Bid Cobra

ATASCOSA SH 97 (0328-06-030)

Items: 95

County: ATASCOSA
Length: N/A
Highway: SH 97
District: SAN ANTONIO
Control Number: 0328-06-030
DBE Goal: N/A
Project: STP 1702(814)
Guaranty: N/A
Time: 185 WORKING DAYS
Engineer's Estimate: $2,899,299.12
Date: 08/08/2017 (8 years ago)
Contract Number: N/A
Type: WIDEN ROADWAY TO PROVIDE PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$2,899,299.12
$2,924,983.58
Over/Under Est: 0.89% $25,684.46
Over/Under Est: 2.24% $64,803.50
Amt Left: 1.34% $39,119.04
Over/Under Est: 3.71% $107,450.34
Amt Left: 2.8% $81,765.88
Delta: -1.44% -$42,646.84
Over/Under Est: 11.19% $324,292.37
Amt Left: 10.21% $298,607.91
Delta: -7.21% -$216,842.03
$3,249,665.49
Over/Under Est: 12.08% $350,366.37
Amt Left: 11.1% $324,681.91
Delta: -0.81% -$26,074.00
$3,301,452.79
Over/Under Est: 13.87% $402,153.67
Amt Left: 12.87% $376,469.21
Delta: -1.59% -$51,787.30
Over/Under Est: 27.1% $785,810.32
Amt Left: 25.99% $760,125.86
Delta: -11.62% -$383,656.65
Over/Under Est: 36.12% $1,047,111.26
Amt Left: 34.92% $1,021,426.80
Delta: -7.09% -$261,300.94

Bid Items & Bid Tabulations

95 Total 0 of 95
ATASCOSA  |  SH 97  |  SAN ANTONIO  |  0328-06-030  |  08/08/2017  |  $2,899,299.12  |  STP 1702(814)  |  WIDEN ROADWAY TO PROVIDE PASSING LAN...  |  185 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
DEAN WORD COMPANY, LTD.
ANGEL BROTHERS HOLDINGS CORP.
DAN WILLIAMS COMPANY
RAY FARIS, INC.
ACME BRIDGE COMPANY, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 106.000 $200.000 $739.260 $83.000 $643.194 $625.000 $800.000 $594.760 $544.000 $228.390
EXCAVATION (ROADWAY)
CY 10,656.000 $12.000 $11.220 $9.700 $8.083 $8.500 $9.500 $11.150 $9.900 $12.100
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 4,080.000 $8.000 $7.890 $2.900 $6.582 $6.000 $21.000 $15.610 $5.300 $8.820
COMPOST MANUF TOPSOIL (4")
SY 24,929.000 $1.000 $1.150 $2.050 $1.066 $1.750 $1.750 $2.130 $3.100 $1.800
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 24,929.000 $0.250 $0.150 $0.150 $0.144 $0.160 $0.150 $0.150 $0.160 $0.220
DRILL SEED (TEMP)(WARM OR COOL)
SY 24,929.000 $0.350 $0.100 $0.100 $0.063 $0.150 $0.100 $0.100 $0.110 $0.180
VEGETATIVE WATERING
MG 589.000 $20.000 $23.310 $21.000 $19.649 $0.150 $15.000 $23.150 $29.000 $35.120
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 24,929.000 $1.000 $0.750 $0.750 $1.035 $0.800 $0.800 $0.750 $0.790 $1.660
FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS
CY 8,200.000 $50.000 $56.890 $43.400 $51.677 $56.500 $52.000 $60.980 $68.200 $67.890
CEMENT
TON 170.000 $140.000 $141.750 $250.000 $134.620 $141.000 $145.000 $132.000 $192.000 $171.980
CEMENT TREAT (EXIST MATL) (6")
SY 1,000.000 $3.000 $1.600 $4.500 $3.599 $1.750 $12.500 $2.230 $7.300 $9.470
CEMENT TREAT (NEW BASE) (6")
SY 25,135.000 $2.000 $1.600 $3.500 $1.952 $1.250 $1.800 $2.950 $1.450 $1.500
PRIME COAT (MC-30)
GAL 5,157.000 $4.000 $3.830 $3.100 $3.679 $3.650 $3.550 $3.860 $3.500 $3.960
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
GAL 24,223.000 $3.000 $2.730 $2.500 $2.423 $2.850 $3.100 $2.510 $3.000 $3.310
AGGR (TY-PB GR-4)
CY 734.000 $85.000 $69.700 $69.000 $68.244 $106.000 $90.000 $67.530 $92.000 $133.970
D-GR HMA TY-B PG64-22
TON 6,563.000 $60.000 $63.210 $63.000 $70.159 $78.000 $75.000 $79.820 $74.700 $76.120
D-GR HMA TY-D SAC-B PG70-22
TON 3,249.000 $75.000 $68.460 $82.000 $69.488 $81.000 $80.000 $83.880 $81.200 $81.010
