Show Job Controls
Bid Cobra

BEXAR SL 13 (0521-02-042)

Items: 81

County: BEXAR
Length: N/A
Highway: SL 13
District: SAN ANTONIO
Control Number: 0521-02-042
DBE Goal: N/A
Project: C 521-2-42
Guaranty: N/A
Time: 207 WORKING DAYS
Engineer's Estimate: $7,162,097.48
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$7,162,097.48
$6,683,653.51
Over/Under Est: -6.68% -$478,443.97
Over/Under Est: -2.8% -$200,199.76
Amt Left: 4.16% $278,244.21
Over/Under Est: 0.15% $10,679.21
Amt Left: 7.32% $489,123.18
Delta: -3.03% -$210,878.97
Over/Under Est: 30.04% $2,151,789.95
Amt Left: 39.35% $2,630,233.92
Delta: -29.85% -$2,141,110.74
Over/Under Est: 34.98% $2,505,405.41
Amt Left: 44.64% $2,983,849.38
Delta: -3.80% -$353,615.46
$10,355,393.48
Over/Under Est: 44.59% $3,193,296.00
Amt Left: 54.94% $3,671,739.97
Delta: -7.12% -$687,890.59

Bid Items & Bid Tabulations

81 Total 0 of 81
BEXAR  |  SL 13  |  SAN ANTONIO  |  0521-02-042  |  02/04/2022  |  $7,162,097.48  |  C 521-2-42  |  RESURF ROADWAY  |  207 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CLARK CONSTRUCTION OF TEXAS, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
TEXAS MATERIALS GROUP, INC.
H. L. ZUMWALT CONSTRUCTION, INC.
LONE STAR PAVING COMPANY
HUNTER INDUSTRIES, LTD.
PREPARING ROW
AC 2.000 $10,000.000 $2,000.000 $25,000.000 $12,800.000 $25,000.000 $11,250.000 $48,000.000
REMOVING CONC (RIPRAP)
SY 325.000 $10.000 $18.000 $18.600 $14.000 $13.500 $25.000 $35.650
REMOVING CONCRETE(MOW STRIP)
LF 130.000 $5.780 $24.000 $15.120 $12.000 $15.000 $15.000 $21.440
COMPOST MANUF TOPSOIL (4")
SY 1,008.000 $1.500 $2.550 $4.250 $3.150 $3.500 $4.500 $2.300
BLOCK SODDING
SY 1,008.000 $3.000 $7.500 $8.000 $7.600 $10.000 $8.250 $3.600
VEGETATIVE WATERING
MG 16.000 $21.080 $1,000.000 $20.000 $50.000 $35.000 $100.000 $53.460
ASPH (A-R TYPE II OR III)
GAL 29,773.000 $3.000 $16.000 $4.820 $5.100 $31.500 $26.410 $17.640
AGGR (TY-PB GR-4)
CY 543.000 $132.290 $55.520 $60.000 $145.000 $415.000 $375.000 $146.630
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 15,918.000 $24.590 $28.570 $27.000 $27.500 $30.000 $36.000 $38.300
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 53,889.000 $39.920 $43.110 $42.000 $43.850 $46.000 $57.000 $52.790
PLANE ASPH CONC PAV(0" TO 2")
SY 6,193.000 $1.660 $1.150 $1.630 $1.600 $2.000 $2.750 $3.640
PLANE ASPH CONC PAV (2")
SY 176,548.000 $3.000 $1.150 $1.190 $1.600 $2.000 $1.900 $2.920
CL C CONC (RAIL FOUNDATION)
CY 40.000 $328.430 $1,150.000 $600.000 $980.000 $1,100.000 $1,200.000 $1,800.000
RIPRAP (CONC)(4 IN)
CY 72.000 $439.390 $515.000 $582.510 $650.000 $500.000 $445.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 98.000 $467.920 $515.000 $579.280 $600.000 $500.000 $445.000 $1,000.000
CLEANING AND SEALING EXISTING JOINTS
LF 3,720.000 $18.950 $9.500 $9.800 $9.700 $26.000 $10.000 $1.630
RAIL (TY C221)
LF 256.000 $87.350 $165.200 $200.000 $150.000 $135.000 $170.000 $300.000
RETROFIT RAIL (TY SSTR)
LF 924.000 $125.540 $113.400 $275.000 $130.000 $130.000 $118.000 $300.000
HEADER TYPE EXPANSION JOINT
CF 620.000 $370.270 $279.670 $281.440 $286.000 $600.000 $290.000 $477.820
JOINT SEALANT
LF 3,720.000 $17.130 $6.000 $6.000 $6.130 $12.000 $6.250 $14.620
CLEAN EXIST CULVERTS
EA 2.000 $2,000.000 $1,500.000 $2,505.030 $3,275.000 $3,000.000 $2,600.000 $1,800.000
MOBILIZATION
