$8,500.000
|
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
1.000
|
$17,020.000
|
$12,700.000
|
$13,066.000
|
$16,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
4.000
|
$21,025.000
|
$15,000.000
|
$14,824.000
|
$24,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$26,205.000
|
$21,000.000
|
$16,176.000
|
$35,000.000
|
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$31,375.000
|
$28,200.000
|
$18,327.000
|
$45,000.000
|
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
2.000
|
$13,225.000
|
$7,000.000
|
$14,994.000
|
$18,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$10,160.000
|
$11,500.000
|
$14,287.000
|
$16,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
1.000
|
$15,100.000
|
$13,000.000
|
$14,912.000
|
$20,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,050.000
|
$800.000
|
$1,095.000
|
$890.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$1,160.000
|
$850.000
|
$1,183.000
|
$1,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
62.000
|
$1,440.000
|
$1,100.000
|
$1,499.000
|
$1,290.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$1,340.000
|
$1,300.000
|
$1,526.000
|
$1,310.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,190.000
|
$1,500.000
|
$1,807.000
|
$1,645.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,200.000
|
$2,500.000
|
$2,690.000
|
$2,585.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$2,630.000
|
$2,500.000
|
$3,200.000
|
$2,960.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$3,250.000
|
$2,300.000
|
$2,349.000
|
$4,000.000
|
|
|
|
REMOV STR (WINGWALL)
|
EA
|
7.000
|
$2,300.000
|
$1,500.000
|
$1,509.000
|
$1,500.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
27.000
|
$1,500.000
|
$1,000.000
|
$1,509.000
|
$1,200.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
1,288.000
|
$1,050.000
|
$16.000
|
$11.800
|
$15.000
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
49.000
|
$120.000
|
$120.000
|
$301.000
|
$125.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$524,143.290
|
$1,311,000.000
|
$1,229,210.000
|
$1,100,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$6,000.000
|
$5,550.000
|
$26,590.000
|
$7,275.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
8,447.000
|
$26.000
|
$35.000
|
$35.000
|
$50.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
8,447.000
|
$8.000
|
$7.500
|
$10.000
|
$10.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,933.000
|
$3.050
|
$4.000
|
$6.200
|
$3.850
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,933.000
|
$1.000
|
$0.750
|
$1.000
|
$1.000
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,083.000
|
$70.000
|
$95.000
|
$65.000
|
$80.000
|
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
2,580.000
|
$30.000
|
$18.500
|
$35.000
|
$19.500
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,580.000
|
$15.000
|
$12.500
|
$33.000
|
$14.000
|
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
2,580.000
|
$23.000
|
$18.000
|
$29.000
|
$19.000
|
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
2,970.000
|
$30.000
|
$45.000
|
$52.250
|
$95.000
|
|
|
|
DRIVEWAYS (CONC)(TYPE 1)
|
SY
|
345.000
|
$110.000
|
$120.000
|
$139.000
|
$145.000
|
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
811.000
|
$51.000
|
$60.000
|
$80.800
|
$160.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
59,928.000
|
$0.600
|
$0.220
|
$0.070
|
$0.150
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
29,242.000
|
$2.000
|
$0.220
|
$0.110
|
$0.200
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,275.000
|
$32.000
|
$35.000
|
$33.650
|
$26.750
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,500.000
|
$3,500.000
|
$4,904.500
|
$2,275.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$2.250
|
$6.000
|
$5.900
|
$2.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$4,125.000
|
$4,000.000
|
$4,082.000
|
$2,775.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$285.000
|
$550.000
|
$559.000
|
$250.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,200.000
|
$1,500.000
|
$2,300.000
|
$2,200.000
|
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
6.000
|
$1,700.000
|
$1,300.000
|
$1,455.000
|
$1,200.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,500.000
|
$10,500.000
|
$10,545.000
|
$8,000.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
5.000
|
$635.000
|
$495.000
|
$530.000
|
$500.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
17.000
|
$300.000
|
$305.000
|
$325.000
|
$300.000
|
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
4.000
|
$360.000
|
$350.000
|
$380.000
|
$300.000
|
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
12.000
|
$3,850.000
|
$5,500.000
|
$5,772.550
|
$4,900.000
|
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
2,213.000
|
$18.000
|
$28.000
|
$30.650
|
$26.000
|
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
344.000
|
$30.000
|
$75.000
|
$84.850
|
$72.000
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,557.000
