|
|
PREPARING ROW
|
STA
|
112.000
|
$10,000.000
|
$4,070.000
|
$7,455.890
|
$2,800.000
|
$6,000.000
|
$8,000.000
|
|
|
REMOV CONC (MOWSTRIP)
|
SY
|
1,388.000
|
$30.000
|
$19.800
|
$10.200
|
$19.000
|
$19.440
|
$15.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
1,676.000
|
$12.000
|
$23.100
|
$10.200
|
$16.300
|
$19.180
|
$20.000
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
5,783.000
|
$18.000
|
$23.100
|
$6.000
|
$12.950
|
$13.790
|
$20.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
215.000
|
$20.000
|
$26.400
|
$14.000
|
$41.700
|
$19.100
|
$25.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
1,403.000
|
$18.000
|
$19.800
|
$8.000
|
$16.300
|
$16.210
|
$15.000
|
|
|
REMOV CONC (CURB)
|
LF
|
4,789.000
|
$5.000
|
$16.500
|
$3.000
|
$14.350
|
$3.860
|
$6.000
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
175.000
|
$10.000
|
$60.500
|
$25.000
|
$51.450
|
$74.970
|
$25.000
|
|
|
RMV (18"-22") TRT/UNTRT BASE & ASPH PAV
|
SY
|
19,952.000
|
$10.000
|
$14.550
|
$7.000
|
$10.000
|
$12.880
|
$15.000
|
|
|
RMV (15") TRT/UNTRT BASE & ASPH PAV
|
SY
|
873.000
|
$8.000
|
$10.990
|
$24.000
|
$39.600
|
$27.580
|
$30.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
28,142.000
|
$18.000
|
$24.200
|
$21.000
|
$9.000
|
$15.000
|
$30.000
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
5,090.000
|
$16.000
|
$37.470
|
$29.000
|
$54.000
|
$40.000
|
$60.000
|
|
|
EMBANK (FNL)(OC)(TY C2)
|
CY
|
13,729.000
|
$8.000
|
$37.020
|
$29.000
|
$23.000
|
$45.000
|
$35.000
|
|
|
EMBANK (FNL)(OC)(TY C2)(DS)
|
CY
|
7,348.000
|
$40.000
|
$65.120
|
$46.000
|
$130.000
|
$58.000
|
$115.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
77,020.000
|
$1.500
|
$1.930
|
$2.500
|
$3.200
|
$2.200
|
$3.000
|
|
|
DRILL SEED (PERM_URBAN_CLAY)
|
SY
|
77,020.000
|
$0.220
|
$0.250
|
$0.250
|
$0.190
|
$0.250
|
$0.250
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
75,524.000
|
$0.200
|
$0.220
|
$0.150
|
$0.190
|
$0.190
|
$0.150
|
|
|
VEGETATIVE WATERING
|
TGL
|
2,400.000
|
$25.000
|
$29.700
|
$30.000
|
$41.050
|
$30.000
|
$20.140
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL)
|
SY
|
149,838.000
|
$3.000
|
$2.750
|
$1.500
|
$1.290
|
$2.980
|
$1.450
|
|
|
IRRIGATION SYSTEM
|
LS
|
1.000
|
$35,000.000
|
$72,541.450
|
$75,000.000
|
$152,535.450
|
$180,520.000
|
$145,000.000
|
|
|
MULCH
|
CY
|
1,394.000
|
$85.000
|
$75.360
|
$78.000
|
$53.700
|
$103.000
|
$60.000
|
|
|
PLANT BED PREP
|
SY
|
12,557.000
|
$9.500
|
$6.140
|
$6.350
|
$6.450
|
$4.000
|
$8.000
|
|
|
PLANT MATERIAL (15 GAL) (TREE)
|
EA
|
498.000
|
$150.000
|
$224.960
|
$230.000
|
$177.000
|
$315.000
|
$212.000
|
|
|
PLANT MATERIAL (MIN 4' TRNK HT)(PALM)
|
EA
|
39.000
|
$700.000
|
$1,284.130
|
$1,330.000
|
$810.000
|
$1,293.000
|
$767.000
|
|
|
LANDSCAPE ESTABLISH
|
MO
|
9.000
|
$3,500.000
|
$5,775.840
|
$6,000.000
|
$7,000.000
|
$3,125.000
|
$5,230.000
|
|
|
IRRIG SYS OPER AND MAINT
|
MO
|
9.000
|
$3,500.000
|
$3,491.280
|
$3,600.000
|
$4,830.000
|
$2,083.000
|
$2,090.000
|
|
|
PROOF ROLLING
|
HR
|
19.000
|
$100.000
|
$121.000
|
$142.000
|
$96.200
|
$328.570
|
$200.000
|
|
|
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
|
CY
|
8,341.000
|
$60.000
|
$68.840
|
$85.000
|
$70.000
|
$60.000
|
$65.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
285.000
|
$350.000
|
$385.000
|
$312.000
|
$370.000
|
$308.000
|
$360.000
|
|
|
LIME TRT (EXIST MATL)(6")
|
SY
|
18,923.000
|
$4.400
|
$4.400
|
$6.150
|
$5.600
|
$10.310
|
$10.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
8,853.000
|
$4.500
|
$7.700
|
$3.950
|
$4.050
|
$4.160
|
$5.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
21,800.000
|
$95.000
|
$101.200
|
$83.000
|
$85.900
|
$68.630
|
$92.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
1,165.000
|
$115.000
|
$117.700
|
$84.000
|
$86.650
|
$97.100
|
$105.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
9,610.000
|
$95.000
|
$113.300
|
$100.000
|
$104.000
|
$90.490
|
$110.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
15,182.000
|
$150.000
|
$169.400
|
$136.000
|
$141.000
|
$127.600
|
$145.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,172.000
|
$50.000
|
$55.190
|
$61.000
|
$63.400
|
$35.080
|
$70.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
50,431.000
|
$1.800
|
$2.200
|
$1.700
|
$1.740
|
$3.000
|
$2.250
|
|
|
PLANE ASPH CONC PAV (1" TO 2")
|
SY
|
3,512.000
|
$2.100
|
$2.200
|
$3.050
|
$3.150
|
$1.500
|
$4.000
|
|
|
PLANE ASPH CONC PAV (2.5")
|
SY
|
84,987.000
|
$3.000
|
$2.200
|
$1.800
|
$1.850
|
$2.000
|
$2.500
|
|
|
CUT & RESTORING PAV
|
SY
|
99.000
|
$175.000
|
$238.600
|
$220.000
|
$134.000
|
$69.140
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
194.000
|
$185.000
|
$326.450
|
$198.000
|
$228.000
|
$200.000
|
$220.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,800.000
|
$9.000
|
$45.180
|
$2.300
|
$10.000
|
$2.100
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
21,393.000
|
$25.000
|
$1.990
|
$28.000
|
$1.700
|
$29.760
|
$20.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
60.000
|
$260.000
|
$275.000
|
$220.000
|
$215.000
|
$230.000
|
$240.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,980.000
|
$320.000
|
$218.820
|
$180.000
|
$210.000
|
$179.010
|
$150.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
672.000
|
$250.000
|
$291.200
|
$290.000
|
$290.000
|
$350.590
|
$180.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
438.000
|
$270.000
|
$583.890
|
$600.000
|
$530.000
|
$489.660
|
$340.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$140.000
|
$165.000
|
$165.000
|
$177.000
|
$150.000
|
$185.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
22.000
|
$280.000
|
$200.000
|
$220.000
|
$215.000
|
$260.000
|
$300.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
1,000.000
|
$360.000
|
$390.000
