Show Job Controls
Bid Cobra

BEXAR US 90 (0024-07-074)

Items: 71

County: BEXAR
Length: 2.3000 MILES
Highway: US 90
District: SAN ANTONIO
Control Number: 0024-07-074
DBE Goal: 0.0%
Project: C 24-7-74
Guaranty: $100,000.00
Time: 127 WORKING DAYS
Engineer's Estimate: $6,680,545.51
Date: 04/04/2025 (1 year ago)
Contract Number: 4253207
Type: HIGHWAY IMPROVEMENT
Project ID: A00207468
Project Description: CONSTRUCT AUXILIARY LANES BETWEEN RAMPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CARLOS ARCILA
DANNY GALLEGOS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$6,680,545.51
$4,223,266.29
Over/Under Est: -36.78% -$2,457,279.22
Over/Under Est: -30.78% -$2,056,081.21
Amt Left: 9.5% $401,198.01
Over/Under Est: -20.8% -$1,389,441.00
Amt Left: 25.28% $1,067,838.22
Delta: -14.42% -$666,640.21
Over/Under Est: -17.69% -$1,181,881.31
Amt Left: 30.2% $1,275,397.91
Delta: -3.92% -$207,559.69
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 29.81% $1,298,642.41
LONE STAR EROSION CONTROL 2.18% $94,969.49
TRP CONSTRUCTION GROUP, LLC 1.98% $86,256.69
Total: 33.97% $1,479,868.59

