BEXAR IH 410 (0521-05-151)

Items: 99

County: BEXAR
Length: 0.0000 MILES
Highway: IH 410
District: SAN ANTONIO
Control Number: 0521-05-151
DBE Goal: 0.0%
Project: C 521-5-151
Guaranty: $100,000.00
Time: 247 WORKING DAYS
Engineer's Estimate: $12,327,581.15
Date: 05/01/2025 (1 year ago)
Contract Number: 5253009
Type: RESURFACE ROADWAY
Project ID: A00063599
Project Description: BASE REPAIR, MILL, INLAY & PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CARLOS ARCILA
DANNY GALLEGOS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$12,327,581.15
$9,693,874.28
Over/Under Est: -21.36% -$2,633,706.87
Over/Under Est: -20.72% -$2,554,330.80
Amt Left: 0.82% $79,376.07
Over/Under Est: -18.93% -$2,333,788.45
Amt Left: 3.09% $299,918.42
Delta: -2.26% -$220,542.35
$10,518,394.56
Over/Under Est: -14.68% -$1,809,186.59
Amt Left: 8.51% $824,520.28
Delta: -5.25% -$524,601.86
$11,594,306.51
Over/Under Est: -5.95% -$733,274.64
Amt Left: 19.6% $1,900,432.23
Delta: -10.23% -$1,075,911.95
$12,502,486.35
Over/Under Est: 1.42% $174,905.20
Amt Left: 28.97% $2,808,612.07
Delta: -7.83% -$908,179.84
Subcontractor Percentage Amount
RPV CONSTRUCTION, LLC 3.92% $379,999.87
TRP CONSTRUCTION GROUP, LLC 3.35% $324,744.79
PRIMATE CONSTRUCTION, LP 1.73% $167,704.03
CENTERLINE TECHNOLOGIES, LLC 1.47% $142,499.95
A K FUQUAY CONSTRUCTION 0.62% $60,102.02
BUYERS BARRICADES SAN ANTONIO, LLC 0.34% $32,959.17
PROFESSIONAL TRAFFIC CONTROL LLC 0.12% $11,632.65
Total: 11.55% $1,119,642.48

Bid Items & Bid Tabulations

99 Total 0 of 99
BEXAR  |  IH 410  |  SAN ANTONIO  |  0521-05-151  |  05/01/2025  |  $12,327,581.15  |  C 521-5-151  |  RESURF ROADWAY  |  247 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
CLARK CONSTRUCTION OF TEXAS, INC.
LONE STAR PAVING COMPANY
ALLEN KELLER COMPANY
DEAN WORD COMPANY, LTD.
HUNTER INDUSTRIES, LTD.
REMOV CONC (MOWSTRIP)
LF 300.000 $15.000 $15.000 $22.000 $16.000 $14.450 $10.720 $9.900
REMOV CONC (MISC)
SY 40.000 $20.000 $36.000 $27.000 $26.500 $342.600 $65.130 $9.900
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 910.000 $35.000 $15.500 $25.000 $9.000 $6.960 $1.900 $9.900
EMBANK (FNL)(OC)(TY B)
CY 157.000 $34.420 $70.000 $45.000 $114.000 $24.480 $210.730 $48.400
BLADING
HR 24.000 $150.000 $137.000 $450.000 $530.000 $367.050 $249.110 $99.000
COMPOST MANUF TOPSOIL (4")
SY 3,369.000 $1.450 $5.200 $5.180 $7.000 $3.880 $5.510 $5.600
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 3,369.000 $0.500 $0.800 $0.800 $0.500 $0.600 $0.910 $0.860
VEGETATIVE WATERING
TGL 52.560 $22.590 $60.000 $275.000 $260.000 $341.080 $86.280 $36.290
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 15,535.000 $122.190 $110.000 $124.740 $115.000 $112.070 $116.340 $125.400
TOM-C PG76-22 SAC-A
TON 14,795.000 $176.890 $145.000 $146.440 $135.000 $163.000 $153.110 $151.800
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 14,843.000 $45.000 $38.000 $34.880 $35.000 $38.130 $42.590 $43.750
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
SY 46,824.000 $64.000 $46.200 $48.940 $48.000 $50.040 $56.920 $61.230
FLEX PAVEMENT STRUCTURE REPAIR (7"-9")
SY 802.000 $75.000 $94.000 $67.180 $150.000 $61.980 $68.740 $83.390
PLANE ASPH CONC PAV(0" TO 2")
SY 4,526.000 $2.000 $1.000 $0.550 $3.000 $0.710 $3.710 $2.420
