Show Job Controls
Bid Cobra

BEE FM 797 (1119-01-013)

Items: 43

County: BEE
Length: N/A
Highway: FM 797
District: CORPUS CHRISTI
Control Number: 1119-01-013
DBE Goal: N/A
Project: STP 2020(448)HES
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $1,228,039.80
Date: 01/10/2020 (6 years ago)
Contract Number: N/A
Type: WIDEN AND SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,228,039.80
$1,364,407.90
Over/Under Est: 11.1% $136,368.10
Over/Under Est: 17.76% $218,113.22
Amt Left: 5.99% $81,745.12
Over/Under Est: 24.06% $295,526.91
Amt Left: 11.67% $159,158.81
Delta: -5.35% -$77,413.69
Over/Under Est: 34.41% $422,541.47
Amt Left: 20.97% $286,173.37
Delta: -8.34% -$127,014.56
Over/Under Est: 36.2% $444,610.51
Amt Left: 22.59% $308,242.41
Delta: -1.34% -$22,069.04
$1,887,231.72
Over/Under Est: 53.68% $659,191.92
Amt Left: 38.32% $522,823.82
Delta: -12.83% -$214,581.41

Bid Items & Bid Tabulations

43 Total 0 of 43
BEE  |  FM 797  |  CORPUS CHRISTI  |  1119-01-013  |  01/10/2020  |  $1,228,039.80  |  STP 2020(448)HES  |  WIDEN AND SAFETY TREAT FIXED OBJECTS  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TIERRA LEASE SERVICE, LLC
J. CARROLL WEAVER, INC.
HAAS-ANDERSON CONSTRUCTION, LTD.
HUNTER INDUSTRIES, LTD.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
ALTUS CONSTRUCTION LLC
SUBGRADE WIDENING (DENS CONT)
STA 195.000 $550.000 $250.000 $148.750 $735.000 $541.830 $482.160 $873.450
BACKFILL (TY A OR B)
STA 195.000 $125.000 $110.000 $218.210 $189.000 $149.850 $256.520 $237.290
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 6,015.000 $55.000 $82.000 $87.000 $84.000 $81.370 $61.340 $89.680
PRIME COAT (MC-30)
GAL 4,767.000 $3.850 $4.250 $3.740 $3.900 $5.910 $7.080 $4.340
ASPH (MULTI OPTION)
GAL 10,140.000 $3.000 $2.750 $2.570 $2.100 $4.520 $4.800 $4.450
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 20,805.000 $3.030 $3.250 $3.130 $2.650 $4.400 $4.690 $4.540
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 585.000 $100.000 $100.000 $99.540 $113.000 $110.800 $116.000 $115.530
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
CY 300.000 $80.000 $125.000 $157.350 $175.000 $110.880 $185.900 $125.640
FLOWABLE BACKFILL
CY 7.440 $150.000 $400.000 $134.400 $204.000 $200.000 $283.420 $173.320
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 20.000 $500.000 $650.000 $2,052.310 $892.000 $800.000 $775.670 $870.230
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 24.000 $360.000 $700.000 $1,668.310 $1,200.000 $800.000 $646.390 $681.670
RC PIPE (CL III)(18 IN)
LF 368.000 $65.000 $74.000 $62.950 $80.000 $200.000 $67.760 $68.850
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 10.000 $7,000.000 $5,500.000 $7,420.730 $4,120.000 $4,800.000 $8,092.000 $10,015.150
SET (TY I)(S= 5 FT)(HW= 2 FT)(4:1) (C)
EA 6.000 $5,500.000 $8,500.000 $7,194.540 $4,810.000 $3,400.000 $7,602.220 $5,228.370
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 24.000 $1,200.000 $1,500.000 $1,755.400 $1,350.000 $2,800.000 $1,067.100 $1,489.980
CLEAN EXIST CULVERTS
EA 12.000 $1,500.000 $450.000 $923.420 $696.000 $500.000 $3,002.070 $2,249.020
REMOV STR (WINGWALL)
EA 8.000 $1,500.000 $500.000 $614.540 $2,990.000 $750.000 $1,747.650 $1,936.110
REMOV STR (PIPE)
LF 248.000 $18.000 $10.000 $16.420 $17.000 $20.000 $15.320 $16.470
MOBILIZATION
LS 1.000 $82,000.000 $130,000.000 $144,058.990 $143,000.000 $125,441.110 $183,794.180 $167,049.070
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,500.000 $4,000.000 $1,264.000 $1,420.000 $1,515.140 $1,093.620 $10,022.940
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 78.000 $25.000 $20.000 $16.800 $20.000 $65.000 $45.280 $31.730
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $5.000 $10.000 $3.360 $5.000 $20.000 $23.280 $8.910
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 400.000 $5.000 $5.000 $8.960 $8.900 $8.000 $9.300 $7.510
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $1.000 $1.000 $2.800 $2.800 $2.500 $3.000 $1.230
INTERSECTIONS (SURF TREAT)
SY 228.000 $30.000 $22.000 $29.190 $56.000 $39.420 $78.840 $4.780
DRIVEWAYS (SURF TREAT)
SY 2,485.000 $25.000 $20.000 $14.290 $41.000 $30.660 $23.520 $21.560
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 31.000 $350.000 $385.000 $347.200 $345.000 $350.000 $525.730 $554.600
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 30.000 $450.000 $575.000 $571.200 $568.000 $520.000 $689.820 $735.020
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 3.000 $525.000 $725.000 $868.000 $863.000 $650.000 $766.820 $995.610
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $650.000 $750.000 $952.000 $946.000 $685.000 $882.320 $1,149.300
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $75.000 $75.000 $84.000 $83.000 $60.000 $92.520 $66.820
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,470.000 $1.000 $1.000 $0.370 $1.100 $1.780 $1.440 $0.950
REFL PAV MRK TY II (W) 4" (SLD)
LF 38,885.000 $0.150 $0.350 $0.340 $0.350 $0.200 $0.300 $0.400
REFL PAV MRK TY II (Y) 4" (BRK)
LF 4,578.000 $0.150 $0.350 $0.360 $0.350 $0.200 $0.300 $0.430
REFL PAV MRK TY II (Y) 4" (SLD)
LF 8,875.000 $0.150 $0.350 $0.360 $0.350 $0.200 $0.300 $0.430
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
LF 38,885.000 $0.500 $0.650 $0.650 $0.650 $0.750 $0.910 $0.780
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 8,875.000 $0.500 $0.650 $0.670 $0.650 $0.750 $0.900 $0.800
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 4,578.000 $0.500 $0.950 $0.950 $0.950 $0.750 $4.060 $1.140
REFL PAV MRKR TY II-A-A
EA 346.000 $3.000 $4.000 $5.040 $5.000 $5.000 $5.790 $6.010
GEOGRID BASE REINFORCEMENT (TY I)
SY 30,330.000 $1.000 $0.750 $0.790 $1.000 $2.280 $2.120 $1.650
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $4,000.000 $2,800.000 $2,000.000 $7,531.570 $14,561.470 $5,899.230
TMA (STATIONARY)
DAY 102.000 $150.000 $175.000 $39.200 $10.000 $301.260 $245.410 $668.200
TMA (MOBILE OPERATION)
HR 350.000 $50.000 $30.000 $61.600 $10.000 $150.630 $119.490 $106.910
Totals: $1,228,039.800 $1,364,407.900 $1,446,153.026 $1,523,566.710 $1,650,581.270 $1,672,650.315 $1,887,231.721