Show Job Controls
Bid Cobra

BEXAR SL 1604 (2452-03-123)

Items: 84

County: BEXAR
Length: N/A
Highway: SL 1604
District: SAN ANTONIO
Control Number: 2452-03-123
DBE Goal: N/A
Project: C 2452-3-123
Guaranty: N/A
Time: 114 WORKING DAYS
Engineer's Estimate: $3,933,435.89
Date: 03/06/2019 (7 years ago)
Contract Number: N/A
Type: OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$3,933,435.89
$4,014,717.41
Over/Under Est: 2.07% $81,281.52
Over/Under Est: 8.03% $316,003.51
Amt Left: 5.85% $234,721.99
Over/Under Est: 13.42% $528,038.01
Amt Left: 11.13% $446,756.49
Delta: -4.99% -$212,034.50
$4,494,160.81
Over/Under Est: 14.26% $560,724.92
Amt Left: 11.94% $479,443.40
Delta: -0.73% -$32,686.91
Over/Under Est: 25.22% $992,036.64
Amt Left: 22.69% $910,755.12
Delta: -9.60% -$431,311.72
Over/Under Est: 33.19% $1,305,672.91
Amt Left: 30.5% $1,224,391.39
Delta: -6.37% -$313,636.27

Bid Items & Bid Tabulations

84 Total 0 of 84
BEXAR  |  SL 1604  |  SAN ANTONIO  |  2452-03-123  |  03/06/2019  |  $3,933,435.89  |  C 2452-3-123  |  OVERLAY  |  114 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
LONE STAR PAVING COMPANY
CLARK CONSTRUCTION OF TEXAS, INC.
AUSTIN MATERIALS, LLC
DEAN WORD COMPANY, LTD.
HUNTER INDUSTRIES, LTD.
REMOVING CONC (FOUNDATIONS)
SY 42.000 $14.250 $150.000 $60.000 $20.000 $75.000 $42.800 $183.150
BACKFILL (TY B)
STA 408.000 $111.450 $75.000 $55.000 $137.200 $92.500 $101.682 $161.250
BLADING
HR 51.000 $142.650 $100.000 $105.000 $5.000 $127.500 $95.230 $102.600
SPEC EXCAV WORK (BACKHOE)
HR 34.000 $152.890 $120.000 $65.000 $5.000 $60.000 $70.449 $91.200
AGGR (TY-B GR-4)
CY 1,802.000 $29.980 $0.000 $0.000 $0.000 $0.000 $92.555 $0.000
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 59,472.000 $0.700 $0.000 $0.000 $0.000 $0.000 $3.777 $0.000
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 21,807.000 $85.000 $87.000 $86.500 $95.730 $90.000 $86.519 $100.860
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 9,247.000 $40.000 $45.000 $52.000 $46.450 $46.000 $46.063 $58.090
PLANE ASPH CONC PAV (2")
SY 196,932.000 $1.100 $0.750 $1.500 $1.130 $2.200 $2.161 $3.610
PLANE ASPH CONC PAV (3"-3 1/2")
SY 1,306.000 $2.500 $2.000 $6.000 $2.000 $5.700 $3.953 $3.610
RIPRAP (MOW STRIP)(4 IN)
CY 324.000 $423.000 $435.000 $450.000 $420.000 $410.000 $497.550 $441.010
CLEANING AND SEALING EXISTING JOINTS
LF 126.000 $12.760 $5.550 $15.000 $10.000 $16.000 $16.480 $13.200
HEADER TYPE EXPANSION JOINT
CF 21.000 $337.650 $415.000 $600.000 $875.000 $590.000 $607.700 $638.000
JOINT SEALANT
LF 126.000 $11.520 $50.000 $8.000 $5.000 $9.000 $9.270 $7.700
MOBILIZATION
LS 1.000 $289,574.150 $260,000.000 $325,000.000 $255,000.000 $229,300.000 $490,031.207 $471,111.930
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,500.000 $6,000.000 $3,750.000 $2,500.000 $16,000.000 $9,657.823 $1,481.190
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 6,150.000 $3.610 $3.500 $3.500 $3.500 $2.640 $3.296 $2.640
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,150.000 $0.800 $0.850 $0.750 $0.700 $0.870 $0.773 $0.870
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 660.000 $22.590 $70.000 $30.000 $85.000 $85.000 $78.110 $27.810
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,980.000 $25.360 $63.000 $30.000 $79.000 $79.000 $69.550 $23.720
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,410.000 $15.000 $11.550 $25.000 $25.000 $25.000 $19.260 $14.920
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
