Show Job Controls
Bid Cobra

BANDERA SH 16 (0291-06-062)

Items: 123

County: BANDERA
Length: N/A
Highway: SH 16
District: SAN ANTONIO
Control Number: 0291-06-062
DBE Goal: N/A
Project: F 2023(863)
Guaranty: N/A
Time: 193 WORKING DAYS
Engineer's Estimate: $7,293,348.45
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD SHOULDERS
Mail/Deliver Bids To: N/A
ANDRES GONZALEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$7,293,348.45
$5,064,944.51
Over/Under Est: -30.55% -$2,228,403.94
Over/Under Est: -26.46% -$1,929,550.65
Amt Left: 5.9% $298,853.29
$5,637,322.72
Over/Under Est: -22.71% -$1,656,025.73
Amt Left: 11.3% $572,378.21
Delta: -5.10% -$273,524.92
$6,040,780.40
Over/Under Est: -17.17% -$1,252,568.05
Amt Left: 19.27% $975,835.89
Delta: -7.16% -$403,457.68
Over/Under Est: -16.65% -$1,214,135.76
Amt Left: 20.03% $1,014,268.18
Delta: -0.64% -$38,432.29
Subcontractor Percentage Amount
MPB, INC. 21.74% $1,158,312.23
TEXAS MATERIALS GROUP, INC. 12.44% $662,806.08
LONE STAR EROSION CONTROL 3.49% $185,948.01
DIIBS SPECIALISTS, LLC 3.40% $181,152.79
D. I. J. CONSTRUCTION, INC. 3.22% $171,562.35
SAFETEX,INC. 1.06% $56,477.05
D&G ENERGY CORPORATION 0.50% $26,640.12
FLASHER EQUIPMENT COMPANY 0.47% $25,041.71
Total: 46.32% $2,467,940.34

Bid Items & Bid Tabulations

123 Total 0 of 123
BANDERA  |  SH 16  |  SAN ANTONIO  |  0291-06-062  |  06/28/2023  |  $7,293,348.45  |  F 2023(863)  |  WIDEN ROAD - ADD SHOULDERS  |  193 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
STERLING DELAWARE HOLDING COMPANY
DAN WILLIAMS COMPANY
ALLEN KELLER COMPANY
HUNTER INDUSTRIES, LTD.
PREPARING ROW
STA 203.000 $5,500.000 $1,070.000 $1,131.000 $2,000.000 $1,200.000 $1,942.500
REMOVING CONC (RIPRAP)
SY 3,027.000 $19.030 $14.300 $8.000 $10.000 $18.000 $24.500
REMOVING CONC (DRIVEWAYS)
SY 239.000 $27.780 $14.300 $11.000 $13.000 $26.000 $31.500
REMOVING CONC (CURB)
LF 91.000 $11.740 $6.000 $3.000 $8.000 $28.000 $31.500
REMOVING CONCRETE(MOW STRIP)
LF 3,285.000 $10.390 $5.100 $3.000 $5.000 $5.000 $14.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 18,442.000 $18.000 $4.250 $10.000 $6.000 $5.750 $10.400
EXCAVATION (ROADWAY)
CY 12,579.000 $15.950 $16.900 $25.000 $16.000 $16.000 $23.600
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 10,589.000 $23.240 $14.900 $10.000 $16.000 $60.000 $23.600
COMPOST MANUF TOPSOIL (4")
SY 48,279.000 $2.930 $1.320 $5.000 $4.500 $4.250 $1.640
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 48,279.000 $0.260 $0.360 $0.340 $0.370 $0.350 $0.340
DRILL SEED (TEMP)(WARM OR COOL)
SY 48,279.000 $0.230 $0.310 $0.220 $0.350 $0.250 $0.220
VEGETATIVE WATERING
MG 738.000 $28.130 $30.000 $30.000 $12.000 $16.000 $31.500
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 18,784.000 $2.130 $1.550 $1.920 $1.500 $2.000 $1.920
PROOF ROLLING
HR 48.000 $158.300 $89.200 $87.000 $65.000 $160.000 $132.000
FLBS (CMP IN PLC)(TY D GR 1-2 OR 5)(8")
SY 28,052.000 $13.410 $18.000 $19.000 $17.000 $20.000 $22.230
PRIME COAT(MC-30 OR AE-P)
GAL 6,181.000 $7.200 $4.300 $5.000 $4.000 $5.750 $6.700
AGGR(TY-PD GR-4 SAC-B)
CY 1,116.000 $172.270 $194.000 $147.000 $130.000 $180.000 $172.370
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 39,984.000 $5.420 $4.650 $4.000 $5.000 $5.000 $5.360
CEM STABIL BKFL
CY 30.000 $148.410 $245.000 $151.000 $250.000 $250.000 $199.800
TEMPORARY SPL SHORING
SF 1,101.000 $25.110 $85.000 $29.000 $35.000 $87.000 $48.600
