BEXAR IH 35 (0017-09-106)

Items: 129

County: BEXAR
Length: 0.0000 MILES
Highway: IH 35
District: SAN ANTONIO
Control Number: 0017-09-106
DBE Goal: 0.0%
Project: F 2026(375)
Guaranty: $100,000.00
Time: 265 WORKING DAYS
Engineer's Estimate: $18,518,602.56
Date: 02/04/2026 (4 months ago)
Contract Number: 2263004
Type: RESURFACE ROADWAY
Project ID: A00063678
Contract Type: Federal
Project Description: BASE REPAIR, MILL, INLAY & PAVEMENT MARKINGS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CARLOS ARCILA
DANNY GALLEGOS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$18,518,602.56
$15,028,560.49
Over/Under Est: -18.85% -$3,490,042.07
Over/Under Est: -13.71% -$2,538,091.06
Amt Left: 6.33% $951,951.01
$16,117,333.38
Over/Under Est: -12.97% -$2,401,269.18
Amt Left: 7.24% $1,088,772.89
Delta: -0.86% -$136,821.88
Over/Under Est: -1.62% -$299,430.08
Amt Left: 21.23% $3,190,611.99
Delta: -13.04% -$2,101,839.10

Bid Items & Bid Tabulations

129 Total 0 of 129
BEXAR  |  IH 35  |  SAN ANTONIO  |  0017-09-106  |  02/04/2026  |  $18,518,602.56  |  F 2026(375)  |  RESURF ROADWAY  |  265 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR PAVING COMPANY
TEXAS MATERIALS GROUP, INC.
HUNTER INDUSTRIES, LTD.
CLARK CONSTRUCTION OF TEXAS, INC.
PREPARING ROW
AC 0.305 $15,000.000 $50,000.000 $82,600.000 $43,632.130 $0.100
REMOV CONC (MOWSTRIP)
LF 5,512.500 $17.190 $11.000 $14.000 $9.900 $10.000
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 140.000 $17.050 $30.000 $6.000 $6.600 $20.000
RMV (12"-30") TRT/UNTRT BASE & ASPH PAV
SY 1,134.000 $14.300 $30.000 $22.500 $12.100 $17.780
EXCAV (ROADWAY)
CY 1,360.000 $18.800 $15.000 $24.250 $23.100 $21.380
EMBANK (FNL)(OC)(TY B)
CY 806.000 $33.820 $9.500 $49.000 $23.100 $36.000
BLADING
HR 24.000 $137.000 $125.000 $170.000 $110.000 $240.000
COMPOST MANUF TOPSOIL (4")
SY 8,636.000 $1.990 $1.400 $1.400 $1.570 $5.900
HYDRO MULCH SEED (PERM_RURAL_SANDY)
SY 8,636.000 $0.610 $0.680 $0.680 $0.760 $0.700
VEGETATIVE WATERING
TGL 135.190 $29.270 $30.000 $50.000 $36.300 $50.000
SOIL RET BLKT(SL_MOD_SAND_SHORT)
SY 1,970.000 $1.250 $2.000 $2.000 $2.250 $2.450
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 2,222.000 $83.850 $80.000 $72.000 $67.480 $60.070
PRIME COAT(MC-30 OR AE-P)
GAL 228.000 $4.680 $7.000 $9.600 $6.600 $47.160
D-GR HMA TY-C PG76-22
TON 913.000 $111.130 $118.000 $98.000 $108.900 $182.340
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 617.000 $114.860 $140.000 $137.000 $108.900 $322.530
STONE-MTRX-ASPH SMA-D SAC-A HPG
TON 45,420.000 $197.840 $162.500 $172.500 $159.500 $198.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 71,051.000 $39.450 $39.500 $37.750 $44.590 $43.280
FLEX. PAVE. STRUCTURE REPAIR 6" TO 9"
SY 2,981.000 $78.900 $45.000 $54.450 $66.420 $80.780
PLANE ASPH CONC PAV(0" TO 6")
SY 47,972.000 $6.750 $2.500 $3.600 $4.620 $5.870
PLANE ASPH CONC PAV(2")
SY 346,881.000 $1.500 $1.900 $2.000 $1.980 $1.700
RIPRAP (MOW STRIP)(4 IN)
CY 1,023.800 $630.290 $515.000 $723.000 $660.400 $585.000
CLEANING EXISTING JOINTS
LF 3,966.000 $17.770 $12.000 $12.000 $13.650 $8.500
HEADER TYPE EXPANSION JOINT
CF 661.200 $576.720 $289.000 $289.000 $335.960 $383.870
JOINT SEALANT
LF 4,034.000 $23.740 $10.000 $10.000 $11.550 $10.500
CLEAN EXIST CULVERTS
EA 2.000 $4,300.000 $2,850.000 $3,500.000 $2,200.000 $5,000.000
MOBILIZATION
LS 1.000 $1,345,000.000 $400,000.000 $720,000.000 $989,388.880 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $13,715.350 $6,800.000 $10,700.000 $9,473.410 $2,200.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 532.000 $80.570 $80.000 $50.000 $80.110 $75.000
TMA (STATIONARY)
DAY 304.000 $102.720 $300.000 $100.000 $106.810 $75.000
TMA (MOBILE OPERATION)
DAY 126.000 $141.080 $300.000 $100.000 $267.020 $75.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 21,686.000 $3.800 $3.800 $3.800 $4.270 $3.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 21,686.000 $0.850 $0.800 $0.800 $0.900 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,920.000 $58.270 $65.000 $24.000 $30.000 $65.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 1,920.000 $14.350 $40.000 $24.000 $15.000 $40.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 86,864.000 $0.320 $0.300 $0.140 $0.200 $0.280
MTL W-BEAM GD FEN (TIM POST)
