PREPARING ROW
|
STA
|
10.000
|
$1,500.000
|
$2,000.000
|
$4,000.000
|
$1,050.000
|
$1,750.000
|
$630.000
|
$4,000.020
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
126.000
|
$17.000
|
$10.000
|
$39.000
|
$40.000
|
$26.000
|
$15.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
480.000
|
$6.000
|
$10.000
|
$10.000
|
$10.000
|
$7.500
|
$6.500
|
$10.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
690.000
|
$9.000
|
$10.000
|
$11.000
|
$9.000
|
$12.000
|
$9.000
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
45,824.000
|
$8.900
|
$2.500
|
$1.500
|
$4.050
|
$2.500
|
$3.950
|
$5.140
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,221.000
|
$8.000
|
$14.000
|
$20.000
|
$16.300
|
$5.000
|
$6.700
|
$9.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
91.700
|
$450.000
|
$900.000
|
$400.000
|
$475.000
|
$500.000
|
$1,150.000
|
$350.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
9,480.000
|
$9.000
|
$14.000
|
$10.000
|
$17.300
|
$15.000
|
$16.000
|
$22.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
79,048.000
|
$1.000
|
$0.500
|
$0.440
|
$0.900
|
$0.400
|
$1.300
|
$1.300
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
39,524.000
|
$0.350
|
$0.070
|
$0.060
|
$0.060
|
$0.060
|
$0.140
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
39,524.000
|
$0.350
|
$0.070
|
$0.060
|
$0.060
|
$0.060
|
$0.140
|
$0.130
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
79,048.000
|
$0.150
|
$0.100
|
$0.090
|
$0.090
|
$0.090
|
$0.170
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
2,570.000
|
$13.000
|
$5.000
|
$1.000
|
$0.010
|
$18.000
|
$21.000
|
$28.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
2,672.000
|
$1.850
|
$1.500
|
$1.000
|
$0.900
|
$1.500
|
$1.220
|
$1.150
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
22,156.000
|
$38.000
|
$35.000
|
$31.000
|
$28.000
|
$40.350
|
$33.500
|
$42.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
233.000
|
$135.000
|
$180.000
|
$160.000
|
$158.000
|
$165.000
|
$150.000
|
$140.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
11,650.000
|
$3.250
|
$5.000
|
$3.000
|
$6.400
|
$4.000
|
$4.400
|
$3.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
16,773.000
|
$3.100
|
$3.000
|
$2.850
|
$2.750
|
$2.860
|
$2.900
|
$2.760
|
|
|
ASPH (CRS-2)
|
GAL
|
82,455.000
|
$1.800
|
$1.100
|
$1.800
|
$1.900
|
$1.980
|
$2.000
|
$2.630
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
1,466.000
|
$110.000
|
$40.000
|
$91.000
|
$66.400
|
$69.730
|
$71.000
|
$93.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
17,532.000
|
$62.500
|
$53.000
|
$58.500
|
$50.450
|
$54.150
|
$60.500
|
$55.000
|
|
|
D-GR HMA TY-C SAC-A PG64-22
|
TON
|
19,509.000
|
$70.000
|
$60.000
|
$62.950
|
$54.000
|
$57.250
|
$66.000
|
$65.000
|
|
|
D-GR HMA TY-D PG64-22(LEVEL-UP)
|
TON
|
19,973.000
|
$65.000
|
$53.000
|
$60.000
|
$50.000
|
$57.250
|
$64.000
|
$60.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
500.000
|
$45.000
|
$50.000
|
$50.000
|
$48.000
|
$53.000
|
$53.000
|
$64.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
5,282.000
|
$4.500
|
$3.000
|
$3.750
|
$2.000
|
$2.050
|
$2.450
|
$4.750
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
172.000
|
$37.000
|
$40.000
|
$35.000
|
$58.000
|
$45.000
|
$38.000
|
$32.000
|
|
|
CEM STABIL BKFL
|
CY
|
39.000
|
$160.000
|
$120.000
|
$154.000
|
$153.000
|
$110.000
|
$160.000
|
$157.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
200.000
|
$20.000
|
$35.000
|
$17.500
|
$55.000
|
