Show Job Controls
Bid Cobra

BEXAR US 90 (0024-08-128)

Items: 70

County: BEXAR
Length: N/A
Highway: US 90
District: SAN ANTONIO
Control Number: 0024-08-128
DBE Goal: N/A
Project: STP 2017(331)HES
Guaranty: N/A
Time: 210 WORKING DAYS
Engineer's Estimate: $2,178,952.75
Date: 01/04/2017 (9 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN BRIDGE OVER US 90
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$2,178,952.75
1
$2,331,043.05
Over/Under Est: 6.98% $152,090.30
Over/Under Est: 9.91% $216,005.83
Amt Left: 2.74% $63,915.53
$2,503,646.54
Over/Under Est: 14.9% $324,693.79
Amt Left: 7.4% $172,603.49
Delta: -4.54% -$108,687.96
Over/Under Est: 17.05% $371,464.45
Amt Left: 9.41% $219,374.15
Delta: -1.87% -$46,770.66
$2,895,136.17
Over/Under Est: 32.87% $716,183.42
Amt Left: 24.2% $564,093.12
Delta: -13.52% -$344,718.97
Over/Under Est: 33.34% $726,555.44
Amt Left: 24.64% $574,465.14
Delta: -0.36% -$10,372.02
Over/Under Est: 34.33% $748,140.90
Amt Left: 25.57% $596,050.60
Delta: -0.74% -$21,585.46
Over/Under Est: 57.93% $1,262,201.70
Amt Left: 47.62% $1,110,111.40
Delta: -17.56% -$514,060.80