Bid Items & Bid Tabulations

71 Total 0 of 71
BEXAR  |  US 90  |  SAN ANTONIO  |  0024-07-074  |  04/04/2025  |  $6,680,545.51  |  C 24-7-74  |  HWY IMPRV  |  127 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DAN WILLIAMS COMPANY
DEAN WORD COMPANY, LTD.
HUNTER INDUSTRIES, LTD.
TEXAS MATERIALS GROUP, INC.
REMOV CONC (MOWSTRIP)
SY 2,768.000 $30.000 $25.000 $15.400 $12.900 $26.000
REMOV CONC (RIPRAP)
SY 64.000 $30.000 $35.000 $28.200 $43.300 $32.000
EXCAV (ROADWAY)
CY 10,855.000 $30.000 $25.000 $11.300 $19.830 $44.000
EMBANK (FNL)(DC)(TY C)
CY 6,368.000 $35.000 $45.000 $25.400 $46.900 $48.000
COMPOST MANUF TOPSOIL (4")
SY 40,639.000 $5.000 $2.500 $2.500 $1.320 $2.500
DRILL SEED (PERM_RURAL_CLAY)
SY 40,639.000 $0.300 $0.240 $0.300 $0.260 $0.240
VEGETATIVE WATERING
TGL 634.000 $50.000 $5.000 $34.200 $24.500 $33.000
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
CY 3,290.000 $45.000 $70.000 $92.700 $79.170 $70.700
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 356.000 $400.000 $325.000 $327.000 $357.500 $326.000
LIME TRT (SUBGRADE) (8")
SY 21,518.000 $6.000 $4.750 $10.400 $3.000 $5.300
PRIME COAT(MC-30 OR AE-P)
GAL 3,795.000 $6.000 $4.000 $3.700 $6.460 $4.700
D-GR HMA TY-B PG64-22
TON 5,045.000 $130.000 $90.000 $96.400 $118.500 $85.700
D-GR HMA TY-C PG76-22
TON 2,098.000 $130.000 $100.000 $112.700 $129.500 $92.350
TOM-C PG76-22 SAC-B
TON 3,907.000 $175.000 $175.000 $151.300 $157.000 $171.000
PLANE ASPH CONC PAV(1")
SY 45,183.000 $3.000 $1.250 $1.500 $2.440 $1.600
PLANE ASPH CONC PAV(3")
SY 1,590.000 $6.000 $3.000 $9.300 $4.640 $5.900
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 28.000 $150.000 $150.000 $89.700 $90.170 $82.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 40.500 $270.000 $250.000 $177.100 $178.080 $162.000
RIPRAP (CONC)(CL A)
CY 226.000 $700.000 $300.000 $594.600 $585.160 $589.000
CLEAN EXIST CULVERTS
EA 4.000 $6,000.000 $4,500.000 $4,616.700 $1,200.000 $11,800.000
MOBILIZATION
LS 1.000 $490,421.410 $420,000.000 $420,000.000 $504,573.520 $521,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $30,000.000 $50,000.000 $14,345.200 $5,657.280 $35,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $18,300.000 $8,000.000 $15,681.100 $5,092.470 $9,300.000
TMA (STATIONARY)
DAY 10.000 $300.000 $175.000 $299.200 $509.250 $500.000
TMA (MOBILE OPERATION)
DAY 6.000 $285.000 $500.000 $681.200 $1,018.490 $200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 400.000 $50.000 $40.000 $43.900 $88.240 $40.000
ROCK FILTER DAMS (REMOVE)
LF 400.000 $15.000 $12.000 $13.200 $13.240 $12.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $30.000 $24.000 $26.300 $26.470 $24.000
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $15.000 $5.000 $5.500 $5.510 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,624.000 $6.000 $3.000 $3.300 $3.290 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,624.000 $1.500 $1.000 $0.900 $0.940 $0.850
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 700.000 $8.000 $4.000 $4.400 $4.390 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 700.000 $2.000 $1.000 $0.600 $0.550 $0.500
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 14,700.000 $70.000 $5.000 $26.100 $48.000 $42.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 14,700.000 $50.000 $7.000 $15.000 $27.000 $23.000
PORT CTB (PINNING)
EA 1,960.000 $70.000 $27.000 $162.000 $88.000 $115.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 15,963.000 $3.000 $1.250 $0.200 $0.510 $0.320
CABLE BARRIER SYSTEM (INSTALL)(TL-3)
LF 7,709.000 $20.000 $15.000 $17.300 $18.560 $21.500
CABLE BARRIER TERM SEC (INSTL)(TL-3)
EA 4.000 $7,500.000 $5,000.000 $3,182.500 $4,034.000 $4,035.000
CABLE BARRIER (REMOVE)
LF 8,335.000 $5.000 $4.000 $4.200 $2.500 $2.500
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 10.000 $500.000 $1,850.000 $395.100 $285.130 $286.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $850.000 $1,500.000 $586.100 $1,397.540 $654.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $10,000.000 $7,961.100 $9,177.120 $8,500.000
ALUMINUM SIGNS (TY G)
SF 382.250 $30.000 $30.000 $32.600 $31.580 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $800.000 $830.000 $905.400 $877.310 $825.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $900.000 $770.000 $839.500 $813.510 $765.000
REMOVE SM RD SN SUP&AM
EA 3.000 $140.000 $100.000 $109.800 $106.340 $100.000
INSTALL LRSS (STRUCT STEEL)
LB 2,521.000 $10.000 $7.000 $7.000 $6.490 $6.350
REMOVE LRSA
EA 5.000 $900.000 $1,000.000 $795.600 $740.830 $725.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 147.000 $18.000 $30.000 $32.400 $31.370 $29.500
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 12.000 $120.000 $77.000 $83.400 $80.820 $76.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 740.000 $1.300 $1.250 $1.400 $1.250 $1.250
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 4,680.000 $1.300 $1.250 $1.400 $1.250 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 56.000 $3.000 $3.000 $3.700 $20.600 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 234.000 $2.000 $3.000 $2.700 $5.310 $3.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 4,329.000 $1.800 $1.700 $1.900 $1.250 $1.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,860.000 $2.000 $1.100 $1.200 $1.250 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,751.000 $4.500 $4.000 $4.400 $4.060 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,228.000 $10.000 $9.500 $10.400 $8.120 $9.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $240.000 $185.000 $203.000 $187.390 $185.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 12.000 $240.000 $225.000 $246.900 $218.620 $225.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 13.000 $64.000 $75.000 $82.300 $56.220 $75.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 3,709.000 $1.300 $0.950 $1.000 $1.000 $0.950
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 15,348.000 $1.300 $0.800 $0.900 $0.960 $0.800
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 14,987.000 $1.300 $0.800 $0.900 $0.960 $0.800
REFL PAV MRKR TY I-C
EA 122.000 $6.000 $7.500 $8.200 $6.870 $7.500
REFL PAV MRKR TY II-C-R
EA 183.000 $6.000 $7.500 $8.200 $6.870 $7.500
ELIM EXT PM & MRKS (4")
LF 3,625.000 $1.000 $0.750 $0.800 $0.750 $0.750
UNDERSEAL COURSE
GAL 32,683.000 $5.000 $0.010 $0.100 $4.640 $0.010
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $11,500.000 $6,000.000 $10,929.300 $5,092.470 $12,000.000
TEMP CONSTR EQUIPMENT ALERT SYS
EA 2.000 $15,000.000 $15,000.000 $19,957.800 $13,839.240 $21,500.000
Totals: $6,680,545.510 $4,223,266.290 $4,624,464.300 $5,291,104.505 $5,498,664.200
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $75,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $30,000.00
Total: $110,000.00