Show Job Controls
Bid Cobra

BEXAR IH0035 (6313-44-001)

Items: 28

County: BEXAR
Length: N/A
Highway: IH0035
District: SAN ANTONIO
Control Number: 6313-44-001
DBE Goal: N/A
Project: RMC - 631344001
Guaranty: N/A
Time: 52 W
Engineer's Estimate: $289,263.82
Date: 05/24/2017 (9 years ago)
Contract Number: N/A
Type: INSTALL CONCRETE RIPRAP AND GABIONS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$289,263.82
1
Awarded
$260,354.32
Over/Under Est: -9.99% -$28,909.50
$277,263.50
Over/Under Est: -4.15% -$12,000.32
Amt Left: 6.49% $16,909.18
Over/Under Est: 3.42% $9,884.18
Amt Left: 14.9% $38,793.68
Delta: -7.89% -$21,884.50
Over/Under Est: 3.56% $10,288.18
Amt Left: 15.06% $39,197.68
Delta: -0.14% -$404.00
Over/Under Est: 6.22% $18,005.18
Amt Left: 18.02% $46,914.68
Delta: -2.58% -$7,717.00
Over/Under Est: 32.91% $95,211.18
Amt Left: 47.67% $124,120.68
Delta: -25.13% -$77,206.00
$405,874.42
Over/Under Est: 40.31% $116,610.60
Amt Left: 55.89% $145,520.10
Delta: -5.57% -$21,399.42

Bid Items & Bid Tabulations

28 Total 0 of 28
BEXAR  |  IH0035  |  SAN ANTONIO  |  6313-44-001  |  05/24/2017  |  $289,263.82  |  RMC - 631344001  |  INSTL CONC RIPRAP AND GABIONS  |  52 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
TMES LLC
CRG
DAN WILLIAMS COMPANY
MAIN LANE INDUSTRIES LTD.
CHAMPION INFRASTRUCTURE, LLC
FNH CONSTRUCTION, LLC
KEGLEY, INC.
PREPARING ROW
STA 5.000 $5,000.000 $2,008.250 $2,325.030 $2,500.000 $5,000.000 $1,600.000 $2,000.000 $5,750.000
REMOVING CONC (RIPRAP)
SY 384.000 $31.610 $17.950 $40.040 $10.000 $20.000 $50.000 $20.000 $92.000
EXCAVATION (CHANNEL)
CY 232.000 $40.800 $30.000 $39.000 $35.000 $40.000 $42.000 $30.000 $57.500
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 250.000 $26.900 $30.000 $29.660 $65.000 $35.000 $50.000 $50.000 $52.900
COMPOST MANUF TOPSOIL (4")
SY 600.000 $1.500 $8.570 $11.450 $5.000 $4.000 $12.000 $5.500 $5.750
VEGETATIVE WATERING
MG 9.000 $66.130 $100.000 $216.450 $15.000 $25.000 $65.000 $1,000.000 $69.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 600.000 $1.450 $3.040 $2.800 $3.000 $1.000 $3.000 $7.500 $6.900
AGGR (TY-B GR-4)
CY 1.300 $150.000 $500.000 $194.600 $1,200.000 $1,000.000 $600.000 $1,000.000 $201.250
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 45.000 $3.750 $12.000 $10.120 $15.000 $100.000 $15.000 $25.000 $5.520
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 142.000 $60.930 $70.000 $150.000 $175.000 $100.000 $160.000 $200.000 $184.000
RIPRAP (CONC)(4 IN)
CY 195.000 $521.000 $475.000 $375.000 $600.000 $675.000 $675.000 $550.000 $575.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $370.000 $500.000 $655.370 $525.000 $500.000 $720.000 $650.000 $569.250
GABION MATTRESSES (GALV) (24 IN)
SY 200.000 $300.000 $150.000 $161.810 $150.000 $165.000 $145.000 $300.000 $207.000
MOBILIZATION
LS 1.000 $19,700.000 $25,000.000 $24,953.710 $25,000.000 $25,000.000 $7,000.000 $35,000.000 $29,415.600
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $6,000.000 $9,770.090 $5,842.150 $8,000.000 $4,000.000 $2,400.000 $12,500.000 $8,625.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $21.000 $15.000 $29.570 $26.000 $8.000 $20.000 $50.000 $63.250
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $8.500 $8.000 $15.100 $10.000 $1.000 $10.000 $20.000 $27.600
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 20.000 $4.000 $6.750 $9.340 $8.000 $6.000 $4.000 $18.000 $10.350
BIODEG EROSN CONT LOGS (REMOVE)
LF 20.000 $2.000 $3.000 $3.110 $1.500 $1.000 $2.000 $12.000 $3.450
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 180.000 $10.000 $15.000 $21.870 $9.000 $20.000 $42.000 $60.000 $34.500
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 180.000 $20.000 $28.000 $50.240 $20.000 $5.000 $60.000 $60.000 $34.500
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $21.000 $35.000 $38.920 $28.000 $17.500 $24.000 $30.000 $80.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $960.000 $650.000 $3,891.970 $1,200.000 $900.000 $1,600.000 $1,850.000 $3,220.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.500 $1.000 $12.460 $2.000 $2.000 $4.000 $5.000 $17.250
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $180.000 $100.000 $1,323.270 $350.000 $125.000 $320.000 $500.000 $517.500
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,100.000 $2,500.000 $1,323.270 $3,000.000 $2,000.000 $3,200.000 $2,850.000 $4,600.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,100.000 $1,200.000 $2,081.190 $400.000 $2,400.000 $2,100.000 $5,000.000 $2,415.000
CRASH CUSH ATTEN (STKPL)
EA 1.000 $688.000 $950.000 $2,081.190 $550.000 $250.000 $2,400.000 $2,000.000 $3,220.000
Totals: $289,263.820 $260,354.320 $277,263.500 $299,148.000 $299,552.000 $307,269.000 $384,475.000 $405,874.425