Show Job Controls
Bid Cobra

YOAKUM SH 214 (0461-05-011)

Items: 87

County: YOAKUM
Length: N/A
Highway: SH 214
District: LUBBOCK
Control Number: 0461-05-011
DBE Goal: N/A
Project: STP 2019(753)
Guaranty: N/A
Time: 306 WORKING DAYS
Engineer's Estimate: $21,661,891.90
Date: 06/05/2019 (7 years ago)
Contract Number: N/A
Type: SUPER 2 PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$21,661,891.90
$24,052,607.74
Over/Under Est: 11.04% $2,390,715.84
$24,332,345.26
Over/Under Est: 12.33% $2,670,453.36
Amt Left: 1.16% $279,737.52
$24,547,024.93
Over/Under Est: 13.32% $2,885,133.03
Amt Left: 2.06% $494,417.19
Delta: -0.88% -$214,679.67
Over/Under Est: 27.36% $5,926,586.62
Amt Left: 14.7% $3,535,870.78
Delta: -12.39% -$3,041,453.59

Bid Items & Bid Tabulations

87 Total 0 of 87
YOAKUM  |  SH 214  |  LUBBOCK  |  0461-05-011  |  06/05/2019  |  $21,661,891.90  |  STP 2019(753)  |  SUPER 2 PASSING LANES  |  306 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
A. L. HELMCAMP, INC.
FNF CONSTRUCTION, INC.
KIEWIT INFRASTRUCTURE SOUTH CO.
PREPARING ROW
STA 35.700 $500.000 $995.000 $650.000 $3,500.000 $185.030
REMOVING CONC (DRIVEWAYS)
SY 556.000 $20.000 $21.500 $35.000 $22.000 $17.760
REMOVING STAB BASE & ASPH PAV (12")
SY 96,106.000 $4.750 $5.950 $3.000 $5.500 $5.180
EXCAVATION (ROADWAY)
CY 55,065.000 $7.000 $11.000 $8.000 $12.000 $10.000
EXCAVATION (CHANNEL)
CY 1,414.000 $7.000 $22.500 $12.000 $20.000 $17.450
SUBGRADE WIDENING (DENS CONT)
SY 106,054.000 $3.000 $6.150 $3.800 $10.500 $10.070
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 6,843.000 $14.000 $12.500 $13.000 $5.500 $10.000
BACKFILL (TY B)
STA 775.900 $200.000 $165.000 $170.000 $200.000 $48.930
BLADING
STA 775.900 $150.000 $245.000 $170.850 $200.000 $47.670
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 18,515.000 $10.000 $20.000 $20.000 $25.000 $18.210
PRIME COAT (MC-30)
GAL 21,211.000 $4.000 $4.950 $4.800 $4.300 $3.630
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 21,293.000 $3.500 $3.600 $3.500 $5.000 $3.550
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 177,545.000 $3.500 $3.500 $3.500 $3.500 $3.720
FOG SEAL (CSS-1H)
GAL 29,574.000 $3.000 $3.350 $3.500 $3.500 $3.670
ASPH (AC-20-5TR)
GAL 4,485.000 $4.000 $4.900 $4.300 $5.000 $4.260
AGGR(TY-PB GR-4 SAC-B)
CY 102.000 $150.000 $320.000 $300.000 $200.000 $358.600
AGGR(TY-PB GR-5 SAC-B)
CY 142.000 $150.000 $230.000 $250.000 $200.000 $301.090
D-GR HMA TY-D SAC-B PG70-28
TON 16,728.000 $95.000 $130.000 $133.000 $120.750 $159.600
D-GR HMA TY-B PG70-28
TON 52,559.000 $95.000 $115.000 $121.000 $114.000 $132.290
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 40,261.000 $145.000 $150.000 $138.000 $130.000 $154.810
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 16,056.000 $40.000 $52.000 $60.000 $45.000 $65.700
PLANE ASPH CONC PAV(0" TO 3")
SY 1,847.000 $5.000 $6.600 $7.000 $5.000 $6.320
CEM STABIL BKFL
CY 154.500 $100.000 $330.000 $300.000 $165.000 $344.340
RIPRAP (CONC)(4 IN)
CY 11.300 $400.000 $660.000 $700.000 $1,600.000 $688.690
CMP (GAL STL 24 IN)
LF 15.000 $90.000 $87.500 $90.000 $260.000 $91.820
CMP (GAL STL 30 IN)
LF 20.000 $110.000 $110.000 $110.000 $290.000 $114.780
RC PIPE (CL III)(24 IN)
LF 168.000 $90.000 $130.000 $135.000 $180.000 $137.740
RC PIPE (CL III)(30 IN)
LF 128.000 $110.000 $175.000 $175.000 $222.000 $183.650
RC PIPE (CL III)(36 IN)
LF 240.000 $120.000 $275.000 $290.000 $280.000 $286.950
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 3.000 $1,200.000 $1,500.000 $1,600.000 $2,300.000 $1,606.940
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 4.000 $1,400.000 $1,600.000 $1,800.000 $3,200.000 $1,721.720
SET (TY II) (30 IN) (CMP) (4: 1) (C)
EA 4.000 $1,500.000 $3,800.000 $4,000.000 $2,500.000 $4,017.340
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $1,800.000 $3,800.000 $4,000.000 $3,500.000 $4,017.340
SET (TY II) (36 IN) (CMP) (4: 1) (C)
EA 6.000 $2,000.000 $4,200.000 $4,500.000 $2,800.000 $4,419.070
CLEAN EXIST CULVERTS
EA 11.000 $2,000.000 $3,300.000 $3,500.000 $3,100.000 $3,768.520
REMOV STR (PIPE)
EA 3.000 $1,500.000 $1,100.000 $1,200.000 $5,200.000 $1,147.810
MOBILIZATION
LS 1.000 $1,969,000.000 $1,380,420.360 $2,250,000.000 $2,450,000.000 $2,677,820.200
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000 $10,000.000 $17,000.000 $24,450.000 $5,000.000 $20,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 400.000 $30.000 $33.000 $10.000 $18.000 $19.510
CONSTRUCTION EXITS (REMOVE)
