Bid Cobra

BEXAR FM 1560 (2230-01-016)

Items: 84

County: BEXAR
Length: N/A
Highway: FM 1560
District: SAN ANTONIO
Control Number: 2230-01-016
DBE Goal: N/A
Project: STP 2017(477)
Guaranty: N/A
Time: 181 WORKING DAYS
Engineer's Estimate: $1,544,302.96
Date: 01/05/2017 (9 years ago)
Contract Number: N/A
Type: REPLACE EXISTING CULVERT WITH BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (10)
E
Engineer's Estimate
$1,544,302.96
$1,447,520.48
Over/Under Est: -6.27% -$96,782.48
Over/Under Est: -0.31% -$4,831.89
Amt Left: 6.35% $91,950.59
Over/Under Est: -0.03% -$458.21
Amt Left: 6.65% $96,324.27
Delta: -0.28% -$4,373.68
Over/Under Est: 0.55% $8,446.78
Amt Left: 7.27% $105,229.26
Delta: -0.58% -$8,904.99
$1,622,626.26
Over/Under Est: 5.07% $78,323.30
Amt Left: 12.1% $175,105.78
Delta: -4.50% -$69,876.52
$1,741,742.91
Over/Under Est: 12.79% $197,439.95
Amt Left: 20.33% $294,222.43
Delta: -7.34% -$119,116.65
Over/Under Est: 12.96% $200,188.19
Amt Left: 20.52% $296,970.67
Delta: -0.16% -$2,748.24
Over/Under Est: 13.51% $208,674.21
Amt Left: 21.1% $305,456.69
Delta: -0.49% -$8,486.02
Over/Under Est: 20.46% $316,017.69
Amt Left: 28.52% $412,800.17
Delta: -6.12% -$107,343.48
$2,414,165.06
Over/Under Est: 56.33% $869,862.10
Amt Left: 66.78% $966,644.58
Delta: -29.77% -$553,844.41

Bid Items & Bid Tabulations

84 Total 0 of 84
BEXAR  |  FM 1560  |  SAN ANTONIO  |  2230-01-016  |  01/05/2017  |  $1,544,302.96  |  STP 2017(477)  |  REPLACE EXIST CULVERT WITH BRIDGE  |  181 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
CURRAN CONTRACTING COMPANY
TROPICAL CONTRACTING, LLC
CAPITAL EXCAVATION COMPANY
SB CONTRACTORS LLC
RELMCO, INC.
ACME BRIDGE COMPANY, INC.
E-Z BEL CONSTRUCTION, LLC
JORDAN FOSTER CONSTRUCTION, LLC
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 12.000 $4,500.000 $3,200.000 $1,217.000 $800.000 $3,000.000 $2,000.000 $12,000.000 $2,000.000 $9,750.000 $1,500.000 $3,240.000
EXCAVATION (ROADWAY)
CY 669.000 $9.000 $18.000 $14.750 $10.000 $15.000 $15.000 $11.000 $20.000 $22.000 $24.000 $97.350
EXCAVATION (CHANNEL)
CY 467.000 $7.000 $18.000 $18.400 $10.000 $25.000 $15.000 $12.000 $30.000 $31.000 $25.000 $109.890
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 3,335.000 $5.000 $20.000 $29.700 $20.000 $26.000 $30.000 $15.000 $30.000 $17.000 $35.000 $73.260
FURNISHING AND PLACING TOPSOIL (4")
STA 13.000 $435.000 $320.000 $184.350 $100.000 $1,000.000 $1,100.000 $793.000 $1,000.000 $2,100.000 $375.000 $1,314.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 50.000 $0.250 $15.500 $1.050 $0.250 $17.000 $15.000 $1.750 $1.050 $1.500 $1.000 $15.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 3,548.000 $0.200 $0.310 $0.200 $0.250 $0.240 $0.220 $0.500 $0.180 $0.180 $0.190 $0.300
DRILL SEEDING (TEMP) (WARM)
SY 1,774.000 $0.100 $0.150 $0.150 $0.250 $0.480 $0.430 $0.500 $0.160 $0.150 $0.160 $0.150
DRILL SEEDING (TEMP) (COOL)
SY 1,774.000 $0.100 $0.150 $0.150 $0.250 $0.480 $0.430 $0.500 $0.160 $0.180 $0.160 $0.150
VEGETATIVE WATERING
MG 1,152.000 $16.000 $6.000 $10.000 $14.000 $10.000 $41.000 $1.500 $45.000 $0.010 $2.000 $36.630
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 50.000 $0.840 $6.500 $10.600 $15.000 $4.000 $2.000 $8.000 $10.600 $10.000 $10.000 $5.000
D-GR HMA(SQ) TY-B PG64-22
TON 1,710.000 $75.000 $80.000 $60.000 $90.000 $74.000 $72.000 $77.350 $71.400 $92.000 $68.000 $102.900
