PREPARING ROW
|
STA
|
407.900
|
$500.000
|
$250.000
|
$1,050.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
289.000
|
$20.000
|
$15.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
7,112.000
|
$40.000
|
$15.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
704.000
|
$25.000
|
$15.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
2,914.000
|
$10.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
1.000
|
$1,500.000
|
$50.000
|
$1,000.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
618.000
|
$50.000
|
$15.000
|
$20.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
828.000
|
$30.000
|
$20.000
|
$35.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
240.000
|
$130.000
|
$120.000
|
$150.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
47,817.000
|
$2.000
|
$1.000
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
47,817.000
|
$4.500
|
$4.000
|
$6.000
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
47,817.000
|
$0.350
|
$0.150
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,917.000
|
$30.000
|
$20.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
169.000
|
$2.000
|
$5.000
|
$6.500
|
|
|
IRRIGATION SYSTEM
|
LS
|
1.000
|
$15,000.000
|
$50,000.000
|
$850,000.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
18.000
|
$2,000.000
|
$250.000
|
$250.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
3.000
|
$1,025.000
|
$1,000.000
|
$1,500.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
107.000
|
$550.000
|
$700.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
7.000
|
$200.000
|
$200.000
|
$185.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
2,264.000
|
$80.000
|
$160.000
|
$185.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
472.000
|
$65.000
|
$60.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
71.000
|
$80.000
|
$100.000
|
$95.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
9.000
|
$120.000
|
$150.000
|
$105.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
2.000
|
$150.000
|
$250.000
|
$150.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
47.000
|
$150.000
|
$250.000
|
$135.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$6,000.000
|
$3,500.000
|
$8,000.000
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
11.000
|
$6,000.000
|
$12,000.000
|
$12,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$3,000.000
|
$5,000.000
|
$5,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,000.000
|
$7,500.000
|
$8,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$850.000
|
$1,000.000
|
$1,850.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$650.000
|
$1,000.000
|
$2,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
29.000
|
$600.000
|
$1,000.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$3,500.000
|
$3,500.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
4.000
|
$1,000.000
|
$1,100.000
|
$2,500.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
4.000
|
$500.000
|
$400.000
|
$1,500.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
1.000
|
$1,500.000
|
$1,100.000
|
$1,500.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
4.000
|
$750.000
|
$500.000
|
$750.000
|
|
|
ADJUSTING MANHOLES (ELECTRIC BOX)
|
EA
|
14.000
|
$1,750.000
|
$500.000
|
$750.000
|
|
|
ADJUSTING MANHOLES (TELEPHONE BOX)
|
EA
|
3.000
|
$750.000
|
$1,000.000
|
$750.000
|
|
|
REMOV STR (PIPE)
|
LF
|
403.000
|
$15.000
|
$15.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$390,000.000
|
$400,000.000
|
$650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
33.000
|
$1,800.000
|
$7,500.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
356.000
|
$30.000
|
$30.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
356.000
|
$10.000
|
$10.000
|
$15.000
|
|
|
SANDBAGS FOR EROSION CONTROL (12")
|
LF
|
460.000
|
$10.000
|
$10.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,910.000
|
$3.000
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,910.000
|
$1.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
460.000
|
$5.000
|
$5.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
460.000
|
$1.000
|
$1.000
|
$9.000
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
54.000
|
$125.000
|
$120.000
|
$125.000
|
|
|
CONC CURB (TY II)
|
LF
|
484.000
|
$40.000
|
$15.000
|
$35.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,246.000
|
$40.000
|
$25.000
|
$45.000
|
|
|
CONC CURB (TY C1)
|
LF
|
2,555.000
|
$65.000
|
$180.000
|
$55.000
|
|
|
CONC CURB (TY F1)
|
LF
|
560.000
|
$95.000
|
$180.000
|
$66.000
|
|
|
CONC CURB (TY F2)
|
LF
|
988.000
|
$105.000
|
$180.000
|
$66.000
|
|
|
CONC CURB (TY F3)
|
LF
|
157.000
|
$150.000
|
$180.000
|
$66.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
9,388.000
|
$75.000
|
$80.000
|
$85.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
16,926.000
|
$50.000
|
$85.000
|
$55.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
9.000
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
3.000
|
$2,200.000
|
$1,500.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$2,500.000
|
$1,500.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
51.000
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
13.000
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
2.000
|
$600.000
|
$300.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
14.000
|
$500.000
|
$400.000
|
$450.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
6.000
|
$600.000
|
$400.000
|
$450.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
21.000
|
$400.000
|
$400.000
|
$450.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$15,000.000
|
$9,999.000
|
$30,000.000
|
|
Totals: |
$4,274,919.450
|
$5,294,835.550
|
$6,544,399.500
|