BOSQUE FM 219 (0724-02-020)

Items: 73

County: BOSQUE
Length: N/A
Highway: FM 219
District: WACO
Control Number: 0724-02-020
DBE Goal: 650.0%
Project: BR 2B24(133)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $7,591,387.30
Date: 06/06/2024 (2 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$7,591,387.30
$6,464,516.70
Over/Under Est: -14.84% -$1,126,870.60
Over/Under Est: -1.81% -$137,492.32
Amt Left: 15.3% $989,378.28
$8,772,914.09
Over/Under Est: 15.56% $1,181,526.79
Amt Left: 35.71% $2,308,397.39
Delta: -17.70% -$1,319,019.11
Over/Under Est: 39.48% $2,996,735.70
Amt Left: 63.79% $4,123,606.30
Delta: -20.69% -$1,815,208.91
Subcontractor Percentage Amount
HODGES AND SON CONSTRUCTION COMPANY, INC. 5.10% $331,813.52
WILKO INDUSTRIAL, L.L.C. 4.01% $260,896.51
JB PINNACLE GROUP, LLC 3.88% $252,438.52
LINDAMOOD, INC. 1.78% $115,809.42
ODUM SERVICES, LLC 1.07% $69,615.78
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.38% $24,723.36
TIMBER T'S TREE SERVICE, LLC 0.31% $20,169.06
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.28% $18,217.21
D. I. J. CONSTRUCTION, INC. 0.26% $16,915.98
PRIMATE CONSTRUCTION, LP 0.17% $11,060.45
DUSTROL, INC. 0.10% $6,506.15
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
Total: 17.34% $1,128,165.96