D-GR HMA(SQ) TY-C PG70-22
TON 1,195.000 $104.000 $85.000 $65.400 $90.000 $79.000 $75.500 $83.140 $75.700 $75.000 $72.000 $108.150
PLANE ASPH CONC PAV (2")
SY 2,196.000 $1.500 $4.000 $3.350 $10.000 $5.500 $4.500 $9.720 $5.300 $5.000 $5.750 $5.710
CEM STABIL BKFL
CY 55.000 $105.000 $125.000 $97.200 $125.000 $165.000 $115.000 $105.000 $200.000 $230.000 $125.000 $166.550
FLOWABLE BACKFILL
CY 9.000 $140.000 $135.000 $113.650 $125.000 $150.000 $115.000 $110.000 $200.000 $162.000 $180.000 $150.960
TRENCH EXCAVATION PROTECTION
LF 346.000 $5.380 $1.500 $1.000 $5.000 $1.000 $2.000 $7.000 $5.000 $5.000 $2.000 $16.780
TEMPORARY SPL SHORING
SF 4,376.000 $16.000 $9.000 $15.000 $15.000 $13.000 $21.000 $27.000 $25.000 $24.000 $27.000 $40.290
DRILL SHAFT (30 IN)
LF 300.000 $177.000 $175.000 $135.000 $175.000 $145.000 $155.000 $130.000 $150.000 $188.000 $150.000 $192.200
CL C CONC (ABUT)
CY 38.600 $940.000 $900.000 $1,100.000 $750.000 $1,200.000 $900.000 $1,500.000 $1,200.000 $1,110.000 $800.000 $1,114.260
REINF CONC SLAB (BOX BEAM)
SF 2,530.000 $18.000 $14.000 $19.000 $20.000 $16.000 $19.000 $18.400 $18.500 $25.500 $42.000 $25.090
APPROACH SLAB
CY 64.500 $450.000 $450.000 $418.000 $425.000 $550.000 $500.000 $1,200.000 $600.000 $600.000 $750.000 $552.540
PRESTR CONC BOX BEAM (4B20)
LF 178.500 $180.000 $180.000 $139.750 $200.000 $185.000 $160.000 $161.270 $220.000 $167.000 $200.000 $163.030
PRESTR CONC BOX BEAM (5B20)
LF 357.000 $185.000 $175.000 $153.350 $200.000 $155.000 $160.000 $161.270 $220.000 $167.000 $225.000 $163.290
RIPRAP (CONC)(5 IN)
CY 177.000 $427.000 $365.000 $462.000 $450.000 $420.000 $375.000 $416.000 $475.000 $400.000 $650.000 $400.450
RIPRAP (STONE PROTECTION)(12 IN)
CY 154.000 $118.610 $105.000 $130.000 $200.000 $136.540 $140.000 $201.500 $125.000 $144.000 $140.000 $125.330
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $415.000 $450.000 $425.000 $450.000 $500.000 $450.000 $481.000 $600.000 $450.000 $475.000 $420.580
RAIL (TY T223)
LF 152.000 $112.000 $75.000 $152.000 $120.000 $75.000 $110.000 $57.200 $100.000 $180.000 $450.000 $194.430
ARMOR JOINT (SEALED)
LF 80.000 $100.000 $80.000 $100.000 $100.000 $95.800 $85.000 $73.320 $100.000 $86.000 $110.000 $116.190
CMP AR (GAL STL DES 3)
LF 570.000 $85.000 $35.000 $30.450 $75.000 $60.000 $40.000 $37.130 $35.000 $53.000 $80.000 $57.910
CMP AR (GAL STL DES 5)
LF 27.000 $175.000 $75.000 $48.400 $100.000 $140.000 $90.000 $143.520 $100.000 $100.000 $150.000 $184.830
RC PIPE (CL III)(30 IN)
LF 253.000 $87.490 $65.000 $88.950 $120.000 $75.000 $65.000 $53.950 $70.000 $127.000 $140.000 $121.080
RC PIPE (CL III)(36 IN)
LF 93.000 $109.690 $90.000 $98.500 $160.000 $95.000 $105.000 $90.810 $100.000 $175.000 $155.000 $153.750
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 8.000 $4,000.000 $1,800.000 $2,700.000 $1,800.000 $2,000.000 $1,200.000 $1,700.400 $3,000.000 $1,740.000 $3,000.000 $3,149.220
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $4,000.000 $2,400.000 $3,500.000 $3,000.000 $2,500.000 $1,600.000 $1,791.920 $4,000.000 $4,250.000 $3,500.000 $5,453.050
MOBILIZATION
LS 1.000 $107,800.000 $140,000.000 $131,500.000 $75,000.000 $146,000.000 $157,335.910 $150,000.000 $152,000.000 $126,500.000 $125,000.000 $215,336.180
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,100.000 $9,500.000 $7,900.150 $1,500.000 $1,000.000 $4,000.000 $3,000.000 $5,000.000 $5,500.000 $5,000.000 $5,046.490