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 20.000 $235.640 $175.000 $160.000 $300.000 $180.000 $237.660
RIPRAP (CONC)(4 IN)
CY 871.000 $840.000 $445.000 $484.000 $450.000 $450.000 $534.590
RIPRAP (STONE PROTECTION)(12 IN)
CY 234.000 $165.200 $170.000 $200.000 $225.000 $170.000 $185.430
RIPRAP (MOW STRIP)(4 IN)
CY 282.000 $557.450 $600.000 $594.000 $725.000 $610.000 $642.590
CLEANING AND SEALING EXISTING JOINTS
LF 180.000 $50.490 $45.000 $26.000 $33.000 $46.000 $47.970
CMP AR (GAL STL DES 3)
LF 220.000 $279.250 $105.000 $112.000 $95.000 $110.000 $131.760
CMP AR (GAL STL DES 4)
LF 140.000 $253.000 $135.000 $152.000 $105.000 $140.000 $181.440
CONC BOX CULV (5 FT X 2 FT)
LF 140.000 $635.640 $535.000 $385.000 $525.000 $540.000 $782.990
CONC BOX CULV (9 FT X 8 FT)(EXTEND)
LF 20.000 $1,070.000 $1,400.000 $1,296.000 $1,250.000 $1,430.000 $1,435.300
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
LF 30.000 $1,601.390 $1,495.000 $1,296.000 $1,200.000 $1,520.000 $1,814.370
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 52.000 $1,581.000 $1,250.000 $958.000 $1,200.000 $1,270.000 $2,375.970
RC PIPE (CL III)(24 IN)
LF 150.000 $105.310 $98.000 $105.000 $85.000 $100.000 $135.000
RC PIPE (ARCH)(CL IV)(DES 3)
LF 50.000 $301.740 $305.000 $265.000 $205.000 $310.000 $373.670
WINGWALL (FW - S) (HW=10 FT)
EA 1.000 $48,000.000 $27,000.000 $57,000.000 $25,000.000 $27,490.000 $37,324.270
WINGWALL (FW - S) (HW=11 FT)
EA 1.000 $82,500.000 $39,000.000 $72,000.000 $35,000.000 $39,700.000 $52,195.650
WINGWALL (PW - 2) (HW=11 FT)
EA 1.000 $70,200.000 $50,000.000 $87,000.000 $55,000.000 $50,900.000 $80,512.850
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $12,135.000 $6,500.000 $10,655.000 $12,000.000 $6,620.000 $6,965.900
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,683.900 $2,000.000 $2,200.000 $2,000.000 $2,040.000 $2,527.160
SET (TY II) (DES 2) (RCP) (6: 1) (P)
EA 2.000 $5,842.780 $5,100.000 $1,980.000 $3,000.000 $5,190.000 $3,779.950
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 4.000 $3,400.000 $1,700.000 $2,200.000 $1,200.000 $1,730.000 $3,023.960
SET (TY II) (DES 4) (CMP) (6: 1) (P)
EA 8.000 $3,545.450 $3,100.000 $3,530.000 $3,000.000 $3,160.000 $1,349.980
ADJUSTING MANHOLES
EA 1.000 $1,767.770 $1,580.000 $3,100.000 $1,300.000 $1,020.000 $1,935.490
CLEAN EXIST CULVERTS
EA 21.000 $4,432.230 $3,170.000 $1,000.000 $850.000 $4,660.000 $1,066.810
REMOV STR (SET)
EA 8.000 $603.050 $150.000 $315.000 $250.000 $590.000 $1,349.980
REMOV STR (WINGWALL)
EA 2.000 $2,612.340 $1,250.000 $3,400.000 $1,300.000 $1,710.000 $2,699.960
REMOV STR (HEADWALL)
EA 1.000 $2,039.610 $1,500.000 $5,500.000 $1,200.000 $1,960.000 $7,019.900
REMOV STR (PIPE)
LF 291.000 $25.750 $10.000 $23.000 $16.000 $30.000 $31.320
MOBILIZATION
LS 1.000 $663,090.530 $470,000.000 $530,000.000 $560,000.000 $400,000.000 $454,346.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $15,987.900 $4,820.000 $6,100.000 $20,000.000 $7,990.000 $5,031.690
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 425.000 $49.080 $45.400 $38.590 $49.500 $39.000 $38.590
ROCK FILTER DAMS (REMOVE)
LF 425.000 $13.220 $10.600 $7.820 $22.000 $8.000 $7.820
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 452.000 $32.320 $33.810 $16.350 $58.000 $17.000 $16.350
CONSTRUCTION EXITS (REMOVE)
SY 452.000 $11.080 $10.600 $6.450 $21.000 $6.500 $6.450
TEMP SEDMT CONT FENCE (INSTALL)
