Show Job Controls
Bid Cobra

ANGELINA VA (0911-00-076)

Items: 69

County: ANGELINA
Length: N/A
Highway: VA
District: LUFKIN
Control Number: 0911-00-076
DBE Goal: N/A
Project: STP 1902(159)
Guaranty: N/A
Time: 382 WORKING DAYS
Engineer's Estimate: $4,274,919.45
Date: 07/09/2019 (6 years ago)
Contract Number: N/A
Type: PEDESTRIAN, SIDEWALKS & CURB RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$4,274,919.45
$5,294,835.55
Over/Under Est: 23.86% $1,019,916.10
$6,544,399.50
Over/Under Est: 53.09% $2,269,480.05
Amt Left: 23.6% $1,249,563.95

Bid Items & Bid Tabulations

69 Total 0 of 69
ANGELINA  |  VA  |  LUFKIN  |  0911-00-076  |  07/09/2019  |  $4,274,919.45  |  STP 1902(159)  |  PEDESTRIAN, SIDEWALKS & CURB RAMPS  |  382 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 407.900 $500.000 $250.000 $1,050.000
REMOVING CONC (RIPRAP)
SY 289.000 $20.000 $15.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 7,112.000 $40.000 $15.000 $20.000
REMOVING CONC (CURB)
LF 704.000 $25.000 $15.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 2,914.000 $10.000 $20.000 $20.000
REMOVING CONC (RETAINING WALLS)
SY 1.000 $1,500.000 $50.000 $1,000.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 618.000 $50.000 $15.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 828.000 $30.000 $20.000 $35.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 240.000 $130.000 $120.000 $150.000
FURNISHING AND PLACING TOPSOIL (4")
SY 47,817.000 $2.000 $1.000 $6.000
BLOCK SODDING
SY 47,817.000 $4.500 $4.000 $6.000
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 47,817.000 $0.350 $0.150 $1.000
VEGETATIVE WATERING
MG 1,917.000 $30.000 $20.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 169.000 $2.000 $5.000 $6.500
IRRIGATION SYSTEM
LS 1.000 $15,000.000 $50,000.000 $850,000.000
CUT & RESTORE CONC PAVING
SY 18.000 $2,000.000 $250.000 $250.000
CL A CONC (COLLAR)
EA 3.000 $1,025.000 $1,000.000 $1,500.000
RIPRAP (CONC)(6 IN)
CY 107.000 $550.000 $700.000 $650.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 7.000 $200.000 $200.000 $185.000
RAIL (HANDRAIL)(TY E)
LF 2,264.000 $80.000 $160.000 $185.000
RC PIPE (CL III)(18 IN)
LF 472.000 $65.000 $60.000 $85.000
RC PIPE (CL III)(24 IN)
LF 71.000 $80.000 $100.000 $95.000
RC PIPE (CL III)(30 IN)
LF 9.000 $120.000 $150.000 $105.000
RC PIPE (CL III)(36 IN)
LF 2.000 $150.000 $250.000 $150.000
RC PIPE (CL IV)(30 IN)
LF 47.000 $150.000 $250.000 $135.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $6,000.000 $3,500.000 $8,000.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 11.000 $6,000.000 $12,000.000 $12,000.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 1.000 $3,000.000 $5,000.000 $5,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $7,000.000 $7,500.000 $8,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $850.000 $1,000.000 $1,850.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $650.000 $1,000.000 $2,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 29.000 $600.000 $1,000.000 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,000.000 $1,500.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,000.000 $3,500.000 $3,500.000
ADJUSTING MANHOLES (SANITARY)
EA 4.000 $1,000.000 $1,100.000 $2,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 4.000 $500.000 $400.000 $1,500.000
ADJUSTING INLET (CAP)
EA 1.000 $1,500.000 $1,100.000 $1,500.000
ADJUSTING MANHOLES (WATER METER)
EA 4.000 $750.000 $500.000 $750.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 14.000 $1,750.000 $500.000 $750.000
ADJUSTING MANHOLES (TELEPHONE BOX)
EA 3.000 $750.000 $1,000.000 $750.000
REMOV STR (PIPE)
LF 403.000 $15.000 $15.000 $30.000
MOBILIZATION
LS 1.000 $390,000.000 $400,000.000 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 33.000 $1,800.000 $7,500.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 356.000 $30.000 $30.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 356.000 $10.000 $10.000 $15.000
SANDBAGS FOR EROSION CONTROL (12")
LF 460.000 $10.000 $10.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,910.000 $3.000 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,910.000 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 460.000 $5.000 $5.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 460.000 $1.000 $1.000 $9.000
COLORED TEXTURED CONC (4")
SY 54.000 $125.000 $120.000 $125.000
CONC CURB (TY II)
LF 484.000 $40.000 $15.000 $35.000
CONC CURB & GUTTER (TY II)
LF 3,246.000 $40.000 $25.000 $45.000
CONC CURB (TY C1)
LF 2,555.000 $65.000 $180.000 $55.000
CONC CURB (TY F1)
LF 560.000 $95.000 $180.000 $66.000
CONC CURB (TY F2)
LF 988.000 $105.000 $180.000 $66.000
CONC CURB (TY F3)
LF 157.000 $150.000 $180.000 $66.000
DRIVEWAYS (CONC)
SY 9,388.000 $75.000 $80.000 $85.000
CONC SIDEWALKS (4")
SY 16,926.000 $50.000 $85.000 $55.000
CURB RAMPS (TY 1)
EA 9.000 $2,000.000 $1,500.000 $2,000.000
CURB RAMPS (TY 2)
EA 3.000 $2,200.000 $1,500.000 $2,000.000
CURB RAMPS (TY 5)
EA 1.000 $2,500.000 $1,500.000 $2,000.000
CURB RAMPS (TY 7)
EA 51.000 $2,000.000 $1,500.000 $2,000.000
CURB RAMPS (TY 10)
EA 13.000 $2,000.000 $1,500.000 $2,000.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 2.000 $600.000 $300.000 $650.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 14.000 $500.000 $400.000 $450.000
RELOCATE SM RD SN SUP&AM TY S80
EA 6.000 $600.000 $400.000 $450.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 21.000 $400.000 $400.000 $450.000
TMA (STATIONARY)
EA 2.000 $15,000.000 $9,999.000 $30,000.000
Totals: $4,274,919.450 $5,294,835.550 $6,544,399.500