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 87.000 $41.000 $24.500 $33.450 $100.000 $27.600 $30.000 $34.920 $28.500 $38.000 $25.000 $24.000
ROCK FILTER DAMS (REMOVE)
LF 87.000 $6.000 $7.500 $9.150 $50.000 $7.000 $10.000 $8.240 $6.700 $8.000 $8.000 $7.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $14.000 $11.000 $13.650 $15.000 $12.500 $15.000 $34.920 $25.100 $19.000 $11.000 $10.500
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $6.000 $2.250 $10.500 $5.000 $5.150 $9.000 $8.240 $6.700 $6.200 $2.000 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,404.000 $3.000 $2.300 $2.300 $4.000 $2.150 $3.000 $2.800 $2.300 $3.300 $2.500 $2.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,404.000 $1.000 $0.550 $0.350 $2.000 $0.350 $0.500 $0.460 $0.370 $1.250 $0.600 $0.500
CONSTRUCTING DETOURS
SY 4,291.000 $40.000 $31.000 $32.750 $25.000 $45.000 $30.000 $45.000 $30.400 $50.000 $40.000 $48.180
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 60.000 $50.000 $50.000 $28.300 $75.000 $16.000 $62.000 $35.000 $25.900 $71.000 $55.000 $60.570
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,540.000 $33.000 $20.000 $24.750 $75.000 $14.000 $57.000 $20.000 $48.400 $14.000 $40.000 $61.840
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 200.000 $35.000 $35.000 $18.000 $80.000 $16.000 $60.000 $20.000 $33.600 $16.000 $40.000 $64.260
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,780.000 $7.000 $6.000 $12.150 $15.000 $5.000 $8.000 $8.780 $4.300 $6.000 $5.000 $8.530
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 180.000 $10.000 $6.000 $16.300 $15.000 $5.000 $10.000 $10.140 $9.000 $9.000 $5.000 $18.420
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 60.000 $6.000 $40.000 $13.050 $15.000 $16.000 $15.000 $26.520 $22.800 $14.000 $19.000 $17.940
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,540.000 $6.000 $8.000 $8.600 $15.000 $16.000 $13.000 $7.480 $19.400 $7.500 $15.000 $12.060
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 200.000 $7.000 $8.000 $5.750 $15.000 $16.000 $15.000 $7.930 $16.600 $7.500 $15.000 $20.320
CONC CURB (MONO) (TY II)
LF 440.000 $11.000 $17.000 $23.170 $20.000 $17.000 $18.000 $13.000 $23.000 $19.300 $30.000 $14.630
DRIVEWAYS (ACP)
SY 492.000 $35.000 $32.000 $77.700 $20.000 $46.010 $42.000 $28.000 $51.600 $45.000 $29.000 $48.180
MTL W-BEAM GD FEN (TIM POST)
LF 438.000 $18.000 $19.500 $19.100 $25.000 $18.000 $19.300 $19.800 $21.500 $19.000 $18.000 $20.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,410.000 $1,500.000 $1,766.000 $1,500.000 $1,102.000 $1,402.000 $1,212.200 $1,330.000 $1,110.000 $1,102.000 $1,752.000
SHORT RADIUS
LF 75.000 $32.000 $25.000 $39.700 $50.000 $37.390 $24.500 $41.130 $26.000 $40.000 $38.000 $24.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $720.000 $900.000 $900.000 $1,500.000 $850.000 $850.000 $935.000 $1,090.000 $850.000 $850.000 $1,025.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $1,300.000 $4,500.000 $8,300.000 $8,000.000 $8,000.000 $8,400.000 $7,696.000 $6,980.000 $7,000.000 $8,000.000 $6,582.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $900.000 $800.000 $563.600 $500.000 $500.000 $875.000 $1,248.000 $238.000 $225.000 $500.000 $225.000
MAILBOX INSTALL-S (TWG-POST) TY 4
EA 2.000 $205.000 $80.000 $163.300 $300.000 $250.000 $175.000 $169.140 $265.000 $245.000 $205.000 $175.000