PLANE ASPH CONC PAV(0" TO 4")
SY 16,635.000 $2.420 $3.350 $1.740 $4.500 $0.950 $5.410 $3.960
PLANE ASPH CONC PAV(2" TO 4")
SY 6,678.000 $3.000 $3.350 $1.740 $5.200 $1.060 $5.310 $3.960
PLANE ASPH CONC PAV(0" TO 0.5" MICRO)
SY 12,858.000 $0.250 $3.000 $1.190 $1.700 $1.020 $5.010 $1.320
PLANE ASPH CONC PAV(2")
SY 233,871.000 $1.850 $1.950 $1.740 $2.000 $0.910 $2.200 $2.420
DRILL SHAFT (SIGN MTS) (24 IN)
LF 16.000 $271.970 $225.000 $200.000 $240.000 $168.450 $299.910 $270.030
RIPRAP (MOW STRIP)(4 IN)
CY 523.600 $616.360 $725.000 $550.000 $720.000 $499.260 $638.400 $813.100
CLEANING EXISTING JOINTS
LF 1,424.000 $24.680 $10.000 $5.000 $5.300 $3.740 $10.720 $5.600
HEADER TYPE EXPANSION JOINT
CF 237.600 $670.000 $532.000 $615.000 $650.000 $460.430 $569.460 $689.360
JOINT SEALANT
LF 1,460.000 $20.500 $12.500 $32.000 $34.000 $23.950 $13.430 $35.870
MOBILIZATION
LS 1.000 $1,260,000.000 $571,400.000 $150,000.000 $420,000.000 $1,000,000.000 $915,000.000 $712,595.430
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $7,801.400 $12,400.000 $2,500.000 $2,000.000 $12,878.920 $22,519.510 $46,590.150
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 492.000 $90.000 $75.000 $100.000 $90.000 $101.240 $91.790 $91.470
TMA (STATIONARY)
DAY 232.000 $241.140 $200.000 $100.000 $260.000 $917.080 $294.600 $559.100
TMA (MOBILE OPERATION)
DAY 87.000 $419.880 $200.000 $100.000 $260.000 $787.960 $913.160 $807.580
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 10,107.000 $5.100 $3.500 $3.500 $4.000 $2.620 $3.810 $3.780
BIODEG EROSN CONT LOGS (REMOVE)
LF 10,107.000 $1.180 $0.500 $0.500 $1.500 $0.370 $0.500 $0.540
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 75,362.000 $0.140 $0.140 $0.320 $0.150 $0.160 $0.200 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 7,287.500 $24.240 $25.000 $28.500 $27.500 $18.720 $26.750 $30.910
MTL W-BEAM GD FEN (STEEL POST)
LF 700.000 $32.600 $27.000 $40.000 $105.000 $20.210 $28.960 $118.280
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,321.650 $3,300.000 $3,000.000 $2,340.000 $1,871.660 $3,395.620 $2,615.250
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,403.800 $1,200.000 $1,400.000 $1,660.000 $898.400 $1,285.420 $1,860.390
MTL BM GD FEN TRANS (31"-28")
EA 9.000 $1,000.000 $900.000 $950.000 $1,060.000 $673.800 $964.070 $1,188.750
REMOVE METAL BEAM GUARD FENCE
LF 7,900.000 $2.670 $2.000 $2.000 $4.000 $1.500 $2.100 $4.460
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $216.960 $200.000 $200.000 $265.000 $149.730 $214.240 $297.190
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $100.700 $100.000 $200.000 $265.000 $74.870 $107.120 $297.190
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $341.890 $200.000 $200.000 $370.000 $149.730 $214.240 $416.060
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $3,051.910 $3,000.000 $3,000.000 $3,790.000 $2,246.000 $3,213.450 $4,249.780
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $249.750 $200.000 $250.000 $370.000 $149.730 $214.240 $416.060
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $950.000 $2,700.000 $1,800.000 $610.000 $845.380 $937.210 $683.530
ALUMINUM SIGNS (TY G)
SF 176.000 $30.100 $28.000 $8.000 $30.000 $20.960 $30.260 $40.140