|
$470.000
|
$480.000
|
$420.000
|
$460.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
108.000
|
$900.000
|
$700.000
|
$830.000
|
$750.000
|
$830.000
|
$900.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
24.000
|
$240.000
|
$200.000
|
$280.000
|
$215.000
|
$270.000
|
$300.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
91.000
|
$420.000
|
$305.000
|
$390.000
|
$330.000
|
$330.000
|
$410.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$570.000
|
$415.000
|
$520.000
|
$450.000
|
$490.000
|
$550.000
|
|
|
SOUND WALL
|
SF
|
13,720.000
|
$55.000
|
$50.650
|
$53.000
|
$52.250
|
$70.000
|
$60.000
|
|
|
CL C CONC (ABUT)
|
CY
|
22.200
|
$1,100.000
|
$1,600.000
|
$2,100.000
|
$2,270.000
|
$1,700.000
|
$1,250.000
|
|
|
CL C CONC (CAP)
|
CY
|
84.900
|
$1,000.000
|
$1,600.000
|
$2,100.000
|
$1,990.000
|
$2,000.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
92.700
|
$1,550.000
|
$1,600.000
|
$2,000.000
|
$1,880.000
|
$1,500.000
|
$1,500.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
124.000
|
$1,400.000
|
$1,600.000
|
$1,450.000
|
$2,120.000
|
$1,400.000
|
$1,250.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
84.000
|
$500.000
|
$525.660
|
$600.000
|
$900.000
|
$350.000
|
$750.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
467.000
|
$1,200.000
|
$1,800.000
|
$1,350.000
|
$1,100.000
|
$1,000.000
|
$1,400.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
14.000
|
$1,000.000
|
$750.000
|
$1,400.000
|
$980.000
|
$400.000
|
$2,500.000
|
|
|
CL C CONC (VEH DEFL WALL)
|
CY
|
217.800
|
$500.000
|
$1,400.000
|
$1,200.000
|
$1,350.000
|
$1,200.000
|
$1,250.000
|
|
|
REINF CONC SLAB
|
SF
|
7,000.000
|
$20.000
|
$36.500
|
$36.000
|
$34.750
|
$30.000
|
$45.000
|
|
|
APPROACH SLAB
|
CY
|
51.000
|
$750.000
|
$800.000
|
$780.000
|
$960.000
|
$600.000
|
$750.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
31,007.000
|
$73.000
|
$53.500
|
$65.000
|
$60.000
|
$63.000
|
$65.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
992.000
|
$200.000
|
$220.000
|
$210.000
|
$260.000
|
$230.910
|
$250.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
169.100
|
$575.000
|
$485.090
|
$500.000
|
$870.000
|
$510.320
|
$550.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
24.000
|
$600.000
|
$520.260
|
$920.000
|
$1,070.000
|
$924.940
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
273.600
|
$605.000
|
$583.900
|
$600.000
|
$900.000
|
$963.660
|
$700.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
59.000
|
$250.000
|
$202.820
|
$450.000
|
$242.000
|
$262.780
|
$275.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
160.000
|
$70.000
|
$48.520
|
$39.000
|
$23.700
|
$50.000
|
$55.000
|
|
|
RAIL (TY SSTR)
|
LF
|
3,061.000
|
$70.000
|
$100.000
|
$73.000
|
$90.150
|
$55.000
|
$110.000
|
|
|
RAIL (TY C223)
|
LF
|
83.000
|
$250.000
|
$300.000
|
$340.000
|
$360.000
|
$255.000
|
$300.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
50.000
|
$200.000
|
$195.150
|
$290.000
|
$246.000
|
$185.860
|
$300.000
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
500.000
|
$150.000
|
$350.000
|
$188.000
|
$208.000
|
$280.000
|
$200.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
1,126.000
|
$250.000
|
$350.000
|
$380.000
|
$270.000
|
$125.000
|
$220.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
85.000
|
$200.000
|
$225.000
|
$300.000
|
$320.000
|
$249.180
|
$220.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
34.000
|
$500.000
|
$492.790
|
$390.000
|
$490.000
|
$300.000
|
$500.000
|
|
|
JOINT SEALANT
|
LF
|
160.000
|
$20.000
|
$30.330
|
$24.000
|
$19.200
|
$20.000
|
$40.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
24.000
|
$700.000
|
$446.180
|
$1,410.000
|
$570.000
|
$489.350
|
$1,500.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
654.000
|
$900.000
|
$491.370
|
$550.000
|
$600.000
|
$457.800
|
$600.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
838.000
|
$1,105.000
|
$734.220
|
$750.000
|
$840.000
|
$754.840
|
$800.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
|
LF
|
86.000
|
$1,600.000
|
$1,005.320
|
$1,300.000
|
$1,360.000
|
$977.810
|
$1,800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
938.000
|
$90.000
|
$110.700
|
$105.000
|
$117.000
|
$183.760
|
$110.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
473.000
|
$120.000
|
$129.900
|
$110.000
|
$185.000
|
$179.160
|
$135.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
4.000
|
$7,500.000
|
$5,083.100
|
$10,000.000
|
$8,200.000
|
$8,776.270
|
$8,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
4.000
|
$8,500.000
|
$5,083.100
|
$10,000.000
|
$8,100.000
|
$8,776.270
|
$8,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$8,000.000
|
$6,325.630
|
$13,000.000
|
$5,500.000
|
$6,407.020
|
$8,000.000
|
|
|
INLET (COMPL)(ARMOR CURB SLOT)
|
EA
|
8.000
|
$3,000.000
|
$4,758.080
|
$8,000.000
|
$4,840.000
|
$7,280.550
|
$7,500.000
|
|
|
INLET(COMPL)(TY MSE1)
|
EA
|
4.000
|
$5,000.000
|
$9,079.050
|
$11,000.000
|
$8,300.000
|
$4,852.020
|
$10,000.000
|
|
|
INLET (COMPL)(TY SIDEWALK BRIDGE)(MOD)
|
EA
|
15.000
|
$20,000.000
|
$21,431.840
|
$19,000.000
|
$19,000.000
|
$23,472.200
|
$22,500.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$18,000.000
|
$11,295.770
|
$45,000.000
|
$21,800.000
|
$44,445.350
|
$30,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$25,000.000
|
$33,887.310
|
$50,000.000
|
$7,000.000
|
$25,217.620
|
$30,000.000
|
|
|
WINGWALL (SW - 0) (HW=10 FT) (MOD)
|
EA
|
1.000
|
$70,000.000
|
$46,256.170
|
$85,000.000
|
$47,700.000
|
$88,676.170
|
$80,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
1.000
|
$12,000.000
|
$6,061.310
|
$13,500.000
|
$18,600.000
|
$12,717.480
|
$11,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$13,500.000
|
$6,569.620
|
$13,500.000
|
$18,500.000
|
