|
|
REMOV CONC (MOWSTRIP)
|
SY
|
2,842.000
|
$15.000
|
$25.000
|
$22.000
|
$9.900
|
$18.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
2,701.000
|
$27.000
|
$27.000
|
$22.000
|
$13.200
|
$17.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
360.000
|
$25.000
|
$25.000
|
$22.000
|
$13.200
|
$24.000
|
|
|
REMOV CONC (CURB)
|
LF
|
348.000
|
$50.000
|
$9.000
|
$20.000
|
$9.900
|
$15.000
|
|
|
REMOV CONC (RAIL W/ METAL ELEMENT)
|
LF
|
953.000
|
$60.000
|
$44.000
|
$25.000
|
$10.000
|
$44.000
|
|
|
RMV (4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
423.000
|
$5.000
|
$27.000
|
$6.000
|
$9.900
|
$16.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
40.000
|
$400.000
|
$135.000
|
$45.000
|
$36.300
|
$170.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
360.000
|
$200.000
|
$99.000
|
$40.000
|
$17.600
|
$77.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
4,221.000
|
$10.000
|
$6.750
|
$5.500
|
$1.860
|
$5.000
|
|
|
BLOCK SODDING
|
SY
|
4,221.000
|
$10.000
|
$5.950
|
$10.000
|
$6.630
|
$10.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
66.400
|
$90.000
|
$100.000
|
$120.000
|
$19.780
|
$250.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
31,947.000
|
$150.000
|
$100.000
|
$116.670
|
$101.200
|
$120.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
55,986.000
|
$140.000
|
$121.000
|
$115.470
|
$114.400
|
$125.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
102,544.000
|
$90.000
|
$50.000
|
$51.250
|
$55.980
|
$55.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
2,108.000
|
$180.000
|
$93.000
|
$101.780
|
$104.100
|
$90.000
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
2,533.000
|
$4.000
|
$6.750
|
$11.200
|
$3.520
|
$5.500
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
138,690.000
|
$3.500
|
$1.850
|
$2.050
|
$1.870
|
$1.500
|
|
|
PLAN ASPH CONC PAV (3.5")
|
SY
|
347,937.000
|
$5.500
|
$2.650
|
$2.450
|
$2.420
|
$2.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
33.000
|
$300.000
|
$585.000
|
$195.000
|
$635.030
|
$750.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
552.000
|
$700.000
|
$460.000
|
$625.000
|
$506.510
|
$580.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
61.000
|
$800.000
|
$560.000
|
$635.000
|
$615.590
|
$680.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
432.000
|
$620.000
|
$556.000
|
$595.000
|
$613.430
|
$560.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
15.000
|
$190.000
|
$398.000
|
$595.000
|
$454.120
|
$950.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(8 IN)
|
CY
|
3.000
|
$200.000
|
$450.000
|
$595.000
|
$525.110
|
$1,500.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
1,141.000
|
$80.000
|
$20.000
|
$90.000
|
$90.000
|
$25.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
2,084.000
|
$200.000
|
$165.000
|
$178.000
|
$146.420
|
$165.000
|
|
|
JOINT SEALANT
|
LF
|
1,141.000
|
$10.000
|
$22.000
|
$43.000
|
$43.000
|
$23.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$3,500.000
|
$2,000.000
|
$1,200.000
|
$2,267.950
|
$3,300.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$3,000.000
|
$2,625.000
|
$850.000
|
$1,800.000
|
$1,700.000
|
|
|
ADJUSTING MANHOLES (UTILITY BOX)
|
EA
|
2.000
|
$3,500.000
|
$850.000
|
$450.000
|
$1,500.000
|
$1,600.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
5.000
|
$2,000.000
|
$695.000
|
$485.000
|
$1,200.000
|
$1,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
10.000
|
$5,000.000
|
$5,000.000
|
$6,500.000
|
$1,000.000
|
$3,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,800.000
|
$1,000.000
|
$2,500.000
|
$971.980
|
