PREPARING ROW
|
STA
|
95.000
|
$2,300.000
|
$1,000.000
|
$988.040
|
$2,000.000
|
$2,800.000
|
$6,762.830
|
$2,217.320
|
$1,123.113
|
$1,226.640
|
$3,350.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
177.000
|
$10.000
|
$20.000
|
$45.690
|
$16.500
|
$17.000
|
$15.490
|
$18.000
|
$13.198
|
$10.220
|
$45.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
97.000
|
$9.000
|
$12.000
|
$19.110
|
$10.000
|
$15.000
|
$13.670
|
$15.500
|
$20.088
|
$15.330
|
$23.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (5"-8")
|
SY
|
47,564.000
|
$3.000
|
$3.500
|
$4.290
|
$5.000
|
$2.900
|
$3.970
|
$2.830
|
$5.340
|
$4.820
|
$5.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,430.000
|
$11.000
|
$14.000
|
$11.420
|
$15.000
|
$12.000
|
$13.380
|
$18.000
|
$11.567
|
$18.060
|
$16.750
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
44.000
|
$8.000
|
$30.000
|
$32.570
|
$20.000
|
$75.000
|
$21.350
|
$105.000
|
$43.200
|
$51.120
|
$57.650
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
10,125.000
|
$6.000
|
$24.000
|
$14.450
|
$15.000
|
$8.300
|
$26.450
|
$14.000
|
$14.170
|
$15.590
|
$12.750
|
|
|
BLADING
|
LF
|
430.000
|
$4.500
|
$6.000
|
$2.380
|
$5.000
|
$4.250
|
$17.920
|
$21.000
|
$108.821
|
$5.110
|
$3.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
81,279.000
|
$1.200
|
$0.400
|
$0.960
|
$1.000
|
$1.800
|
$3.540
|
$1.550
|
$1.112
|
$0.870
|
$1.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
81,278.000
|
$0.200
|
$0.140
|
$0.150
|
$0.350
|
$0.450
|
$0.140
|
$0.140
|
$0.144
|
$0.230
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
1,268.000
|
$20.000
|
$30.000
|
$22.230
|
$25.000
|
$15.950
|
$35.000
|
$39.000
|
$20.142
|
$36.470
|
$24.000
|
|
|
PROOF ROLLING
|
HR
|
246.000
|
$113.000
|
$90.000
|
$73.400
|
$100.000
|
$50.000
|
$62.640
|
$111.000
|
$68.040
|
$109.200
|
$104.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2 OR 5)6"
|
SY
|
47,775.000
|
$10.000
|
$8.500
|
$8.190
|
$9.000
|
$9.000
|
$7.250
|
$11.000
|
$10.459
|
$13.410
|
$11.500
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
16,919.000
|
$2.000
|
$5.000
|
$3.890
|
$2.000
|
$6.500
|
$3.840
|
$4.000
|
$2.614
|
$2.300
|
$7.350
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
232.000
|
$162.000
|
$245.000
|
$197.750
|
$220.000
|
$205.000
|
$199.760
|
$310.000
|
$200.309
|
$261.140
|
$192.500
|
|
|
CEMENT
|
TON
|
287.000
|
$117.000
|
$175.000
|
$167.100
|
$175.000
|
$163.000
|
$147.300
|
$240.000
|
$171.465
|
$207.060
|
$174.900
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
34,040.000
|
$2.000
|
$3.500
|
$2.450
|
$1.100
|
$3.900
|
$2.240
|
$2.500
|
$2.398
|
$1.150
|
$3.750
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
11,236.000
|
$3.000
|
$4.500
|
$4.350
|
$3.500
|
$3.000
|
$4.780
|
$3.000
|
$4.039
|
$4.150
|
$4.300
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,390.000
|
$2.000
|
$6.000
|
$3.750
|
$5.000
|
$3.000
|
$2.400
|
$3.000
|
$5.003
|
$4.150
|
$3.800
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
171.000
|
$84.000
|
$100.000
|
$151.810
|
$115.000
|
$118.000
|
$344.300
|
$340.000
|
$128.750
|
$103.670
|
$315.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
794.000
|
$3.000
|
$10.000
|
$5.840
|
$11.000
|
$2.000
|
$1.090
|
$2.710
|
$10.300
|
$3.680
|
$11.750
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,315.000
|
$17.000
|
$22.000
|
$19.220
|
$23.000
|
$15.000
|
$24.700
|
$30.000
|
$39.140
|
$19.220
|
$26.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
13.000
|
$230.000