LF 11,756.000 $3.550 $3.000 $7.000 $5.000 $3.500 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 11,756.000 $0.960 $0.530 $0.500 $0.550 $0.500 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 320.000 $5.020 $6.300 $8.500 $5.000 $8.750 $8.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 320.000 $1.560 $1.050 $1.000 $0.550 $1.000 $1.000
CONC CURB (TY I)
LF 165.000 $44.430 $30.000 $50.000 $35.000 $31.000 $48.600
DRIVEWAYS (CONC)
SY 156.000 $112.100 $80.000 $89.000 $100.000 $100.000 $113.400
DRIVEWAYS (ACP)
SY 4,261.000 $70.150 $58.600 $43.000 $47.000 $61.000 $59.800
TURNOUTS (ACP)
SY 69.000 $80.990 $72.400 $44.000 $70.000 $120.000 $64.400
MTL W-BEAM GD FEN (TIM POST)
LF 3,613.000 $25.630 $24.800 $24.750 $34.000 $25.000 $24.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,407.630 $2,350.000 $2,700.000 $2,500.000 $3,490.000 $2,415.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 113.000 $88.620 $79.200 $82.500 $110.000 $84.000 $100.200
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $1,105.000 $824.000 $850.000 $1,300.000 $870.000 $990.000
REMOVE METAL BEAM GUARD FENCE
LF 2,725.000 $2.720 $2.650 $2.000 $5.000 $2.000 $3.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $518.840 $264.000 $200.000 $165.000 $200.000 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $3,254.490 $3,060.000 $2,900.000 $4,000.000 $2,950.000 $3,320.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $284.850 $264.000 $200.000 $350.000 $200.000 $225.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $860.000 $528.000 $620.000 $865.000 $780.000 $759.140
CONDT (PVC) (SCH 80) (2")
LF 116.000 $19.550 $26.400 $22.000 $32.500 $33.000 $25.000
ELEC CONDR (NO.8) BARE
LF 290.000 $1.550 $1.850 $1.300 $3.200 $3.250 $1.750
TRAY CABLE (4 CONDR) (12 AWG)
LF 324.000 $2.810 $3.850 $6.800 $4.400 $4.500 $3.650
GROUND BOX TY D (162922)W/APRON
EA 2.000 $1,447.580 $1,480.000 $1,406.000 $4,000.000 $3,560.000 $1,400.000
REMOVE GROUND BOX
EA 2.000 $1,096.770 $317.000 $143.000 $240.000 $240.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $734.250 $700.000 $670.000 $675.000 $760.000 $670.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 29.000 $1,143.360 $852.000 $731.000 $810.000 $900.000 $731.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 14.000 $1,207.670 $967.000 $875.000 $920.000 $940.000 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $950.870 $898.000 $906.000 $855.000 $1,180.000 $906.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 3.000 $1,430.000 $1,080.000 $1,052.000 $1,100.000 $1,300.000 $1,052.000
REMOVE SM RD SN SUP&AM
EA 49.000 $123.060 $111.000 $150.000 $120.000 $140.000 $123.100
ISRSA TY10BWG(1)SA(T) (EXCLUDING SIGN)
EA 4.000 $2,764.260 $1,060.000 $620.000 $2,050.000 $710.000 $2,013.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 54.000 $34.160 $27.100 $30.000 $40.000 $31.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $35.910 $27.100 $35.000 $40.000 $36.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 37.000 $116.170 $80.600 $80.000 $49.000 $100.000 $80.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 6,674.000 $0.390 $1.300 $1.000 $1.250 $1.250 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,736.000 $1.830 $1.700 $0.490 $2.220 $3.500 $1.630
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,576.000 $1.550 $1.700 $0.590 $2.220 $3.500 $1.630