LS 1.000 $628,244.550 $130,000.000 $683,000.000 $437,550.000 $700,000.000 $723,500.000 $1,031,094.450
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $7,107.340 $1,900.000 $2,300.000 $5,175.000 $10,000.000 $5,250.000 $25,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 223.000 $23.000 $16.000 $16.000 $18.000 $22.000 $16.500 $23.880
CONSTRUCTION EXITS (REMOVE)
SY 223.000 $8.000 $2.000 $2.000 $6.200 $14.000 $2.100 $8.530
SANDBAGS FOR EROSION CONTROL (12")
LF 1,815.000 $10.260 $6.000 $6.000 $9.500 $20.000 $6.300 $17.600
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,623.000 $2.340 $3.350 $3.250 $3.400 $3.300 $4.450 $2.810
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,623.000 $0.550 $0.500 $1.150 $0.450 $1.650 $1.200 $0.920
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,400.000 $32.860 $18.000 $34.750 $23.000 $45.000 $18.500 $125.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 240.000 $36.740 $18.000 $41.860 $29.000 $88.000 $18.500 $180.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $47.400 $18.000 $37.080 $29.000 $92.000 $18.500 $190.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,400.000 $7.450 $15.000 $9.590 $13.000 $25.000 $15.500 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 240.000 $7.230 $15.000 $22.850 $13.000 $25.000 $15.500 $70.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $9.180 $15.000 $20.910 $13.000 $25.000 $15.500 $80.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,652.000 $21.550 $28.250 $28.850 $28.000 $32.000 $28.500 $30.370
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,504.930 $1,400.000 $1,153.000 $1,325.000 $1,275.000 $1,250.000 $1,316.230
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,163.120 $1,775.000 $1,515.000 $1,335.000 $1,675.000 $1,635.000 $1,714.000
REMOVE METAL BEAM GUARD FENCE
LF 1,942.000 $2.820 $2.000 $3.400 $1.000 $3.700 $1.700 $1.800
REMOVE TERMINAL ANCHOR SECTION
EA 11.000 $224.550 $495.000 $265.000 $184.000 $295.000 $320.000 $338.020
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $226.870 $495.000 $245.000 $188.000 $270.000 $215.000 $225.640
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $163.220 $495.000 $245.000 $260.000 $270.000 $215.000 $225.200
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,726.250 $3,825.000 $3,208.000 $3,400.000 $3,600.000 $3,725.000 $3,915.510
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $339.960 $400.000 $265.000 $280.000 $295.000 $215.000 $224.740
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $690.860 $750.000 $925.000 $1,000.000 $810.000 $785.000 $683.880
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 2.000 $19,558.000 $8,000.000 $16,100.000 $25,000.000 $8,000.000 $25,650.000 $30,565.080
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 158.000 $26.770 $95.000 $25.000 $26.000 $28.000 $26.000 $27.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 57.000 $550.590 $565.000 $510.000 $520.000 $560.000 $525.000 $561.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $684.720 $580.000 $625.000 $638.000 $690.000 $650.000 $687.500
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 11.000 $850.000 $575.000 $975.000 $995.000 $1,070.000 $1,000.000 $1,072.500
REMOVE SM RD SN SUP&AM