LF 1,290.000 $17.480 $5.250 $20.000 $20.000 $20.000 $11.235 $12.070
MTL W-BEAM GD FEN (TIM POST)
LF 5,300.000 $19.000 $17.000 $25.000 $19.050 $16.500 $18.386 $19.050
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 24.000 $1,745.620 $1,700.000 $1,500.000 $1,448.000 $1,650.000 $2,229.500 $1,448.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $1,120.960 $1,000.000 $1,100.000 $895.000 $940.000 $952.750 $895.000
MTL BM GD FEN TRANS (NON - SYM)
EA 12.000 $812.000 $700.000 $800.000 $695.000 $660.000 $715.850 $695.000
REMOVE METAL BEAM GUARD FENCE
LF 7,450.000 $2.350 $1.250 $1.000 $1.000 $1.000 $1.391 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 32.000 $212.650 $110.000 $125.000 $125.000 $100.000 $87.550 $125.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $374.150 $110.000 $100.000 $175.000 $100.000 $427.450 $175.000
RM MTL BM GD FEN TRANS (T101)
EA 32.000 $185.950 $110.000 $100.000 $130.000 $100.000 $154.500 $130.000
REMOVE CABLE BARRIER
LF 1,811.000 $4.920 $3.000 $3.500 $4.000 $2.750 $4.172 $4.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $2,475.230 $2,500.000 $2,800.000 $2,530.000 $2,350.000 $2,466.850 $2,530.000
GUARDRAIL END TREATMENT (REMOVE)
EA 31.000 $203.560 $160.000 $125.000 $225.000 $150.000 $177.160 $225.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $771.300 $110.000 $1,250.000 $1,000.000 $100.000 $684.950 $1,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $12,000.000 $17,000.000 $15,000.000 $18,495.000 $15,400.000 $17,484.250 $18,495.000
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
EA 1.000 $25,000.000 $22,000.000 $20,000.000 $24,875.000 $20,400.000 $21,115.000 $24,875.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 58.000 $31.000 $44.000 $42.000 $40.000 $40.000 $41.200 $40.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 593.000 $23.930 $31.000 $29.000 $28.000 $28.000 $28.840 $28.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 1,689.000 $22.030 $47.850 $45.000 $43.500 $43.500 $44.805 $43.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $475.100 $413.000 $500.000 $505.000 $413.000 $498.994 $484.460
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 55.000 $470.350 $468.000 $550.000 $610.000 $468.000 $561.093 $544.750
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 15.000 $630.500 $672.000 $700.000 $720.000 $672.000 $692.078 $671.920
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $1,117.100 $879.000 $900.000 $915.000 $879.000 $952.863 $925.110
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 12.000 $1,069.750 $1,309.000 $1,700.000 $1,575.000 $1,309.000 $1,682.454 $1,633.450
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $1,515.500 $1,472.000 $1,500.000 $1,440.000 $1,472.000 $1,524.369 $1,479.970
REMOVE SM RD SN SUP&AM
EA 113.000 $71.740 $85.000 $65.000 $100.000 $85.000 $66.950 $65.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 2,922.000 $17.400 $16.000 $10.000 $15.000 $10.000 $10.043 $9.750
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 59.000 $22.500 $24.000 $13.000 $15.000 $15.000 $13.648 $13.250
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $18.300 $24.000 $13.000 $15.000 $15.000 $24.720 $13.250
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 10.000 $0.690 $2.500 $2.500 $3.000 $2.500 $2.575 $2.980
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 13,586.000 $0.730 $0.670 $0.700 $1.000 $0.670 $0.690 $0.800