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,435.000 $1.600 $0.850 $1.000 $0.800 $0.800 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 272.000 $8.330 $11.600 $10.000 $11.000 $11.000 $11.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 20.000 $7.870 $11.600 $10.000 $11.000 $11.000 $11.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 5.000 $461.070 $423.000 $350.000 $400.000 $410.000 $400.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 5,470.000 $0.370 $0.200 $0.350 $0.190 $0.200 $0.190
REFL PAV MRK TY II (W) 6" (SLD)
LF 37,945.000 $0.250 $0.200 $0.300 $0.190 $0.200 $0.190
REFL PAV MRK TY II (W) 8" (SLD)
LF 5,435.000 $0.520 $0.330 $0.400 $0.310 $0.300 $0.310
REFL PAV MRK TY II (Y) 6" (BRK)
LF 840.000 $0.310 $0.200 $0.350 $0.190 $0.200 $0.190
REFL PAV MRK TY II (Y) 6" (SLD)
LF 48,410.000 $0.510 $0.200 $0.300 $0.190 $0.200 $0.190
PAVEMENT SEALER 24"
LF 247.000 $3.790 $2.650 $2.000 $2.500 $2.500 $2.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 5,970.000 $0.760 $0.610 $0.700 $0.580 $0.600 $0.580
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 37,970.000 $1.140 $0.950 $1.250 $0.900 $0.900 $0.900
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 1,290.000 $1.560 $1.050 $1.350 $1.000 $1.000 $1.000
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 50,210.000 $1.080 $0.950 $1.250 $0.900 $0.900 $0.900
PREFAB PAV MRK TY C (W) (ARROW)
EA 22.000 $229.110 $291.000 $275.000 $275.000 $280.000 $275.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 4.000 $544.370 $739.000 $350.000 $700.000 $710.000 $700.000
PREFAB PAV MRK TY C (W) (WORD)
EA 14.000 $300.160 $407.000 $250.000 $385.000 $390.000 $385.000
REFL PAV MRKR TY I-C
EA 495.000 $4.750 $4.250 $5.000 $4.000 $4.000 $4.000
REFL PAV MRKR TY II-A-A
EA 1,837.000 $4.710 $4.250 $5.000 $4.000 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 11,930.000 $0.500 $1.300 $0.800 $1.250 $1.250 $1.250
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $81.230 $317.000 $100.000 $300.000 $310.000 $300.000
ELIM EXT PAV MRK & MRKS (MED NOSE)
EA 2.000 $296.830 $528.000 $200.000 $500.000 $510.000 $500.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 625.000 $3.190 $4.100 $7.880 $5.500 $5.500 $3.900
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $8,900.000 $5,810.000 $2,197.000 $6,000.000 $4,580.000 $5,500.000
LITTER REMOVAL
CYC 12.000 $2,699.430 $1,590.000 $960.000 $800.000 $5,290.000 $2,860.640
TREE REMOVAL (12" - 18" DIA)
EA 11.000 $291.360 $881.000 $1,300.000 $1,200.000 $610.000 $880.000
TREE REMOVAL (18" - 24" DIA)
EA 10.000 $484.640 $969.000 $1,300.000 $1,200.000 $1,020.000 $1,320.000
TREE REMOVAL (24" - 30" DIA)
EA 3.000 $1,038.600 $1,610.000 $1,300.000 $2,000.000 $1,530.000 $1,980.000
TREE REMOVAL (36" - 42" DIA)
EA 1.000 $100.000 $4,840.000 $1,300.000 $5,000.000 $3,690.000 $4,400.000
D-GR HMA TY-B PG64-22
TON 5,366.000 $110.210 $104.000 $100.000 $110.000 $122.000 $124.000
TACK COAT
GAL 202.000 $6.120 $3.150 $6.000 $3.000 $6.500 $6.800
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,158.380 $9,700.000 $7,400.000 $15,000.000 $32,940.000 $9,000.000
TMA (STATIONARY)
DAY 30.000 $252.640 $142.000 $75.000 $300.000 $240.000 $225.000
TMA (MOBILE OPERATION)
HR 60.000 $80.000 $165.000 $60.000 $65.000 $160.000 $155.000
SOLAR POWERED LED SIGN
EA 2.000 $3,588.800 $2,850.000 $4,711.000 $5,000.000 $3,970.000 $2,700.000
Totals: $7,293,348.450 $5,064,944.510 $5,363,797.800 $5,637,322.720 $6,040,780.400 $6,079,212.690