$12,683.210
|
$13,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$1,357.000
|
$1,355.490
|
$1,370.000
|
$2,540.000
|
$1,911.000
|
$2,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,400.000
|
$1,637.890
|
$1,510.000
|
$2,970.000
|
$2,054.900
|
$2,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,300.000
|
$1,637.890
|
$1,510.000
|
$2,970.000
|
$2,054.880
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,807.320
|
$1,700.000
|
$3,320.000
|
$2,084.920
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$2,100.000
|
$1,807.320
|
$1,880.000
|
$3,380.000
|
$2,252.450
|
$2,000.000
|
|
|
THERMOPLASTIC PIPE (HDPE) (18")
|
LF
|
42.000
|
$60.000
|
$110.700
|
$102.000
|
$430.000
|
$215.600
|
$105.000
|
|
|
ADJUSTING INLETS (CAP)
|
EA
|
4.000
|
$3,000.000
|
$3,671.120
|
$4,800.000
|
$3,220.000
|
$2,736.070
|
$3,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
8.000
|
$3,700.000
|
$2,823.940
|
$2,600.000
|
$5,300.000
|
$3,424.080
|
$5,000.000
|
|
|
PIPE (PVC) (SCH 80) (12 IN)
|
LF
|
150.000
|
$150.000
|
$97.140
|
$77.000
|
$155.000
|
$181.970
|
$50.000
|
|
|
REMOV STR (INLET)
|
EA
|
10.000
|
$1,000.000
|
$2,823.940
|
$1,580.000
|
$2,090.000
|
$2,035.550
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$800.000
|
$1,411.970
|
$900.000
|
$1,080.000
|
$2,518.190
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$5,000.000
|
$1,411.970
|
$3,100.000
|
$17,100.000
|
$9,223.020
|
$3,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$5,000.000
|
$1,411.970
|
$2,800.000
|
$5,900.000
|
$4,629.010
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
100.000
|
$20.000
|
$32.760
|
$45.000
|
$21.650
|
$125.000
|
$75.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
129.000
|
$20.000
|
$25.650
|
$21.000
|
$45.700
|
$63.910
|
$75.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,176,905.440
|
$2,749,227.150
|
$3,306,840.410
|
$2,775,000.000
|
$2,578,955.000
|
$3,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$15,000.000
|
$8,382.880
|
$20,500.000
|
$38,000.000
|
$29,387.950
|
$28,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
12.000
|
$75.000
|
$150.000
|
$114.000
|
$260.000
|
$144.950
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$7,500.000
|
$5,000.000
|
$7,000.000
|
$25,700.000
|
$12,806.910
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
710.000
|
$200.000
|
$150.000
|
$360.000
|
$340.000
|
$541.250
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
14.000
|
$120.000
|
$750.000
|
$780.000
|
$940.000
|
$1,434.310
|
$1,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,210.000
|
$40.000
|
$49.590
|
$43.000
|
$38.650
|
$42.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,210.000
|
$12.000
|
$20.800
|
$7.750
|
$12.900
|
$8.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
720.000
|
$25.000
|
$40.160
|
$20.000
|
$26.850
|
$25.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
720.000
|
$5.000
|
$13.100
|
$4.900
|
$12.900
|
$6.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,050.000
|
$4.000
|
$4.090
|
$3.250
|
$3.450
|
$3.300
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,050.000
|
$1.000
|
$1.050
|
$0.250
|
$1.050
|
$0.800
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
640.000
|
$5.300
|
$6.990
|
$6.900
|
$6.450
|
$6.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
640.000
|
$1.000
|
$1.050
|
$1.000
|
$1.050
|
$4.000
|
$0.750
|
|
|
CONSTRUCTING DETOURS
|
SY
|
9,261.000
|
$78.000
|
$105.190
|
$106.000
|
$120.000
|
$121.190
|
$128.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
11,610.000
|
$30.000
|
$25.000
|
$35.000
|
$74.500
|
$49.390
|
$25.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
3,340.000
|
$20.000
|
$30.000
|
$25.000
|
$18.900
|
$43.410
|
$25.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$35.000
|
$30.000
|
$70.000
|
$18.900
|
$48.650
|
$30.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
12,260.000
|
$7.000
|
$11.000
|
$5.850
|
$14.200
|
$11.360
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
6,120.000
|
$6.000
|
$14.000
|
$10.000
|
$10.300
|
$7.890
|
$8.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$20.000
|
$14.000
|
$20.000
|
$10.300
|
$14.060
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
11,610.000
|
$10.000
|
$10.000
|
$8.550
|
$31.000
|
$14.520
|
$12.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
3,340.000
|
$8.000
|
$10.000
|
$9.300
|
$18.900
|
$20.090
|
$12.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$10.000
|
$10.000
|
$29.000
|
$18.900
|
$29.150
|
$12.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
50.000
|
$95.000
|
$350.000
|
$260.000
|
$167.000
|
$245.000
|
$250.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
125.000
|
$250.000
|
$350.000
|
$310.000
|
$246.000
|
$265.000
|
$250.000
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
5,595.000
|
$95.000
|
$83.160
|
$84.000
|
$110.000
|
$154.500
|
$80.000
|
|
|
CONC CURB (TY I)
|
LF
|
12,202.000
|
$16.000
|
$14.380
|
$14.500
|
$17.050
|
$44.620
|
$15.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
214.000
|
$140.000
|
$102.680
|
$160.000
|
$206.000
|
$142.900
|
$140.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
205.000
|
$70.000
|
$72.600
|
$133.000
|
$132.000
|
$82.900
|
$125.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
5,289.000
|
$75.000
|
$72.760
|
$68.000
|
$86.850
|
$106.530
|
$70.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
10.000
|
$2,800.000
|
$2,966.000
|
$3,200.000
|
$1,990.000
|
$3,917.290
|
$2,500.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$3,200.000
|
$2,656.470
|
$3,200.000
|
$2,940.000
|
$3,919.010
|
$2,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
6.000
|
$2,800.000
|
$2,945.210
|
$3,200.000
|
$1,970.000
|
$3,917.250
|
$2,500.000
|
|
|
CURB RAMPS (TY 21)
|
SY
|
531.000
