Show Job Controls
Bid Cobra

BEE FM 351 (2412-02-014)

Items: 92

County: BEE
Length: N/A
Highway: FM 351
District: CORPUS CHRISTI
Control Number: 2412-02-014
DBE Goal: N/A
Project: STP 2018(273)
Guaranty: N/A
Time: 84 WORKING DAYS
Engineer's Estimate: $3,526,078.05
Date: 11/02/2017 (8 years ago)
Contract Number: N/A
Type: MILL AND INLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,526,078.05
$2,807,514.44
Over/Under Est: -20.38% -$718,563.61
Over/Under Est: -13.94% -$491,682.18
Amt Left: 8.08% $226,881.43
Over/Under Est: -9.8% -$345,523.55
Amt Left: 13.29% $373,040.06
Delta: -4.82% -$146,158.63
$3,433,544.59
Over/Under Est: -2.62% -$92,533.46
Amt Left: 22.3% $626,030.15
Delta: -7.95% -$252,990.09

Bid Items & Bid Tabulations

92 Total 0 of 92
BEE  |  FM 351  |  CORPUS CHRISTI  |  2412-02-014  |  11/02/2017  |  $3,526,078.05  |  STP 2018(273)  |  MILL AND INLAY  |  84 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANGEL BROTHERS HOLDINGS CORP.
HAAS-ANDERSON CONSTRUCTION, LTD.
RAY FARIS, INC.
REMOVING CONCRETE(MOW STRIP)
LF 319.000 $8.000 $11.440 $10.000 $8.350 $7.680
BACKFILL (TY A OR B)
STA 92.000 $100.000 $83.250 $225.000 $108.000 $373.490
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 12,533.000 $80.000 $63.990 $74.000 $82.250 $77.450
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 107,145.000 $15.000 $9.740 $10.500 $12.400 $12.180
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 107,145.000 $1.000 $1.160 $0.750 $1.100 $1.290
PLANE ASPH CONC PAV (6")
SY 2,118.000 $3.000 $3.260 $5.500 $7.000 $6.720
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $400.000 $455.000 $480.000 $507.000 $455.000
RIPRAP (MOW STRIP)(4 IN)
CY 38.000 $450.000 $571.860 $525.000 $479.000 $500.000
CLEAN EXIST CULVERTS
EA 10.000 $1,800.000 $2,203.190 $600.000 $1,070.000 $625.000
MOBILIZATION
LS 1.000 $225,000.000 $246,056.090 $265,000.000 $80,900.000 $249,920.840
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $2,500.000 $2,686.080 $1,250.000 $1,530.000 $20,983.080
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 690.000 $8.000 $4.850 $5.000 $5.400 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 690.000 $1.500 $1.600 $1.500 $1.800 $1.500
DRIVEWAYS (ACP)
SY 2,289.000 $20.000 $13.310 $14.000 $20.000 $17.260
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $20.000 $28.470 $19.500 $25.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,600.000 $2,454.690 $1,850.000 $1,610.000 $2,200.000
REMOVE METAL BEAM GUARD FENCE
LF 550.000 $1.500 $3.160 $2.500 $2.800 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,300.000 $2,846.930 $2,500.000 $2,510.000 $2,500.000
CONDT (PVC) (SCH 40) (2")
LF 90.000 $12.000 $15.000 $15.850 $17.000 $15.000
CONDT (PVC) (SCH 40) (4")
LF 90.000 $20.000 $21.000 $22.000 $23.000 $21.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 305.000 $25.000 $41.000 $42.000 $46.000 $41.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 405.000 $30.000 $51.000 $52.000 $57.000 $51.000
ELEC CONDR (NO.8) BARE
LF 1,150.000 $1.000 $1.450 $1.500 $1.600 $1.450
ELEC CONDR (NO.8) INSULATED
LF 1,455.000 $1.500 $1.450 $1.500 $1.600 $1.450
ELEC CONDR (NO.6) BARE
LF 75.000 $1.750 $1.750 $1.800 $1.950 $1.750
ELEC CONDR (NO.6) INSULATED
LF 150.000 $1.750 $1.750 $1.800 $1.950 $1.750
GROUND BOX TY C (162911)W/APRON
EA 3.000 $950.000 $1,000.000 $1,000.000 $1,110.000 $1,000.000
GROUND BOX TY D (162922)W/APRON
EA 7.000 $1,200.000 $1,250.000 $1,300.000 $1,390.000 $1,250.000
REMOVE GROUND BOX
EA 5.000 $300.000 $82.000 $90.000 $91.000 $82.000
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 1.000 $1,200.000 $2,850.000 $3,000.000 $3,180.000 $2,850.000
ELC SRV TY T 120/240 000(NS)GS(N)EX(O)
EA 1.000 $1,050.000 $2,850.000 $3,000.000 $3,180.000 $2,850.000
ALUMINUM SIGNS (TY A)
SF 36.000 $18.500 $17.180 $27.000 $17.000 $16.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 29.000 $450.000 $532.000 $475.000 $535.000 $455.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 13.000 $500.000 $576.330 $585.000 $580.000 $560.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $700.000 $648.370 $650.000 $652.000 $620.000
IN SM RD SN SUP&AM TYS80(1)SA(T-EXAL)
EA 2.000 $680.000 $698.250 $725.000 $702.000 $695.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 9.000 $600.000 $687.170 $750.000 $691.000 $710.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 5.000 $675.000 $753.660 $835.000 $758.000 $795.000
REMOVE SM RD SN SUP&AM
EA 57.000 $65.000 $49.870 $100.000 $50.000 $95.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 4.000 $60.000 $22.170 $100.000 $22.000 $55.000
ISRSA TY10BWG(1)SA(P) (EXCLUDING SIGN)
