PREPARING ROW
|
STA
|
204.530
|
$3,276.460
|
$1,000.000
|
$2,240.000
|
$654.900
|
$1,500.000
|
$700.000
|
$452.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
279.000
|
$20.000
|
$30.000
|
$23.200
|
$31.500
|
$55.000
|
$12.000
|
$42.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
745.000
|
$13.000
|
$30.000
|
$9.800
|
$15.200
|
$16.500
|
$5.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
26,029.000
|
$21.000
|
$24.000
|
$18.600
|
$28.000
|
$20.500
|
$13.000
|
$27.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
15,520.000
|
$20.100
|
$21.000
|
$9.300
|
$21.400
|
$15.250
|
$22.000
|
$9.000
|
|
|
BACKFILL (TY A)
|
STA
|
45.000
|
$99.350
|
$275.000
|
$251.000
|
$197.000
|
$480.000
|
$500.000
|
$560.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
88,929.000
|
$2.250
|
$2.650
|
$1.040
|
$2.080
|
$2.950
|
$2.000
|
$2.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
88,929.000
|
$0.300
|
$0.160
|
$0.170
|
$0.160
|
$0.300
|
$0.100
|
$0.500
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
88,929.000
|
$0.600
|
$0.140
|
$0.150
|
$0.140
|
$0.180
|
$0.100
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
1,492.000
|
$25.000
|
$30.000
|
$38.900
|
$24.500
|
$69.000
|
$25.000
|
$47.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
88,929.000
|
$1.250
|
$1.100
|
$1.170
|
$1.090
|
$2.050
|
$1.000
|
$2.000
|
|
|
WILDFLOWER SEEDING
|
AC
|
18.440
|
$3,000.000
|
$1,500.000
|
$1,620.000
|
$1,500.000
|
$2,900.000
|
$1,500.000
|
$3,081.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
16,645.000
|
$82.000
|
$66.000
|
$64.300
|
$74.860
|
$75.000
|
$81.500
|
$97.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
13,947.000
|
$5.750
|
$4.200
|
$4.600
|
$5.360
|
$5.500
|
$4.500
|
$5.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,500.000
|
$92.000
|
$78.600
|
$84.800
|
$69.800
|
$70.000
|
$125.000
|
$96.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
16,627.000
|
$2.300
|
$2.800
|
$2.400
|
$2.440
|
$2.650
|
$2.000
|
$3.000
|
|
|
CUT & RESTORING PAV
|
SY
|
43.340
|
$250.000
|
$350.000
|
$315.000
|
$338.120
|
$300.000
|
$65.000
|
$289.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
125.000
|
$225.000
|
$240.000
|
$252.000
|
$300.000
|
$300.000
|
$300.000
|
$185.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
100.000
|
$5.000
|
$20.000
|
$21.000
|
$22.540
|
$19.750
|
$5.000
|
$6.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
485.000
|
$36.600
|
$85.000
|
$89.000
|
$95.800
|
$84.000
|
$62.000
|
$42.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
560.500
|
$845.000
|
$607.000
|
$430.000
|
$465.830
|
$435.000
|
$1,000.000
|
$972.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
63.000
|
$210.000
|
$285.000
|
$195.000
|
$270.000
|
$180.000
|
$225.000
|
$240.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
45.000
|
$610.000
|
$660.000
|
$645.000
|
$625.000
|
$650.000
|
$1,100.000
|
$835.000
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
432.000
|
$100.000
|
$65.000
|
$68.000
|
$73.260
|
$64.000
|
$97.000
|
$124.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
37.000
|
$1,440.000
|
$850.000
|
$892.000
|
$958.010
|
$900.000
|
$1,400.000
|
$1,739.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
111.000
|
$1,450.000
|
$530.000
|
$556.000
|
$597.350
|
$500.000
|
$1,300.000
|
$1,404.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
52.000
|
$1,131.150
|
$823.000
|
$864.000
|
$927.580
|
$800.000
|
$1,400.000
|
$1,635.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
32.000
|
$1,252.500
|
$850.000
|
$892.000
|
$958.010
|
$800.000
|
$1,600.000
|
$1,706.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
38.000
|
$1,610.000
|