|
$1.650
|
$3.500
|
$3.500
|
$3.000
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
5,164.000
|
$1.800
|
$5.000
|
$4.700
|
$4.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$985.000
|
$2,000.000
|
$2,240.000
|
$1,900.000
|
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,150.000
|
$8,200.000
|
$9,306.000
|
$7,900.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$650.000
|
$880.000
|
$942.000
|
$750.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
|
EA
|
2.000
|
$1,030.000
|
$900.000
|
$1,030.000
|
$900.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$1,115.000
|
$880.000
|
$942.000
|
$800.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
2.000
|
$1,300.000
|
$1,050.000
|
$1,120.000
|
$1,200.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,400.000
|
$1,300.000
|
$1,415.000
|
$1,350.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$2,350.000
|
$1,980.000
|
$2,120.000
|
$1,750.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
57.000
|
$550.000
|
$435.000
|
$471.250
|
$550.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
5.000
|
$620.000
|
$500.000
|
$530.000
|
$675.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
31.000
|
$150.000
|
$110.000
|
$118.000
|
$200.000
|
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
26.000
|
$185.000
|
$300.000
|
$500.000
|
$200.000
|
|
|
|
ISRSA TY10BWG(1)SA(T) (EXCLUDING SIGN)
|
EA
|
6.000
|
$2,015.000
|
$600.000
|
$680.000
|
$650.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$35.000
|
$20.000
|
$21.000
|
$20.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
38.000
|
$100.000
|
$65.000
|
$69.800
|
$150.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
24.000
|
$35.000
|
$52.000
|
$56.000
|
$100.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
76,215.000
|
$0.250
|
$0.300
|
$0.390
|
$0.330
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(LNDP)
|
LF
|
34.000
|
$1.550
|
$3.300
|
$0.820
|
$0.700
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
198.000
|
$0.850
|
$2.200
|
$2.360
|
$2.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
125.000
|
$3.850
|
$5.500
|
$3.530
|
$3.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
75,914.000
|
$0.250
|
$0.300
|
$0.460
|
$0.390
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,820.000
|
$0.750
|
$1.500
|
$1.000
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,023.000
|
$8.000
|
$7.700
|
$10.600
|
$9.000
|
|
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
415.000
|
$110.000
|
$2.200
|
$0.240
|
$0.200
|
|
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,134.000
|
$0.600
|
$1.100
|
$0.240
|
$0.200
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
60,437.000
|
$0.550
|
$0.800
|
$0.740
|
$0.630
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
12,462.000
|
$0.500
|
$0.950
|
$0.270
|
$0.230
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
45,209.000
|
$0.500
|
$0.850
|
$0.750
|
$0.640
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$250.000
|
$300.000
|
$295.000
|
$260.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$295.000
|
$360.000
|
$430.000
|
$365.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
5.000
|
$25.000
|
$130.000
|
$88.350
|
$75.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
14.000
|
$11.750
|
$11.000
|
$10.600
|
$9.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,119.000
|
$4.150
|
$5.250
|
$7.650
|
$6.500
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
22,755.000
|
$0.550
|
$0.550
|
$0.850
|
$0.730
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$3,000.000
|
$7,000.000
|
$9,015.000
|
$2,500.000
|
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
5.600
|
$250.000
|
$1,000.000
|
$4,045.000
|
$790.000
|
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
19,870.000
|
$106.250
|
$114.000
|
$133.000
|
$148.200
|
|
|
|
UNDERSEAL COURSE
|
GAL
|
35,677.000
|
$4.500
|
$4.500
|
$1.000
|
$0.010
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,650.000
|
$12,000.000
|
$5,900.000
|
$19,500.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$205.000
|
$400.000
|
$626.000
|
$277.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$70.000
|
$95.000
|
$112.000
|
$95.000
|
|
|
|
SOLAR POWERED LED SIGN
|
EA
|
6.000
|
$4,205.000
|
$5,000.000
|
$3,770.000
|
$11,500.000
|
|
1
|
|
THERMOPLASTIC PIPE (HDPE) (18")
|
LF
|
856.000
|
$70.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
THERMOPLASTIC PIPE (HDPE) (24")
|
LF
|
160.000
|
$85.000
|
$0.000
|
$0.000
|
$0.000
|
|
1
|
|
THERMOPLASTIC PIPE (HDPE) (30")
|
LF
|
64.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
856.000
|
$70.000
|
$75.000
|
$73.000
|
$69.000
|
|
1A
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
160.000
|
$85.000
|
$95.000
|
$94.250
|
$94.000
|
|
1A
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
64.000
|
$100.000
|
$128.000
|
$194.400
|
$110.000
|
|
Totals: |
$13,999,598.960
|
$13,110,489.920
|
$13,328,642.462
|
$13,632,617.360
|