LF 17,550.000 $24.540 $20.250 $24.250 $21.520 $21.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 31.000 $2,269.790 $2,015.000 $3,200.000 $2,141.130 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 34.000 $1,136.870 $1,125.000 $1,250.000 $1,195.420 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,226.930 $1,250.000 $1,500.000 $1,328.250 $600.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $706.520 $875.000 $1,000.000 $929.770 $800.000
REMOVE METAL BEAM GUARD FENCE
LF 17,422.000 $3.410 $2.000 $2.000 $2.130 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 32.000 $267.720 $200.000 $200.000 $212.520 $225.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $164.480 $200.000 $200.000 $212.520 $225.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $320.730 $200.000 $200.000 $212.520 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 31.000 $2,966.870 $2,725.000 $3,000.000 $2,895.580 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 30.000 $273.710 $200.000 $200.000 $212.520 $250.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,139.630 $800.000 $650.000 $1,275.120 $800.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 2.000 $11,420.000 $5,100.000 $8,000.000 $9,563.370 $5,100.000
REPLACE LUMINAIRE W/(250W EQ) LED
EA 6.000 $623.120 $1,100.000 $1,100.000 $1,154.860 $1,100.000
REPLACE LUMINAIRE W/(400W EQ) LED
EA 8.000 $945.000 $1,200.000 $1,200.000 $1,259.850 $1,200.000
REPLC LED HI MST IL(6 FIXT) (TY S)
EA 4.000 $7,432.900 $12,800.000 $12,800.000 $13,438.370 $12,800.000
CONDT (PVC) (SCH 80) (2")
LF 40.000 $19.460 $56.000 $56.000 $58.790 $56.000
CONDT (PVC) (SCH 80) (3")
LF 40.000 $24.630 $56.000 $56.000 $58.790 $56.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 100.000 $32.110 $100.000 $100.000 $104.990 $100.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 80.000 $43.230 $120.000 $120.000 $125.980 $120.000
ELEC CONDR (NO.14) INSULATED
LF 260.000 $1.200 $2.200 $2.200 $2.310 $2.200
GROUND BOX TY D (162922)W/APRON
EA 4.000 $1,805.790 $2,700.000 $2,700.000 $2,834.660 $2,700.000
REMOVE GROUND BOX
EA 4.000 $421.330 $180.000 $180.000 $188.980 $180.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 63.000 $730.550 $550.000 $550.000 $577.430 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 100.000 $789.350 $730.000 $730.000 $766.410 $885.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $896.390 $800.000 $800.000 $839.900 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 1.000 $771.780 $650.000 $650.000 $682.420 $865.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 22.000 $952.790 $850.000 $850.000 $892.390 $1,050.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,201.560 $3,400.000 $3,400.000 $3,569.570 $1,200.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 3.000 $1,742.500 $3,500.000 $3,500.000 $3,674.550 $1,200.000
REMOVE SM RD SN SUP&AM
EA 165.000 $100.610 $100.000 $100.000 $104.990 $120.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 5.000 $223.330 $350.000 $350.000 $367.460 $100.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 5.000 $52.190 $25.000 $25.000 $26.250 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 79.000 $23.760 $20.000 $20.000 $21.000 $78.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 214.000 $30.400 $28.000 $45.000 $29.400 $85.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 40.000 $24.010 $20.000 $20.000 $21.000 $85.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 104.000 $28.000 $28.000 $45.000 $29.400 $60.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 50.000 $30.000 $28.000 $45.000 $29.400 $75.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 154.000 $10.000 $10.000 $10.000 $10.500 $125.000
INSTL OM SM RD SIGN (1-OM-PW)R
EA 34.000 $10.000 $10.000 $10.000 $10.500 $125.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 24,219.000 $0.410 $0.210 $0.210 $0.220 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 2,324.000 $1.190 $0.300 $0.300 $0.310 $0.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 84,290.000 $0.450 $0.190 $0.190 $0.200 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,877.000 $1.160 $0.400 $0.400 $0.420 $0.600
WK ZN PAV MRK NON-REMOV (W)12"(DOT)
LF 321.000 $1.790 $1.750 $1.750 $1.840 $3.000