Bid Items & Bid Tabulations

70 Total 0 of 70
BEXAR  |  US 90  |  SAN ANTONIO  |  0024-08-128  |  01/04/2017  |  $2,178,952.75  |  STP 2017(331)HES  |  CONSTRUCT PEDESTRIAN BRIDGE OVER US...  |  210 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
CAPITAL EXCAVATION COMPANY
DAN WILLIAMS COMPANY
CURRAN CONTRACTING COMPANY
ALTUS CONSTRUCTION LLC
ACME BRIDGE COMPANY, INC.
HUNTER INDUSTRIES, LTD.
JORDAN FOSTER CONSTRUCTION, LLC
PREPARING ROW
AC 0.700 $4,250.000 $150,000.000 $5,000.000 $60,000.000 $10,000.000 $19,557.000 $20,000.000 $24,975.000 $175,000.000
EXCAVATION (ROADWAY)
CY 246.600 $6.000 $25.000 $50.000 $65.000 $34.100 $41.070 $30.000 $98.340 $75.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 301.800 $12.000 $60.000 $34.000 $55.000 $25.000 $58.670 $30.000 $192.720 $150.000
COMPOST MANUF TOPSOIL (4")
SY 5,796.000 $1.150 $1.254 $1.000 $2.750 $1.650 $1.650 $3.500 $1.140 $11.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 5,796.000 $0.170 $0.176 $0.160 $0.170 $0.150 $0.780 $0.170 $0.160 $0.500
STRAW OR HAY MULCHING
SY 5,796.000 $0.180 $0.490 $0.450 $0.500 $0.650 $0.150 $0.480 $0.450 $1.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 11,592.000 $0.150 $0.176 $0.160 $0.160 $0.100 $0.170 $0.170 $0.160 $0.450
VEGETATIVE WATERING
MG 120.600 $13.250 $40.000 $10.000 $10.000 $29.850 $58.670 $50.000 $73.250 $100.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 264.600 $58.000 $80.000 $65.000 $65.000 $74.100 $156.460 $70.000 $176.700 $150.000
CEM STABIL BKFL
CY 31.000 $104.500 $125.000 $200.000 $160.000 $114.700 $325.950 $200.000 $130.000 $175.000
DRILL SHAFT (24 IN)
LF 242.000 $125.500 $125.000 $75.000 $135.000 $112.000 $175.690 $85.800 $116.270 $125.000
DRILL SHAFT (36 IN)
LF 431.000 $134.500 $185.000 $138.000 $190.000 $160.000 $328.020 $186.000 $166.480 $175.000
DRILL SHAFT (48 IN)
LF 245.000 $274.500 $265.000 $235.000 $290.000 $255.000 $582.650 $345.000 $340.640 $240.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 48.000 $164.000 $181.500 $165.000 $200.000 $175.150 $215.130 $206.000 $230.000 $250.000
CL C CONC (ABUT)
CY 18.800 $941.500 $1,342.900 $1,300.000 $1,100.000 $1,400.000 $1,334.220 $1,200.000 $1,250.000 $2,000.000
CL C CONC (CAP)
CY 16.500 $633.500 $1,342.900 $3,400.000 $1,250.000 $1,600.000 $2,432.550 $2,000.000 $1,550.000 $6,000.000
CL C CONC (CAP)(MASS)
CY 88.500 $910.000 $1,342.900 $2,100.000 $1,300.000 $1,100.000 $1,125.650 $1,200.000 $1,350.000 $1,500.000
CL C CONC (COLUMN)
CY 95.700 $675.000 $897.000 $1,300.000 $1,250.000 $1,850.000 $937.410 $1,700.000 $1,650.000 $2,000.000
CL C CONC (RETAINING WALL)
CY 156.700 $1,473.000 $591.000 $1,060.000 $750.000 $1,025.000 $1,088.760 $900.000 $1,450.000 $1,475.000
REINF CONC SLAB (BOX BEAM)
SF 9,757.000 $12.000 $7.000 $16.250 $17.000 $12.400 $16.570 $14.000 $32.000 $25.000
SHEAR KEY
CY 64.400 $321.500 $250.000 $392.000 $320.000 $321.750 $346.760 $600.000 $475.000 $325.000
PRESTR CONC BOX BEAM (4B20)
LF 1,209.190 $187.500 $185.000 $176.000 $210.000 $159.000 $281.120 $235.000 $195.000 $225.000
PRESTR CONC BOX BEAM (4B40)
LF 1,033.780 $200.000 $185.000 $179.000 $210.000 $182.000 $287.160 $235.000 $200.000 $250.000
RIPRAP (CONC)(4 IN)
CY 6.000 $380.000 $500.000 $535.450 $550.000 $522.600 $911.420 $1,000.000 $425.000 $2,300.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $450.000 $500.000 $608.210 $700.000 $516.200 $772.510 $800.000 $725.000 $725.000
STR STEEL (MISC NON - BRIDGE)
LB 1,197.000 $5.500 $18.000 $9.000 $9.000 $11.000 $10.430 $10.800 $14.000 $15.000
RAIL (TY PR2) (MOD)
LF 1,369.300 $100.000 $116.850 $92.000 $85.000 $165.000 $199.480 $120.000 $90.000 $111.000
RAIL(PEDESTRIAN)(SPL)
LF 692.200 $161.000 $400.000 $550.000 $325.000 $540.000 $166.230 $388.000 $475.000 $485.000
ARMOR JOINT
LF 72.000 $100.000 $80.000 $65.000 $85.000 $83.050 $104.370 $73.700 $60.000 $110.000
MOBILIZATION
LS 1.000 $198,096.430 $215,000.000 $200,000.000 $245,000.000 $232,200.000 $280,760.000 $230,000.000 $291,534.810 $315,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $7,500.000 $15,000.000 $3,000.000 $17,500.000 $8,725.950 $6,519.000 $25,400.000 $2,000.000 $26,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 192.000 $18.000 $28.050 $25.250 $27.000 $33.900 $54.050 $27.000 $25.500 $55.000
ROCK FILTER DAMS (REMOVE)