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $722.040 $695.000 $800.000 $740.000 $520.320 $696.220 $745.550
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 45.000 $795.790 $763.000 $800.000 $810.000 $571.230 $996.130 $1,066.710
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $931.430 $952.000 $785.000 $1,000.000 $712.730 $1,178.300 $1,261.700
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 11.000 $901.710 $987.000 $985.000 $1,040.000 $738.930 $1,172.890 $1,255.960
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,192.260 $1,100.000 $1,250.000 $1,160.000 $823.530 $1,301.450 $1,393.600
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 5.000 $1,216.830 $1,210.000 $1,300.000 $1,280.000 $905.890 $1,430.020 $1,531.240
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,937.380 $1,905.000 $2,000.000 $2,020.000 $1,426.210 $2,249.390 $2,408.700
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $3,706.200 $2,285.000 $550.000 $2,400.000 $1,709.210 $2,495.790 $2,672.510
REMOVE SM RD SN SUP&AM
EA 68.000 $100.040 $93.000 $125.000 $100.000 $69.620 $101.810 $108.960
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 2.000 $370.000 $250.000 $100.000 $270.000 $187.160 $1,108.660 $1,187.140
INSTALL LRSS (STRUCT STEEL)
LB 704.200 $10.210 $8.500 $4.000 $9.000 $6.360 $8.520 $11.880
REMOVE LRSA
EA 1.000 $1,262.030 $1,200.000 $250.000 $1,270.000 $898.400 $792.620 $1,080.130
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 40.000 $77.330 $87.000 $75.000 $90.000 $65.130 $26.250 $28.100
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 6.000 $120.000 $97.000 $75.000 $103.000 $72.620 $56.220 $60.220
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 53.000 $25.170 $20.000 $78.000 $21.000 $14.980 $26.250 $28.100
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 181.000 $35.000 $28.000 $85.000 $30.000 $20.960 $30.560 $32.690
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 53.000 $26.220 $20.000 $85.000 $21.000 $14.980 $26.250 $28.100
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 142.000 $37.800 $28.000 $60.000 $30.000 $20.960 $30.560 $32.690
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 188.000 $30.800 $30.000 $75.000 $32.000 $22.460 $31.060 $33.260
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 7.000 $59.920 $87.000 $75.000 $92.000 $65.130 $74.950 $80.290
INSTL OM ASSM (OM-1)(WFLX)GND
EA 5.000 $150.000 $87.000 $70.000 $92.000 $65.130 $227.060 $243.160
REMOVE DELIN & OBJECT MARKER ASSMS
EA 453.000 $25.180 $7.000 $75.000 $7.400 $5.240 $19.840 $21.220
INSTL OM LG RD SIGN (2-OM-TY1)Y
EA 2.000 $75.000 $45.000 $85.000 $50.000 $33.690 $283.880 $303.950
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 34,886.000 $0.410 $0.400 $0.450 $0.300 $0.300 $0.300 $0.440
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 1,589.000 $0.740 $1.000 $0.450 $0.400 $0.750 $0.400 $0.590
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 141,113.000 $0.600 $0.300 $0.450 $0.300 $0.230 $0.300 $0.380
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 67.000 $3.180 $2.500 $3.000 $1.600 $1.870 $1.600 $2.210
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 620.000 $3.870 $4.000 $6.000 $3.200 $3.000 $3.210 $4.420