|
$380.000
|
$399.000
|
$400.000
|
$380.000
|
$380.000
|
$380.000
|
$391.400
|
$485.600
|
$445.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
29.000
|
$255.000
|
$350.000
|
$367.500
|
$500.000
|
$350.000
|
$350.000
|
$350.000
|
$360.500
|
$447.260
|
$410.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
66.000
|
$400.000
|
$680.000
|
$487.300
|
$700.000
|
$410.000
|
$583.010
|
$660.000
|
$556.200
|
$453.960
|
$800.000
|
|
|
CL C CONC (MISC)
|
CY
|
1.000
|
$520.000
|
$2,500.000
|
$1,100.750
|
$2,800.000
|
$2,500.000
|
$999.000
|
$2,300.000
|
$540.750
|
$1,620.590
|
$2,900.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
580.000
|
$65.000
|
$90.000
|
$133.460
|
$100.000
|
$100.000
|
$137.900
|
$105.000
|
$123.552
|
$89.420
|
$105.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
58.000
|
$325.000
|
$380.000
|
$541.240
|
$440.000
|
$475.000
|
$483.920
|
$610.000
|
$391.400
|
$353.270
|
$505.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
53.000
|
$330.000
|
$390.000
|
$472.330
|
$475.000
|
$490.000
|
$468.300
|
$640.000
|
$401.700
|
$371.380
|
$535.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
182.000
|
$330.000
|
$450.000
|
$538.940
|
$460.000
|
$445.000
|
$400.000
|
$500.000
|
$458.350
|
$381.970
|
$512.000
|
|
|
RAIL (TY C223)
|
LF
|
165.000
|
$140.000
|
$125.000
|
$231.260
|
$140.000
|
$175.000
|
$224.500
|
$310.000
|
$216.114
|
$182.050
|
$142.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
388.000
|
$45.000
|
$85.000
|
$76.870
|
$90.000
|
$100.000
|
$140.320
|
$153.000
|
$216.000
|
$71.540
|
$100.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
392.000
|
$168.000
|
$375.000
|
$250.000
|
$400.000
|
$380.000
|
$187.400
|
$250.000
|
$448.050
|
$499.520
|
$440.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
35.000
|
$700.000
|
$850.000
|
$1,000.000
|
$900.000
|
$2,000.000
|
$1,581.250
|
$3,000.000
|
$875.500
|
$1,331.430
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,265.000
|
$60.000
|
$60.000
|
$55.000
|
$65.000
|
$84.000
|
$62.610
|
$90.000
|
$75.860
|
$55.690
|
$69.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
531.000
|
$73.000
|
$75.000
|
$70.000
|
$77.000
|
$124.000
|
$76.840
|
$110.000
|
$139.050
|
$73.500
|
$85.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
354.000
|
$111.000
|
$125.000
|
$100.000
|
$130.000
|
$129.000
|
$93.510
|
$130.000
|
$190.550
|
$110.880
|
$147.000
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
2.000
|
$6,000.000
|
$15,000.000
|
$8,500.000
|
$16,000.000
|
$26,000.000
|
$15,000.000
|
$15,000.000
|
$19,106.500
|
$15,002.420
|
$17,650.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
1.000
|
$40,000.000
|
$65,000.000
|
$75,000.000
|
$70,000.000
|
$85,000.000
|
$31,573.170
|
$44,000.000
|
$39,655.000
|
$42,077.360
|
$76,475.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
4.000
|
$6,600.000
|
$5,800.000
|
$8,000.000
|
$6,100.000
|
$15,000.000
|
$4,093.050
|
$4,500.000
|
$6,761.950
|
$7,592.990
|
$6,765.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(P)
|
EA
|
4.000
|
$5,000.000
|
$6,500.000
|
$9,600.000
|
$7,000.000
|
$14,000.000
|
$4,093.050
|
$6,200.000
|
$6,205.750
|
$8,257.700
|
$7,645.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
|
EA
|
2.000
|
$17,000.000
|
$27,500.000
|
$38,000.000
|
$30,000.000
|
$45,000.000
|
$31,174.740
|
$21,000.000
|
$14,935.000
|
$21,518.860
|
$32,350.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$1,700.000
|
$1,200.000
|
$1,000.000
|
$1,300.000
|
$2,500.000
|