|
$250.000
|
$202.120
|
$108.000
|
$310.000
|
$245.530
|
$200.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,075.000
|
$25.000
|
$25.800
|
$26.000
|
$27.700
|
$25.800
|
$25.800
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$2,250.000
|
$2,406.000
|
$1,910.000
|
$2,050.000
|
$1,906.000
|
$1,906.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,200.000
|
$1,234.000
|
$1,230.000
|
$1,330.000
|
$1,234.000
|
$1,234.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$1,000.000
|
$1,174.000
|
$1,170.000
|
$1,260.000
|
$1,174.000
|
$1,174.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,029.000
|
$3.000
|
$2.750
|
$2.750
|
$2.950
|
$2.750
|
$2.750
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$220.000
|
$265.000
|
$270.000
|
$280.000
|
$265.000
|
$265.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$300.000
|
$234.000
|
$230.000
|
$250.000
|
$234.000
|
$234.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$3,200.000
|
$3,459.000
|
$3,500.000
|
$3,720.000
|
$3,459.000
|
$3,459.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$300.000
|
$266.000
|
$270.000
|
$290.000
|
$266.000
|
$266.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
11.000
|
$1,500.000
|
$724.000
|
$720.000
|
$780.000
|
$724.000
|
$724.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$850.000
|
$677.000
|
$680.000
|
$730.000
|
$677.000
|
$677.000
|
|
|
CCA (INSTL)(N)(TL3)(WORK ZONE)
|
EA
|
5.000
|
$7,000.000
|
$7,695.000
|
$7,700.000
|
$8,300.000
|
$7,695.000
|
$7,695.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
2,701.000
|
$25.000
|
$37.650
|
$21.000
|
$32.800
|
$51.570
|
$25.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
6,448.000
|
$35.000
|
$41.510
|
$22.000
|
$31.650
|
$34.000
|
$25.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
19.000
|
$1,000.000
|
$365.000
|
$550.000
|
$390.000
|
$320.000
|
$333.670
|
|
|
REPLACE LUMINAIRE W/(150W EQ) LED
|
EA
|
12.000
|
$600.000
|
$500.000
|
$550.000
|
$540.000
|
$470.000
|
$490.080
|
|
|
REPLACE LUMINAIRE W/(250W EQ) LED
|
EA
|
17.000
|
$700.000
|
$515.000
|
$660.000
|
$550.000
|
$450.000
|
$469.230
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
6.000
|
$1,900.000
|
$1,540.000
|
$2,000.000
|
$1,650.000
|
$1,900.000
|
$1,981.180
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
3.000
|
$60,000.000
|
$47,500.000
|
$56,000.000
|
$51,024.200
|
$52,900.000
|
$55,160.330
|
|
|
LED HI MST IL ASM(6 FIXT) (TY A)SHLD
|
EA
|
3.000
|
$40,000.000
|
$43,500.000
|
$45,000.000
|
$46,700.000
|
$47,600.000
|
$49,633.870
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
8,800.000
|
$12.000
|
$11.000
|
$9.350
|
$11.800
|
$8.300
|
$8.650
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
1,560.000
|
$20.000
|
$12.000
|
$12.000
|
$12.900
|
$11.000
|
$11.470
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
15,330.000
|
$25.000
|
$21.000
|
$15.000
|
$22.550
|
$24.000
|
$25.030
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
2,315.000
|
$17.900
|
$11.000
|
$10.500
|
$11.800
|
$14.000
|
$14.600
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
4,395.000
|
$30.000
|
$20.000
|
$31.000
|
$21.500
|
$22.000
|
$22.940
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,905.000
|
$22.500
|
$12.000
|
$15.500
|
$12.900
|
$16.000
|
$16.680
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
3,945.000
|
$32.000
|
$23.000
|
$35.000
|
$24.700
|
$27.500
|
$28.680
|
|
|
CONDT (PVC) (SCH 80) (3") (CONC ENCSE)
|
LF
|
4,030.000
|
$50.000
|
$22.000
|
$16.500
|
$23.650
|
$26.000
|
$27.110
|
|
|
CONDT (RM) (2")
|
LF
|
140.000
|
$50.000
|
$27.000
|
$57.000
|
$29.000
|
$68.000
|
$70.910
|
|
|
CONDT (RM) (3")
|
LF
|
440.000
|
$60.000
|
$55.000
|
$61.000
|
$59.100
|
$52.000
|
$54.220
|
|
|
CONDUIT (PREPARE)
|
LF
|
4,530.000
|
$3.000
|
$1.650
|
$1.100
|
$1.750
|
$1.600
|
$1.670
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
11,325.000
|
$1.100
|
$0.950
|
$1.100
|
$1.000
|
$0.900
|
$0.940
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
1,115.000
|
$1.900
|
$1.750
|
$1.650
|
$1.900
|
$1.650
|
$1.720
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,840.000
|
$2.100
|
$1.550
|
$1.800
|
$1.650
|
$1.550
|
$1.620
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
6,825.000
|
$2.300
|
$1.750
|
$2.200
|
$1.900
|
$1.700
|
$1.770
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
5,125.000
|
$2.500
|
$1.950
|
$2.300
|
$2.100
|
$2.150
|
$2.240
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
6,780.000
|
$2.800
|
$2.600
|
$3.300
|
$2.800
|
$2.850
|
$2.970
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
17,050.000
|
$3.100
|
$2.800
|
$3.450
|
$3.000
|
$2.900
|
$3.020
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
7,760.000
|
$4.900
|
$4.250
|
$4.800
|
$4.550
|
$4.500
|
$4.690
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
2,485.000
|
$3.000
|
$2.350
|
$2.750
|
$2.500
|
$2.550
|
$2.660
|
|
|
TRAY CABLE (4 CONDR) (14 AWG)
|
LF
|
4,900.000
|
$3.250
|
$3.200
|
$3.700
|
$3.450
|
$3.550
|
$3.700
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
31.000
|
$5,400.000
|
$5,500.000
|
$4,700.000
|
$5,900.000
|
$4,800.000
|
$5,005.100
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
2.000
|
$8,500.000
|
$7,200.000
|
$8,000.000
|
$7,700.000
|
$7,600.000
|
$7,924.740
|
|
|
GROUND BOX TY A (122311)
|
EA
|
14.000
|
$1,200.000
|
$965.000
|
$1,100.000
|
$1,040.000
|
$1,000.000
|
$1,042.730
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
12.000
|
$1,500.000
|
$965.000
|
$1,570.000
|
$1,040.000
|
$1,300.000
|
$1,355.550
|
|
|
GROUND BOX TY D (162922)
|
EA
|
1.000
|
$1,500.000
|
$1,025.000
|
$1,320.000
|
$1,100.000
|
$1,200.000
|
$1,251.270
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
24.000
|
$1,800.000
|
$1,100.000
|
$1,960.000
|
$1,180.000
|
$1,600.000
|
$1,668.370