SY 400.000 $10.000 $11.000 $3.000 $8.000 $6.890
SANDBAGS FOR EROSION CONTROL
EA 38.000 $8.000 $16.500 $20.000 $5.100 $17.220
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,300.000 $3.000 $2.750 $2.200 $3.000 $2.120
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,300.000 $1.000 $1.100 $0.750 $1.000 $0.980
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,500.000 $4.000 $5.500 $4.000 $4.000 $4.020
INTERSECTIONS (ACP)
SY 2,660.000 $35.000 $50.500 $50.000 $50.000 $49.490
DRIVEWAYS (CONC)
SY 556.000 $100.000 $115.000 $125.000 $116.000 $131.900
DRIVEWAYS (ACP)
SY 2,794.000 $23.000 $39.500 $53.000 $72.000 $51.200
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 132,708.000 $0.100 $0.140 $0.170 $0.200 $0.180
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 61,930.000 $0.100 $0.210 $0.230 $0.200 $0.230
WIRE FENCE (TY A)
LF 795.000 $10.000 $16.500 $8.000 $15.000 $14.120
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 40.000 $700.000 $635.000 $650.000 $590.000 $665.730
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 50.000 $800.000 $730.000 $740.000 $680.000 $763.290
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 5.000 $400.000 $470.000 $480.000 $440.000 $493.560
REMOVE SM RD SN SUP&AM
EA 93.000 $90.000 $87.500 $100.000 $85.000 $91.820
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 22.000 $80.000 $93.000 $95.000 $90.000 $97.560
REMOVE DELIN & OBJECT MARKER ASSMS
EA 22.000 $30.000 $38.500 $40.000 $36.000 $40.170
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 578,209.000 $0.200 $0.120 $0.120 $0.120 $0.130
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 240,506.000 $0.300 $0.180 $0.180 $0.170 $0.180
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 600.000 $0.400 $0.120 $0.120 $0.120 $0.130
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 266.000 $2.200 $1.650 $1.650 $1.600 $1.720
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 9.000 $60.000 $55.000 $55.000 $51.000 $57.390
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 7,500.000 $0.200 $0.120 $0.120 $0.120 $0.130
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 571,489.000 $0.200 $0.120 $0.120 $0.120 $0.130
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 23,218.000 $1.000 $1.100 $0.600 $1.800 $2.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 15,028.000 $1.000 $1.100 $0.600 $1.900 $2.300
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 1,564.000 $0.600 $0.580 $0.580 $0.600 $0.610
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,302.000 $1.000 $0.770 $0.770 $0.750 $0.800
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 156,402.000 $0.400 $0.380 $0.390 $0.400 $0.400
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 12,033.000 $0.600 $0.580 $0.580 $0.550 $0.610
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 125,801.000 $0.400 $0.380 $0.390 $0.400 $0.400
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,091.000 $0.400 $0.580 $0.580 $0.550 $0.610
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 233.000 $15.000 $22.000 $22.000 $21.000 $22.960
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $200.000 $330.000 $330.000 $310.000 $344.340
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $200.000 $875.000 $880.000 $820.000 $918.250
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 32.000 $50.000 $44.000 $44.000 $41.000 $45.910
REFL PAV MRKR TY I-C
EA 223.000 $3.000 $3.300 $3.300 $3.100 $3.440
REFL PAV MRKR TY II-A-A
EA 1,600.000 $3.000 $3.300 $3.300 $3.100 $3.440
ELIM EXT PAV MRK & MRKS (4")
LF 512,438.000 $0.400 $0.550 $0.400 $0.550 $0.570
ELIM EXT PAV MRK & MRKS (8")
LF 100.000 $0.600 $1.100 $1.000 $1.400 $1.150
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $52.000 $110.000 $100.000 $117.000 $114.780
FULL - WIDTH MOWING
CYC 4.000 $20,000.000 $7,100.000 $6,000.000 $6,900.000 $9,756.400
LITTER REMOVAL
CYC 4.000 $10,000.000 $6,000.000 $6,000.000 $2,800.000 $4,784.780
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 280,973.000 $7.000 $5.650 $5.600 $6.000 $6.260
ASPH FOR REINF FAB (AC-20-5TR)
GAL 56,195.000 $4.000 $3.400 $4.000 $4.750 $3.590
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $11,000.000 $15,000.000 $24,000.000 $22,611.140
TMA (STATIONARY)
DAY 550.000 $250.000 $220.000 $300.000 $190.000 $286.210
TMA (MOBILE OPERATION)
DAY 75.000 $250.000 $985.000 $600.000 $620.000 $777.260
Totals: $21,661,891.900 $24,052,607.740 $24,332,345.265 $24,547,024.930 $27,588,478.538