$1,175.000
|
$1,234.000
|
$1,324.310
|
$1,200.000
|
$1,600.000
|
$1,944.000
|
|
|
CONC BOX CULV (9 FT X 7 FT)(EXTEND)
|
LF
|
90.000
|
$1,750.000
|
$900.000
|
$945.000
|
$1,014.370
|
$900.000
|
$1,900.000
|
$2,054.000
|
|
|
CONC BOX CULV (5 FT X 2.5 FT) (EXTEND)
|
LF
|
45.000
|
$1,000.000
|
$875.000
|
$919.000
|
$986.190
|
$900.000
|
$1,600.000
|
$1,989.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
472.000
|
$120.000
|
$85.000
|
$89.000
|
$95.800
|
$84.000
|
$81.000
|
$158.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
472.000
|
$150.000
|
$107.000
|
$112.000
|
$120.600
|
$110.000
|
$98.000
|
$191.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
24.000
|
$250.000
|
$245.000
|
$257.000
|
$276.130
|
$240.000
|
$158.000
|
$393.000
|
|
|
WINGWALL (FW - 0) (HW=10 FT)
|
EA
|
1.000
|
$20,000.000
|
$25,775.000
|
$27,000.000
|
$29,050.290
|
$25,500.000
|
$41,000.000
|
$43,541.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$17,650.000
|
$15,325.000
|
$16,100.000
|
$17,272.380
|
$15,200.000
|
$15,000.000
|
$22,411.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$16,000.000
|
$16,100.000
|
$16,900.000
|
$18,145.860
|
$16,000.000
|
$18,000.000
|
$25,509.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
4.000
|
$15,550.000
|
$14,450.000
|
$15,172.000
|
$16,286.190
|
$14,300.000
|
$15,000.000
|
$21,626.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$17,666.000
|
$17,350.000
|
$18,217.000
|
$19,554.700
|
$17,200.000
|
$15,000.000
|
$22,248.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$17,900.000
|
$17,810.000
|
$18,700.000
|
$20,073.160
|
$17,600.000
|
$20,000.000
|
$26,004.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$28,000.000
|
$19,725.000
|
$20,711.000
|
$22,231.500
|
$19,500.000
|
$25,000.000
|
$30,636.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$33,000.000
|
$27,300.000
|
$28,665.000
|
$30,769.070
|
$27,100.000
|
$45,000.000
|
$47,925.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$26,000.000
|
$28,000.000
|
$29,400.000
|
$31,558.020
|
$27,700.000
|
$35,000.000
|
$37,877.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$2,205.000
|
$1,900.000
|
$1,995.000
|
$2,141.440
|
$1,900.000
|
$3,100.000
|
$2,393.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$2,100.000
|
$2,225.000
|
$2,336.000
|
$2,507.740
|
$2,200.000
|
$3,700.000
|
$2,308.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$5,300.000
|
$8,300.000
|
$8,715.000
|
$9,354.700
|
$8,200.000
|
$4,200.000
|
$6,853.000
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
16.000
|
$2,948.000
|
$130.000
|
$1,365.000
|
$1,465.190
|
$1,300.000
|
$3,100.000
|
$2,847.000
|
|
|
REMOV STR (SET)
|
EA
|
37.000
|
$800.000
|
$155.000
|
$163.000
|
$174.700
|
$150.000
|
$700.000
|
$389.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
11.000
|
$1,800.000
|
$645.000
|
$677.000
|
$726.960
|
$600.000
|
$1,800.000
|
$8,600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,100.000
|
$1,600.000
|
$1,680.000
|
$1,803.320
|
$1,600.000
|
$728.000
|
$8,600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,969.000
|
$35.000
|
$5.000
|
$5.250
|
$5.640
|
$4.950
|
$44.000
|
$37.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
50.000
|
$3.000
|
$16.000
|
$7.500
|
$20.000
|
$51.000
|
$12.000
|
$42.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$891,598.630
|
$1,120,000.000
|
$910,000.000
|
$1,024,154.310
|
$730,000.000
|
$165,000.000
|
$793,484.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$8,500.000
|
$6,525.000
|
$3,500.000
|
$12,959.940
|
$12,100.000
|
$5,100.000
|
$4,249.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
640.000
|
$51.800
|
$35.300
|
$49.500
|
$65.000
|
$31.000