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
EA 26.000 $324.000 $300.000 $300.000 $320.000 $224.600 $321.360 $442.210
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
EA 24.000 $324.000 $300.000 $600.000 $320.000 $224.600 $321.360 $442.210
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 147,069.000 $0.600 $0.300 $0.450 $0.300 $0.230 $0.300 $0.380
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 29,324.000 $1.820 $1.600 $1.000 $1.000 $2.130 $3.610 $1.780
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,589.000 $2.650 $1.500 $0.950 $1.600 $1.120 $1.600 $2.210
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 300.000 $1.190 $1.500 $0.950 $1.000 $1.120 $1.100 $1.470
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 67.000 $5.370 $2.500 $4.000 $3.200 $1.870 $3.210 $4.420
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 733.000 $7.970 $8.500 $8.000 $6.400 $6.360 $6.410 $8.840
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $118.560 $125.000 $200.000 $160.000 $93.590 $160.730 $221.100
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 13.000 $1,102.700 $700.000 $450.000 $635.000 $524.070 $642.710 $884.410
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 12.000 $1,881.250 $700.000 $900.000 $635.000 $524.070 $642.710 $884.410
PAVEMENT SLER 6"
LF 140,244.000 $0.250 $0.250 $0.250 $0.300 $0.180 $0.300 $0.380
PAVEMENT SLER 12"
LF 67.000 $1.610 $1.500 $2.000 $2.100 $1.120 $2.100 $2.950
PAVEMENT SLER 24"
LF 620.000 $2.130 $3.500 $4.000 $4.200 $2.620 $4.310 $5.900
PAVEMENT SLER (ENTR GORE)
EA 13.000 $182.700 $250.000 $200.000 $320.000 $187.170 $321.360 $442.210
PAVEMENT SLER (EXIT GORE)
EA 12.000 $537.500 $250.000 $400.000 $320.000 $187.160 $321.360 $442.210
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 16,501.000 $0.670 $0.750 $0.750 $0.700 $0.560 $0.700 $0.960
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 65,878.000 $0.630 $0.750 $0.750 $0.650 $0.560 $0.700 $0.900
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 67,335.000 $0.640 $0.750 $0.750 $0.650 $0.560 $0.700 $0.900
PREFAB PM TY C (W)(NUMBER)
EA 6.000 $258.970 $250.000 $75.000 $320.000 $187.170 $321.360 $442.210
REFL PAV MRKR TY I-A
EA 2,786.000 $4.210 $4.750 $5.000 $5.300 $3.550 $5.310 $7.370
REFL PAV MRKR TY II-C-R
EA 1,584.000 $5.050 $4.750 $5.000 $5.300 $3.550 $5.310 $7.370
DEBRIS REMOVAL (SPOT DEBRIS)
MI 0.680 $7,016.130 $43,300.000 $56,500.000 $60,000.000 $42,299.620 $65,259.430 $63,331.180
UNDERSEAL COURSE
GAL 51,439.000 $4.060 $1.000 $4.600 $4.000 $3.940 $4.810 $4.180
BONDING COURSE
GAL 51,439.000 $4.030 $0.100 $3.700 $4.000 $3.940 $1.700 $3.300
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 334.000 $51.500 $65.000 $42.000 $64.000 $48.660 $84.570 $71.320
LONG CHANNEL MOUNT CURB SYS (REMOVE)
LF 334.000 $3.930 $10.000 $2.500 $10.600 $7.490 $19.840 $11.890
Totals: $12,327,581.147 $9,693,874.280 $9,773,250.350 $9,993,792.700 $10,518,394.562 $11,594,306.504 $12,502,486.342
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $15,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $350,000.00
CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $15,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $15,000.00
Total: $395,000.00