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 432.000 $2.300 $2.330 $2.500 $2.500 $2.330 $2.400 $2.780
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,128.000 $2.760 $2.330 $2.500 $3.000 $2.330 $2.400 $2.780
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $106.300 $124.000 $125.000 $135.000 $124.000 $127.720 $147.970
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 2.000 $143.780 $200.000 $200.000 $165.000 $200.000 $206.000 $238.660
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 4.000 $340.710 $300.000 $300.000 $175.000 $300.000 $309.000 $357.990
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 8.000 $123.560 $137.000 $145.000 $125.000 $137.000 $141.110 $163.480
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 7.000 $33.750 $44.000 $45.000 $25.000 $44.000 $45.320 $52.510
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 700.000 $0.830 $0.700 $0.750 $0.850 $0.700 $0.721 $0.840
PAVEMENT SEALER 4"
LF 10.000 $0.110 $1.000 $5.000 $0.250 $1.000 $1.030 $1.190
PAVEMENT SEALER 6"
LF 102,135.000 $0.150 $0.180 $0.200 $0.350 $0.180 $0.185 $0.210
PAVEMENT SEALER 8"
LF 14,156.000 $0.270 $0.440 $0.500 $0.400 $0.440 $0.453 $0.530
PAVEMENT SEALER 12"
LF 2,560.000 $0.650 $1.090 $1.150 $0.850 $1.090 $1.123 $1.300
PAVEMENT SEALER (ARROW)
EA 4.000 $42.560 $63.000 $65.000 $55.000 $63.000 $64.890 $75.180
PAVEMENT SEALER (WORD)
EA 8.000 $42.170 $63.000 $65.000 $55.000 $63.000 $64.890 $75.180
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $93.600 $121.000 $125.000 $65.000 $121.000 $124.630 $144.390
PAVEMENT SEALER (LNDP ARROW)
EA 4.000 $140.950 $149.000 $150.000 $75.000 $149.000 $153.470 $177.800
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 8,858.000 $0.510 $0.550 $0.600 $0.350 $0.550 $0.567 $0.660
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 47,124.000 $0.860 $0.640 $0.650 $0.800 $0.640 $0.659 $0.760
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 45,988.000 $0.860 $0.640 $0.650 $0.800 $0.640 $0.659 $0.760
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 840.000 $8.140 $15.000 $15.000 $12.000 $15.000 $15.450 $17.900
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 4.000 $1,657.000 $2,200.000 $2,250.000 $2,250.000 $2,200.000 $2,266.000 $2,625.280
REFL PAV MRKR TY II-A-A
EA 425.000 $3.010 $3.300 $3.250 $3.000 $3.300 $3.399 $3.940
REFL PAV MRKR TY II-C-R
EA 1,300.000 $3.250 $3.300 $3.250 $4.000 $3.300 $3.399 $3.940
ELIM EXT PAV MRK & MRKS (4")
LF 10,141.000 $0.400 $0.470 $0.500 $0.700 $0.470 $0.484 $0.560
PAV SURF PREP FOR MRK (6")
LF 9,178.000 $0.050 $0.200 $0.200 $0.010 $0.200 $0.206 $0.240
PAV SURF PREP FOR MRK (8")
LF 383.000 $0.120 $0.500 $0.500 $0.020 $0.500 $0.515 $0.600
PAV SURF PREP FOR MRK (10")
LF 840.000 $0.100 $1.000 $1.000 $0.030 $1.000 $1.030 $1.190
PAV SURF PREP FOR MRK (12")
LF 123.000 $0.290 $1.250 $1.250 $0.030 $1.250 $1.288 $1.490
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 5.000 $4,400.000 $800.000 $450.000 $0.010 $450.000 $1,030.000 $400.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 151.000 $70.000 $55.000 $65.000 $100.000 $60.000 $90.950 $91.020
TMA (STATIONARY)
DAY 175.000 $175.000 $150.000 $150.000 $350.000 $150.000 $214.000 $199.170
TMA (MOBILE OPERATION)
DAY 36.000 $157.500 $150.000 $250.000 $350.000 $175.000 $508.250 $267.700
1
MEMBRANE UNDERSEAL
GAL 49,559.000 $1.930 $2.500 $2.500 $2.750 $3.500 $0.000 $4.040
Totals: $4,029,090.250 $4,014,717.410 $4,249,439.400 $4,461,473.900 $4,494,160.810 $4,925,472.662 $5,239,108.800