ARMSTRONG US 287 (0042-03-047)

Items: 54

County: ARMSTRONG
Length: 11.2820 MILES
Highway: US 287
District: AMARILLO
Control Number: 0042-03-047
DBE Goal: 0.0%
Project: F 2025(201)
Guaranty: $100,000.00
Time: 162 WORKING DAYS
Engineer's Estimate: $21,345,607.38
Date: 11/06/2024 (1 year ago)
Contract Number: 11243009
Type: PREVENTIVE MAINTENANCE
Project ID: A00195667
Project Description: 3" ACP OVERLAY AND 10% FLEXIBLE PAVEMENT REPAIR
Mail/Deliver Bids To: N/A
ZACHARY MAYER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$21,345,607.38
$19,891,474.25
Over/Under Est: -6.81% -$1,454,133.13
$20,517,261.85
Over/Under Est: -3.88% -$828,345.53
Amt Left: 3.15% $625,787.60
$20,630,582.92
Over/Under Est: -3.35% -$715,024.46
Amt Left: 3.72% $739,108.67
Delta: -0.55% -$113,321.07
Over/Under Est: -1.82% -$387,570.22
Amt Left: 5.36% $1,066,562.91
Delta: -1.59% -$327,454.24
$26,911,075.92
Over/Under Est: 26.07% $5,565,468.54
Amt Left: 35.29% $7,019,601.67
Delta: -28.40% -$5,953,038.76
Subcontractor Percentage Amount
INDUSTRIAL FABRICS, INC. 4.47% $892,292.04
ALAMO BROTHERS CONCRETE INC 3.54% $706,647.39
HJC FARMS, INC. 2.28% $455,128.83
TRP CONSTRUCTION GROUP, LLC 1.14% $227,564.41
MURRAY CONSTRUCTION 1.13% $225,568.23
LMSE TRUCKING, LLC 1.00% $199,617.91
H & F TRUCKING 1.00% $199,617.91
A BROTHERS MILLING, LLC 0.30% $59,885.37
J. H. ODEN CONTRACTING COMPANY 0.25% $49,904.48
BARRICADES UNLIMITED 0.17% $33,935.04
SURFACE PREPARATION TECHNOLOGIES, LLC 0.00% $0.00
Total: 15.28% $3,050,161.61