EA 86.000 $109.530 $110.000 $85.000 $86.000 $95.000 $89.000 $93.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,000.000 $1.450 $1.250 $1.500 $1.000 $1.250 $1.050 $1.690
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 2,000.000 $1.650 $1.250 $1.500 $1.000 $1.250 $1.050 $1.690
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 8,942.000 $0.760 $0.850 $0.850 $0.710 $0.770 $0.750 $0.940
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 7,511.000 $5.890 $6.000 $6.000 $5.850 $6.400 $6.050 $6.600
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 93.000 $123.190 $110.000 $110.000 $153.000 $165.000 $155.000 $121.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 47.000 $143.970 $150.000 $150.000 $153.000 $165.000 $155.000 $165.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 12.000 $426.670 $500.000 $500.000 $566.000 $615.000 $575.000 $550.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 11.000 $320.570 $500.000 $500.000 $306.000 $330.000 $315.000 $550.000
PAVEMENT SEALER 4"
LF 153,744.000 $0.120 $0.150 $0.150 $0.160 $0.170 $0.160 $0.160
PAVEMENT SEALER 8"
LF 8,942.000 $0.310 $0.300 $0.300 $0.450 $0.480 $0.460 $0.330
PAVEMENT SEALER 24"
LF 7,511.000 $2.150 $3.000 $3.000 $2.400 $2.600 $2.480 $3.300
PAVEMENT SEALER (ARROW)
EA 93.000 $44.890 $45.000 $45.000 $65.000 $70.000 $66.000 $49.500
PAVEMENT SEALER (WORD)
EA 47.000 $46.250 $55.000 $55.000 $68.000 $74.000 $70.000 $60.500
PAVEMENT SEALER (MED NOSE)
EA 11.000 $87.040 $125.000 $125.000 $190.000 $210.000 $197.000 $137.500
PAVEMENT SEALER (RR XING)
EA 12.000 $80.100 $125.000 $125.000 $340.000 $365.000 $350.000 $137.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 28,330.000 $0.350 $0.350 $0.350 $0.390 $0.420 $0.400 $0.390
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 58,344.000 $0.300 $0.350 $0.350 $0.370 $0.400 $0.380 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,600.000 $0.350 $0.350 $0.350 $0.390 $0.420 $0.400 $0.390
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 63,470.000 $0.320 $0.350 $0.350 $0.370 $0.400 $0.380 $0.390
REFL PAV MRKR TY I-C
EA 890.000 $3.130 $3.000 $3.000 $3.500 $3.800 $3.500 $3.300
REFL PAV MRKR TY II-A-A
EA 1,503.000 $2.890 $3.000 $3.000 $3.500 $3.800 $3.500 $3.300
REFL PAV MRKR TY II-C-R
EA 1,162.000 $3.080 $3.000 $3.000 $3.500 $3.800 $3.500 $3.300
FULL - WIDTH MOWING
CYC 6.000 $3,775.700 $3,500.000 $843.310 $2,500.000 $2,000.000 $3,525.000 $5,500.000
LITTER REMOVAL
CYC 18.000 $1,765.760 $1,295.000 $807.590 $1,200.000 $200.000 $1,515.000 $2,500.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 18.000 $1,015.580 $1,000.000 $1,278.050 $850.000 $8,000.000 $1,375.000 $1,384.020
SP MIXES SP-D SAC-B PG76-22
TON 21,020.000 $89.200 $83.050 $81.040 $97.000 $100.000 $120.000 $100.850
UNDERSEAL COURSE
GAL 23,017.000 $2.410 $3.500 $3.050 $3.000 $5.000 $3.050 $3.620
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $504.000 $200.000 $100.000 $300.000 $390.000 $625.000 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,036.390 $17,000.000 $15,000.000 $7,500.000 $20,000.000 $15,250.000 $15,000.000
TMA (STATIONARY)
DAY 301.000 $175.260 $200.000 $150.000 $150.000 $225.000 $250.000 $500.000
TMA (MOBILE OPERATION)
DAY 15.000 $184.480 $250.000 $700.000 $200.000 $300.000 $500.000 $1,250.000
Totals: $7,162,097.480 $6,683,653.510 $6,961,897.720 $7,172,776.690 $9,313,887.430 $9,667,502.890 $10,355,393.480