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 1,900.000 $3.000 $2.330 $18.000 $7.025 $5.000 $4.000 $5.580 $3.800 $4.490
CEM STABIL BKFL
CY 889.000 $45.000 $84.000 $122.000 $82.000 $85.000 $170.000 $80.000 $167.000 $109.150
FLOWABLE BACKFILL
CY 31.000 $114.000 $160.000 $125.000 $153.200 $165.000 $170.000 $155.000 $180.000 $175.050
TEMPORARY SPL SHORING
SF 900.000 $15.000 $42.000 $20.000 $54.590 $42.000 $25.000 $40.000 $23.200 $51.220
CL A CONC (MISC)
CY 4.000 $600.000 $400.000 $970.000 $1,804.800 $425.000 $800.000 $385.000 $731.000 $1,023.410
RIPRAP (MOW STRIP)(4 IN)
CY 63.000 $440.000 $415.000 $440.000 $403.960 $425.000 $485.000 $397.000 $577.000 $552.030
GABION MATTRESSES (GALV)
CY 79.000 $200.000 $170.000 $160.000 $165.490 $171.000 $162.000 $160.000 $169.000 $203.570
GABION MATTRESSES (GALV)(6 IN)
SY 333.000 $70.000 $52.000 $48.000 $44.513 $51.250 $50.000 $48.000 $50.700 $45.270
GABION MATTRESSES (GALV)(12 IN)
SY 140.000 $80.000 $59.000 $55.000 $52.470 $59.000 $60.000 $55.000 $58.100 $97.060
CMP AR (GAL STL DES 3)
LF 140.000 $85.000 $56.000 $73.000 $91.292 $58.000 $80.000 $54.000 $42.000 $85.070
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 46.000 $420.000 $235.000 $690.000 $489.960 $240.000 $285.000 $224.860 $727.000 $791.630
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 78.000 $1,200.000 $480.000 $750.000 $961.918 $492.000 $290.000 $460.380 $673.000 $1,502.300
CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)
LF 23.000 $350.000 $185.000 $680.000 $429.750 $192.000 $315.000 $180.000 $592.000 $1,395.770
WINGWALL (FW - 0) (HW=3 FT)
EA 3.000 $5,200.000 $3,600.000 $5,100.000 $5,598.400 $3,750.000 $7,500.000 $3,520.000 $6,180.000 $12,879.840
WINGWALL (FW - 0) (HW=4 FT)
EA 3.000 $6,800.000 $4,500.000 $2,100.000 $5,902.000 $4,600.000 $8,000.000 $4,300.000 $7,170.000 $13,156.090
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $28,000.000 $42,000.000 $32,000.000 $38,117.240 $43,800.000 $17,500.000 $40,920.000 $29,100.000 $32,960.880
WINGWALL (PW - 1) (HW=3 FT)
EA 1.000 $5,200.000 $5,600.000 $6,300.000 $5,405.960 $5,700.000 $7,500.000 $5,360.000 $7,680.000 $11,961.590
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $9,200.000 $7,900.000 $7,100.000 $6,464.960 $8,100.000 $8,000.000 $7,600.000 $7,670.000 $12,571.590
SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C)
EA 1.000 $4,000.000 $2,900.000 $5,900.000 $4,727.050 $3,000.000 $8,000.000 $2,800.000 $4,990.000 $7,845.680
SET (TY I)(S=2 FT)(HW=4FT)(4:1)(C)
EA 1.000 $4,500.000 $4,000.000 $5,950.000 $4,635.250 $4,300.000 $8,000.000 $4,000.000 $5,660.000 $8,025.680
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 1.000 $5,300.000 $3,200.000 $5,800.000 $4,441.300 $3,300.000 $8,000.000 $3,100.000 $4,940.000 $8,025.680
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $6,500.000 $4,800.000 $5,900.000 $4,011.250 $5,000.000 $8,000.000 $4,700.000 $5,720.000 $8,205.680
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 4.000 $1,800.000 $1,400.000 $1,300.000 $1,050.500 $1,450.000 $2,000.000 $1,350.000 $1,320.000 $3,328.270
CLEAN EXIST CULVERTS
EA 8.000 $1,000.000 $1,500.000 $1,200.000 $873.000 $1,600.000 $1,000.000 $1,500.000 $3,650.000 $2,994.790
REMOV STR (WINGWALL)
EA 14.000 $1,200.000 $997.470 $790.000 $992.700 $1,000.000 $800.000 $950.000 $521.000 $1,419.700
REMOV STR (SMALL)