$50.000
|
$35.000
|
$18.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
25.200
|
$250.000
|
$1,000.000
|
$1,350.000
|
$1,600.000
|
$900.000
|
$400.000
|
$1,378.010
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
7.000
|
$300.000
|
$500.000
|
$500.000
|
$1,350.000
|
$160.000
|
$650.000
|
$317.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
92.000
|
$115.000
|
$110.000
|
$194.000
|
$192.000
|
$120.000
|
$87.000
|
$198.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
211.000
|
$433.000
|
$400.000
|
$385.000
|
$340.000
|
$380.000
|
$395.000
|
$393.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
172.000
|
$40.000
|
$40.000
|
$35.000
|
$48.000
|
$45.000
|
$39.000
|
$32.000
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
314.000
|
$42.000
|
$40.000
|
$35.000
|
$48.000
|
$45.000
|
$39.000
|
$32.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
81.000
|
$340.000
|
$400.000
|
$346.000
|
$340.000
|
$430.000
|
$264.000
|
$353.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
35.000
|
$384.000
|
$500.000
|
$364.000
|
$390.000
|
$520.000
|
$375.000
|
$372.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
25.000
|
$560.000
|
$900.000
|
$592.000
|
$650.000
|
$820.000
|
$500.000
|
$604.000
|
|
|
CONC BOX CULV (3 FT X 1.5 FT)(EXTEND)
|
LF
|
20.000
|
$406.000
|
$400.000
|
$342.000
|
$390.000
|
$580.000
|
$370.000
|
$349.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
434.000
|
$60.000
|
$50.000
|
$48.000
|
$55.000
|
$55.000
|
$50.000
|
$80.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
46.000
|
$90.000
|
$80.000
|
$77.000
|
$135.000
|
$85.000
|
$90.000
|
$130.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
1.000
|
$9,500.000
|
$12,000.000
|
$7,100.000
|
$6,500.000
|
$10,200.000
|
$7,650.000
|
$7,243.030
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
6.000
|
$6,030.000
|
$5,500.000
|
$8,000.000
|
$5,200.000
|
$6,500.000
|
$5,320.000
|
$8,209.040
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$5,233.000
|
$8,500.000
|
$9,300.000
|
$6,050.000
|
$8,300.000
|
$3,740.000
|
$9,497.040
|
|
|
SET (TY I)(S=3 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
2.000
|
$6,500.000
|
$7,000.000
|
$8,700.000
|
$5,700.000
|
$8,000.000
|
$5,900.000
|
$8,902.040
|
|
|
SET (TY I)(S=3 FT)(HW= 5 FT)(4:1)(C)
|
EA
|
1.000
|
$9,840.000
|
$12,000.000
|
$10,900.000
|
$6,800.000
|
$10,600.000
|
$9,360.000
|
$11,193.050
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
2.000
|
$6,900.000
|
$6,500.000
|
$8,300.000
|
$6,000.000
|
$8,200.000
|
$6,050.000
|
$8,547.040
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$5,600.000
|
$9,000.000
|
$9,600.000
|
$7,200.000
|
$11,000.000
|
$6,600.000
|
$9,833.040
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$9,400.000
|
$12,000.000
|
$10,600.000
|
$7,700.000
|
$11,500.000
|
$8,625.000
|
$10,845.050
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$8,700.000
|
$5,000.000
|
$7,800.000
|
$6,500.000
|
$7,800.000
|
$6,500.000
|
$8,022.040
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$900.000
|
$750.000
|
$950.000
|
$945.000
|
$700.000
|
$620.000
|
$1,200.010
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,205.000
|
$1,400.000
|
$1,750.000
|
$2,000.000
|
$1,650.000
|
$2,200.000
|
$1,700.010
|
|
|
REMOV STR (SET)
|
EA
|
28.000
|
$350.000
|
$250.000
|
$625.000
|
$650.000
|
$230.000
|
$280.000
|
$800.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$1,040.000
|
$2,500.000
|
$2,800.000
|
$1,580.000
|
$2,200.010
|
|
|
