|
|
PREPARING ROW
|
STA
|
35.700
|
$500.000
|
$995.000
|
$650.000
|
$3,500.000
|
$185.030
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
556.000
|
$20.000
|
$21.500
|
$35.000
|
$22.000
|
$17.760
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
96,106.000
|
$4.750
|
$5.950
|
$3.000
|
$5.500
|
$5.180
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
55,065.000
|
$7.000
|
$11.000
|
$8.000
|
$12.000
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,414.000
|
$7.000
|
$22.500
|
$12.000
|
$20.000
|
$17.450
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
SY
|
106,054.000
|
$3.000
|
$6.150
|
$3.800
|
$10.500
|
$10.070
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
6,843.000
|
$14.000
|
$12.500
|
$13.000
|
$5.500
|
$10.000
|
|
|
BACKFILL (TY B)
|
STA
|
775.900
|
$200.000
|
$165.000
|
$170.000
|
$200.000
|
$48.930
|
|
|
BLADING
|
STA
|
775.900
|
$150.000
|
$245.000
|
$170.850
|
$200.000
|
$47.670
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
18,515.000
|
$10.000
|
$20.000
|
$20.000
|
$25.000
|
$18.210
|
|
|
PRIME COAT (MC-30)
|
GAL
|
21,211.000
|
$4.000
|
$4.950
|
$4.800
|
$4.300
|
$3.630
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
21,293.000
|
$3.500
|
$3.600
|
$3.500
|
$5.000
|
$3.550
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
177,545.000
|
$3.500
|
$3.500
|
$3.500
|
$3.500
|
$3.720
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
29,574.000
|
$3.000
|
$3.350
|
$3.500
|
$3.500
|
$3.670
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
4,485.000
|
$4.000
|
$4.900
|
$4.300
|
$5.000
|
$4.260
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
102.000
|
$150.000
|
$320.000
|
$300.000
|
$200.000
|
$358.600
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
142.000
|
$150.000
|
$230.000
|
$250.000
|
$200.000
|
$301.090
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
16,728.000
|
$95.000
|
$130.000
|
$133.000
|
$120.750
|
$159.600
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
52,559.000
|
$95.000
|
$115.000
|
$121.000
|
$114.000
|
$132.290
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
|
TON
|
40,261.000
|
$145.000
|
$150.000
|
$138.000
|
$130.000
|
$154.810
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
16,056.000
|
$40.000
|
$52.000
|
$60.000
|
$45.000
|
$65.700
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
1,847.000
|
$5.000
|
$6.600
|
$7.000
|
$5.000
|
$6.320
|
|
|
CEM STABIL BKFL
|
CY
|
154.500
|
$100.000
|
$330.000
|
$300.000
|
$165.000
|
$344.340
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
11.300
|
$400.000
|
$660.000
|
$700.000
|
$1,600.000
|
$688.690
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
15.000
|
$90.000
|
$87.500
|
$90.000
|
$260.000
|
$91.820
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
20.000
|
$110.000
|
$110.000
|
$110.000
|
$290.000
|
$114.780
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
168.000
|
$90.000
|
$130.000
|
$135.000
|
$180.000
|
$137.740
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
128.000
|
$110.000
|
$175.000
|
$175.000
|
$222.000
|
$183.650
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
240.000
|
$120.000
|
$275.000
|
$290.000
|
$280.000
|
$286.950
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
3.000
|
$1,200.000
|
$1,500.000
|
$1,600.000
|
$2,300.000
|
$1,606.940
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$1,400.000
|
$1,600.000
|
$1,800.000
|
$3,200.000
|
$1,721.720
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$1,500.000
|
$3,800.000
|
$4,000.000
|
$2,500.000
|
$4,017.340
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,800.000
|
$3,800.000
|
$4,000.000
|
$3,500.000
|
$4,017.340
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
6.000
|
$2,000.000
|
$4,200.000
|
$4,500.000
|
$2,800.000
|
$4,419.070
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,000.000
|
$3,300.000
|
$3,500.000
|
$3,100.000
|
$3,768.520
|
|
|
REMOV STR (PIPE)
|
EA
|
3.000
|
$1,500.000
|
$1,100.000
|
$1,200.000
|
$5,200.000
|
$1,147.810
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,969,000.000
|
$1,380,420.360
|
$2,250,000.000
|
$2,450,000.000
|
$2,677,820.200
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$10,000.000
|
$17,000.000
|
$24,450.000
|
$5,000.000
|
$20,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
400.000
|
$30.000
|
$33.000
|
$10.000
|
$18.000
|
$19.510
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
400.000
|
$10.000
|
$11.000
|
$3.000
|
$8.000
|
$6.890
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
38.000
|
$8.000
|
$16.500
|
$20.000
|
$5.100
|
$17.220
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,300.000
|
$3.000
|
$2.750
|
$2.200
|
$3.000
|
$2.120
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,300.000