$1,065.500
|
$2,000.000
|
$2,513.200
|
$1,188.570
|
$2,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
5.000
|
$1,700.000
|
$1,200.000
|
$2,500.000
|
$1,300.000
|
$2,500.000
|
$1,065.500
|
$2,000.000
|
$2,060.000
|
$1,188.570
|
$2,125.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
58.000
|
$1,000.000
|
$1,200.000
|
$1,200.000
|
$1,250.000
|
$2,100.000
|
$1,142.610
|
$2,100.000
|
$2,060.000
|
$1,210.610
|
$2,075.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,700.000
|
$1,400.000
|
$1,400.000
|
$1,400.000
|
$3,000.000
|
$1,117.420
|
$2,200.000
|
$3,090.000
|
$1,256.040
|
$1,532.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,412.000
|
$1,400.000
|
$1,400.000
|
$1,400.000
|
$2,500.000
|
$1,242.590
|
$2,200.000
|
$2,935.500
|
$1,426.250
|
$1,475.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,700.000
|
$1,700.000
|
$2,300.000
|
$1,750.000
|
$4,000.000
|
$1,541.470
|
$2,200.000
|
$4,120.000
|
$1,937.690
|
$1,890.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,750.000
|
$2,500.000
|
$1,800.000
|
$2,700.000
|
$1,100.000
|
$1,010.510
|
$2,500.000
|
$2,575.000
|
$2,571.570
|
$2,950.000
|
|
|
REMOV STR (SET)
|
EA
|
24.000
|
$400.000
|
$100.000
|
$430.000
|
$100.000
|
$650.000
|
$447.840
|
$500.000
|
$875.500
|
$498.370
|
$110.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,450.000
|
$1,000.000
|
$1,700.000
|
$1,000.000
|
$1,000.000
|
$1,653.370
|
$4,100.000
|
$2,935.500
|
$1,836.200
|
$1,065.000
|
|
|
REMOV STR (PIPE)
|
LF
|
967.000
|
$13.000
|
$10.000
|
$19.000
|
$4.000
|
$18.000
|
$31.430
|
$17.230
|
$10.300
|
$15.270
|
$4.200
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$513,205.720
|
$490,000.000
|
$600,000.000
|
$600,000.000
|
$550,000.000
|
$647,879.810
|
$695,131.680
|
$704,634.529
|
$734,786.550
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$6,850.000
|
$4,000.000
|
$5,000.000
|
$12,000.000
|
$6,200.000
|
$2,181.110
|
$7,500.000
|
$4,655.557
|
$12,778.900
|
$6,850.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
622.000
|
$26.000
|
$26.000
|
$25.200
|
$30.000
|
$24.000
|
$24.000
|
$24.000
|
$24.720
|
$38.340
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
429.000
|
$53.000
|
$58.000
|
$57.750
|
$50.000
|
$55.000
|
$55.000
|
$55.000
|
$56.650
|
$76.670
|
$70.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,051.000
|
$8.000
|
$10.500
|
$10.500
|
$15.000
|
$10.000
|
$10.000
|
$10.000
|
$10.300
|
$19.170
|
$17.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,248.000
|
$15.000
|
$13.000
|
$12.600
|
$30.000
|
$12.000
|
$12.000
|
$12.000
|
$12.360
|
$31.950
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,248.000
|
$5.000
|
$2.000
|
$2.100
|
$15.000
|
$2.000
|
$2.000
|
$2.000
|
$2.060
|
$12.780
|
$11.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,161.000
|
$2.000
|
$2.250
|
$2.260
|
$3.000
|
$2.150
|
$2.150
|
$2.150
|
$2.215
|
$4.470
|
$4.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,161.000
|
$1.000
|
$0.700
|
$0.680
|
$1.100
|
$1.000
|
$0.650
|
$0.650
|
$0.670
|
$1.280
|
$1.200
|
|
|
CONSTRUCTING DETOURS
|
SY
|
7,267.000
|
$44.000
|
$56.000
|
$63.390
|
$30.000
|
$47.500
|
$45.320
|
$46.000
|
$71.194
|
$53.880
|
$60.500
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
12.000
|
$3,100.000
|
$5,730.000
|
$9,000.000
|
$4,500.000
|
$5,000.000
|
$5,312.500
|
$1,800.000
|
$2,560.945
|
$6,263.860
|
$4,675.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
307.000
|
$12.000
|
$32.000
|
$40.000
|
$30.000
|
$22.000
|
$28.300
|
$59.000
|