EA 2.000 $1,600.000 $997.470 $960.000 $515.000 $1,000.000 $1,650.000 $950.000 $372.000 $1,656.320
MOBILIZATION
LS 1.000 $213,400.000 $257,169.310 $140,000.000 $303,804.627 $315,000.000 $320,000.000 $363,159.830 $257,000.000 $424,531.780
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,100.000 $2,894.660 $2,800.000 $2,730.988 $4,800.000 $7,000.000 $4,970.770 $1,890.000 $1,791.440
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 70.000 $30.000 $45.000 $22.000 $22.660 $23.500 $23.000 $22.000 $23.200 $33.210
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 84.000 $25.000 $45.000 $25.000 $25.750 $26.750 $30.000 $25.000 $26.400 $44.210
ROCK FILTER DAMS (REMOVE)
LF 154.000 $9.000 $7.000 $7.000 $7.210 $7.500 $8.000 $7.000 $7.400 $14.460
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $18.000 $12.000 $12.000 $12.360 $25.000 $13.000 $12.000 $12.700 $17.410
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $8.000 $2.000 $2.000 $2.060 $6.500 $3.000 $2.000 $2.100 $6.400
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 25.000 $75.000 $79.800 $105.000 $77.100 $60.000 $80.000 $80.000 $110.000 $96.210
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,872.000 $0.900 $1.750 $1.800 $1.803 $1.850 $1.800 $1.750 $1.850 $2.560
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,872.000 $0.600 $0.500 $0.500 $0.515 $0.550 $0.550 $0.500 $0.530 $0.420
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 5,280.000 $16.000 $17.000 $17.000 $17.520 $26.000 $16.000 $18.000 $70.900 $46.560
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 15,580.000 $9.000 $6.500 $17.000 $5.155 $8.000 $6.000 $6.670 $8.800 $6.070
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 5,280.000 $10.000 $11.500 $10.000 $17.520 $12.500 $8.000 $7.790 $16.500 $10.410
INTERSECTIONS (ACP)
SY 245.000 $30.000 $28.470 $58.000 $33.558 $35.000 $27.000 $37.840 $40.100 $73.170
DRIVEWAYS (ACP)
SY 518.000 $45.000 $30.660 $45.000 $37.567 $35.000 $27.000 $44.530 $40.100 $39.110
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $20.000 $18.150 $18.000 $20.209 $20.000 $20.000 $19.620 $19.200 $22.110
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $66.000 $45.000 $45.000 $65.972 $70.000 $75.000 $64.050 $47.500 $39.240
REMOVE METAL BEAM GUARD FENCE
LF 1,325.000 $1.000 $1.000 $1.000 $1.030 $1.000 $1.300 $1.000 $1.050 $2.820
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $50.000 $200.000 $202.000 $36.050 $50.000 $80.000 $35.000 $211.000 $176.500
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 8.000 $2,500.000 $2,626.000 $2,700.000 $2,190.810 $2,300.000 $2,500.000 $2,127.000 $2,770.000 $946.500
CRASH CUSH ATTEN (MOVE & RESET)
EA 14.000 $1,000.000 $1,200.000 $1,020.000 $973.350 $1,000.000 $1,100.000 $1,623.000 $1,060.000 $1,530.980
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $500.000 $500.000 $510.000 $566.500 $600.000 $700.000 $812.000 $528.000 $925.980
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 8.000 $7,500.000 $6,785.000 $6,700.000 $7,189.400 $7,500.000 $8,500.000 $8,380.000 $6,960.000 $11,045.980
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $400.000 $385.000 $510.000 $396.550 $415.000 $400.000 $385.000 $407.000 $432.700
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $420.000 $425.000 $550.000 $437.750 $455.000 $450.000 $425.000 $449.000 $476.700