|
$52.000
|
$56.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
640.000
|
$26.900
|
$9.800
|
$16.200
|
$15.000
|
$8.750
|
$31.000
|
$34.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,985.000
|
$3.800
|
$6.600
|
$4.300
|
$4.000
|
$6.000
|
$4.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,985.000
|
$1.350
|
$1.000
|
$1.100
|
$1.000
|
$0.520
|
$1.000
|
$1.000
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
120.000
|
$30.000
|
$60.000
|
$48.400
|
$165.000
|
$170.000
|
$113.000
|
$37.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
960.000
|
$2.000
|
$50.000
|
$35.800
|
$120.000
|
$57.000
|
$21.000
|
$73.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
120.000
|
$22.000
|
$50.000
|
$46.400
|
$145.000
|
$82.000
|
$23.000
|
$37.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,035.000
|
$72.300
|
$73.000
|
$95.100
|
$55.400
|
$66.000
|
$102.000
|
$93.000
|
|
|
TURNOUTS (ACP)
|
SY
|
697.000
|
$80.000
|
$85.000
|
$96.100
|
$55.400
|
$85.000
|
$102.000
|
$98.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
640.000
|
$25.500
|
$30.200
|
$34.300
|
$33.610
|
$33.000
|
$45.000
|
$40.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,600.000
|
$1,312.000
|
$1,490.000
|
$1,448.930
|
$1,400.000
|
$2,000.000
|
$2,226.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$5.100
|
$4.880
|
$5.600
|
$6.000
|
$6.000
|
$6.000
|
$7.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,295.000
|
$2,755.000
|
$3,130.000
|
$3,509.260
|
$3,500.000
|
$4,500.000
|
$4,842.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$435.000
|
$175.000
|
$197.000
|
$426.670
|
$420.000
|
$400.000
|
$459.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$300.000
|
$1,200.000
|
$767.000
|
$1,069.170
|
$1,100.000
|
$2,000.000
|
$2,240.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$725.000
|
$600.000
|
$789.000
|
$941.820
|
$900.000
|
$1,000.000
|
$1,143.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$6,750.000
|
$8,120.000
|
$9,110.000
|
$9,644.070
|
$9,600.000
|
$11,000.000
|
$11,506.000
|
|
|
WIRE FENCE (TY D)
|
LF
|
50.000
|
$15.000
|
$20.000
|
$16.200
|
$20.000
|
$87.000
|
$18.000
|
$103.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
14.000
|
$415.000
|
$310.000
|
$334.000
|
$333.080
|
$410.000
|
$474.000
|
$506.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$405.000
|
$395.000
|
$425.000
|
$365.840
|
$420.000
|
$477.000
|
$510.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$800.000
|
$950.000
|
$1,020.000
|
$748.060
|
$1,100.000
|
$1,200.000
|
$1,367.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
36.000
|
$610.000
|
$950.000
|
$1,020.000
|
$671.620
|
$1,000.000
|
$1,100.000
|
$1,214.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$130.000
|
$135.000
|
$145.000
|
$114.670
|
$95.000
|
$163.000
|
$116.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
|
EA
|
16.000
|
$61.250
|
$65.000
|
$70.000
|
$38.770
|
$53.000
|
$78.000
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
59,940.000
|
$0.250
|
$0.270
|
$0.290
|
$0.270
|
$0.270
|
$0.450
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
14,940.000
|
$0.300
|
$0.280
|
$0.300
|
$0.280
|
$0.280
|
$0.450
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
59,940.000
|
$0.250
|
$0.270
|
$0.290
|
$0.270
|
$0.270
|
$0.450
|
$0.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,000.000
|
$2.000
|
$1.500
|
$1.750
|
$1.630
|
$2.550
|
$6.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,000.000
|
$1.500
|
$1.500
|
$1.750
|
$1.630
|
$2.550
|
$6.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
183.000
|
$9.000
|
$11.900
|
$12.800
|
$11.900
|
$11.750
|
$8.000
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$175.000