|
$1.000
|
$1.100
|
$0.750
|
$1.000
|
$0.980
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,500.000
|
$4.000
|
$5.500
|
$4.000
|
$4.000
|
$4.020
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,660.000
|
$35.000
|
$50.500
|
$50.000
|
$50.000
|
$49.490
|
|
|
DRIVEWAYS (CONC)
|
SY
|
556.000
|
$100.000
|
$115.000
|
$125.000
|
$116.000
|
$131.900
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,794.000
|
$23.000
|
$39.500
|
$53.000
|
$72.000
|
$51.200
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
132,708.000
|
$0.100
|
$0.140
|
$0.170
|
$0.200
|
$0.180
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
61,930.000
|
$0.100
|
$0.210
|
$0.230
|
$0.200
|
$0.230
|
|
|
WIRE FENCE (TY A)
|
LF
|
795.000
|
$10.000
|
$16.500
|
$8.000
|
$15.000
|
$14.120
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
40.000
|
$700.000
|
$635.000
|
$650.000
|
$590.000
|
$665.730
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
50.000
|
$800.000
|
$730.000
|
$740.000
|
$680.000
|
$763.290
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$400.000
|
$470.000
|
$480.000
|
$440.000
|
$493.560
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
93.000
|
$90.000
|
$87.500
|
$100.000
|
$85.000
|
$91.820
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
22.000
|
$80.000
|
$93.000
|
$95.000
|
$90.000
|
$97.560
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
22.000
|
$30.000
|
$38.500
|
$40.000
|
$36.000
|
$40.170
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
578,209.000
|
$0.200
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
240,506.000
|
$0.300
|
$0.180
|
$0.180
|
$0.170
|
$0.180
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
600.000
|
$0.400
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
266.000
|
$2.200
|
$1.650
|
$1.650
|
$1.600
|
$1.720
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
9.000
|
$60.000
|
$55.000
|
$55.000
|
$51.000
|
$57.390
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
7,500.000
|
$0.200
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
571,489.000
|
$0.200
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
23,218.000
|
$1.000
|
$1.100
|
$0.600
|
$1.800
|
$2.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
15,028.000
|
$1.000
|
$1.100
|
$0.600
|
$1.900
|
$2.300
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,564.000
|
$0.600
|
$0.580
|
$0.580
|
$0.600
|
$0.610
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,302.000
|
$1.000
|
$0.770
|
$0.770
|
$0.750
|
$0.800
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
156,402.000
|
$0.400
|
$0.380
|
$0.390
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
12,033.000
|
$0.600
|
$0.580
|
$0.580
|
$0.550
|
$0.610
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
125,801.000
|
$0.400
|
$0.380
|
$0.390
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,091.000
|
$0.400
|
$0.580
|
$0.580
|
$0.550
|
$0.610
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
233.000
|
$15.000
|
$22.000
|
$22.000
|
$21.000
|
$22.960
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$200.000
|
$330.000
|
$330.000
|
$310.000
|
$344.340
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
8.000
|
$200.000
|
$875.000
|
$880.000
|
$820.000
|
$918.250
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
32.000
|
$50.000
|
$44.000
|
$44.000
|
$41.000
|
$45.910
|
|
REFL PAV MRKR TY I-C
|
EA
|
223.000
|
$3.000
|
$3.300
|
$3.300
|
$3.100
|
$3.440
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,600.000
|
$3.000
|
$3.300
|
$3.300
|
$3.100
|
$3.440
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
512,438.000
|
$0.400
|
$0.550
|
$0.400
|
$0.550
|
$0.570
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
100.000
|
$0.600
|
$1.100
|
$1.000
|
$1.400
|
$1.150
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$52.000
|
$110.000
|
$100.000
|
$117.000
|
$114.780
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$20,000.000
|
$7,100.000
|
$6,000.000
|
$6,900.000
|
$9,756.400
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$10,000.000
|
$6,000.000
|
$6,000.000
|
$2,800.000
|
$4,784.780
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
280,973.000
|
$7.000
|
$5.650
|
$5.600
|
$6.000
|
$6.260
|
|
|
ASPH FOR REINF FAB (AC-20-5TR)
|
GAL
|
56,195.000
|
$4.000
|
$3.400
|
$4.000
|
$4.750
|
$3.590
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$11,000.000
|
$15,000.000
|
$24,000.000
|
$22,611.140
|
|
|
TMA (STATIONARY)
|
DAY
|
550.000
|
$250.000
|
$220.000
|
$300.000
|
$190.000
|
$286.210
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
75.000
|
$250.000
|
$985.000
|
$600.000
|
$620.000
|
$777.260
|
|
Totals: |
$21,661,891.900
|
$24,052,607.740
|
$24,332,345.265
|
$24,547,024.930
|
$27,588,478.538
|