$2,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,500,000.000
|
$1,126,000.000
|
$650,000.000
|
$1,637,112.400
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$40,000.000
|
$17,000.000
|
$2,500.000
|
$23,880.320
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$15,000.000
|
$9,800.000
|
$18,000.000
|
$10,000.000
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
541.000
|
$300.000
|
$160.000
|
$100.000
|
$225.000
|
$270.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
69.000
|
$400.000
|
$250.000
|
$100.000
|
$350.000
|
$700.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
8,086.000
|
$6.500
|
$3.300
|
$7.000
|
$5.750
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
8,086.000
|
$2.000
|
$1.000
|
$0.250
|
$0.750
|
$3.000
|
|
|
CONC CURB (TY I)
|
LF
|
343.000
|
$35.000
|
$53.500
|
$45.000
|
$59.400
|
$26.000
|
|
|
CONC CURB (TY II)
|
LF
|
169.000
|
$65.000
|
$64.000
|
$55.000
|
$70.200
|
$35.000
|
|
|
CONC CURB (TY F2)
|
LF
|
122.000
|
$225.000
|
$220.000
|
$55.000
|
$256.280
|
$175.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
2,588.000
|
$150.000
|
$68.500
|
$85.000
|
$69.120
|
$106.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
7.000
|
$3,000.000
|
$2,500.000
|
$2,500.000
|
$2,699.940
|
$3,500.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
15.000
|
$3,300.000
|
$2,500.000
|
$2,500.000
|
$2,699.940
|
$3,500.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
3.000
|
$3,700.000
|
$2,700.000
|
$2,500.000
|
$2,915.930
|
$4,500.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
5.000
|
$4,100.000
|
$4,000.000
|
$2,500.000
|
$4,319.900
|
$4,000.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$4,100.000
|
$2,500.000
|
$2,500.000
|
$2,699.940
|
$4,000.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$4,100.000
|
$3,450.000
|
$2,500.000
|
$3,725.910
|
$4,000.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
8,988.000
|
$35.000
|
$26.500
|
$31.000
|
$26.790
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,000.000
|
$3,100.000
|
$3,000.000
|
$2,206.000
|
$2,400.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
35.000
|
$725.000
|
$1,400.000
|
$1,650.000
|
$1,377.000
|
$1,450.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
1.000
|
$700.000
|
$1,000.000
|
$950.000
|
$622.000
|
$2,000.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
8.000
|
$6.000
|
$1,000.000
|
$1,150.000
|
$1,043.000
|
$1,500.000
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
11.000
|
$1,500.000
|
$35.000
|
$1,676.000
|
$1,976.000
|
$1,650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
13,763.000
|
$6.000
|
$2.500
|
$2.000
|
$2.500
|
$3.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
36.000
|
$350.000
|
$100.000
|
$225.000
|
$250.000
|
$150.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$3,500.000
|
$200.000
|
$300.000
|
$250.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$250.000
|
$2,800.000
|
$3,200.000
|
$3,059.000
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
21.000
|
$8.000
|
$200.000
|
$250.000
|
$250.000
|
$225.000
|
|
|
REPLACE LUMINAIRE W/(250W EQ) LED
|
EA
|
6.000
|
$1,000.000
|
$820.000
|
$1,450.000
|
$820.000
|
$1,500.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
438.000
|
$45.000
|
$28.000
|
$25.000
|
$28.000
|
$23.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
32.000
|
$40.000
|
$34.000
|
$45.000
|
$34.000
|
$72.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$900.000
|
$615.000
|
$800.000
|
$615.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$1,000.000
|
$745.000
|
$800.000
|
$745.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