$28.728
|
$76.320
|
$36.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
420.000
|
$22.000
|
$19.000
|
$40.000
|
$30.000
|
$18.000
|
$28.810
|
$61.000
|
$24.840
|
$75.040
|
$56.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
100.000
|
$32.250
|
$20.000
|
$40.000
|
$50.000
|
$50.000
|
$33.010
|
$220.000
|
$37.800
|
$72.480
|
$60.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
240.000
|
$6.000
|
$13.000
|
$30.000
|
$7.000
|
$15.000
|
$4.730
|
$32.000
|
$14.040
|
$10.830
|
$15.750
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$12.000
|
$20.000
|
$50.000
|
$7.000
|
$35.000
|
$5.680
|
$94.000
|
$31.320
|
$14.030
|
$15.110
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
307.000
|
$4.000
|
$18.000
|
$25.000
|
$15.000
|
$15.000
|
$13.300
|
$33.000
|
$21.600
|
$11.030
|
$23.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
420.000
|
$8.000
|
$10.000
|
$20.000
|
$15.000
|
$11.000
|
$6.560
|
$22.000
|
$19.440
|
$9.080
|
$24.350
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
100.000
|
$8.500
|
$11.000
|
$20.000
|
$15.000
|
$16.000
|
$16.020
|
$80.000
|
$17.280
|
$11.150
|
$25.500
|
|
|
CONC CURB (TY I)
|
LF
|
3,125.000
|
$8.000
|
$26.000
|
$15.000
|
$14.000
|
$17.000
|
$12.790
|
$24.000
|
$27.000
|
$13.850
|
$14.350
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,987.000
|
$65.000
|
$88.000
|
$75.000
|
$92.000
|
$85.000
|
$88.780
|
$85.000
|
$95.674
|
$61.710
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,738.000
|
$35.000
|
$46.000
|
$32.040
|
$40.000
|
$35.000
|
$18.970
|
$25.000
|
$48.168
|
$50.800
|
$57.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
4,208.000
|
$42.000
|
$54.000
|
$48.700
|
$50.000
|
$55.000
|
$54.070
|
$56.000
|
$44.805
|
$52.470
|
$55.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
730.000
|
$35.000
|
$34.000
|
$34.230
|
$63.000
|
$33.000
|
$38.000
|
$33.000
|
$33.578
|
$26.040
|
$44.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,750.000
|
$3,100.000
|
$2,633.400
|
$4,000.000
|
$2,510.000
|
$2,908.000
|
$2,500.000
|
$3,009.840
|
$1,907.470
|
$3,430.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$1,050.000
|
$1,200.000
|
$1,518.730
|
$2,700.000
|
$1,450.000
|
$1,200.000
|
$1,450.000
|
$1,489.802
|
$1,389.410
|
$1,400.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$25.000
|
$28.000
|
$30.030
|
$65.000
|
$29.000
|
$70.000
|
$29.000
|
$29.458
|
$44.180
|
$80.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$2,500.000
|
$2,830.000
|
$3,242.400
|
$4,000.000
|
$3,099.000
|
$3,288.000
|
$3,100.000
|
$3,180.640
|
$2,659.520
|
$3,875.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$800.000
|
$790.000
|
$1,312.500
|
$700.000
|
$1,250.000
|
$750.000
|
$1,250.000
|
$1,287.500
|
$1,280.290
|
$885.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$7,000.000
|
$11,000.000
|
$8,242.500
|
$24,000.000
|
$7,850.000
|
$10,500.000
|
$7,900.000
|
$8,085.500
|
$3,079.710
|
$12,400.000
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
39.000
|
$25.000
|
$67.000
|
$37.440
|
$70.000
|
$64.000
|
$78.890
|
$200.000
|
$103.000
|
$17.470
|
$95.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
42.000
|
$26.000
|
$60.000
|
$128.970
|
$60.000
|
$65.000
|
$79.000
|
$191.000
|
$128.750
|
$30.990
|
$90.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
70.000
|
$15.000
|
$60.000
|
$60.900
|
$20.000
|
$58.000
|
$58.000
|
$58.000
|
$59.740
|
$74.120
|
$68.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
70.000
|
$1.000
|
$4.000
|
$3.670
|
$2.000
