YOUNG US 380 (0134-02-060)

Items: 37

County: YOUNG
Length: N/A
Highway: US 380
District: WICHITA FALLS
Control Number: 0134-02-060
DBE Goal: N/A
Project: F 2022(135)
Guaranty: N/A
Time: 46 WORKING DAYS
Engineer's Estimate: $2,616,997.33
Date: 10/07/2021 (4 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$2,616,997.33
$2,285,264.98
Over/Under Est: -12.68% -$331,732.35
$2,374,218.56
Over/Under Est: -9.28% -$242,778.77
Amt Left: 3.89% $88,953.58
$2,394,683.06
Over/Under Est: -8.5% -$222,314.27
Amt Left: 4.79% $109,418.08
Delta: -0.86% -$20,464.50
$2,530,490.96
Over/Under Est: -3.31% -$86,506.37
Amt Left: 10.73% $245,225.98
Delta: -5.67% -$135,807.90
Over/Under Est: 1.57% $41,040.05
Amt Left: 16.31% $372,772.40
Delta: -5.04% -$127,546.42
Over/Under Est: 3.49% $91,391.62
Amt Left: 18.52% $423,123.97
Delta: -1.89% -$50,351.57

Bid Items & Bid Tabulations

37 Total 0 of 37
YOUNG  |  US 380  |  WICHITA FALLS  |  0134-02-060  |  10/07/2021  |  $2,616,997.33  |  F 2022(135)  |  RESURF ROADWAY  |  46 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACK BURKETT CO.
A. L. HELMCAMP, INC.
JAGOE-PUBLIC COMPANY
DUININCK, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
EUROVIA ATLANTIC COAST LLC
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 20.000 $29.000 $25.000 $120.000 $140.000 $265.000 $101.030 $150.000
BACKFILL (TY A OR B)
STA 20.000 $200.000 $300.000 $260.000 $300.000 $415.000 $318.710 $740.000
ASPH (AC-20-5TR)
GAL 32,560.000 $3.400 $3.600 $3.500 $4.450 $3.750 $4.180 $4.180
AGGR(TY-PB GR-4 SAC-B)
CY 660.000 $120.000 $123.500 $110.000 $230.000 $140.000 $212.000 $212.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 509.000 $44.000 $50.500 $69.000 $52.000 $79.500 $61.970 $63.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 4,580.000 $34.000 $26.500 $33.000 $25.250 $34.000 $32.240 $26.000
PLANE ASPH CONC PAV(0" TO 2")
SY 5,242.000 $3.750 $3.000 $2.800 $5.300 $5.450 $5.000 $5.000
RIPRAP (MOW STRIP)(4 IN)
CY 44.400 $530.000 $1,018.000 $550.000 $670.000 $630.000 $792.670 $780.000
CLEANING AND SEALING EXISTING JOINTS
LF 120.000 $29.000 $75.800 $60.000 $57.000 $63.000 $56.000 $75.000
MOBILIZATION
LS 1.000 $236,000.000 $108,850.000 $145,000.000 $72,000.000 $240,000.000 $260,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $7,500.000 $3,343.000 $6,500.000 $17,500.000 $24,000.000 $25,000.000 $28,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 940.000 $3.750 $3.070 $2.800 $2.750 $2.750 $3.600 $2.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 940.000 $1.000 $1.180 $1.100 $1.050 $1.050 $0.700 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 940.000 $3.440 $3.720 $3.300 $3.350 $3.300 $2.900 $3.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 940.000 $0.830 $1.180 $1.100 $1.050 $1.050 $0.900 $1.000
RUMBLE STRIPS (SHOULDER)
LF 90,700.000 $0.220 $0.130 $0.170 $0.110 $0.080 $0.090 $0.140
RUMBLE STRIPS (CENTERLINE)
LF 45,350.000 $0.350 $0.130 $0.170 $0.110 $0.130 $0.090 $0.170
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $25.000 $34.800 $30.000 $31.250 $31.000 $29.500 $28.600
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,360.000 $2,300.000 $2,100.000 $2,400.000 $2,000.000 $2,150.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $650.000 $1,121.000 $760.000 $1,000.000 $1,000.000 $950.000 $725.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $3.000 $2.360 $3.200 $2.100 $2.100 $2.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $225.000 $177.000 $320.000 $160.000 $160.000 $150.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,422.000 $3,800.000 $3,100.000 $3,100.000 $2,900.000 $3,560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $660.000 $814.000 $1,600.000 $730.000 $1,100.000 $690.000 $550.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $33.000 $27.000 $32.000 $24.500 $24.000 $23.000 $30.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,234.000 $1.400 $1.000 $0.650 $1.650 $1.050 $0.500 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 54.000 $14.000 $9.440 $13.000 $13.250 $8.400 $8.000 $12.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 103,336.000 $0.620 $0.410 $0.400 $0.400 $0.370 $0.350 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 8,858.000 $0.610 $0.440 $0.420 $0.420 $0.390 $0.370 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 51,521.000 $0.630 $0.410 $0.400 $0.400 $0.370 $0.350 $0.380
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 96.000 $9.200 $10.620 $6.600 $6.600 $9.500 $9.000 $6.240
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 12.000 $40.000 $118.000 $48.000 $47.750 $105.000 $100.000 $45.000
REFL PAV MRKR TY II-A-A
EA 1,088.000 $3.100 $4.720 $3.700 $3.700 $4.200 $4.000 $3.500
D-GR HMA TY-D PG70-28
TON 17,921.000 $95.000 $87.250 $89.000 $89.000 $86.450 $90.900 $95.550
BONDING COURSE
GAL 9,776.000 $3.000 $2.750 $3.000 $1.750 $2.750 $3.000 $4.300
TMA (STATIONARY)
DAY 25.000 $300.000 $50.000 $250.000 $75.000 $315.000 $277.500 $300.000
TMA (MOBILE OPERATION)
DAY 10.000 $450.000 $25.000 $100.000 $85.000 $950.000 $100.000 $525.000
Totals: $2,616,997.330 $2,285,264.980 $2,374,218.560 $2,394,683.060 $2,530,490.960 $2,658,037.388 $2,708,388.950