|
|
|
REMOVE GROUND BOX
|
EA
|
41.000
|
$440.000
|
$245.000
|
$880.000
|
$260.000
|
$780.000
|
$813.330
|
|
|
TIMBER POLE (CL 2) 40 FT
|
EA
|
70.000
|
$4,600.000
|
$1,425.000
|
$2,000.000
|
$1,530.000
|
$2,000.000
|
$2,085.460
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
5.000
|
$790.000
|
$545.000
|
$880.000
|
$590.000
|
$400.000
|
$417.090
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$9,700.000
|
$6,000.000
|
$9,500.000
|
$6,400.000
|
$8,060.000
|
$8,404.390
|
|
|
ELC SRV TY A 120/240 100(NS)SS(E)SP(O)
|
EA
|
1.000
|
$9,200.000
|
$6,600.000
|
$10,200.000
|
$7,100.000
|
$8,400.000
|
$8,758.920
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)SP(O)
|
EA
|
4.000
|
$8,400.000
|
$5,100.000
|
$8,500.000
|
$5,500.000
|
$6,400.000
|
$6,673.460
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
1.000
|
$9,000.000
|
$6,600.000
|
$9,800.000
|
$7,100.000
|
$6,700.000
|
$6,986.280
|
|
|
ELC SRV TY T 120/240 000(NS)GS(N)SP(U)
|
EA
|
1.000
|
$7,000.000
|
$3,600.000
|
$7,200.000
|
$3,870.000
|
$4,400.000
|
$4,588.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
340.000
|
$45.000
|
$25.000
|
$39.000
|
$26.850
|
$39.000
|
$23.250
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
205.000
|
$30.000
|
$28.000
|
$43.000
|
$30.100
|
$32.000
|
$43.400
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
6,137.000
|
$30.000
|
$26.800
|
$39.000
|
$28.800
|
$32.000
|
$33.370
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
21.000
|
$720.000
|
$750.000
|
$620.000
|
$810.000
|
$600.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
32.000
|
$800.000
|
$850.000
|
$670.000
|
$920.000
|
$650.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$950.000
|
$1,215.000
|
$770.000
|
$1,310.000
|
$750.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
14.000
|
$1,000.000
|
$1,100.000
|
$850.000
|
$1,190.000
|
$825.000
|
$825.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$2,100.000
|
$2,125.000
|
$1,690.000
|
$2,290.000
|
$1,650.000
|
$1,650.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,200.000
|
$2,203.820
|
$2,800.000
|
$2,950.000
|
$2,500.000
|
$2,958.810
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
1.000
|
$4,500.000
|
$4,565.300
|
$6,200.000
|
$6,400.000
|
$2,200.000
|
$5,713.560
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
72.000
|
$115.000
|
$135.390
|
$72.000
|
$78.400
|
$70.000
|
$149.640
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
4.000
|
$120.000
|
$82.610
|
$51.000
|
$56.000
|
$50.000
|
$50.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,381.000
|
$7.000
|
$8.000
|
$8.800
|
$8.600
|
$6.450
|
$6.730
|
|
|
REMOVE LRSA
|
EA
|
5.000
|
$1,200.000
|
$500.000
|
$880.000
|
$540.000
|
$530.000
|
$552.650
|
|
|
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$20,000.000
|
$23,900.000
|
$25,000.000
|
$25,700.000
|
$26,900.000
|
$28,049.390
|
|
|
INS OH SN SUP(90 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$111,000.000
|
$87,300.000
|
$102,000.000
|
$93,777.050
|
$98,600.000
|
$102,813.010
|
|
|
INS OH SN SUP(100 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$115,000.000
|
$99,300.000
|
$120,000.000
|
$106,667.400
|
$113,378.300
|
$118,223.490
|
|
|
INS OH SN SUP(110 FT BRDG)(SPAN ONLY)
|
EA
|
3.000
|
$130,000.000
|
$112,500.000
|
$139,000.000
|
$120,846.750
|
$128,195.700
|
$133,673.280
|
|
|
INS OH SN SUP(130 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$135,000.000
|
$142,000.000
|
$172,000.000
|
$152,535.450
|
$157,747.850
|
$164,488.150
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$15,000.000
|
$5,500.000
|
$10,500.000
|
$5,900.000
|
$7,700.000
|
$8,029.010
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
12.000
|
$1,000.000
|
$660.000
|
$1,790.000
|
$1,750.000
|
$440.000
|
$458.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
39.000
|
$20.000
|
$25.000
|
$15.500
|
$27.000
|
$15.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
35.000
|
$40.000
|
$43.500
|
$26.000
|
$46.950
|
$25.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
11.000
|
$30.000
|
$25.000
|
$15.500
|
$27.000
|
$15.000
|
$32.650
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
21.000
|
$30.000
|
$43.500
|
$26.000
|
$46.950
|
$25.000
|
$40.810
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
9.000
|
$85.000
|
$105.000
|
$154.000
|
$113.000
|
$150.000
|
$87.060
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
69.000
|
$10.000
|
$32.500
|
$51.000
|
$35.100
|
$50.000
|
$47.610
|
|
|
INSTL OM SM RD SIGN (2-OM-PW)Y
|
EA
|
2.000
|
$20.000
|
$32.500
|
$51.000
|
$35.100
|
$50.000
|
$47.620
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
6,306.000
|
$0.300
|
$0.800
|
$0.310
|
$0.850
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
387.000
|
$1.100
|
$2.100
|
$0.310
|
$2.250
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
25,905.000
|
$0.250
|
$0.430
|
$0.310
|
$0.450
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
67.000
|
$0.800
|
$2.200
|
$1.050
|
$2.400
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
16,944.000
|
$0.500
|
$0.600
|
$0.420
|
$0.650
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(DOT)
|
LF
|
782.000
|
$1.790
|
$2.250
|
$2.100
|
$2.450
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
2,027.000
|
$3.000
|
$2.350
|
$2.600
|
$2.550
|
$2.500
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,902.000
|
$4.000
|
$4.750
|
$3.400
|
$5.150
|
$3.250
|
$3.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
67.000
|
$88.000
|
$82.000
|
$104.000
|
$88.550
|
$100.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
|
EA
|
5.000
|
$100.000
|
$95.000
|
$156.000
|
$103.000
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(UTURN ARW)
|
EA
|
4.000
|
$125.000
|
$115.000
|
$156.000
|
$124.000
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