Bid Items & Bid Tabulations

54 Total 0 of 54
ARMSTRONG  |  US 287  |  AMARILLO  |  0042-03-047  |  11/06/2024  |  $21,345,607.38  |  F 2025(201)  |  PREVENT MAINT  |  162 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
J. LEE MILLIGAN, INC.
RK HALL, LLC
KIEWIT INFRASTRUCTURE SOUTH CO.
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 462.520 $169.000 $10.500 $25.000 $34.450 $43.900 $150.000
RMV (18") TRT/UNTRT BASE & ASPH PAV
SY 3,708.000 $22.000 $21.500 $15.000 $30.820 $23.980 $40.000
EXCAV (ROADWAY)
CY 5.000 $100.000 $65.000 $85.000 $114.340 $28.920 $100.000
SUBGR WIDEN (DC)
STA 45.000 $2,000.000 $905.000 $1,900.000 $1,571.680 $857.640 $6,000.000
EMBANK (FNL)(DC)(TY B)
CY 2,393.000 $44.000 $35.500 $75.000 $12.730 $115.770 $100.000
BACKFILL (TY A)
STA 913.040 $220.000 $270.000 $240.000 $253.980 $60.860 $500.000
BLADING
HR 330.000 $250.000 $185.000 $150.000 $312.320 $306.080 $150.000
DRILL SEED (PERM_RURAL_CLAY)
AC 40.000 $692.000 $585.000 $590.000 $599.500 $657.940 $600.000
DRILL SEED (TEMP_WARM_COOL)
AC 40.000 $500.000 $485.000 $475.000 $484.000 $531.180 $500.000
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
SY 6,208.000 $40.000 $57.500 $48.000 $41.350 $39.000 $70.000
PRIME COAT (MC-30)
GAL 1,156.000 $8.000 $5.200 $9.900 $7.220 $9.970 $12.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 8,189.000 $5.000 $6.000 $4.650 $4.260 $2.180 $10.000
TACK COAT
GAL 54,199.000 $7.000 $6.400 $5.450 $6.880 $6.310 $6.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 69,958.000 $194.000 $169.000 $176.150 $197.440 $172.000 $235.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 12,613.000 $29.000 $47.000 $46.000 $37.210 $42.910 $75.000
PLANE CONC PAV(0" TO 3")
SY 5,200.000 $6.000 $7.800 $7.100 $4.090 $7.270 $10.000
RIPRAP (CONC)(FLUME)
CY 903.000 $775.000 $700.000 $700.000 $712.800 $1,207.230 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 147.000 $775.000 $680.000 $680.000 $690.530 $834.210 $700.000
MOBILIZATION
LS 1.000 $1,975,000.000 $1,950,000.000 $2,047,000.000 $1,000,000.000 $2,100,183.850 $2,680,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $20,000.000 $29,000.000 $40,000.000 $28,576.990 $33,389.390 $90,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $17,000.000 $11,000.000 $24,000.000 $18,868.630 $19,602.380 $18,500.000
TMA (STATIONARY)
DAY 160.000 $300.000 $270.000 $550.000 $556.760 $598.100 $700.000
TMA (MOBILE OPERATION)
HR 80.000 $130.000 $97.000 $100.000 $105.690 $110.310 $95.000
SANDBAGS FOR EROSION CONTROL (12")
LF 825.000 $10.000 $5.400 $25.000 $6.600 $22.710 $5.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 825.000 $7.000 $7.550 $9.450 $4.730 $5.190 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 825.000 $3.000 $1.600 $5.000 $1.930 $2.110 $1.500
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 3,450.000 $105.000 $135.000 $106.750 $105.620 $120.940 $150.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 45,653.000 $0.200 $0.090 $0.450 $0.080 $0.360 $0.330
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 11,604.000 $14.000 $18.500 $18.350 $18.700 $20.520 $20.000
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 12.000 $4,000.000 $5,500.000 $5,450.000 $5,555.000 $6,096.510 $10,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $18,000.000 $44,000.000 $44,000.000 $38,500.000 $43,158.430 $41,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 34.000 $980.000 $785.000 $1,025.000 $797.500 $1,448.670 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 138.000 $980.000 $885.000 $1,180.000 $902.000 $1,448.670 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 46.000 $1,000.000 $1,100.000 $1,490.000 $1,100.000 $1,448.670 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,000.000 $1,100.000 $1,410.000 $1,127.500 $1,690.120 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $1,100.000 $1,480.000 $1,155.000 $1,690.120 $1,100.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 32.000 $150.000 $130.000 $162.000 $132.000 $132.800 $70.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 29.000 $150.000 $130.000 $162.000 $132.000 $132.800 $65.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR)
EA 35.000 $10.000 $48.500 $49.000 $49.500 $72.430 $65.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 140.000 $150.000 $130.000 $162.000 $132.000 $132.800 $65.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 79.000 $150.000 $130.000 $162.000 $132.000 $132.800 $65.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 248.000 $18.000 $16.000 $16.000 $16.500 $24.140 $20.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,400.000 $1.000 $1.650 $1.550 $2.620 $2.410 $2.000
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 105.000 $2.000 $2.150 $2.150 $2.200 $2.410 $2.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,303.000 $1.000 $1.100 $1.100 $1.100 $1.210 $1.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 232.000 $11.000 $11.000 $10.800 $11.000 $12.070 $10.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 325.000 $44.000 $48.500 $48.550 $49.500 $54.330 $45.000
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 22,704.000 $0.770 $0.720 $0.750 $0.740 $0.810 $0.670
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 88,283.000 $0.740 $0.680 $0.700 $0.690 $0.760 $0.630
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 90,480.000 $0.770 $0.680 $0.700 $0.690 $0.760 $0.630
UNDERSEAL COURSE
GAL 101,933.000 $7.000 $5.800 $5.450 $5.760 $6.240 $0.720
REINFORMT GRID FOR ASPHALT PVMT OVERLA
SY 131,884.000 $8.000 $8.000 $7.350 $7.430 $8.330 $7.700
REC REFL PAV MRKR TY II-C-R
EA 1,442.000 $34.000 $48.500 $49.000 $49.500 $54.330 $45.000
REC REFL PAV MRKR TY I-A
EA 128.000 $34.000 $65.000 $64.750 $66.000 $72.430 $60.000
Totals: $21,345,607.380 $19,891,474.250 $20,517,261.850 $20,630,582.933 $20,958,037.172 $26,911,075.920