ANGELINA FM 326 (2507-01-020)

Items: 94

County: ANGELINA
Length: N/A
Highway: FM 326
District: LUFKIN
Control Number: 2507-01-020
DBE Goal: N/A
Project: STP 1902(160)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $3,873,890.10
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$3,873,890.10
$3,646,856.65
Over/Under Est: -5.86% -$227,033.45
Over/Under Est: 1.85% $71,784.03
Amt Left: 8.19% $298,817.48
$4,172,793.43
Over/Under Est: 7.72% $298,903.33
Amt Left: 14.42% $525,936.78
Delta: -5.76% -$227,119.30
Over/Under Est: 9.31% $360,782.50
Amt Left: 16.12% $587,815.95
Delta: -1.48% -$61,879.17
Over/Under Est: 15.92% $616,828.85
Amt Left: 23.14% $843,862.30
Delta: -6.05% -$256,046.35

Bid Items & Bid Tabulations

94 Total 0 of 94
ANGELINA  |  FM 326  |  LUFKIN  |  2507-01-020  |  07/09/2019  |  $3,873,890.10  |  STP 1902(160)  |  REHAB OF EXIST ROAD  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PINTO CONSTRUCTION CO., INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
A. L. HELMCAMP, INC.
L. S. EQUIPMENT CO., INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 220.700 $900.000 $615.000 $785.000 $1,500.000 $1,200.000 $1,000.000
REMOVING CONC (RIPRAP)
SY 11.000 $30.000 $26.250 $26.000 $30.000 $15.000 $55.000
REMOVING CONC (DRIVEWAYS)
SY 385.000 $30.000 $26.250 $26.000 $26.000 $15.000 $35.000
SUBGRADE WIDENING (ORD COMP)
STA 197.000 $300.000 $409.000 $150.000 $155.000 $250.000 $200.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 9,178.000 $10.000 $11.250 $20.000 $10.000 $15.000 $12.250
BACKFILL (TY B)
STA 15.000 $170.000 $52.000 $235.000 $210.000 $300.000 $250.000
BLADING
STA 197.000 $100.000 $50.000 $105.000 $145.000 $100.000 $125.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 31.000 $125.000 $52.500 $158.000 $160.000 $75.000 $240.000
BLOCK SODDING
SY 1,417.000 $5.000 $5.250 $5.250 $4.000 $3.500 $5.500
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 179,981.000 $0.300 $0.280 $0.280 $0.250 $0.320 $0.300
CELL FBR MLCH SEED(TEMP)(WARM)
SY 179,981.000 $0.300 $0.260 $0.250 $0.250 $0.300 $0.240
CELL FBR MLCH SEED(TEMP)(COOL)
SY 179,981.000 $0.300 $0.260 $0.250 $0.250 $0.300 $0.240
VEGETATIVE WATERING
MG 10,825.220 $10.000 $0.010 $0.010 $0.010 $0.010 $17.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 500.000 $3.000 $1.770 $1.750 $2.200 $2.350 $1.860
SPRINKLING (DUST CONTROL)
MG 613.000 $10.000 $0.010 $23.000 $0.010 $0.010 $0.010
FL BS (RDWY DEL)(TY D GR 1-2 OR GR 5)
TON 18,708.000 $40.000 $37.500 $37.350 $38.800 $34.000 $45.000
CEMENT
TON 1,317.000 $140.000 $145.000 $152.000 $160.000 $175.000 $160.000
CEM TRT(MX EXST MTL & NEW BS)(14")
SY 61,314.000 $3.250 $1.900 $2.550 $3.600 $4.000 $4.200
ASPH (RC-250)
GAL 15,329.000 $4.000 $3.850 $3.800 $4.500 $4.000 $5.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 32,643.000 $4.000 $3.250 $3.300 $3.600 $4.000 $4.000
AGGR (TY-PE, E, L OR PL GR 3)
CY 755.000 $125.000 $115.000 $120.000 $140.000 $125.000 $140.000
AGGR (TY E OR L GR 5)
CY 471.000 $125.000 $116.000 $119.000 $140.000 $125.000 $150.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 5,611.000 $90.000 $100.340 $100.500 $97.000 $105.000 $103.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 350.000 $100.000 $90.000 $155.000 $100.000 $85.000 $110.000
CEM STABIL BKFL
CY 72.000 $250.000 $187.000 $187.000 $180.000 $120.000 $200.000
CUT & RESTORE ASPH PAVING
SY 41.000 $120.000 $95.000 $95.000 $90.000 $85.000 $45.000
TEMPORARY SPL SHORING