45.000
|
$95.000
|
$95.000
|
$104.000
|
$103.000
|
$100.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
20,375.000
|
$0.300
|
$0.300
|
$0.370
|
$0.300
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
3,191.000
|
$1.000
|
$0.950
|
$1.550
|
$1.050
|
$1.500
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
32.000
|
$1.900
|
$2.150
|
$2.100
|
$2.300
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
26,110.000
|
$0.750
|
$0.750
|
$0.990
|
$0.800
|
$0.950
|
$0.950
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
2,234.000
|
$1.400
|
$1.500
|
$1.300
|
$1.600
|
$1.250
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
337.000
|
$5.000
|
$3.250
|
$6.250
|
$3.500
|
$6.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
183.000
|
$7.000
|
$5.350
|
$12.500
|
$5.800
|
$12.000
|
$12.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
10.000
|
$180.000
|
$135.000
|
$156.000
|
$146.000
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
9.000
|
$250.000
|
$160.000
|
$156.000
|
$173.000
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
37.000
|
$80.000
|
$57.000
|
$15.500
|
$61.550
|
$15.000
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
22,448.000
|
$0.800
|
$0.750
|
$0.990
|
$0.800
|
$0.950
|
$0.950
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,187.000
|
$0.900
|
$1.720
|
$2.800
|
$9.950
|
$2.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,693.000
|
$1.400
|
$1.720
|
$2.800
|
$9.950
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
374.000
|
$1.200
|
$1.670
|
$2.100
|
$1.800
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
65.000
|
$2.000
|
$1.850
|
$2.100
|
$2.000
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
16,459.000
|
$0.900
|
$0.950
|
$0.990
|
$1.050
|
$0.950
|
$0.950
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
759.000
|
$1.400
|
$1.850
|
$2.350
|
$2.000
|
$2.250
|
$2.250
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,925.000
|
$3.500
|
$3.850
|
$3.150
|
$4.150
|
$3.000
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,837.000
|
$7.000
|
$7.650
|
$6.250
|
$8.250
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
69.000
|
$150.000
|
$135.000
|
$156.000
|
$146.000
|
$150.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
6.000
|
$200.000
|
$190.000
|
$260.000
|
$205.000
|
$250.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
5.000
|
$250.000
|
$200.000
|
$310.000
|
$216.000
|
$300.000
|
$300.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
3.000
|
$200.000
|
$280.000
|
$260.000
|
$300.000
|
$250.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
47.000
|
$190.000
|
$160.000
|
$210.000
|
$173.000
|
$200.000
|
$200.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
113.000
|
$3.000
|
$3.850
|
$3.150
|
$4.150
|
$3.000
|
$3.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
29,789.000
|
$0.650
|
$0.930
|
$0.940
|
$1.000
|
$0.900
|
$0.900
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
30,014.000
|
$0.650
|
$0.930
|
$0.940
|
$1.000
|
$0.900
|
$0.900
|
|
|
PAVEMENT SLER 6"
|
LF
|
73,655.000
|
$0.200
|
$0.220
|
$0.370
|
$0.240
|
$0.350
|
$0.350
|
|
|
PAVEMENT SLER 8"
|
LF
|
16,524.000
|
$0.400
|
$0.370
|
$0.470
|
$0.400
|
$0.450
|
$0.450
|
|
|
PAVEMENT SLER 12"
|
LF
|
3,797.000
|
$1.300
|
$0.880
|
$1.550
|
$0.950
|
$1.500
|
$1.500
|
|
|
PAVEMENT SLER 24"
|
LF
|
1,837.000
|
$2.500
|
$2.600
|
$3.150
|
$2.800
|
$3.000
|
$3.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
69.000
|
$40.000
|
$25.000
|
$78.000
|
$27.000
|
$75.000
|
$75.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
47.000
|
$50.000
|
$32.000
|
$78.000
|
$34.550
|
$75.000
|
$75.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
6.000
|
$60.000
|
$38.000
|
$104.000
|
$41.050
|
$100.000
|
$100.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
5.000
|
$60.000
|
$40.000
|
$104.000
|
$43.200
|
$100.000
|
$100.000
|
|
|
PAVEMENT SLER (SYMBOL)
|
EA
|
2.000
|
$60.000
|
$95.000
|
$260.000
|
$103.000
|
$250.000
|
$250.000
|
|
|
PAVEMENT SLER (NUMBER)
|
EA
|
3.000
|
$100.000
|
$11.000
|
$78.000
|
$11.900
|
$75.000
|
$75.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
8,729.000
|
$0.570
|
$0.700
|
$0.630
|
$0.750
|
$0.600
|
$0.600
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
4,749.000
|
$0.550
|
$0.640
|
$0.630
|
$0.700
|
$0.600
|
$0.600
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,560.000
|
$0.490
|
$0.640
|
$0.630
|
$0.700
|
$0.600
|
$0.600
|
|
PREFAB PM TY C (MULTI)(SHIELD)
|
EA
|
2.000
|
$2,500.000
|
$3,300.000
|
$3,100.000
|
$3,560.000
|
$3,000.000
|
$3,000.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
24.000
|
$3.500
|
$5.000
|
$4.700
|
$5.400
|
$4.500
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
6.000
|
$3.500
|
$5.000
|
$4.700
|
$5.400
|
$4.500
|
$4.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,171.000
|
$4.200
|
$5.000
|
$4.700
|
$5.400
|
$4.500
|
$4.500
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
11,240.000
|
$0.200
|
$0.850
|
$0.610
|
$0.900
|
$0.580
|
$0.580
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
4,644.000
|
$0.900
|
$1.400
|
$0.830
|
$1.500
|
$0.800
|
$0.800
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
302.000
|
$1.500
|
$2.000
|
$3.150
|
$2.150
|
$3.000
|
$3.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
74.000
|
$2.500
|
$2.750
|
$6.250
|
$2.950
|
$6.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
3.000
|
$70.000
|
$40.000
|
$156.000
|
$43.200
|
$150.000
|
$150.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
2.000
|
$75.000
|
$45.000
|
$156.000
|
$48.600
|
$150.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
73,655.000
|
$0.080
|
$0.050
|
$0.020
|
$0.050
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
16,524.000
|
$0.150
|
$0.050
|
$0.040
|