Bid Items & Bid Tabulations

73 Total 0 of 73
BOSQUE  |  FM 219  |  WACO  |  0724-02-020  |  06/06/2024  |  $7,591,387.30  |  BR 2B24(133)  |  REPLACE BRIDGE AND APPROACHES  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
JAMES CONSTRUCTION GROUP, LLC
C. E. BARKER, LTD.
MORTMARA CONSTRUCTION, INC.
PREPARING ROW
STA 14.000 $5,050.000 $13,000.000 $53,150.000 $62,000.000 $2,500.000
REMOVING CONC (RIPRAP)
SY 304.000 $50.000 $29.000 $17.670 $62.990 $60.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 525.000 $20.000 $16.000 $6.320 $14.590 $35.000
REMOVING STB BASE AND ASPH PAV(10-14")
SY 3,825.000 $22.000 $11.000 $9.260 $14.590 $11.000
EXCAVATION (ROADWAY)
CY 970.000 $23.000 $25.000 $20.040 $52.380 $42.000
EXCAVATION (CHANNEL)
CY 2,819.000 $38.000 $36.000 $30.540 $82.210 $39.000
EMBANKMENT (FINAL)(ORD COMP)(TY C1)
CY 1,379.000 $50.000 $25.000 $46.550 $33.150 $46.000
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
CY 85.000 $75.000 $135.000 $124.340 $33.150 $88.000
FURNISHING AND PLACING TOPSOIL (4")
SY 4,766.000 $2.500 $1.500 $1.560 $1.330 $8.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 4,766.000 $1.000 $0.650 $0.500 $0.660 $1.000
BROADCAST SEED (TEMP) (WARM)
SY 2,384.000 $6.000 $1.350 $0.700 $0.660 $2.000
BROADCAST SEED (TEMP) (COOL)
SY 2,384.000 $6.000 $1.350 $0.700 $0.660 $1.000
VEGETATIVE WATERING
MG 78.000 $40.000 $65.000 $54.050 $39.780 $90.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 200.000 $3.300 $7.500 $9.000 $5.300 $10.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 1,569.000 $85.000 $98.000 $94.210 $78.500 $45.000
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 4,705.000 $6.000 $3.000 $4.200 $5.970 $6.000
ASPH (CRS-2P)
GAL 2,822.000 $8.000 $5.250 $6.000 $5.440 $6.000
AGGR(TY D GR 3 OR TY L GR 3)
CY 51.000 $270.000 $325.000 $400.000 $571.510 $640.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $80.000 $98.000 $87.620 $112.710 $125.000
PLANE ASPH CONC PAV(0" TO 2")
SY 10,000.000 $10.000 $2.000 $0.940 $3.980 $5.000
CEM STABIL BKFL
CY 484.000 $275.000 $285.000 $223.860 $196.250 $325.000
TEMPORARY SPL SHORING
SF 2,360.000 $35.000 $15.000 $31.170 $36.470 $1.000
DRILL SHAFT (18 IN)
LF 129.000 $205.000 $225.000 $163.970 $529.300 $270.000
DRILL SHAFT (36 IN)
LF 1,263.000 $350.000 $315.000 $235.510 $520.370 $825.000
DRILL SHAFT (42 IN)
LF 176.000 $540.000 $425.000 $345.890 $629.770 $3,450.000
CL C CONC (ABUT)(HPC)
CY 116.900 $1,700.000 $1,200.000 $1,241.270 $2,002.120 $2,000.000
CL C CONC (CAP)(HPC)
CY 97.500 $2,000.000 $1,200.000 $1,261.720 $2,335.660 $3,000.000
CL C CONC (COLUMN)(HPC)
CY 224.500 $2,050.000 $1,250.000 $1,271.310 $2,725.330 $3,200.000
CL C CONC (RAIL FOUNDATION)
CY 10.000 $950.000 $1,900.000 $899.090 $1,735.730 $1,500.000
REINF CONC SLAB
SF 22,540.000 $31.000 $25.000 $24.570 $28.210 $40.000
APPROACH SLAB
CY 163.000 $800.000 $640.000 $646.600 $1,190.650 $1,400.000
RETAINING WALL (SPREAD FOOTING)
SF 2,662.000 $120.000 $125.000 $97.290 $92.110 $225.000
PRESTR CONC GIRDER (TX28)
LF 1,011.000 $250.000 $250.000 $222.630 $271.140 $650.000
PRESTR CONC GIRDER (TX46)
LF 1,910.900 $250.000 $325.000 $221.610 $268.380 $350.000
RIPRAP (CONC)(4 IN)
CY 20.000 $900.000 $1,000.000 $933.130 $535.700 $800.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 1,350.000 $305.000 $140.000 $161.280 $131.270 $120.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 3,339.000 $185.000 $140.000 $170.900 $131.270 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 53.300 $625.000 $750.000 $682.470 $535.700 $900.000
RAIL (TY T223)
LF 1,366.400 $165.000 $175.000 $108.690 $125.580 $125.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 185.000 $230.000 $250.000 $190.630 $232.050 $200.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $100,000.000 $150,000.000 $407,760.000 $120,666.000 $450,000.000
REMOV STR (RET WALL)
LF 48.000 $200.000 $50.000 $68.980 $99.450 $400.000
MOBILIZATION
LS 1.000 $691,258.000 $630,000.000 $747,137.610 $860,000.000 $1,040,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,500.000 $3,000.000 $4,082.240 $13,525.200 $8,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,968.000 $6.150 $7.000 $5.500 $5.640 $25.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,968.000 $1.800 $1.000 $1.000 $1.330 $1.000
DRIVEWAYS (ACP)
SY 289.000 $63.000 $65.000 $93.360 $59.670 $60.000
DRIVEWAYS (BASE)
SY 145.000 $130.000 $30.000 $68.980 $53.040 $125.000
MTL W-BEAM GD FEN (STEEL POST)
LF 450.000 $35.000 $38.000 $30.130 $39.950 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $2,700.000 $3,500.000 $2,593.670 $3,439.210 $2,800.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,500.000 $3,500.000 $3,465.290 $4,594.980 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $8,200.000 $35,000.000 $28,500.000 $12,487.820 $35,000.000
PIPE UNDERDRAINS (TY 6) (6")
LF 25.000 $50.000 $40.000 $35.640 $46.410 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $800.000 $875.000 $567.610 $895.050 $1,500.000
REMOVE SM RD SN SUP&AM
EA 14.000 $115.000 $115.000 $5.130 $139.230 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 14.000 $35.000 $60.000 $32.430 $19.230 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $50.000 $75.000 $57.130 $24.530 $60.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 6.000 $105.000 $115.000 $140.700 $139.230 $600.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 100.000 $1.500 $2.750 $2.500 $3.980 $12.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,800.000 $1.100 $2.500 $2.250 $3.980 $12.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 470.000 $1.000 $2.500 $2.150 $3.980 $12.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 3,304.000 $1.000 $2.500 $2.250 $3.980 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $295.000 $400.000 $350.000 $132.600 $1,200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $360.000 $450.000 $415.000 $265.200 $1,200.000
REFL PAV MRKR TY I-C
EA 6.000 $7.200 $14.000 $12.000 $6.630 $1,200.000
REFL PAV MRKR TY II-A-A
EA 104.000 $11.000 $14.000 $2.000 $39.780 $90.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 670.000 $160.000 $140.000 $180.000 $192.270 $165.000
D-GR HMA TY-D PG64-22
TON 1,100.000 $300.000 $150.000 $130.000 $237.350 $175.000
TACK COAT
GAL 406.000 $5.000 $4.000 $6.000 $4.050 $4.000
SP MIXES SP-C SAC-B PG70-22 (EXEMPT)
TON 889.000 $175.000 $155.000 $200.000 $225.420 $200.000
LEAD CONTAINING COATING MANAGEMENT
SF 470.000 $105.000 $75.000 $74.330 $132.600 $90.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $19,000.000 $9,748.560 $9,282.000 $14,000.000
TMA (STATIONARY)
DAY 360.000 $305.000 $5.000 $518.490 $530.400 $125.000
Totals: $7,591,387.300 $6,464,516.700 $7,453,895.004 $8,772,914.107 $10,588,123.000