|
$3.500
|
$3.500
|
$3.500
|
$3.605
|
$4.470
|
$4.150
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
63.000
|
$400.000
|
$545.000
|
$565.950
|
$570.000
|
$539.000
|
$539.000
|
$540.000
|
$639.630
|
$577.260
|
$635.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
40.000
|
$500.000
|
$680.000
|
$705.600
|
$710.000
|
$672.000
|
$672.000
|
$670.000
|
$730.435
|
$707.050
|
$795.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$630.000
|
$880.000
|
$822.150
|
$830.000
|
$783.000
|
$783.000
|
$780.000
|
$898.768
|
$827.850
|
$925.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
8.000
|
$685.000
|
$1,020.000
|
$941.850
|
$950.000
|
$897.000
|
$897.000
|
$900.000
|
$999.368
|
$947.010
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
5.000
|
$750.000
|
$1,345.000
|
$1,011.150
|
$1,020.000
|
$963.000
|
$963.000
|
$960.000
|
$1,101.461
|
$954.960
|
$1,100.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
8.000
|
$80.000
|
$76.000
|
$75.600
|
$76.000
|
$72.000
|
$72.000
|
$72.000
|
$60.255
|
$73.610
|
$84.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
294.000
|
$7.000
|
$10.500
|
$5.250
|
$6.300
|
$5.000
|
$5.000
|
$5.000
|
$6.180
|
$7.670
|
$11.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
76,391.000
|
$0.500
|
$0.500
|
$0.520
|
$0.670
|
$0.500
|
$0.500
|
$0.500
|
$0.649
|
$0.810
|
$0.550
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
324.000
|
$6.000
|
$5.250
|
$8.920
|
$6.800
|
$8.500
|
$8.500
|
$8.500
|
$6.592
|
$8.180
|
$5.880
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
5.000
|
$100.000
|
$105.000
|
$131.250
|
$160.000
|
$125.000
|
$125.000
|
$125.000
|
$154.500
|
$191.680
|
$118.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
5.000
|
$130.000
|
$158.000
|
$131.250
|
$160.000
|
$125.000
|
$125.000
|
$125.000
|
$154.500
|
$191.680
|
$175.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
23.000
|
$55.000
|
$23.000
|
$52.500
|
$47.000
|
$50.000
|
$50.000
|
$50.000
|
$45.320
|
$56.230
|
$26.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
59,490.000
|
$0.080
|
$0.150
|
$0.210
|
$0.160
|
$0.250
|
$0.200
|
$0.200
|
$0.155
|
$0.190
|
$0.200
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,370.000
|
$0.150
|
$0.200
|
$0.210
|
$0.210
|
$0.250
|
$0.200
|
$0.200
|
$0.206
|
$0.260
|
$0.200
|
|
|
PAVEMENT SEALER 24"
|
LF
|
324.000
|
$2.000
|
$3.000
|
$1.570
|
$3.150
|
$1.500
|
$1.500
|
$1.500
|
$3.090
|
$3.930
|
$3.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
5.000
|
$43.000
|
$80.000
|
$21.000
|
$70.000
|
$20.000
|
$20.000
|
$20.000
|
$66.950
|
$83.060
|
$88.500
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
5.000
|
$48.000
|
$80.000
|
$21.000
|
$70.000
|
$20.000
|
$20.000
|
$20.000
|
$66.950
|
$83.060
|
$88.500
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
14.000
|
$16.500
|
$10.500
|
$5.250
|
$32.000
|
$5.000
|
$5.000
|
$5.000
|
$30.900
|
$38.340
|
$11.770
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
30,782.000
|
$1.000
|
$0.420
|
$0.370
|
$0.500
|
$0.350
|
$0.350
|
$0.350
|
$0.464
|
$0.580
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,370.000
|
$0.500
|
$0.600
|
$0.520
|
$1.050
|
$0.500
|
$0.500
|
$0.500
|
$1.030
|
$1.280
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
329.000
|
$0.400
|
$0.420
|
$0.470
|
$0.800
|
$0.450
|
$0.450
|
$0.450
|
$0.773
|
$0.960
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
28,381.000
|
$1.000
|
$0.420
|
$0.370
|
$0.480
|
$0.350
|
$0.350
|
$0.350
|
$0.464
|
$0.580
|