$0.050
|
$0.040
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
3,797.000
|
$0.400
|
$0.300
|
$0.210
|
$0.300
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,837.000
|
$1.000
|
$0.500
|
$0.260
|
$0.550
|
$0.250
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
69.000
|
$26.000
|
$11.000
|
$10.500
|
$11.900
|
$10.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
6.000
|
$30.000
|
$15.000
|
$21.000
|
$16.200
|
$20.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
5.000
|
$15.000
|
$20.000
|
$21.000
|
$21.600
|
$20.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
3.000
|
$15.000
|
$15.000
|
$21.000
|
$16.200
|
$20.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
47.000
|
$20.000
|
$15.000
|
$21.000
|
$16.200
|
$20.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (SHIELD)
|
EA
|
2.000
|
$90.000
|
$50.000
|
$21.000
|
$54.000
|
$20.000
|
$20.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
2.000
|
$40,000.000
|
$59,000.000
|
$64,000.000
|
$63,377.400
|
$1,900.000
|
$1,981.190
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
$7,500.000
|
$7,200.000
|
$13,800.000
|
$7,700.000
|
$1,900.000
|
$1,981.180
|
|
|
REMOVING TRAFFIC SIGNALS (DIAMOND)
|
EA
|
1.000
|
$19,100.000
|
$6,900.000
|
$16,500.000
|
$7,400.000
|
$6,100.000
|
$6,360.640
|
|
|
TEMP TRAF SIGNALS
|
EA
|
8.000
|
$77,500.000
|
$31,600.000
|
$28,000.000
|
$33,900.000
|
$47,200.000
|
$49,216.780
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
10.000
|
$325.000
|
$265.000
|
$360.000
|
$280.000
|
$310.000
|
$323.250
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
42.000
|
$335.000
|
$265.000
|
$360.000
|
$280.000
|
$310.000
|
$323.250
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
10.000
|
$325.000
|
$265.000
|
$360.000
|
$280.000
|
$310.000
|
$323.250
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
42.000
|
$335.000
|
$265.000
|
$360.000
|
$280.000
|
$310.000
|
$323.250
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
10.000
|
$325.000
|
$265.000
|
$360.000
|
$280.000
|
$310.000
|
$323.250
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
41.000
|
$340.000
|
$265.000
|
$360.000
|
$280.000
|
$310.000
|
$323.250
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
20.000
|
$830.000
|
$720.000
|
$790.000
|
$770.000
|
$760.000
|
$792.470
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
49.000
|
$180.000
|
$150.000
|
$193.000
|
$161.000
|
$160.000
|
$166.840
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
2.000
|
$250.000
|
$215.000
|
$250.000
|
$231.000
|
$230.000
|
$239.830
|
|
|
TRF SIG CBL (TY A)(12 AWG)(9 CONDR)
|
LF
|
20,845.000
|
$5.500
|
$4.800
|
$5.750
|
$5.150
|
$5.350
|
$5.580
|
|
|
TRF SIG CBL (TY A)(14 AWG)(3 CONDR)
|
LF
|
8,815.000
|
$2.850
|
$1.750
|
$2.200
|
$1.900
|
$1.650
|
$1.720
|
|
|
TRF SIG CBL (TY A)(14 AWG)(4 CONDR)
|
LF
|
760.000
|
$2.200
|
$2.000
|
$2.400
|
$2.150
|
$2.100
|
$2.190
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')ILSN
|
EA
|
2.000
|
$19,500.000
|
$15,000.000
|
$17,400.000
|
$16,100.000
|
$15,900.000
|
$16,579.380
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
|
EA
|
1.000
|
$21,000.000
|
$16,800.000
|
$19,700.000
|
$18,000.000
|
$17,800.000
|
$18,560.560
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')ILSN
|
EA
|
2.000
|
$19,500.000
|
$17,100.000
|
$18,400.000
|
$18,400.000
|
$16,600.000
|
$17,309.290
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
|
EA
|
2.000
|
$20,050.000
|
$18,900.000
|
$20,000.000
|
$20,300.000
|
$18,400.000
|
$19,186.200
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')ILSN
|
EA
|
1.000
|
$37,000.000
|
$38,100.000
|
$42,000.000
|
$40,900.000
|
$37,600.000
|
$39,206.580
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN
|
EA
|
2.000
|
$50,000.000
|
$39,300.000
|
$43,000.000
|
$42,200.000
|
$38,000.000
|
$39,623.680
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM&ILSN
|
EA
|
1.000
|
$52,000.000
|
$40,100.000
|
$45,000.000
|
$43,100.000
|
$39,700.000
|
$41,396.310
|
|
|
PED POLE ASSEMBLY
|
EA
|
30.000
|
$3,100.000
|
$2,300.000
|
$1,490.000
|
$2,470.000
|
$1,300.000
|
$1,355.550
|
|
|
REMOVE PED POLE ASSEMBLY
|
EA
|
5.000
|
$1,050.000
|
$245.000
|
$990.000
|
$260.000
|
$99.000
|
$103.230
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
20.000
|
$1,100.000
|
$1,030.000
|
$1,020.000
|
$1,110.000
|
$910.000
|
$948.880
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$3,500.000
|
$2,710.000
|
$4,200.000
|
$2,910.000
|
$3,600.000
|
$3,753.820
|
|
|
REMOVAL OF CONDUIT
|
LF
|
1,630.000
|
$3.000
|
$2.300
|
$3.300
|
$2.450
|
$7.550
|
$7.870
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
16.000
|
$220.000
|
$245.000
|
$220.000
|
$260.000
|
$110.000
|
$114.700
|
|
|
REMOVAL OF CABLES
|
LF
|
35,035.000
|
$1.100
|
$0.500
|
$1.400
|
$0.550
|
$0.650
|
$0.680
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
69.000
|
$1,010.000
|
$245.000
|
$440.000
|
$260.000
|
$330.000
|
$344.100
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
33.000
|
$100.000
|
$245.000
|
$55.000
|
$260.000
|
$36.000
|
$37.540
|
|
|
REMOVAL OF SIGNAL RELATED SIGNS
|
EA
|
14.000
|
$75.000
|
$245.000
|
$55.000
|
$260.000
|
$31.000
|
$32.320
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
18.000
|
$50.000
|
$40.000
|
$110.000
|
$42.950
|
$18.000
|
$18.770
|
|
|
REMOVAL OF TRAFFIC SIGNAL POLE FND
|
LF
|
16.000
|
$400.000
|
$2,825.000
|
$390.000
|
$3,030.000
|
$250.000
|
$364.960
|
|
|
REMOVAL OF CONTROL CABINET(GRND MNT)
|
EA
|
1.000
|
$1,150.000
|
$245.000
|
$880.000
|
$260.000
|
$410.000
|
$427.520
|
|
|
REMOVAL OF SIGNAL POLE ASSM
|
EA
|
8.000
|
$1,840.000
|
$900.000
|
$1,320.000
|
$970.000
|
$320.000
|
$333.670
|
|
|
REMOVE RADAR VEHICLE DETECTION SYSTEM
|
EA
|
3.000
|
$500.000
|
$245.000
|
$550.000
|
$260.000
|
$160.000
|
$166.840
|
|