|
$395.000
|
$425.000
|
$395.000
|
$390.000
|
$175.000
|
$302.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
320.000
|
$7.000
|
$7.150
|
$7.700
|
$7.150
|
$7.000
|
$4.000
|
$4.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
11,448.000
|
$0.250
|
$0.210
|
$0.230
|
$0.210
|
$0.210
|
$0.200
|
$0.270
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
45,225.000
|
$0.250
|
$0.200
|
$0.220
|
$0.200
|
$0.200
|
$0.200
|
$0.270
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
183.000
|
$4.350
|
$2.500
|
$2.700
|
$2.500
|
$2.450
|
$1.000
|
$4.000
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
8.000
|
$93.000
|
$50.000
|
$53.800
|
$50.000
|
$50.000
|
$60.000
|
$66.000
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
11,228.000
|
$0.300
|
$0.210
|
$0.230
|
$0.210
|
$0.210
|
$0.200
|
$0.270
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
45,776.000
|
$0.250
|
$0.200
|
$0.220
|
$0.200
|
$0.200
|
$0.200
|
$0.270
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
320.000
|
$1.430
|
$1.500
|
$1.600
|
$1.500
|
$1.500
|
$0.850
|
$2.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
11,448.000
|
$0.730
|
$0.750
|
$0.810
|
$0.750
|
$0.750
|
$0.700
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
11,228.000
|
$0.800
|
$0.750
|
$0.810
|
$0.750
|
$0.750
|
$0.700
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
45,225.000
|
$1.050
|
$0.940
|
$1.000
|
$0.940
|
$0.940
|
$0.900
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
45,776.000
|
$0.900
|
$0.940
|
$1.000
|
$0.940
|
$0.940
|
$0.900
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
572.000
|
$5.150
|
$4.950
|
$5.300
|
$4.950
|
$4.900
|
$4.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,192.000
|
$4.200
|
$4.750
|
$5.100
|
$4.750
|
$4.700
|
$4.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
102,599.000
|
$0.250
|
$0.200
|
$0.220
|
$0.200
|
$0.200
|
$0.250
|
$0.300
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$3,500.000
|
$10,500.000
|
$11,100.000
|
$11,248.260
|
$10,200.000
|
$13,000.000
|
$10,870.000
|
|
|
STORM SEWER CLEAN (BOX CULV)(ALL SIZES)
|
LF
|
260.000
|
$78.000
|
$80.000
|
$64.600
|
$40.000
|
$58.000
|
$100.000
|
$110.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
17,376.000
|
$112.500
|
$93.500
|
$107.000
|
$102.300
|
$107.000
|
$118.000
|
$118.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
5,808.000
|
$136.250
|
$114.000
|
$122.000
|
$115.500
|
$130.000
|
$135.000
|
$143.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
5,874.000
|
$136.000
|
$119.350
|
$140.000
|
$116.700
|
$130.000
|
$147.000
|
$149.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
10,182.000
|
$150.000
|
$141.500
|
$162.000
|
$144.650
|
$145.000
|
$175.000
|
$178.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
50,327.000
|
$4.100
|
$4.000
|
$4.350
|
$4.330
|
$5.250
|
$4.000
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$80.500
|
$67.000
|
$71.400
|
$175.000
|
$200.000
|
$60.000
|
$62.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$13,000.000
|
$10,700.000
|
$11,000.000
|
$36,200.000
|
$12,000.000
|
$21,740.000
|
|
|
TMA (STATIONARY)
|
DAY
|
472.000
|
$217.000
|
$215.000
|
$199.000
|
$350.000
|
$270.000
|
$150.000
|
$211.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
224.000
|
$115.000
|
$80.000
|
$111.000
|
$90.000
|
$270.000
|
$150.000
|
$74.000
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
2.000
|
$14,400.000
|
$20,000.000
|
$11,500.000
|
$12,500.000
|
$23,400.000
|
$24,200.000
|
$22,344.000
|
|
Totals: |
$12,831,913.784
|
$11,189,111.150
|
$11,401,846.810
|
$11,603,846.293
|
$11,719,482.470
|
$12,149,030.150
|
$13,799,854.950
|