1.000
|
$750.000
|
$672.000
|
$785.000
|
$672.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,125.000
|
$968.000
|
$985.000
|
$968.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,150.000
|
$1,245.000
|
$1,050.000
|
$1,245.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,325.000
|
$1,280.000
|
$1,080.000
|
$1,280.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,725.000
|
$1,295.000
|
$1,050.000
|
$1,295.000
|
$1,450.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$3,100.000
|
$1,950.000
|
$1,250.000
|
$1,950.000
|
$1,825.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
48.000
|
$350.000
|
$355.000
|
$650.000
|
$355.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(T)
|
EA
|
3.000
|
$700.000
|
$440.000
|
$735.000
|
$440.000
|
$450.000
|
|
|
ISRSA TY10BWG(1)SA(P) (EXCLUDING SIGN)
|
EA
|
1.000
|
$750.000
|
$520.000
|
$735.000
|
$520.000
|
$625.000
|
|
|
ISRSA TY10BWG(1)SA(T) (EXCLUDING SIGN)
|
EA
|
1.000
|
$750.000
|
$650.000
|
$735.000
|
$650.000
|
$750.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
164.000
|
$35.000
|
$35.000
|
$28.000
|
$30.000
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
10,194.000
|
$1.000
|
$0.750
|
$0.350
|
$0.690
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
26.000
|
$1.000
|
$1.000
|
$0.350
|
$2.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
32,195.000
|
$1.000
|
$0.550
|
$0.350
|
$0.620
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
3,829.000
|
$1.500
|
$1.000
|
$0.750
|
$1.360
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
817.000
|
$13.000
|
$6.000
|
$5.000
|
$8.000
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
4,985.000
|
$1.000
|
$0.750
|
$0.350
|
$0.690
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
28,507.000
|
$1.000
|
$0.550
|
$0.350
|
$0.620
|
$0.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
28,029.000
|
$2.000
|
$1.500
|
$1.000
|
$1.630
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
22,360.000
|
$2.000
|
$1.500
|
$1.000
|
$1.630
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
67.000
|
$2.000
|
$1.750
|
$2.500
|
$3.000
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
110.000
|
$2.500
|
$2.000
|
$3.500
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
12,931.000
|
$2.000
|
$1.000
|
$0.950
|
$1.150
|
$1.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
8,021.000
|
$9.000
|
$8.000
|
$6.000
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
126.000
|
$180.000
|
$125.000
|
$100.000
|
$110.000
|
$110.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
1.000
|
$240.000
|
$150.000
|
$250.000
|
$235.000
|
$235.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
72.000
|
$200.000
|
$165.000
|
$125.000
|
$125.000
|
$125.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
13.000
|
$50.000
|
$50.000
|
$20.000
|
$35.000
|
$35.000
|
|
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
|
EA
|
1.000
|
$150.000
|
$125.000
|
$200.000
|
$200.000
|
$200.000
|
|
REFL PAV MRK TY I (Y)6"(DOT)(100MIL)
|
LF
|
39.000
|
$2.000
|
$1.750
|
$2.500
|
$10.000
|
$10.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
47.000
|
$400.000
|
$175.000
|
$450.000
|
$350.000
|
$350.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
240,816.000
|
$0.700
|
$0.150
|
$0.250
|
$0.270
|
$0.300
|
|
|
PAVEMENT SLER 8"
|
LF
|
13,041.000
|
$0.800
|
$0.300
|
$0.400
|
$0.400
|
$0.400
|
|
|
PAVEMENT SLER 24"
|
LF
|
8,021.000
|
$3.000
|
$2.500
|
$3.000
|
$2.500
|
$2.500
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
126.000
|
$45.000
|
$45.000
|
$50.000
|
$52.750
|