|
REPLACE TRANSFORMER BASE COVER
|
EA
|
17.000
|
$100.000
|
$200.000
|
$330.000
|
$215.000
|
$390.000
|
$406.660
|
|
|
REPLACE BREAKAWAY FUSE HOLDER
|
EA
|
17.000
|
$200.000
|
$202.000
|
$220.000
|
$215.000
|
$200.000
|
$208.550
|
|
|
FULL - WIDTH MOWING
|
CYC
|
10.000
|
$6,000.000
|
$6,824.940
|
$4,400.000
|
$5,200.000
|
$5,574.220
|
$6,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
54.000
|
$2,900.000
|
$2,357.370
|
$1,260.000
|
$530.000
|
$2,738.920
|
$3,250.000
|
|
|
DEBRIS REMOV-CNTR MED/MN LNS/RAMPS
|
MI
|
54.000
|
$150.000
|
$589.340
|
$3,250.000
|
$1,030.000
|
$2,468.290
|
$1,500.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
27.000
|
$5,000.000
|
$3,969.930
|
$1,680.000
|
$1,470.000
|
$1,600.000
|
$2,000.000
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
27.000
|
$5,000.000
|
$2,977.450
|
$2,100.000
|
$184.000
|
$1,600.000
|
$2,500.000
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
CYC
|
27.000
|
$2,500.000
|
$1,984.960
|
$1,680.000
|
$184.000
|
$1,600.000
|
$2,500.000
|
|
|
ANTI-GRAFFITI COATING (PERMNENT-TY II)
|
SF
|
51,987.000
|
$1.000
|
$0.810
|
$0.770
|
$0.840
|
$0.870
|
$1.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
28,999.000
|
$3.700
|
$4.840
|
$3.950
|
$4.050
|
$3.400
|
$4.500
|
|
|
BONDING COURSE
|
GAL
|
4,519.000
|
$2.900
|
$3.520
|
$3.550
|
$3.450
|
$3.170
|
$5.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
5.000
|
$500.000
|
$549.480
|
$350.000
|
$280.000
|
$300.000
|
$500.000
|
|
|
ILSN (8D)
|
EA
|
11.000
|
$4,250.000
|
$5,700.000
|
$4,700.000
|
$217.000
|
$3,300.000
|
$3,441.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
2.000
|
$18,020.000
|
$20,000.000
|
$14,300.000
|
$21,500.000
|
$19,200.000
|
$20,020.390
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
1.000
|
$13,900.000
|
$17,100.000
|
$15,900.000
|
$18,400.000
|
$12,500.000
|
$13,034.100
|
|
|
REMOVE ITS RSVD (DC ONLY)
|
EA
|
2.000
|
$500.000
|
$245.000
|
$550.000
|
$260.000
|
$380.000
|
$396.240
|
|
|
ITS POLE MNT CAB (TY 1)(CONF 2)
|
EA
|
2.000
|
$6,400.000
|
$6,500.000
|
$5,800.000
|
$7,000.000
|
$5,100.000
|
$5,317.920
|
|
|
GROUND BOX (PREPARE)
|
EA
|
4.000
|
$440.000
|
$290.000
|
$880.000
|
$310.000
|
$230.000
|
$239.830
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
2.000
|
$8,000.000
|
$8,000.000
|
$1,650.000
|
$8,600.000
|
$1,700.000
|
$1,772.640
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
2.000
|
$2,000.000
|
$245.000
|
$550.000
|
$260.000
|
$430.000
|
$448.380
|
|
|
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
|
LF
|
9,185.000
|
$4.500
|
$4.800
|
$2.200
|
$5.150
|
$3.200
|
$3.340
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
8.000
|
$1,450.000
|
$2,752.000
|
$940.000
|
$2,960.000
|
$1,000.000
|
$1,042.730
|
|
|
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
|
LF
|
11,080.000
|
$4.000
|
$6.200
|
$3.850
|
$6.650
|
$7.650
|
$7.980
|
|
|
FIBER OPTIC PATCH PANEL (36 POSITIONS)
|
EA
|
1.000
|
$3,300.000
|
$6,400.000
|
$1,980.000
|
$6,900.000
|
$1,300.000
|
$1,355.550
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITIONS)
|
EA
|
1.000
|
$8,600.000
|
$25,000.000
|
$6,300.000
|
$26,900.000
|
$2,300.000
|
$2,398.280
|
|
|
FIBER OPTIC CBL (SNGL-MODE)(48 FIBER)
|
LF
|
70.000
|
$6.000
|
$6.250
|
$5.500
|
$6.700
|
$400.000
|
$417.090
|
|
|
FIBER OPTIC CBL (48 SMF)(AERIAL)
|
LF
|
9,690.000
|
$20.000
|
$6.800
|
$4.400
|
$7.300
|
$10.000
|
$10.430
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
48,400.000
|
$1.450
|
$3.000
|
$1.100
|
$3.200
|
$0.950
|
$0.990
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
7.000
|
$1,010.000
|
$275.000
|
$830.000
|
$300.000
|
$400.000
|
$417.090
|
|
|
INSTALL WRONG WAY DRIVER DETECTION SYS
|
EA
|
2.000
|
$62,500.000
|
$61,100.000
|
$71,000.000
|
$65,633.200
|
$48,500.000
|
$50,572.330
|
|
|
REMOVE WRONG WAY DRIVER DETECTION SYS
|
EA
|
1.000
|
$5,000.000
|
$485.000
|
$1,980.000
|
$520.000
|
$630.000
|
$656.920
|
|
|
REMOVE EXIST GND MT COMM CABINET
|
EA
|
3.000
|
$4,090.000
|
$2,900.000
|
$2,200.000
|
$3,120.000
|
$200.000
|
$208.550
|
|
|
INSTALL GND MT COMM CABINET FOUNDATION
|
EA
|
1.000
|
$5,630.000
|
$7,800.000
|
$4,600.000
|
$8,400.000
|
$4,500.000
|
$4,692.280
|
|
|
ITS GRND MNT CAB (TY 4) (CONF 1)
|
EA
|
1.000
|
$19,000.000
|
$7,425.000
|
$11,700.000
|
$8,000.000
|
$40,600.000
|
$42,334.770
|
|
|
ITS GRND MNT CAB (TY 6)(CONF 2)
|
EA
|
2.000
|
$21,000.000
|
$13,220.000
|
$17,200.000
|
$14,200.000
|
$29,000.000
|
$30,239.120
|
|
|
REMOVE DMS
|
EA
|
2.000
|
$10,000.000
|
$2,500.000
|
$6,100.000
|
$2,690.000
|
$4,000.000
|
$4,170.920
|
|
|
REMOVE EXISTING FIBER HUB
|
EA
|
1.000
|
$9,700.000
|
$4,825.000
|
$8,300.000
|
$5,200.000
|
$1,000.000
|
$1,042.730
|
|
|
LCS SIGNAL UNIT (REMOVE)
|
EA
|
2.000
|
$490.000
|
$2,025.000
|
$550.000
|
$2,180.000
|
$1,400.000
|
$1,459.820
|
|
|
FEDS PROCESSOR UNIT
|
EA
|
2.000
|
$28,000.000
|
$15,245.000
|
$21,000.000
|
$16,400.000
|
$15,200.000
|
$15,849.470
|
|
|
FEDS FISH EYE CAMERA ASSEMBLY
|
EA
|
6.000
|
$5,500.000
|
$3,965.000
|
$6,800.000
|
$4,260.000
|
$3,800.000
|
$3,962.370
|
|
|
LIFETIME FEDS DATA COLLECT & REPORTING
|
EA
|
2.000
|
$800.000
|
$11,525.000
|
$13,100.000
|
$12,400.000
|
$11,400.000
|
$11,887.110
|
|
|
FED ETHERNET REPEATER
|
EA
|
2.000
|
$1,500.000
|
$1,565.000
|
$3,000.000
|
$1,680.000
|
$1,500.000
|
$1,564.100
|
|
|
FEDS COMM CABLE (ETHERNET - CAT5E)
|
LF
|
2,600.000
|
$0.250
|
$1.600
|
$3.300
|
$1.700
|
$1.400
|
$1.460
|
|
|
TEMP TRAVEL TIME SYSTEM (2 SYS)
|
DAY
|
191.000
|
$50.000
|
$425.000
|
$55.000
|
$211.000
|
$750.000
|
$350.000
|
|
|
EXISTING MANHOLE ADJUSTMENTS
|
EA
|
1.000
|
$5,000.000
|
$5,000.000
|
$8,200.000
|
$1,680.000
|
$1,342.480
|
$3,500.000
|
|
Totals: |
$34,315,721.050
|
$33,122,614.619
|
$33,402,427.380
|
$34,315,676.200
|
$34,417,509.268
|
$35,211,396.860
|