SF 70.000 $20.000 $58.000 $58.000 $55.000 $45.000 $46.000
CL C CONC (COLLAR)
EA 2.000 $800.000 $788.000 $785.000 $750.000 $1,000.000 $1,315.000
RIPRAP (CONC)(5 IN)
CY 30.000 $600.000 $515.000 $515.000 $500.000 $400.000 $450.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 57.000 $180.000 $168.000 $168.000 $160.000 $120.000 $225.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 10.000 $750.000 $667.000 $670.000 $635.000 $700.000 $875.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 8.000 $800.000 $904.000 $900.000 $861.000 $1,100.000 $1,050.000
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 19.000 $825.000 $914.000 $915.000 $870.000 $900.000 $1,295.000
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
LF 9.000 $850.000 $924.000 $924.000 $880.000 $1,000.000 $1,256.000
RC PIPE (CL III)(18 IN)
LF 936.000 $45.000 $45.000 $45.000 $43.000 $65.000 $45.000
RC PIPE (CL III)(24 IN)
LF 168.000 $65.000 $63.000 $63.000 $60.000 $75.000 $60.000
RC PIPE (CL III)(30 IN)
LF 20.000 $75.000 $105.000 $104.000 $99.000 $135.000 $78.000
RC PIPE (CL III)(36 IN)
LF 32.000 $100.000 $158.000 $158.000 $150.000 $155.000 $110.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $4,000.000 $4,275.000 $4,275.000 $4,100.000 $5,000.000 $5,140.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 2.000 $5,000.000 $5,775.000 $5,800.000 $5,500.000 $5,500.000 $5,435.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $9,000.000 $9,530.000 $9,500.000 $9,100.000 $9,500.000 $5,300.000
WINGWALL (PW - 2) (HW=6 FT)
EA 1.000 $10,800.000 $10,645.000 $11,000.000 $10,200.000 $12,125.000 $7,985.000
WINGWALL (PW - 2) (HW=7 FT)
EA 3.000 $12,000.000 $14,700.000 $15,000.000 $15,000.000 $17,000.000 $9,615.000
WINGWALL (PW - 2) (HW=8 FT)
EA 1.000 $18,000.000 $20,000.000 $20,000.000 $19,500.000 $23,000.000 $14,050.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 7.000 $600.000 $520.000 $520.000 $500.000 $600.000 $660.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 61.000 $700.000 $623.000 $620.000 $600.000 $600.000 $668.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,500.000 $682.000 $685.000 $700.000 $750.000 $655.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $900.000 $788.000 $790.000 $750.000 $750.000 $756.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $1,100.000 $971.000 $970.000 $930.000 $800.000 $1,260.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,200.000 $1,260.000 $1,300.000 $1,200.000 $1,500.000 $1,100.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,200.000 $1,680.000 $1,700.000 $1,700.000 $1,200.000 $1,600.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,500.000 $2,310.000 $2,300.000 $2,300.000 $2,000.000 $2,690.000
REMOV & RE - LAY PIPE (18 IN)
LF 32.000 $117.000 $32.000 $32.000 $31.000 $15.000 $45.000
REMOV STR (PIPE)
EA 29.000 $275.000 $220.000 $220.000 $220.000 $500.000 $465.000
MOBILIZATION
LS 1.000 $300,000.000 $290,000.000 $400,000.000 $390,000.000 $350,000.000 $340,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $1,500.000 $1,150.000 $3,000.000 $10,000.000 $2,500.000 $1,512.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 425.000 $30.000 $29.500 $31.000 $40.000 $35.000 $32.000
ROCK FILTER DAMS (REMOVE)
LF 425.000 $10.000 $6.000 $6.300 $7.000 $10.000 $6.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 250.000 $30.000 $32.500 $20.000 $10.000 $35.000 $32.500
CONSTRUCTION EXITS (REMOVE)