REMOV STR (PIPE)
|
LF
|
411.000
|
$15.000
|
$10.000
|
$9.250
|
$30.000
|
$10.500
|
$15.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$595,000.000
|
$450,000.180
|
$480,000.000
|
$497,000.000
|
$700,000.000
|
$550,000.000
|
$790,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$6,000.000
|
$2,500.000
|
$8,000.000
|
$60,000.000
|
$25,000.000
|
$8,000.000
|
$31,025.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
168.000
|
$28.000
|
$25.000
|
$23.000
|
$25.000
|
$25.000
|
$33.500
|
$22.190
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
168.000
|
$9.000
|
$3.000
|
$6.000
|
$7.000
|
$6.000
|
$12.000
|
$6.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$29.000
|
$10.000
|
$12.500
|
$19.000
|
$20.000
|
$26.000
|
$18.570
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$12.000
|
$1.000
|
$3.500
|
$6.000
|
$6.000
|
$10.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,822.000
|
$2.400
|
$3.000
|
$3.000
|
$2.150
|
$3.300
|
$2.750
|
$2.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,822.000
|
$0.500
|
$0.300
|
$0.250
|
$0.250
|
$0.440
|
$0.850
|
$0.250
|
|
|
DRIVEWAYS (CONC)
|
SY
|
126.000
|
$70.000
|
$80.000
|
$78.000
|
$85.000
|
$90.000
|
$60.000
|
$74.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
817.000
|
$15.000
|
$10.000
|
$18.600
|
$19.000
|
$26.500
|
$21.000
|
$31.500
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
1,475.000
|
$34.000
|
$30.000
|
$35.000
|
$51.000
|
$39.000
|
$37.000
|
$54.500
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
329.000
|
$15.000
|
$15.000
|
$35.000
|
$31.000
|
$37.000
|
$33.000
|
$38.890
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
541.000
|
$65.000
|
$50.000
|
$63.000
|
$98.000
|
$78.000
|
$56.000
|
$62.300
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
33,497.000
|
$0.250
|
$0.250
|
$0.340
|
$0.130
|
$0.130
|
$0.210
|
$0.130
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,152.000
|
$23.000
|
$25.000
|
$19.250
|
$18.760
|
$18.760
|
$20.000
|
$18.760
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$900.000
|
$700.000
|
$800.000
|
$783.040
|
$783.040
|
$830.000
|
$783.040
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$1,500.000
|
$1,600.000
|
$1,990.000
|
$1,439.000
|
$1,439.000
|
$1,530.000
|
$1,739.010
|
|
|
SHORT RADIUS
|
LF
|
106.000
|
$31.000
|
$30.000
|
$25.500
|
$25.140
|
$25.140
|
$27.000
|
$25.140
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,694.000
|
$2.250
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$150.000
|
$125.000
|
$100.000
|
$100.000
|
$100.000
|
$107.000
|
$100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$2,300.000
|
$2,400.000
|
$2,375.000
|
$2,327.000
|
$2,327.000
|
$2,470.000
|
$2,327.010
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$272.000
|
$125.000
|
$100.000
|
$100.000
|
$100.000
|
$107.000
|
$100.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$412.500
|
$280.000
|
$460.000
|
$375.000
|
$450.000
|
$475.000
|
$375.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
40.000
|
$195.000
|
$110.000
|
$180.000
|
$150.000
|
$175.000
|
$185.000
|
$150.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
1.000
|
$215.000
|
$150.000
|
$205.000
|
$195.000
|
$200.000
|
$210.000
|
$195.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
2.000
|
$730.000
|
$600.000
|
$618.000
|
$795.090
|
$600.000
|
$640.000
|
$795.090
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
30.000
|
$315.000
|
$300.000
|
$309.000
|
$349.290
|
$300.000
|
$320.000