REMOVE SM RD SN SUP&AM
EA 2.000 $96.000 $70.000 $26.250 $200.000 $115.000 $150.000 $165.000 $159.000 $119.000 $50.000 $200.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 10,975.000 $0.700 $0.660 $1.400 $0.750 $0.650 $0.650 $0.720 $0.690 $0.650 $0.650 $0.650
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 11,750.000 $0.700 $0.660 $1.400 $0.750 $0.650 $0.650 $0.720 $0.690 $0.650 $0.650 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 340.000 $1.000 $1.750 $0.600 $0.800 $1.000 $1.000 $1.050 $2.350 $2.400 $1.000 $1.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 320.000 $1.000 $1.750 $0.500 $0.650 $1.000 $1.000 $1.050 $2.450 $2.400 $1.000 $1.600
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,100.000 $0.400 $0.560 $1.150 $0.650 $0.550 $0.550 $0.610 $0.580 $0.550 $0.550 $0.550
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 350.000 $0.400 $1.050 $2.100 $1.250 $1.000 $1.000 $1.100 $1.050 $1.000 $1.000 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,800.000 $0.400 $0.560 $1.150 $0.750 $0.550 $0.550 $0.610 $0.580 $0.550 $0.550 $0.550
RE PM W/RET REQ TY II (W) 4" (SLD)
LF 3,100.000 $0.200 $0.260 $0.550 $0.350 $0.250 $0.250 $0.280 $0.260 $0.250 $0.250 $0.250
RE PM W/RET REQ TY II (Y) 4" (BRK)
LF 350.000 $0.200 $0.260 $0.550 $0.350 $0.250 $0.250 $0.280 $0.270 $0.250 $0.250 $0.250
RE PM W/RET REQ TY II (Y) 4" (SLD)
LF 1,800.000 $0.200 $0.260 $0.550 $0.350 $0.250 $0.250 $0.280 $0.260 $0.250 $0.250 $0.250
REFL PAV MRKR TY II-A-A
EA 32.000 $5.000 $12.500 $25.500 $15.000 $12.000 $12.000 $13.200 $12.700 $12.000 $12.000 $12.000
ELIM EXT PAV MRK & MRKS (4")
LF 7,400.000 $0.500 $0.500 $0.950 $0.500 $0.440 $1.500 $0.480 $0.930 $0.440 $1.300 $0.440
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 21.000 $150.000 $200.000 $17.250 $150.000 $165.000 $100.000 $275.000 $90.100 $180.000 $600.000 $162.370
TRENCH EXCAVATION PROTECTION
LF 1,194.000 $2.000 $2.000 $1.000 $5.000 $1.000 $1.500 $5.000 $1.200 $0.010 $1.050 $10.000
ADJUST EXISTING VALVE BOX
EA 4.000 $400.000 $750.000 $210.500 $400.000 $1,000.000 $320.000 $800.000 $592.000 $1,310.000 $700.000 $1,500.000
CONCRETE ENCASEMENT AND SADDLES
CY 67.000 $700.000 $300.000 $272.600 $125.000 $500.000 $450.000 $275.000 $563.000 $180.000 $400.000 $600.000
ADJUST FIRE HYDRANT
EA 1.000 $1,000.000 $2,500.000 $1,050.000 $1,500.000 $2,000.000 $1,500.000 $2,500.000 $6,630.000 $4,420.000 $2,000.000 $3,000.000
SERV LINE BRK/LEAK REPAIR(ALL SIZES)
EA 2.000 $850.000 $3,500.000 $880.000 $900.000 $2,000.000 $2,500.000 $2,500.000 $1,180.000 $2,000.000 $3,500.000 $6,000.000
WATER MAIN BREAK / LEAK REPAIR (20")
EA 2.000 $3,200.000 $10,500.000 $24,500.000 $2,000.000 $8,000.000 $8,000.000 $12,000.000 $1,420.000 $2,700.000 $6,100.000 $25,000.000
RELAY SHORT SERVICE (3/4")
EA 1.000 $1,300.000 $2,300.000 $4,000.000 $1,200.000 $2,100.000 $1,200.000 $2,000.000 $5,210.000 $4,000.000 $1,500.000 $3,500.000
RELAY LONG SERVICE (2")
EA 1.000 $3,000.000 $3,500.000 $8,500.000 $1,800.000 $5,500.000 $2,500.000 $3,000.000 $14,100.000 $6,830.000 $4,400.000 $8,500.000
WATER MAIN BREAK / LEAK REPAIR (6")
EA 2.000 $2,000.000 $4,500.000 $4,000.000 $2,000.000 $4,000.000 $5,000.000 $6,000.000 $1,180.000 $2,000.000 $4,000.000 $15,000.000
Totals: $1,544,302.960 $1,447,520.480 $1,539,471.075 $1,543,844.750 $1,552,749.740 $1,622,626.260 $1,741,742.915 $1,744,491.150 $1,752,977.170 $1,860,320.650 $2,414,165.071