SY 250.000 $10.000 $6.000 $3.000 $2.000 $10.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,130.000 $3.000 $2.880 $2.900 $3.500 $3.000 $3.050
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,130.000 $1.000 $1.050 $1.050 $0.900 $1.000 $1.000
DRIVEWAYS (CONC)
SY 385.000 $100.000 $94.500 $95.000 $95.000 $80.000 $120.000
DRIVEWAYS (ACP)
SY 6,256.000 $40.000 $57.450 $48.000 $43.000 $70.000 $65.000
TURNOUTS (ACP)
SY 752.000 $25.000 $47.900 $53.000 $43.000 $70.000 $40.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $550.000 $446.000 $445.000 $450.000 $150.000 $468.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 30.000 $250.000 $205.000 $205.000 $210.000 $250.000 $215.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 3.000 $300.000 $215.000 $215.000 $220.000 $350.000 $225.000
CONDT (PVC) (SCH 40) (2")
LF 40.000 $8.500 $9.200 $22.000 $14.000 $22.000 $23.100
ELEC CONDR (NO.8) BARE
LF 40.000 $1.500 $2.000 $2.100 $1.300 $2.000 $2.200
ELC SRV TY T 120/240 000(NS)GS(N)SP(O)
EA 1.000 $3,100.000 $4,750.000 $4,725.000 $3,200.000 $4,500.000 $4,950.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $500.000 $604.000 $605.000 $610.000 $600.000 $633.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $600.000 $627.000 $625.000 $630.000 $700.000 $657.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $900.000 $520.000 $520.000 $530.000 $700.000 $546.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $700.000 $756.000 $755.000 $770.000 $900.000 $792.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 25.000 $400.000 $310.000 $310.000 $320.000 $450.000 $325.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 10.000 $450.000 $357.000 $357.000 $360.000 $500.000 $374.000
REMOVE SM RD SN SUP&AM
EA 48.000 $100.000 $79.000 $80.000 $80.000 $100.000 $83.000
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
EA 32.000 $100.000 $110.000 $110.000 $110.000 $150.000 $116.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 84,516.000 $0.200 $0.150 $0.210 $0.250 $0.210 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 41,904.000 $0.200 $0.150 $0.210 $0.250 $0.210 $0.220
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 950.000 $1.000 $1.000 $1.500 $2.500 $1.000 $1.200
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 24,930.000 $0.750 $0.100 $0.700 $0.300 $1.000 $1.250
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 42,258.000 $0.750 $0.660 $1.050 $0.750 $1.000 $1.100
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 20,952.000 $0.750 $0.660 $1.050 $0.750 $1.000 $1.100
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 3,978.000 $0.750 $0.660 $1.300 $0.900 $1.500 $1.400
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 86.000 $30.000 $15.750 $15.750 $17.000 $20.000 $16.500
REFL PAV MRKR TY II-A-A
EA 475.000 $4.000 $5.250 $3.800 $5.400 $3.000 $4.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $225.000 $880.000 $270.000 $233.000 $300.000 $330.000
TRF SIG CBL (TY A)(10 AWG)(7 CONDR)
LF 40.000 $5.000 $5.000 $3.150 $3.700 $3.000 $4.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 2.000 $7,500.000 $6,150.000 $4,700.000 $3,500.000 $5,000.000 $5,875.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 995.000 $20.000 $9.450 $7.350 $7.500 $7.000 $7.700
TMA (STATIONARY)
EA 1.000 $10,000.000 $10,000.000 $10,000.000 $30,000.000 $7,500.000 $20,000.000
TMA (MOBILE OPERATION)
DAY 8.000 $100.000 $110.000 $105.000 $650.000 $100.000 $110.000
Totals: $3,873,890.100 $3,646,856.652 $3,945,674.132 $4,172,793.432 $4,234,672.602 $4,490,718.950