$53.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
72.000
|
$75.000
|
$50.000
|
$60.000
|
$63.270
|
$64.000
|
|
|
PAVEMENT SLER (MED NOSE)
|
EA
|
47.000
|
$100.000
|
$55.000
|
$250.000
|
$195.000
|
$195.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
1.000
|
$60.000
|
$65.000
|
$85.000
|
$115.000
|
$115.000
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
13.000
|
$15.000
|
$10.000
|
$10.000
|
$20.000
|
$20.000
|
|
|
PAVEMENT SLER (BIKE SYMBOL)
|
EA
|
1.000
|
$15.000
|
$45.000
|
$100.000
|
$55.000
|
$55.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
26,123.000
|
$1.100
|
$0.650
|
$0.650
|
$0.670
|
$0.700
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
91,592.000
|
$1.000
|
$0.600
|
$0.550
|
$0.570
|
$0.600
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
19,332.000
|
$1.100
|
$0.650
|
$0.650
|
$0.670
|
$0.700
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
103,706.000
|
$1.000
|
$0.600
|
$0.550
|
$0.570
|
$0.600
|
|
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
|
LF
|
420.000
|
$25.000
|
$7.500
|
$25.000
|
$8.000
|
$8.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
2,029.000
|
$6.500
|
$4.500
|
$5.000
|
$5.500
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,862.000
|
$6.500
|
$4.500
|
$5.000
|
$5.500
|
$5.500
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
11.000
|
$250.000
|
$175.000
|
$225.000
|
$175.000
|
$225.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
2.000
|
$300.000
|
$245.000
|
$400.000
|
$245.000
|
$400.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)ALUM
|
EA
|
1.000
|
$350.000
|
$255.000
|
$400.000
|
$255.000
|
$400.000
|
|
|
RETROFIT REFL BRDR SHEETING (3 SEC)
|
EA
|
66.000
|
$300.000
|
$345.000
|
$200.000
|
$345.000
|
$200.000
|
|
|
RETROFIT REFL BRDR SHEETING (4 SEC)
|
EA
|
27.000
|
$400.000
|
$360.000
|
$200.000
|
$360.000
|
$200.000
|
|
|
RETROFIT REFL BRDR SHEETING (5 SEC)
|
EA
|
1.000
|
$500.000
|
$367.000
|
$200.000
|
$367.000
|
$200.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
29.000
|
$150.000
|
$185.000
|
$100.000
|
$185.000
|
$100.000
|
|
|
REPLACE OF SIGNAL HEAD ASSM
|
EA
|
10.000
|
$1,200.000
|
$635.000
|
$1,100.000
|
$635.000
|
$1,100.000
|
|
|
INSTALL OF SIGNAL HEAD ASSM
|
EA
|
29.000
|
$1,500.000
|
$285.000
|
$1,100.000
|
$285.000
|
$1,100.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
33.000
|
$300.000
|
$50.000
|
$100.000
|
$50.000
|
$100.000
|
|
|
REPLACE OF PEDESTRIAN PUSH BUTTONS
|
EA
|
12.000
|
$700.000
|
$985.000
|
$1,000.000
|
$985.000
|
$1,000.000
|
|
|
INSTALL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
36.000
|
$1,000.000
|
$985.000
|
$1,000.000
|
$985.000
|
$1,000.000
|
|
|
INSTL VID IMAGE VEH DET SYS (VIVDS)
|
EA
|
2.000
|
$20,000.000
|
$24,500.000
|
$27,000.000
|
$24,500.000
|
$27,000.000
|
|
|
INSTL PED POLE ASSM
|
EA
|
27.000
|
$2,000.000
|
$3,050.000
|
$2,900.000
|
$3,050.000
|
$2,900.000
|
|
|
REMOVE PED POLE ASSM
|
EA
|
1.000
|
$1,000.000
|
$590.090
|
$650.000
|
$225.000
|
$650.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
102.000
|
$525.000
|
$579.770
|
$500.000
|
$1,250.000
|
$300.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
70,114.000
|
$5.000
|
$3.900
|
$4.600
|
$4.840
|
$4.000
|
|
|
BONDING COURSE
|
GAL
|
58,425.000
|
$5.000
|
$3.900
|
$3.770
|
$3.190
|
$4.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
8.000
|
$740.000
|
$475.000
|
$250.000
|
$250.000
|
$500.000
|
|
|
ASPHALT PLUG EXPANSION JOINT
|
LF
|
1,141.000
|
$95.000
|
$248.000
|
$285.000
|
$285.000
|
$250.000
|
|
Totals: |
$33,898,933.000
|
$21,789,871.130
|
$21,816,388.250
|
$22,809,061.642
|
$23,496,211.500
|