EA 2.000 $600.000 $310.330 $430.000 $312.000 $670.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 20.000 $60.000 $53.200 $50.000 $54.000 $65.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 36.000 $15.000 $11.080 $20.000 $11.000 $9.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $25.000 $31.030 $25.000 $31.000 $25.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 5,716.000 $0.250 $0.160 $0.170 $0.200 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 19,970.000 $0.250 $0.160 $0.170 $0.200 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,409.000 $0.450 $0.320 $0.340 $0.350 $0.630
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 798.000 $0.750 $0.600 $0.640 $0.650 $2.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 440.000 $1.600 $1.200 $1.250 $1.350 $5.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 12.000 $60.000 $50.000 $55.000 $56.000 $80.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 11.000 $80.000 $60.000 $65.000 $67.000 $90.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 3,191.000 $0.250 $0.160 $0.170 $0.200 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 43,255.000 $0.250 $0.180 $0.190 $0.200 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,825.000 $1.000 $1.760 $0.900 $1.100 $0.940
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,478.000 $1.000 $1.760 $0.900 $1.100 $0.940
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,409.000 $0.650 $0.700 $0.740 $0.800 $0.700
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 5,716.000 $0.350 $0.300 $0.320 $0.350 $0.280
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 19,970.000 $0.300 $0.300 $0.320 $0.350 $0.280
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 3,191.000 $0.200 $0.300 $0.320 $0.350 $0.280
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 43,255.000 $0.300 $0.300 $0.320 $0.350 $0.280
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 798.000 $6.000 $5.000 $5.250 $5.550 $6.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 440.000 $11.400 $10.000 $10.500 $11.000 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $200.000 $200.000 $205.000 $223.000 $188.000
PREFAB PAV MRK TY C (W) (WORD)
EA 11.000 $250.000 $250.000 $260.000 $279.000 $200.000
REFL PAV MRKR TY I-C
EA 161.000 $3.500 $3.250 $3.500 $3.600 $3.000
REFL PAV MRKR TY II-A-A
EA 1,330.000 $3.500 $3.250 $3.500 $3.600 $3.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 360.000 $1.000 $1.000 $1.050 $1.100 $10.000
INSTALL HWY TRF SIG (ISOLATED)
EA 2.000 $16,500.000 $16,000.000 $17,000.000 $17,800.000 $16,000.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $4,000.000 $4,800.000 $5,000.000 $5,350.000 $4,800.000
VEH SIG SEC (12")LED(GRN)
EA 26.000 $250.000 $270.000 $285.000 $301.000 $270.000
VEH SIG SEC (12")LED(GRN ARW)
EA 8.000 $250.000 $270.000 $285.000 $301.000 $270.000
VEH SIG SEC (12")LED(YEL)
EA 26.000 $250.000 $270.000 $285.000 $301.000 $270.000
VEH SIG SEC (12")LED(YEL ARW)
EA 12.000 $250.000 $270.000 $285.000 $301.000 $270.000
VEH SIG SEC (12")LED(RED)
EA 22.000 $250.000 $270.000 $285.000 $301.000 $270.000
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $250.000 $270.000 $285.000 $301.000 $270.000
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $600.000 $720.000 $750.000 $803.000 $720.000
BACK PLATE (12")(3 SEC)(VENTED)ALUM
EA 22.000 $100.000 $100.000 $105.000 $111.000 $100.000
BACK PLATE (12")(4 SEC)(VENTED)ALUM
EA 8.000 $100.000 $125.000 $130.000 $139.000 $125.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 2,562.000 $1.500 $1.200 $1.250 $1.350 $1.200
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 208.000 $1.750 $1.600 $1.650 $1.800 $1.600
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 2,974.000 $2.000 $1.900 $2.350 $2.100 $1.900
TRF SIG CBL (TY A)(14 AWG)(9 CONDR)
LF 1,720.000 $2.750 $2.150 $2.300 $2.400 $2.150
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 2.000 $20,000.000 $15,900.000 $17,000.000 $17,700.000 $15,900.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 2.000 $20,000.000 $16,400.000 $17,500.000 $18,300.000 $16,400.000
VIVDS CABLE (INSTALL)
LF 1,688.000 $1.700 $0.950 $1.000 $1.050 $0.950
VIVDS CAMERA (INSTALL)
EA 9.000 $350.000 $1,000.000 $1,050.000 $1,110.000 $1,000.000
TREE TRIMMING / BRUSH REMOVAL
MI 3.400 $10,000.000 $10,500.000 $20,000.000 $9,700.000 $24,794.120
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 168.000 $76.000 $59.540 $125.000 $60.000 $110.000
CONDUIT (PREPARE)
LF 486.000 $2.500 $2.250 $2.350 $2.500 $2.250
INSTALL OF (RPD) VEHICLE DETECTORS
EA 9.000 $1,400.000 $1,000.000 $1,050.000 $1,110.000 $1,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 360.000 $12.000 $8.000 $8.500 $8.900 $11.000
SOLAR POWERED LED WARNING SIGN
EA 2.000 $4,500.000 $2,800.000 $3,000.000 $3,120.000 $2,800.000
Totals: $3,526,078.050 $2,807,514.440 $3,034,395.870 $3,180,554.500 $3,433,544.598