$0.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
314.000
|
$3.000
|
$5.250
|
$3.670
|
$5.250
|
$3.500
|
$3.500
|
$3.500
|
$5.150
|
$6.390
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
375.000
|
$3.000
|
$5.250
|
$3.670
|
$5.250
|
$3.500
|
$3.500
|
$3.500
|
$5.150
|
$6.390
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
434.000
|
$1.000
|
$1.000
|
$2.620
|
$3.150
|
$2.500
|
$2.500
|
$2.500
|
$3.090
|
$3.830
|
$1.200
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$21,000.000
|
$12,400.000
|
$12,390.000
|
$25,000.000
|
$11,800.000
|
$11,800.000
|
$11,800.000
|
$12,154.000
|
$15,079.100
|
$14,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$4,155.000
|
$5,000.000
|
$4,935.000
|
$5,000.000
|
$4,700.000
|
$4,700.000
|
$4,700.000
|
$4,841.000
|
$6,006.080
|
$5,500.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,345.000
|
$2.000
|
$5.000
|
$4.720
|
$3.500
|
$4.500
|
$4.500
|
$4.500
|
$4.635
|
$5.750
|
$5.300
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$3,900.000
|
$8,200.000
|
$8,190.000
|
$7,500.000
|
$7,800.000
|
$7,800.000
|
$7,800.000
|
$8,034.000
|
$9,967.540
|
$9,200.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$7,000.000
|
$13,430.000
|
$13,440.000
|
$12,000.000
|
$12,800.000
|
$12,800.000
|
$12,800.000
|
$13,184.000
|
$16,356.990
|
$15,000.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-36')
|
EA
|
1.000
|
$9,250.000
|
$18,160.000
|
$18,165.000
|
$20,000.000
|
$17,300.000
|
$17,300.000
|
$17,300.000
|
$17,819.000
|
$22,107.490
|
$20,400.000
|
|
|
INSTALL OF PEDESTRIAN RAMPS
|
EA
|
23.000
|
$1,240.000
|
$1,470.000
|
$1,575.000
|
$2,000.000
|
$2,900.000
|
$2,173.000
|
$2,600.000
|
$2,060.000
|
$6,325.550
|
$6,000.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
333.000
|
$27.000
|
$14.000
|
$16.290
|
$20.000
|
$11.000
|
$14.740
|
$87.000
|
$9.817
|
$4.980
|
$8.850
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
6,530.000
|
$72.000
|
$83.000
|
$85.080
|
$75.000
|
$68.000
|
$72.460
|
$68.000
|
$79.495
|
$88.810
|
$93.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
5,092.000
|
$81.000
|
$86.000
|
$79.320
|
$80.000
|
$78.500
|
$77.360
|
$79.000
|
$84.625
|
$100.950
|
$85.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
6,322.000
|
$106.000
|
$90.000
|
$81.810
|
$85.000
|
$81.000
|
$68.980
|
$81.000
|
$86.505
|
$107.340
|
$82.000
|
|
|
BONDING COURSE
|
GAL
|
6,857.000
|
$3.500
|
$3.300
|
$3.100
|
$3.000
|
$4.000
|
$3.500
|
$4.000
|
$3.920
|
$3.650
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
470.000
|
$165.000
|
$160.000
|
$315.000
|
$200.000
|
$150.000
|
$150.000
|
$350.000
|
$162.000
|
$159.740
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
70.000
|
$180.000
|
$560.000
|
$787.500
|
$300.000
|
$350.000
|
$150.000
|
$850.000
|
$453.600
|
$223.630
|
$150.000
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
4.000
|
$474.000
|
$2,625.000
|
$2,625.000
|
$800.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,575.000
|
$3,194.720
|
$3,000.000
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
2.000
|
$486.000
|
$2,625.000
|
$2,625.000
|
$900.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,575.000
|
$3,194.720
|
$3,000.000
|
|
|
REMOVE RVDS
|
EA
|
1.000
|
$693.000
|
$160.000
|
$157.500
|
$250.000
|
$150.000
|
$150.000
|
$150.000
|
$154.500
|
$191.680
|
$175.000
|
|
Totals: |
$5,699,774.420
|
$6,383,622.460
|
$6,457,680.810
|
$6,485,092.400
|
$6,662,414.250
|
$6,762,836.590
|
$7,021,531.620
|
$7,046,718.568
|
$7,358,508.870
|
$7,687,378.750
|