LF 192.000 $7.500 $11.000 $10.000 $7.000 $8.350 $26.080 $10.600 $10.000 $2.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $19.500 $13.200 $12.000 $13.000 $16.200 $30.780 $12.700 $12.000 $38.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $7.600 $9.730 $8.850 $5.000 $10.500 $13.040 $9.400 $8.850 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,020.000 $2.750 $2.310 $2.100 $2.500 $2.500 $3.910 $2.250 $2.100 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,020.000 $0.850 $0.550 $0.500 $0.550 $0.550 $1.960 $0.530 $0.500 $2.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 2)
LF 1,740.000 $70.000 $25.000 $15.000 $25.000 $32.000 $53.910 $72.500 $20.000 $40.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 740.000 $35.000 $25.000 $15.000 $25.000 $34.950 $60.190 $26.700 $25.000 $35.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $40.000 $25.000 $15.000 $25.000 $44.750 $76.780 $36.800 $100.000 $35.000
PORT CTB (REMOVE)(SGL SLP)(TY 2)
LF 1,740.000 $7.000 $12.000 $15.000 $6.000 $11.100 $5.880 $15.100 $20.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 740.000 $7.500 $12.000 $15.000 $6.000 $11.600 $6.190 $25.500 $25.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $9.000 $12.000 $15.000 $7.000 $15.300 $5.220 $25.400 $100.000 $15.000
PERM CTB (SSCB)(TY 3)(MOD)
LF 210.000 $400.000 $165.000 $190.000 $250.000 $388.000 $150.940 $349.000 $425.000 $100.000
CONC SIDEWALKS (4")
SY 231.000 $45.000 $55.000 $34.000 $60.000 $62.450 $84.750 $53.800 $56.000 $40.000
CURB RAMPS (TY 10)
EA 1.000 $1,600.000 $1,500.000 $3,000.000 $1,700.000 $1,448.000 $1,855.540 $2,630.000 $1,800.000 $3,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $20.000 $32.940 $20.000 $24.000 $27.850 $27.960 $31.800 $29.950 $175.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,500.000 $1,751.200 $1,392.000 $1,400.000 $2,199.350 $2,011.900 $1,690.000 $2,092.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $900.000 $874.500 $631.870 $325.000 $1,850.750 $801.770 $843.000 $795.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.350 $6.600 $2.100 $1.050 $5.650 $11.800 $8.500 $8.000 $6.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 50.000 $10.000 $6.600 $150.000 $0.100 $16.600 $16.620 $8.500 $8.000 $16.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,200.000 $2,557.500 $2,371.390 $2,600.000 $2,000.000 $2,689.750 $2,470.000 $2,325.000 $1,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $240.000 $275.000 $250.000 $60.000 $284.000 $319.790 $292.000 $275.000 $500.000
CRASH CUSH ATTEN (INSTL)
EA 4.000 $12,000.000 $6,900.000 $6,900.000 $6,500.000 $7,695.000 $11,673.160 $9,060.000 $855.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $650.000 $500.000 $900.000 $563.000 $834.430 $901.000 $850.000 $550.000
CHAIN LINK FENCE (INSTALL) (6')
LF 573.000 $22.000 $20.000 $25.000 $25.000 $25.000 $23.960 $21.200 $20.000 $22.000
IN RD IL AM (TY SA) 30S-8 (250W) S
EA 2.000 $2,300.000 $2,970.000 $2,700.000 $3,000.000 $2,866.000 $3,239.940 $3,370.000 $2,200.000 $2,200.000
IN RD IL AM (TY SA) 40S-8 (250W) S
EA 2.000 $2,500.000 $3,465.000 $3,150.000 $3,200.000 $3,344.000 $3,500.700 $3,930.000 $2,500.000 $2,500.000
IN RD IL AM (TY SA) 40S-12 (250W) S
EA 2.000 $3,200.000 $3,740.000 $3,400.000 $3,500.000 $3,610.000 $3,578.930 $4,240.000 $2,600.000 $2,600.000
CONDT (PVC) (SCH 40) (2")
LF 514.000 $8.000 $11.000 $10.000 $11.000 $10.600 $13.230 $12.500 $11.000 $11.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 325.000 $20.000 $38.500 $35.000 $36.000 $37.150 $28.760 $43.700 $42.000 $42.000
ELEC CONDR (NO.8) BARE
LF 878.000 $1.000 $0.880 $0.800 $1.200 $0.850 $1.630 $1.000 $1.600 $1.750
ELEC CONDR (NO.8) INSULATED
LF 1,756.000 $1.500 $1.110 $1.000 $1.200 $1.050 $1.760 $1.250 $1.600 $1.750
GROUND BOX TY A (122311)W/APRON
EA 7.000 $900.000 $770.000 $700.000 $900.000 $744.000 $1,238.610 $873.000 $890.000 $900.000
ELC SRV TY A 240/480 060(NS)AL(E)PS(U)
EA 1.000 $3,600.000 $4,840.000 $4,440.000 $6,000.000 $4,713.000 $6,323.430 $5,540.000 $4,300.000 $4,300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $700.000 $385.000 $350.000 $465.000 $420.000 $814.880 $424.000 $400.000 $300.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $1,800.000 $2,095.500 $2,121.210 $2,250.000 $2,022.000 $325.950 $2,380.000 $2,100.000 $2,200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 11.000 $20.000 $13.200 $12.000 $13.000 $10.600 $23.540 $12.700 $12.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 10.000 $40.000 $19.200 $18.000 $16.000 $13.800 $38.080 $15.900 $15.000 $350.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 660.000 $80.000 $25.000 $40.000 $100.000 $17.250 $65.190 $103.000 $150.000 $40.000
Totals: $2,178,952.755 $2,331,043.067 $2,394,958.580 $2,503,646.540 $2,550,417.200 $2,895,136.233 $2,905,508.190 $2,927,093.660 $3,441,154.450