|
$349.290
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
24.000
|
$340.000
|
$300.000
|
$360.000
|
$374.430
|
$350.000
|
$370.000
|
$374.430
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
57.000
|
$100.000
|
$60.000
|
$67.000
|
$75.000
|
$80.000
|
$80.000
|
$75.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
42.000
|
$192.000
|
$200.000
|
$180.000
|
$175.000
|
$175.000
|
$185.000
|
$410.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
10.000
|
$47.000
|
$50.000
|
$41.000
|
$40.000
|
$40.000
|
$53.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
60.000
|
$50.000
|
$25.000
|
$10.250
|
$10.000
|
$10.000
|
$21.000
|
$10.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
35.000
|
$56.000
|
$55.000
|
$41.000
|
$40.000
|
$40.000
|
$53.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
33.000
|
$50.000
|
$30.000
|
$21.000
|
$20.330
|
$20.330
|
$53.000
|
$20.330
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
59,965.000
|
$0.130
|
$0.140
|
$0.120
|
$0.120
|
$0.150
|
$0.130
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
380.000
|
$0.270
|
$0.140
|
$0.120
|
$0.120
|
$0.500
|
$0.130
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
61,752.000
|
$0.160
|
$0.140
|
$0.120
|
$0.120
|
$0.150
|
$0.130
|
$0.130
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
59,965.000
|
$0.520
|
$0.200
|
$0.410
|
$0.400
|
$0.600
|
$0.420
|
$0.380
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
380.000
|
$0.850
|
$0.200
|
$0.410
|
$0.400
|
$1.000
|
$0.420
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
61,752.000
|
$0.600
|
$0.200
|
$0.410
|
$0.400
|
$0.600
|
$0.420
|
$0.380
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
180.000
|
$1.500
|
$1.000
|
$0.520
|
$0.500
|
$0.700
|
$0.530
|
$0.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
332.000
|
$7.000
|
$6.000
|
$5.770
|
$5.600
|
$5.500
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY II (W) 4" (DOT)
|
LF
|
303.000
|
$0.200
|
$1.000
|
$0.310
|
$0.300
|
$1.000
|
$0.320
|
$1.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
6,170.000
|
$0.280
|
$0.500
|
$0.410
|
$0.400
|
$0.250
|
$0.420
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
4,340.000
|
$0.370
|
$0.280
|
$0.280
|
$0.270
|
$0.340
|
$0.290
|
$0.330
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
72,398.000
|
$0.320
|
$0.280
|
$0.280
|
$0.270
|
$0.320
|
$0.290
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
7,835.000
|
$0.350
|
$0.280
|
$0.280
|
$0.270
|
$0.340
|
$0.290
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
30,512.000
|
$0.340
|
$0.280
|
$0.280
|
$0.270
|
$0.320
|
$0.290
|
$0.330
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$250.000
|
$200.000
|
$190.000
|
$185.000
|
$238.000
|
$200.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$465.000
|
$550.000
|
$520.000
|
$505.000
|
$490.000
|
$540.000
|
$320.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
1.000
|
$300.000
|
$300.000
|
$262.000
|
$255.000
|
$299.000
|
$270.000
|
$275.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
217.000
|
$4.000
|
$5.000
|
$4.400
|
$4.300
|
$3.000
|
$4.600
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
867.000
|
$4.000
|
$4.000
|
$3.850
|
$3.750
|
$3.000
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
99,280.000
|
$0.340
|
$0.380
|
$0.490
|
$0.500
|
$0.300
|
$1.100
|
$0.520
|
|
Totals: |
$7,449,956.410
|
$6,123,477.870
|
$6,521,839.880
|
$6,824,969.770
|
$7,019,799.470
|
$7,090,927.450
|
$7,915,586.062
|