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $775.000 $650.000 $800.000 $669.500 $700.000 $675.000 $650.000 $687.000 $724.200
REMOVE SM RD SN SUP&AM
EA 1.000 $70.000 $95.000 $102.000 $97.850 $100.000 $100.000 $95.000 $100.000 $113.700
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 18.000 $80.000 $55.000 $74.000 $56.650 $60.000 $60.000 $55.000 $58.100 $65.610
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $50.000 $12.000 $16.000 $12.360 $15.000 $13.000 $12.000 $12.700 $17.800
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 27,024.000 $0.500 $0.140 $0.140 $0.144 $0.150 $0.180 $0.140 $0.150 $0.190
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 20.000 $6.000 $4.000 $4.000 $4.120 $4.300 $9.000 $4.000 $4.250 $13.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 27,024.000 $0.500 $0.160 $0.160 $0.165 $0.150 $0.180 $0.160 $0.170 $0.190
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 54,048.000 $0.500 $0.480 $0.490 $0.494 $0.500 $0.680 $0.480 $0.510 $0.740
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 54,048.000 $0.500 $0.500 $0.500 $0.515 $0.550 $0.680 $0.500 $0.530 $0.740
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,386.000 $1.000 $1.550 $1.100 $1.285 $1.000 $2.500 $1.280 $1.750 $1.090
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,386.000 $1.000 $1.550 $0.700 $1.285 $1.000 $2.500 $1.280 $1.750 $1.090
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 101.000 $1.000 $2.500 $2.500 $2.575 $2.650 $5.000 $2.500 $2.650 $5.310
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 2.000 $100.000 $580.000 $580.000 $597.400 $620.000 $250.000 $580.000 $613.000 $314.380
REFL PAV MRK TY II (W) 4" (BRK)
LF 2,026.000 $0.160 $0.200 $0.200 $0.206 $0.250 $0.260 $0.200 $0.210 $0.310
REFL PAV MRK TY II (W) 4" (SLD)
LF 20,600.000 $0.160 $0.160 $0.160 $0.165 $0.200 $0.210 $0.160 $0.170 $0.220
REFL PAV MRK TY II (W) (U-LT ARR)
EA 101.000 $0.160 $0.150 $0.150 $0.155 $0.150 $66.000 $0.150 $0.160 $72.410
REFL PAV MRK TY II (W) (LNDP ARW)
EA 2.000 $70.000 $110.000 $115.000 $113.300 $117.000 $130.000 $110.000 $116.000 $183.480
REFL PAV MRK TY II (Y) 4" (SLD)
LF 20,600.000 $0.160 $0.170 $0.170 $0.175 $0.200 $0.210 $0.170 $0.180 $0.230
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,026.000 $0.450 $0.750 $0.780 $0.773 $0.800 $0.510 $0.750 $0.790 $0.600
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 20,600.000 $1.000 $0.690 $0.700 $0.711 $0.750 $0.750 $0.690 $0.730 $0.820
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 20,600.000 $1.000 $0.690 $0.700 $0.711 $0.750 $0.750 $0.690 $0.730 $0.820
REFL PAV MRKR TY I-C
EA 103.000 $4.500 $4.000 $4.100 $4.120 $6.500 $5.000 $4.000 $4.250 $5.290
REFL PAV MRKR TY II-A-A
EA 262.000 $4.000 $3.350 $3.400 $3.451 $6.500 $5.000 $3.350 $3.550 $4.750
ELIM EXT PAV MRK & MRKS (4")
LF 54,048.000 $0.400 $0.650 $0.540 $0.541 $0.700 $0.500 $0.500 $1.060 $0.830
SPOT MOWING
AC 22.000 $150.000 $500.000 $192.000 $204.000 $225.000 $100.000 $150.000 $182.000 $192.500
LITTER REMOVAL
CYC 2.000 $2,200.000 $2,777.010 $2,600.000 $1,530.000 $1,300.000 $700.000 $2,800.000 $2,220.000 $3,040.020
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,500.000 $8,118.750 $17,500.000 $7,344.000 $10,000.000 $6,000.000 $8,100.000 $19,400.000 $27,503.560
Totals: $2,899,299.120 $2,924,983.580 $2,964,102.620 $3,006,749.602 $3,223,591.490 $3,249,665.490 $3,301,452.790 $3,685,109.440 $3,946,410.380