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 2,053.000 $3.790 $1.000 $1.000 $1.050 $3.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 604.000 $6.190 $2.000 $2.000 $2.100 $6.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 3.000 $88.050 $40.000 $40.000 $41.990 $100.000
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
EA 18.000 $300.000 $500.000 $500.000 $524.940 $500.000
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
EA 19.000 $300.000 $500.000 $500.000 $524.940 $800.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 14.000 $157.250 $45.000 $45.000 $47.240 $125.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 39.000 $21.590 $10.000 $10.000 $10.500 $20.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 86,197.000 $0.370 $0.190 $0.190 $0.200 $0.500
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 7,080.000 $0.790 $0.500 $0.500 $0.520 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,266.000 $1.650 $0.750 $1.650 $1.720 $1.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,324.000 $1.290 $0.600 $0.600 $0.630 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,877.000 $1.000 $0.800 $0.800 $0.840 $1.250
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,053.000 $2.980 $2.600 $2.600 $2.730 $3.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 604.000 $6.520 $6.250 $6.250 $6.560 $7.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $139.310 $150.000 $150.000 $157.480 $125.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 11.000 $63.310 $200.000 $200.000 $209.970 $50.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $173.390 $156.000 $156.000 $163.780 $150.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 18.000 $700.000 $1,200.000 $1,200.000 $1,259.850 $750.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 19.000 $790.870 $1,500.000 $1,500.000 $1,574.810 $1,500.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 39.000 $51.030 $27.000 $27.000 $28.350 $25.000
PAVEMENT SLER 6"
LF 192,100.000 $0.260 $0.100 $0.100 $0.100 $0.300
PAVEMENT SLER 8"
LF 2,877.000 $0.400 $0.130 $0.130 $0.140 $0.350
PAVEMENT SLER 12"
LF 2,374.000 $1.990 $0.400 $0.400 $0.420 $1.500
PAVEMENT SLER 24"
LF 604.000 $2.780 $0.700 $0.700 $0.730 $3.000
PAVEMENT SLER (ARROW)
EA 3.000 $52.270 $10.000 $10.000 $10.500 $65.000
PAVEMENT SLER (WORD)
EA 3.000 $56.130 $10.000 $10.000 $10.500 $75.000
PAVEMENT SLER (ENTR GORE)
EA 18.000 $106.160 $100.000 $100.000 $104.990 $200.000
PAVEMENT SLER (EXIT GORE)
EA 19.000 $130.650 $100.000 $100.000 $104.990 $500.000
PAVEMENT SLER (YLD TRI)
EA 39.000 $17.060 $10.000 $10.000 $10.500 $20.000
PAVEMENT SLER (NUMBER)
EA 11.000 $5.000 $10.000 $10.000 $10.500 $50.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 23,489.000 $0.550 $0.530 $0.530 $0.560 $0.850
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 80,090.000 $0.500 $0.530 $0.530 $0.560 $0.850
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 86,197.000 $0.510 $0.530 $0.530 $0.560 $0.850
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 321.000 $3.000 $1.000 $1.000 $1.050 $1.750
REFL PAV MRKR TY I-C
EA 89.000 $3.630 $4.000 $4.000 $4.200 $5.000
REFL PAV MRKR TY II-C-R
EA 2,477.000 $3.590 $3.650 $3.650 $3.830 $5.000
ELIM EXT PM & MRKS (6")
LF 4,930.000 $0.710 $0.800 $0.800 $0.840 $1.000
VEH LP DETECT (SAWCUT)
LF 365.000 $17.100 $37.000 $37.000 $38.850 $37.000
REPLACE LUMINAIRE POLE
EA 5.000 $2,510.250 $1,700.000 $1,700.000 $1,784.780 $1,700.000
MAINTAIN ROADWAY ILLUMINATION
EA 10.000 $600.000 $440.000 $440.000 $461.940 $440.000
REPLACE TRANSFORMER BASE
EA 5.000 $829.690 $1,600.000 $1,600.000 $1,679.800 $1,600.000
REPLACE FUSE
EA 5.000 $56.590 $120.000 $120.000 $125.980 $120.000
REPLACE LUMINAIRE (LED)
EA 10.000 $500.000 $540.000 $540.000 $566.930 $540.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 1.290 $55,115.000 $8,000.000 $10,000.000 $500.000 $69,054.260
UNDERSEAL COURSE
GAL 16,842.000 $3.500 $4.800 $0.050 $3.680 $0.010
BONDING COURSE
GAL 79,277.000 $4.250 $3.000 $3.550 $3.300 $3.550
RELOCATE BACKLIT LED RDSD SGN
EA 1.000 $2,000.000 $530.000 $530.000 $556.430 $530.000
LOOP INSTALLATION
LF 625.000 $35.000 $13.000 $13.000 $13.650 $13.000
SENSOR INSTALLATION
EA 4.000 $20,000.000 $2,000.000 $2,000.000 $2,099.740 $2,000.000
Totals: $18,518,602.562 $15,028,560.490 $15,980,511.500 $16,117,333.379 $18,219,172.480
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $400,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $430,000.00